ML20041C134

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 4.3.3.1-1 Re ECCS Actuation Instrumentation Surveillance Requirements.Footnote (a) of Items A.1.F,A.2.C & B.2.C Should Be Deleted
ML20041C134
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/22/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20041C133 List:
References
NUDOCS 8202260242
Download: ML20041C134 (2)


Text

.

8202260242 820222 l---~~........._

PDR ADOCK 05000373 A

PDR f b.b. -)[,'. f Q,I.,

[

-3.

TABLE 4.3.3.1-l'(Continued)

' ' ~ ~

5-ENERGENCY CORE COOLING SYSTEM /STUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS 4

m>

OPERATIONAL h

CilANNEL CONDITIONS FOR WHICH CllANNEL FUNCTIONAL CHANNEL TRIP FUNCTION CllECK TEST CALIBRATION SURVEILLANCE REQUIRED e

z U

B.

DIVISION 2 TRIP SYSTEM l

1.

RilR B AND C (LPCI MODE) a.

Reactor Vt.ssel Water Level -

Low Low Low, level 1 S

M R

1, 2, 3, 4*, 5*

b.

D'rywell Pressure - liigh NA M

Q 1, 2, 3 c.

LPCI Injection Valve Differential Pressure-Low S

M R

1, 2, 3, 4*, 5*

d.

LPCI Pump B Start Time Del 4/

Relay NA M

Q 1, 2, 3, 4*, 5*

R$

e.

LPCI Pump Discharge Flow-lw NA M

Q 1, 2, 3, 4*, 5*

f.

Manual Initiation NA R

NA 1, 2, 3, 4*, 5*

T AUTOMATIC DEPRESSURIZATION SYSTEM TRIP SYSTEM "B"#

2.

[o\\To a.

Reactor Vessel Water Level -

0 R

1, 2, 3

< Low Low Low, Leyel 1 5

M b.

Drywell Pressure-liigh

~NA Q

1, 2, 3 c.

ADS Timer NA Q

I, 2, 3 d.

Reactor Vessel Water Level -

Low, Level 3 5

M R

1, 2, 3 e.

LPCI Pump B and C Discharge l

Pressure-liigh NA M

Q 1,2,3 f.

Manual Initiatton NA R

NA 1, 2, 3 b

ame 3

~~'i~

~

!._,,,.... - n,, np r. C(." :, {

\\ p:,_..g

...i.a e :. 1 n.

a

~

' - - ' " ~ '

I TAB *_1 4.3.3.1-1

  • (

9 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS m?

CHANNEL OPERATIONAL E

CHANNEL FUNCTIONAL CHANNEL CONDITIONS FOR WHICH TRIP FUNCTION CHECK TEST CALIBRATION SURVEILLANCE REQUIRED c

A.

DIVISION I TRIP SYSTEM e

1.

RHR-A (LPCI MODE) AND LPCS SYSTEM Reactor Vessel Nater Level -

a.

Low Lme Low, level 1 S

M R

1, 2, 3, 4 *, 5*

b.

Drywell Pressure - High NA M

Q 1, 2, 3 c.

LPCS Pump Discharge Flow-Low

'NA M

Q 1, 2, 3, 4*, 5*.

d.

LPCS Injection Valve Differential Pressure-Low S

M R

1, 2, 3, 4*, 5*

e.

LCPI Injection Valve. Differential Pressure-Low S

M R

1, 2, 3, 4*,55*

w D

f.

LPCI Pump A Start Time Delay

,) g\\gr, g Q

1, 2,'3, 4*, 5" Relay NA w

g.

LPCI Pump A Flow-Low NA M

Q 1, 2, 3, 4*, 5*

h.

Manual Initiation NA R

NA 1, 2, 3, 4,*, 5*

AUTOMATIC DEPRESSURIZATION SYSTEM TRIP SYSTEM "A"#

}

2.

.. t a.

Reactor Vessel Water Level -

Low Low' Low, Level 1 S

M R'

1, 2, 3 Q

1, 2, 3 Aogv b.

Drywell Pressure-High NA

,)

Q 1, 2, 3 c.

ADS Timer NA d.

Reactor Vessel Water Level -

/

i Low, Level 3 S-M R

1, 2, 3' e.

LPCS Pump Discharge Pressure-High NA M

Q 1, 2, 3 s

g f.

LPCI Pump A Discharge s7 Pressure-High NA M

Q 1, 2, 3 g.

Manual Initiation NA R

NA 1, 2, 3 8.

G~>

oj