Proposed Tech Spec 3.6.1.8 Re Periodic Cycling of pneumatically-operated Valves & Tech Spec Table 3.6.3-1, Primary Containment Isolation Valves
ML20044B149
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/11/1990
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20044B148 List:
References
NUDOCS 9007170435
Download: ML20044B149 (13)


Text

.

h

s.

IJ g

AIIActilEKT_B ERQEOSID_ CHARGES TO THE_lECHtilCAL f

SELCIILCal10NS_E0fL0EIRAIIRG_LICIESIS RPF-11 AND NPF-1B Revised Pages:

NPF-11 NPF-18 j.

r-3/4 6-15 3/4 6-18 3/4 6-25 3/4 6-28 3/4 6-34 3/4 6-37 8 3/4 6-2 B 3/4 6-2 i

1080

?

9007170433 900731 e

PDR ADOCK 05000373

.P FDC 1

CONTAINMENT SYSTEMS ORYWELL AND SUPPRESSION CHAM 8ER PURGE SYSTEh e

l LIMITING CONDITION FOR OPERATION s

3. 6.1. 8 The drywell and suppression chamber purge system may be in operation with the drywell and/or suppression chamber purge supply and exhaust butterfly isolation valves open for inerting, de-inerting and pressure control.

Purging through the Standby Gas Treatment System shall be restricted to less than or equal to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per 365 days.

1 APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2 and 3.

t ACTION:

[

With a drywell and/or suppression chamber purge supply and/or exhaust butterflh isolation valve open for other than inerting, de-inerting or pressure control, close the butterfly valve (s) within oite hour or be in at least. HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

'I 7

8E.PIACE WITH NSERT d

SURVEILLANCE REQUIREMENTS l

4.6.1.8.1 The cumulative time that the drywell and suppression cl.2mber purge system has been in operation purging through the Standby Gas Treatment System shall be verified to be less than or equal to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per 365 days prior to use in this mode of operation.

i i

LA SALLE - UNIT 1 3/4 6-15 Amendment No. 37 1

. - ~. - -...

i g

TABLE 3.6.3-1 (Continued)

PRIM RY CONTAINMENT ISOLATION VALVES 5m MAXIpRM I

ISOLATION TINE VALVE FUNCTION AND NUPEER VALVE GROUP *)

(Seconds)

Automatic Isolation Valves (Continued)-

8.

Containment Vent and Purge Valves 4

IVQO26 ' (m)

IVQO27 On1 i 10

< 10 IVQO29 (m) 510 IVQO30 (m) 4

< 10 IVQO31 (m) 510 IVQO32

<5 IVQO34 (m) 7 10 i

R IVQO35 75 IVQO36(w0 7 3D i

IVQ040(ed IM M

IVQ042(m) 5 16 IVQ043(m)

IVQ047 i 10 IVQ048 15

(

IVQ050 55 IVQ051

$5 l

IVQ068 55 55 l

9.

RCIC Turbine Exhaust Vacuum Breaker 9

N.A.

Line Valves IE51-F080 IE51-F086 10.

LPCS, HPCS, RCIC, RHR Injection N

Testable Check Bypass Valves N. A.

N.A.

m E

2 a

4

... ~. _.,,

_.,.. - _, ~, _, _..,,.. -

... ~.

q a

TASSE 3.6i3-1 (Continued)

E-PRIMARY CONTAlfGENT ISOLATION VALVES

s.

{

VALVE FUNCTION AfW NUPSER

[s Other Isolation Valves (Continued)

E 7.

Post LOCA Hydrogen Control ING001A, 8 1HG002A, 8 1HG005A, 8 1HG006A, B 8.

Stan&y Liquid Control System IC41-F004A, 8 1C41-F007 9.

Reactor Recirculation Seal Injection ***

I5) 1833-F013A, B w

,D Il}

~

1833-F017A, B i

)

i

10. Drywell Pneumatic System i

IIN018 i

i (a) See 3peciffcation 3.3.2, Table 3.3.2-1, for isolation signal (s) that operates each valve groep.

ll But > 3 seconds, (b) Not includeJ in total sum of Type 8 ~and C tests..

(c) May be opened on an intermittent basis under administrative control.

(d) Not closed by SLCS actuation.

