GO2-15-128, Response to Request for Additional Information Regarding License Amendment Request for Adopt Technical Specification Task Force (TSTF)-425, Revision 3 | 17 September 2015 | Response to Request for Additional Information Regarding License Amendment Request for Adopt Technical Specification Task Force (TSTF)-425, Revision 3 | Internal Flooding Probabilistic Risk Assessment |
GO2-15-137, Response to the Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations | 24 September 2015 | Response to the Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations | Fukushima Dai-Ichi Earthquake |
GO2-15-145, Response to Request to Additional Information (RAI) 3 on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 | 29 October 2015 | Response to Request to Additional Information (RAI) 3 on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 | |
GO2-15-152, Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 | 17 November 2015 | Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 | High Radiation Area Squib Surveillance Frequency Control Program Scram Discharge Volume Excess Flow Check Valve Fuel cladding |
GO2-15-173, Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 | 28 December 2015 | Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 | Squib Surveillance Frequency Control Program Excess Flow Check Valve Offsite Circuit |
GO2-16-021, R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report | 27 October 2015 | R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report | Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Finite Element Analysis FLEX Fukushima Dai-Ichi Tornado Missile Protection Design basis earthquake License Renewal Earthquake Power-Operated Valves Power Uprate |
GO2-16-057, Response to Second Request for Additional Information RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program | 7 April 2016 | Response to Second Request for Additional Information RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program | Probabilistic Risk Assessment |
GO2-16-070, Response to Request for Additional Information Associated with Expedited Seismic Evaluation Process Submittal | 17 May 2016 | Response to Request for Additional Information Associated with Expedited Seismic Evaluation Process Submittal | FLEX Fukushima Dai-Ichi |
GO2-16-090, Response to Request for Additional Information for Relief Request 4ISI-02 | 14 July 2016 | Response to Request for Additional Information for Relief Request 4ISI-02 | Hydrostatic VT-2 Incorporated by reference Pressure Boundary Leakage |
GO2-16-107, Response to Request for Additional Information Related to Relief Request 4ISI-05 Regarding Reactor Pressure Vessel Flange Leak-Off Lines and Code Case N-805 | 3 August 2016 | Response to Request for Additional Information Related to Relief Request 4ISI-05 Regarding Reactor Pressure Vessel Flange Leak-Off Lines and Code Case N-805 | VT-2 |
GO2-16-128, Response to Request for Additional Information Related to Relief Request 4ISI-06 Regarding Code Case N-666-1 | 20 September 2016 | Response to Request for Additional Information Related to Relief Request 4ISI-06 Regarding Code Case N-666-1 | Weld Overlay Liquid penetrant |
GO2-16-153, Response to Request for Additional Information Regarding Mur License Amendment Request Fire Protection | 10 November 2016 | Response to Request for Additional Information Regarding Mur License Amendment Request Fire Protection | FLEX B.5.b Fire Protection Program Power Uprate Measurement Uncertainty Recapture |
GO2-16-155, Response to Request for Additional Information for License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1, Reactor Core Sls from the Reactor Systems Branch | 17 November 2016 | Response to Request for Additional Information for License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1, Reactor Core Sls from the Reactor Systems Branch | Reactor Vessel Water Level |
GO2-16-161, Response to Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC | 8 December 2016 | Response to Request for Additional Information, Columbia Mur LAR: Esgb, Coating and FAC | Coatings Flow Accelerated Corrosion Through-Wall Leak Power Uprate Measurement Uncertainty Recapture |
GO2-16-173, Supplement to Response to Request for Additional Information Related to Columbia LAR: Fire Protection RAI-1 | 12 December 2016 | Supplement to Response to Request for Additional Information Related to Columbia LAR: Fire Protection RAI-1 | Fire Protection Program Power Uprate Measurement Uncertainty Recapture |
GO2-17-014, Response to Request for Additional Information Human Performance | 9 January 2017 | Response to Request for Additional Information Human Performance | Power Uprate Measurement Uncertainty Recapture |
GO2-17-048, Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI-99-01 Revision 6 (MF8219) | 23 February 2017 | Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI-99-01 Revision 6 (MF8219) | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Functionality Assessment Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change Unidentified leakage |
GO2-17-049, Response to Request for Additional Information, Columbia Mur LAR Evib Rais, Enclosure 2 | 16 February 2017 | Response to Request for Additional Information, Columbia Mur LAR Evib Rais, Enclosure 2 | License Renewal Power Uprate |
GO2-17-093, Response to Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutro-Absorbing Materials in Spent Fuel Pools - Licensee-Reported Category 3 Plants | 2 May 2017 | Response to Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutro-Absorbing Materials in Spent Fuel Pools - Licensee-Reported Category 3 Plants | Safe Shutdown Earthquake |
GO2-17-107, Response to Request for Additional Information for Relief Request 3ISI-16 | 26 June 2017 | Response to Request for Additional Information for Relief Request 3ISI-16 | |
GO2-17-119, Supplement to Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01 Revision 6 | 21 June 2017 | Supplement to Response to Request for Additional Information Related to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01 Revision 6 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change Unidentified leakage Control Room Habitability |
GO2-17-166, Response to Request for Additional Information for Relief Request 3ISI-19 | 3 October 2017 | Response to Request for Additional Information for Relief Request 3ISI-19 | VT-2 Through-Wall Leakage |
GO2-17-175, Response to Request for Additional Information Related to License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System | 20 November 2017 | Response to Request for Additional Information Related to License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System | Packing leak Stroke time High Energy Line Break Local Leak Rate Testing |
