GO2-17-107, Response to Request for Additional Information for Relief Request 3ISI-16

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information for Relief Request 3ISI-16
ML17178A204
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/26/2017
From: Javorik A
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF8922, GO2-17-107
Download: ML17178A204 (4)


Text

ENERGY Alex L Javorik Vice President, Engineering P.O. Box 968, Mail Drop PE20 NORTHWEST Richland, WA 99352-0968 Ph. 509-377-8555 F. 509-3n-4317 aljavorik@energy-northwest.com 10 CFR 50.55a June 26, 2017 G02-17-107 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397; RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST 31Sl-16

References:

1) Letter G02-16-149, dated December 7, 2016, AL Javorik (Energy Northwest) to NRC, "Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year lnservice Inspection Interval"
2) Email, dated May 24, 2017, John Klos (NRC) to Lisa Williams (Energy Northwest), "NRC RAls for Columbia Relief Request MF8922, 31Sl-16" (ADAMS Accession No. ML17144A170)

Dear Sir or Madam:

By Reference 1, Energy Northwest submitted for approval Relief Request 31Sl-16.

By Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) to Energy Northwest. Attachment 1 provides the requested information.

This letter and its attachment contain no regulatory commitments. If there are any questions or if additional information is needed, please contact Ms. L. L. Williams, Licensing Supervisor, at 509-377-8148.

I declare under penalty of perjury that the foregoing is true and correct.

Executed this d../ciay of JU ~ -t... , 2017.

G02-17-107 Page 2 of 2

Attachment:

As stated cc: NRC RIV Regional Administrator NRC NRA Project Manager NRC Sr. Resident Inspector - 988C CD Sonoda- BPA 1399 (email)

WA Horin - Winston & Strawn

G02-17-107 Page 1 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (RAI)

NRC RAI 1:

Section XI, Table IWB-2500-1 of the ASME Code requires that for examination category B-A, Item Numbers B1 .21 and B1 .22, the accessible length of all welds must be examined each inspection interval.

a) For the eight components listed in Table 31Sl-16.1 of the Relief Request, discuss if the stated examination coverages are based on the percentage of total weld length, or the percentage of accessible weld length.

b) Please also provide the linear dimension for the accessible weld length for the eight components of this Relief Request.

Energy Northwest Response:

1a. The examination coverages provided in Table 31Sl -16.1 are based on the percentage of the total weld length. The hatched out regions in Figure 31Sl-16.1 of the Relief Request are intended to represent the inaccessible areas that were not covered.

Columbia examined 100% of the accessible weld length. Columbia notes that Table IWB-2500-1 Category B-A, Item B1 .20 of ASME Section XI 2001 edition with 2003 addenda requires only examination of the accessible portion, however Note 2 of the Table indicated that this includes essentially 100% of the weld length. Columbia achieved 100% coverage of the accessible portion per the Table; it is conservatively reported as limited coverage per Note 2 of the Table. Reporting these welds as limited coverage is consistent with the previous interval.

1b. The following table provides the calculated linear dimensions of the total weld length and accessible weld length for each of the eight welds with the values rounded to the nearest inch.

Weld Id Total Weld Length Accessible Length DG (Bottom Head Circumferential Weld) 236in 46in DR (Bottom Head Circumferential Weld) 236in 46in DA (Bottom Head Meridional Weld @ 272°) 61 in 44in DB (Bottom Head Meridional Weld @ 332°) 61 in 44in DC (Bottom Head Meridional Weld @ 32°) 61 in 44in DD (Bottom Head Meridional Weld @ 92°) 61 in 44in DE (Bottom Head Meridional Weld @ 152°) 61 in 44in OF (Bottom Head Meridional Weld @ 212°) 61 in 44in

G02-17-107 Page 2 of 2 NRC RAI 2:

In the lnservice Inspection Program Plan for Interval 3, submitted by the licensee on December 15, 2005 (see ADAMS Accession No. ML053620391 }, the licensee provided the examination coverage obtained during the second ISi interval (see Table 5-3 of the Interval 3 lnservice Inspection Program Plan). The licensee also provided the weld length, weld area, total weld volume and volume scanned for the second ISi interval.

Based on the information provided by the licensee, the examination coverage for the eight components of this Relief Request is the same for both the second and third ISi interval inspections. However, in order for the NRC staff to independently verify the coverages obtained during the third ISi interval, the NRC staff requests the following additional information.

a) Discuss if the examination coverage calculations, and the calculation inputs, are the same for the third ISi interval as for the second ISi interval.

b) If there have been any changes to the calculations described in RAI Question 2.a above, describe the changes and discuss how you verified that examination coverage is the same for both second and third ISi interval inspections.

Energy Northwest Response:

2a. The volumetric examinations performed on these welds during the third interval utilized the same procedures, beam angles (60°), beam directions (parallel and transverse), mode (RL}, and frequency as those used in the second interval. Both intervals used transducers of the same size and shape and there was no change in the weld geometry or physical constraints in the area. Because there is no change in the method, tooling, weld geometry and physical constraints, the calculated volumetric coverages are the same.

2b. As discussed above there were no changes in the key parameters used, hence the volumetric coverages between the two intervals are the same. Columbia utilized plant drawings and simple geometry to estimate weld length and accessible weld lengths in order to verify that the reported volumetric coverages were reasonable. This verification, along with comparison to the previous interval, confirms that all of the accessible portions of the welds were inspected.