(e) Not closed by Trip Functions Sa, b or c, Specification 3.3.2 Table 3.3.2-1.

i (f) Not closed by Trip Functions 4a, c, d, e or f of Specification 3.3.2, Table 3.3.2-1.

(g) Not subject to Type C leakage test.

(h) Opens on as isolation signal. Valves will be open during Type A test. No Type C test required.

l (1) Also closed by drywell pressure-high signal.

1 (j) Hydraulic leak test at 43.6 psig.

S (k) Not subject to Type'C leakage test - leakage rate tested per Specification 4.4.3.2.2.

i (1) These penetrations are provided with removable spools outboard of the outboard isolation valve.

E During operation, these lines will be blind flanged using a double 0 ring and a type 8 leak-F j

test.

In addition,-the packing of.these isolation valves will be soap-bubble tested to ensure I

incianificant or no leakaee at th= caatai -- t. test pressure each refueline r_"

c (i

      • The specified 18-month interval may be waived for Cycle I previous the serveillance is performed during Refuel 1, which is to commence no later than October 27, 1985.

~

k Bl 3ysner J

..-z, a... -.

i CONTAINMENT SYSTEMS f

BASES e

I 3/4.6.1.5 PRIMARY CONTAINMENT STRUCTURAL INTEGRITY This limitation ensures that the structural integrity of the containment will be maintained comparable to the original design standards for the life of i

the facility.

Structural integrity is required to ensure that the containment will withstand the maximum pressure of 45 psig in the event of a LOCA. The 1'

measurement of containment tendon lift off force, the tensile tests of the tendon wires or strands, the visual examination of tendons, anchorages and exposed interior and exterior surfaces of the containment, the chemical and visual examination of the sheething filler grease, and the Type A leakage test are sufficient to demonstrate this capability.

The surveillance requirements for demonstrating the primary containment's structural integrity and the method of predicting the pre-stress loses are in compliance with the recommendations of Regulatory Guide 1.35.1, " Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containment Structures ",

January 1976, and proposed Regulatory Guide 1.35.1, " Determining Prestressing Forces for Inspection of Prestressed Concrete Containment St'ructures,"

April 1979 with the following clarification:

the tested lift-off force of individual tendon tension shall be greater than or equal to the initial pre-stress minus the loses, as predicted in the as-built design, which occur between the initial pre-operational structural integrity test and the time of subsequent surveillance.

The required Special Reports from any engineering evaluation or contain-ment abnormalities shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedure, the tolerances on cracking, the results of the engineering evalua-tion, and the corrective action taken.

3/4.6.1.6 DRYWELL AND SUPPRESSION CHAMBER INTERNAL PRESSURE The limitations on drywell and suppression chamber internal pressure i

ensure that the containment peak presssure of 39.6 psig does not exceed the design pressure of 45 psig during LOCA conditions or that the external pres-sure differential does not exceed the design maximum external pressure differen-tial of 5 psid.

The limit of 2.0 psig for initial positive primary containment -

pressure will. limit the tota 1' pressure to 39.6 psig which is less than the design pressure and is consistent with the accident analysis.

p 3/4.6.1.7 DRYWELL AVERAGE AIR TEMPERATURE

~

The limitation on drywell average air temperature ensures.that the containment peak air temperature does not exceed the design temperature of 340*F during LOCA conditions and is consistent with the accident analysis.

3/4.6.118 ORYWELL AND SUPPRESSION CHAMBER PURGE SYSTEM

[ The drywell and suppression chamber purge supply and exhaust isolation (valvesarerequiredtobeclosedduringplantoperationexceptasrequired for inerting, de-inerting and pressure control.

These valves have been demonstrated capable of closing during a LOCA or steam line break accident rom the full open position.

)

LA SALLE UNIT 1

[ B 3/4 6-2 Amendment.t. J

/

yace. necasn G

'I 1

e o

j 1

t l

PROPOSED TECHNICAL SPECIFICATION INSERTS 1HSERL6 I

Hith more than one drywell or suppression chamber purge system supply or exhaust butterfly isolation valve open, in any purge system primary containment penetration, for any purpose other than inerting, de-inerting or pressure control, close at least one of the isolation valves in the affected.

i primary containment penetration within one hour or be in at least HOT SHUTDOHN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTD0HN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, i

INSERLB m.