GO2-17-186, Response to Request for Additional Information Related to License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies | 2 January 2018 | Response to Request for Additional Information Related to License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies | High winds Internal Flooding Probabilistic Risk Assessment Fukushima Dai-Ichi Integrated leak rate test Earthquake |
GO2-17-204, Energy Northwest Submittal of the Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 Crf 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review ... | 28 December 2017 | Energy Northwest Submittal of the Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 Crf 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review ... | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
GO2-18-075, Response to Request for Additional Information for TSTF-542 License Amendment Request | 27 June 2018 | Response to Request for Additional Information for TSTF-542 License Amendment Request | Water Inventory Control Surveillance Frequency Control Program |
GO2-18-102, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Re-Renewed Facility Operating License and Technical Specification Clean-Up | 7 August 2018 | Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Re-Renewed Facility Operating License and Technical Specification Clean-Up | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Water Inventory Control Post Accident Monitoring Hydrostatic Surveillance Frequency Control Program Scram Discharge Volume Overtravel Operational leakage |
GO2-19-111, Response to Request for Additional Information Related to License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System | 30 July 2019 | Response to Request for Additional Information Related to License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System | Safe Shutdown Ultimate heat sink Fire Barrier Operator Manual Action Emergency Lighting Fire Protection Program GOTHIC Operability Assessment |
GO2-19-124, Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | 20 August 2019 | Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | |
GO2-20-029, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance... | 19 February 2020 | Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance... | Surveillance Frequency Control Program |
GO2-20-071, Response to Request for Additional Information Related to Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems | 23 April 2020 | Response to Request for Additional Information Related to Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems | Anticipated operational occurrence |
GO2-20-086, Response to Request for Additional Information Related to Reduction in Commitment to the Columbia Operational Quality Program Description | 1 June 2020 | Response to Request for Additional Information Related to Reduction in Commitment to the Columbia Operational Quality Program Description | Commercial Grade Dedication Pandemic |
GO2-20-118, Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | 24 August 2020 | Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | |
GO2-20-120, Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | 1 September 2020 | Response to Request for Additional Information Related to Exigent License Amendment Request for Change to Technical Specification 3.8.7 Distribution Systems - Operating | Surveillance Frequency Control Program |
GO2-20-127, Response to Request for Additional Information Related to Fourth Interval Inservice Inspection (ISI) Program Request 4ISI-09 | 22 October 2020 | Response to Request for Additional Information Related to Fourth Interval Inservice Inspection (ISI) Program Request 4ISI-09 | Time of Discovery Finite Element Analysis Feedwater Heater Stress corrosion cracking Affidavit |
GO2-20-150, Response to Request for Additional Information Related to Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises, Due to COVID-19 | 3 December 2020 | Response to Request for Additional Information Related to Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises, Due to COVID-19 | Pandemic Coronavirus |
GO2-21-084, Response to Request for Additional Information Related to On-Site Cooling System Sediment Disposal | 23 June 2021 | Response to Request for Additional Information Related to On-Site Cooling System Sediment Disposal | Annual Radiological Environmental Operating Report Deep Dose Equivalent |
GO2-21-101, Response to Request for Additional Information Related to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) | 24 August 2021 | Response to Request for Additional Information Related to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) | License Renewal |
GO2-21-108, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 20 August 2021 | Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | |
GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves | 11 July 2022 | Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves | Shutdown Margin Hydrostatic Pressure and Temperature Limits Report Affidavit |
GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 4 October 2022 | Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Reactor Vessel Water Level Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Thermoset Large early release frequency Maintenance Rule Program Offsite Circuit |
GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 28 November 2022 | Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program | 29 July 2024 | Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program | Incorporated by reference Surveillance Frequency Control Program Excess Flow Check Valve |
ML17066A493 | 7 March 2017 | Submittal of Additional Information in Response to Mur LAR: Primary Element Accuracy Calculation | |
ML18191A203 | 30 June 1978 | Response to NRC Request for Additional Information (Round 3 Questions) | |
ML18191A205 | 19 June 2018 | Forwards Response to NRC Comments of July 7, 1977 and February 23, 1978 on Caorso Test Plan | Subsequent actuation |
ML18191A235 | 26 March 1975 | Response to Request for Additional Information Protection Against Pipe Breaks Outside Containment | |
ML18191A236 | 26 March 1975 | Wppss Nuclear Project No. 2, Response to Request for Additional Information, Pipe Rupture Protection Inside Containment | Finite Element Analysis |
ML18191A238 | 16 December 1977 | Advising of Intention to Complete Evaluation Regarding BWR Relief Valve Control System & Associated Containment Loads for Wppss Nuclear Project No. 2 Is Scheduled During 2nd Quarter of 1978 | |
ML18191A274 | 12 January 1976 | Wppss Nuclear Project No. 2. Clarification of Criteria, Pipe Rupture Protection Inside Containment | Finite Element Analysis |