The requirements of Technical Specification 3.6.1.8 may also apply.

l INSERT C At least one of the drywell and suppression chamber purge system supply or exhaust isolation valves in each purge system primary containment penetration is required to be closed during plant operation except as required for inerting, d' 'oerting, and pressure control.

These valves have been.

demonstratt a be capable of closing during a LOCA or steam line break accident from the full open position.

The purge system is considered to be in operation whenever more than one of the purge system butterfly valves in any of the containment penetrations are open.

When cycling the purge system butterfly isolation valves for preventive maintenance or testing purposes, one valve in each penetration shall remain closed while cycling the other valve.in that penetration.

i 1

l '-

i' l

CONTAINMENT SYSTEMS DRYWELl, AND SUPPRESSION CHAMBER PURGE SYSTEM LIMITING CONDITION FOR OPERATION

3. 6.1. 8 The drywell and suppression chamber purge system may be in operation with the drywell and/or suppression chamber purge supply and exhaust butterfly isolation valves open for inerting, deinerting, and pressure control. Purging l

through the Standby Gas. Treatment System shall be restricted to less then or equal to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per 365 days.

APP'lCABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

Rgpbc E.

WtTH

-lNSERT A i

ACTION:

With a drywell and/or suppression chamber purge supply and/or exhaust butterf isolation valve open for other than inerting, deinerting, or pressure control, g

close the butterfly valve (s) within I hour or be in at least HOT SHUTDOWN with-in the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS I

4.6.1.8.1. The cumulative time that the drywell and suppression chamber purge i

system has been in operation purging through the Standby Gas Treatment System shall be verified to be less than or equal to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per 365 days prior to use in this mode of operation.

i 1

I i

LA SALLE - UNIT 2 3/4 6-18 Amendment No. 25

~

TABLE 3.6.3-1 (Continued)

E PRIMARY CONTAllWEENT ISOLATION VALVES' s

p MAXIMUN m

ISOLATION TIE VALVE FUNCTION AIG MupBER VALVE GROUP (a)

(Seconds)

E Q

Automatic Isolation Valves (Continued) m 8.

Containment Vent and Purge Valves 4

2VQO26 (fin)

< 10 2VQO27 (evt) 7 10 2VQO29 (,y,)~

7 10 2VQO30 jle 2VQO31 ((m,)}

< 10 2VQO32

< 5 2VQO34 (m )

7 10 l

2VQO35-7 5 R

2VQO36 (m) 7 10 2VQ040(m) 7 10

?

2VQ042 (m )

7 10 g

2VQ043 (tn )

{10 2VQ047

< 5 2VQ048

< 5 2VQ050

< 5 2VQ051 7 5 2VQ068 7

5-9.

RCIC Turbine Exhaust Vacuum Breaker 9

N.A.

Line Valves 2E51-F080 2E51-F006

10. LPCS, HPCS, RCIC, RHR Injection III Testable Check Bypass Valves N.A.

M.A.

E E

O

4 n

i TABLE 3.6.3-1 (Continued) 5 PRIMARY CONTAllWENT ISOLATION VALVES v,

1 jE VALVE FUNCTION AIS IENBER -

E Other Isolation Valves (Continued)

E 7.

Post LOCA lt;1g. Control 4.

2 l

Q 2HG001A, 8 i

2HG002A, 8 u

4 2HG005A, 8 2HG006A, 8 8.

Staney Liquid Control System 2C41-F004A, 8 2C41-F007 9.

Reactor Recirculation Seal Injection W

t 2833-F013A, B Il) w 1

2833-F017A, B

10. Dryuell Pneumatic Valves 21N018 TABLE NOTAT10115 2
  • But > 3 seconds.

g

+

(a) See 5pecification 3.3.2, Tshle 3.3.2-1, for isolation signal (s) that operates each valve gre g.

(b) Not included in total sum of Type 8 and C tests.

(c) Nay be opened on an intermittest basis under a hinistrative control.

[

(d) Not closed by SLCS actuation.

i (e) Not closed by Trip Functions Sa, b, er c, Specification 3.3.2, Table 3.3.2-1.

l (f) Not closed by Trip Functions 4a, c, d, e, or.f.of Specification 3.3.2, Table 3.3.2-1.

(g) Not subject to Type C leakage test.

(h) Opens on an isolation signal. Valves will be open during Type A test. No Type C test required.

l (i) Also closed by dryuell pressure-high signal.

g (j) Hydraulic leak test at 43.6 psig.

'3 Not subject to Type C leakage test - leakage rate tested per Specification 4.4.3.2.2.

(k)

These penetrations are provided with removable spools outboard of the outboard isolation valve.

(1)

During operation, these lines will be blind flanged using a double 0-ring and a type 8 leak test. In addition, the packing of these isolation valves will'be soap-bubble tested to ensure

~

,5 insignificant or no leakage at the containment test pressure each refueling outage.

h INSEg7 g j

U 4-gy

  • e y

y-

'-'e-r.r

'mp-,..

g w---

f

=ys"9"rm-

,q.ev1-vs.

.iy4,,,g-g r.-1.-Pr--

.4-*T Me'WW-

' ' *99grwryv.,.

+

g4 e%,sw.,.-

r

.,as%M-.,i g

-eq r-q

-w---

6,

.-w,e-w w.,

w-.,.-

  • --,-gy-we q,

n 1

l-CONTAINMENT SYSTEMS BASES 3/4.6.1.$ PRIMARY CONTAINMENT STRUCTURAL INTEGRITY This limitation ensures that the structural integrity of the containment will be maintained comparable to the original. design standards for the life of the facility. Structural will withstand the maximum, integrity is required to ensure that the containment pressure of 45 psig in the event of a LOCA. The measurement of containment tendon lift off force, the tensile tests of the i

tendon wires or strands, the visual examination of tendons, anchorages and l

exposed interior and exterior surfaces of the containment, the chemical and visual examination of the sheathing filler grease, and the Type A leakage test are sufficient to demonstrate this capability.

The surveillance requirements for demonstrating the primary containment's structural integrity and the method of predicting the prestress losses are in compliance with the recommendations of Regulatory Guide 1.35, " Inservice l

Inspection of Ungrouted Tendons in Prestressed Concrete Containment Structures,"

January 1976, and proposed Regulatory Guide 1.35.1,inment Structure

" Determining Prestressing Forces for Inspection of Prestressed Concrete Conta 1979 with the following clarification:

the tested lift-off force of individual t

tendon tension shall be greater than or equal to the initial prestress minus j

the losses as predicted in the as-built design, which occur between the initial pre operational structural integrity test and the time of subsequent surveillance.

e

+

The required Special Reports from any engineering evaluation of contain-ment abnormalities shall inglude a description of the tendon condition, the condition of the concrete p

procedure, the tolerances o(es'ecially at tendon anchorages), the inspection n cracking, the results of the engineering evalua-tion, and the corrective action taken.

3/4.6.1.6 DRWELL AND SUPPRES$10F CHAMBER INTERNAL PRESSURE L

t The limitations on drywell ed suppression chamber internal pressure ensure that the contaiheent per.k pressure of 39.6 psig does not exceed the design pressure of 45 psig during LOCA conditions or that the external pres-sure differential does not exceed the design maximum external pressure differen-tial of 5 psid. The limit of 2.0 psig for initial positive primary containment F

pressure w111 limit the total pressure to 19.6 psig which is less than the design pressure and is consistent with t b safety analysis.

3/4.6.1.7 DRYWELL AVERAGE AIR TEMPERATURE

+

The limitation on drywell average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 340*F during LOCA conditions and is consistent with the safety analysis.

1 3/4.6.1.8 DRWELL AND SUPPRESSION CHAMBER PURGE SfSTEM J

The drywell and suppression chamber purge supply and exhaust isolation L

valves are required to be closed during plant operation except as required

-1 for inerting, de-inerting and pressure control. These valves have been 1

demonstrated capable of closin t from the full open position. _g during a LOCA or steam line break accident _

g LA SALLE UNIT 2 B 3/4 6-2 Amendment No. 25 W.,pl A c E.

WITH INSE.EY

-.---... -----m

n r

4 l

l PROPOSED TECHNICAL SPECIFICATION INSERTS

)

?

MSEEI_A

.i Hith more than one drywell or suppression chamber purge system supply or exhaust butterfly isolation valve open, in any purge system primary containment penetration, for any purpose other than inerting, de-inerting or i

pressure control, close at least one of the isolation valves in the affected primary containment penetration within one hour or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, i

i INSLRl_B I

m.

The requirements of Technical Specification 3.6.1.8 may also apply.

INSERT C At least one of the drywell and suppression chamber purge system supply or exhaust isolation valves in each purge system primary containment penetration is required to be_ closed during plant operation except as required for

-inerting, de-inerting, and pressure control.

These valves have been demonstrated to be capable of closing during a LOCA or steam line break accident from the full open position.

The purge system is considered to be in operation whenever more than one of the purge system butterfly valves in any of the: containment penetrations are open.

When cycling the purge system butterfly isolation valves for preventive maintenance or testing purposes, one valve in each penetration shall remain closed while cycling the other valve in that penetration.

i l

l l

l i

i I

b 1

i

??

i L

ATTACHMENT C SIGNIFICANT HAMEDS.. CONSIDERATION Commonwealth Edison has evaluated the proposed Technical Specification

{

Amendment and determined that it does not represent a significant hazards consideration.

Based on the criteria for defining a significant hazards consideration established in 10 CFR 50.92, operation of LaSalle County Station Units 1 and 2 in accordance with the proposed amendment will not:

l 1)

Involve a significant increase in the probability or consequences of an accident previously evaluated because:

The proposed amendment to the action requirements and bases for the drywell L

and suppression chamber purge (VQ) system (Technical Specification 3.6.1.8) will allow one primary containment isolation valve in each VQ system penetration to be open for an indefinite period of time.

This will permit periodic cycling of the VQ system valves in accordance with the manufacturers recommendations without entry into a technical specification action i

statement.

The VQ system is not a safety related system and is not required for mitigation of any accident evaluated in Chapter 15 of the UFSAR. Under normal operating conditions the VQ system penetrations are isolated with both valves in each penetration closed, except when the system is in operation.

Each of these valves have an automatic isolation feature which will close the valve on a signal from the primary containment isolation system.

Therefore, allowing one valve in each penetration to be open does not affect primary containment integrity.

If a VQ system valve in a primary containment penetration is open and inoperable, continued operation of the unit would be governed by the action requirements for inoperable primary containment isolation valves in Technical Specification 3.6.3.

The proposed amendment to Technical Speication 3.6.3 for primary containment isolation valves, adds a fov to Table 3.6.3-1 which provides a cross-reference to Technical Specificath 6.1.8 for the VQ system valves.

This change will help to ensure thh. the station operators are l

sensitive to the potential applicability of Specification 3.6.1.8 when a VQ butterfly valve is inoperable and open.

l Additionally, the proposed amendment deletes Footnotes ""*" from Technical Specification Table 3.6.3-1 for Unit 1.

This footnote allowed relaxation of certain surveillance i*quirements during the Unit 1 Cycle 1.

LaSalle Station Unit 1 is currently in Qcle 4 and the footnote is no longer applicable and l

should be removed.

2) Create the possibility of a i.cw or different kind of accident from any accident previously evaluated because:

The proposed amendments do not involve any changes to the facility, or to the operation of the facility as described in the UFSAR.

.s

ATTACHM@LC SIGNIFICANT HAZARDS CONSIDIRal10B 3)

Involve a significant reduction in the margin of safety because:

The proposed amendments are administrative in nature.

They help to clarify requirements of Specifications 3.6.1.8 and 3.6.3 and make these requirements more consistent.

The proposed amendments will allow greater operational flexibility and allow periodic cycling of the VQ system valves in accordance with the manufacturers recommendations.

This will help to enhance the reliability and availability of these valves.

Guidance has been provided in " Final Procedures and Standards on No Significant Hazards Consideration," Final Rule, 51 FR 7744, for the application of standards to license change requests for determination of the existence of significant hazards considerations.

The proposed amendments most closely resemble example I.C.2.e.11, a purely administrative change to the technical specification to achieve consistency.

This proposed amendment does not involve a significant relaxation of the criteria used to establish safety limits, a significant relaxation of the bases for the limiting safety system settings or a significant relaxation of I

the bases for the limiting conditions for operations.

Therefore, based on the guidance provided in the Federal Register and the criteria established in 10 CFR50.92(e), the proposed change does not constitute a significant hazards consideration.

I L

l-