Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000313/1990008 | 20 August 1990 | Summary of 900718 Meeting W/Entergy Operations,Inc in Arlington,Tx to Discuss Exercise Weaknesses Identified in Insp Repts 50-313/90-08 & 50-368/90-08 | |
ML20054K944 | 16 June 1982 | Summary of 820527 Meeting W/Util & GE in Bethesda,Md Re J Humphrey Concerns Regarding Mark III Containment Sys. Util Requested to Provide Addl Info | |
ML20055E941 | 9 July 1990 | Summary of 900621 Meeting W/Util Re Proposed Mods for Return to 100% Power.List of Attendees & Viewgraphs Encl | Flow Induced Vibration |
ML20056B416 | 17 August 1990 | Summary of 900615 Meeting W/Licensee at Site to Discuss Licensing Activities.List of Attendees,Meeting Agenda, Handout & Licensee Comments on Draft Safety Evaluation of Fire Protection Program Encl | Safe Shutdown Fire Barrier FLEX Earthquake Fire Protection Program |
ML20056D666 | 1 June 1993 | Summary of Operating Reactors Events Briefing 93-19 on 930526 | |
ML20056H572 | 5 August 1993 | Summary of Operating Reactors Events Meeting 93-28 on 930728 | |
ML20058G308 | 19 November 1993 | Summary of Operating Reactors Events Meeting 93-43 on 931117 | |
ML20058H035 | 8 December 1993 | Summary of 930830 Meeting W/Entergy Operations,Inc Re Operation of ANO-2 W/O SG Exam Until Mar 1994 Scheduled Refueling Outage.List of Attendees & Handouts Encl | |
ML20058P449 | 15 December 1993 | Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl | Incorporated by reference Backfit |
ML20059A594 | 14 October 1993 | Summary of 930929 Meeting W/B&W Re Generic Implications for of Steam Generator Leak for Similar Sleeves Installed at Other Facilities.List of Attendees & Meeting Handouts Encl | |
ML20059C404 | 27 December 1993 | Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Proposed Changes to Security Plans for Plant,Units 1 & 2.List of Attendees Encl | |
ML20062B558 | 26 July 1982 | Summary of 820714 Meeting W/Applicant,Ge,Bechtel & Consultants in Bethesda,Md Re Mark III Containment Concerns of J Humphrey.Details of Action Plan & Schedule & Tentative Agenda for ACRS 820729-30 Meeting Encl | |
ML20062D358 | 15 July 1982 | Summary of 820622-24 Meetings W/Util in Russellville,Ak Re App 1 (Radiological Effluent Tech Specs) Review to Resolve Outstanding Issues | Offsite Dose Calculation Manual |
ML20062H481 | 28 November 1990 | Summary of 901023 Meeting W/Util Re Control Room Emergency Filtration Sys.Proposed Change to TS 3/4.7.2 & Handout Encl | Stroke time |
ML20126G072 | 22 December 1992 | Summary of 921203 Meeting W/Entergy Operations,Inc Re Results of ANO-2 Steam Generator Tube Exam During Most Recent Scheduled Outage & Licensee Plan for mid-cycle Tube Insp,Scheduled to Begin 930430 | Boric Acid |
ML20126L233 | 1 May 1981 | Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation | |
ML20127H555 | 7 June 1985 | Summary of 850416 Meeting W/Util & Sutherland,Asbill & Brennan in Atlanta,Ga Re Licensing Activities.List of Meeting Attendees,Meeting Agenda & Licensee Handout Encl | Stroke time Scram Discharge Volume |
ML20128K541 | 21 May 1985 | Summary of 850429 Meeting W/Util & Bechtel Re Soil Structure Interaction for Standby Svc Water Basin.Viewgraphs & Attendees List Encl | Safe Shutdown |
ML20128Q352 | 10 July 1985 | Summary of 850530 Meeting W/Util in Bethesda Re Scope & Scheduling of Licensing Activities to More Effectively Schedule Resources to Complete Activities.List of Attendees & Agenda Encl | Safe Shutdown Stroke time Systematic Assessment of Licensee Performance |
ML20128Q367 | 11 July 1985 | Summary of 850619 Meeting W/Utils,Bechtel & GE Re Containment Suppression Pool Swell Through Encroached Areas. List of Attendees,Slides & Handouts Encl | |
ML20129G492 | 29 August 1996 | Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 | Probabilistic Risk Assessment |
ML20129G526 | 31 July 1996 | Summary of ACRS Plant Operations Subcommittee Meeting on 960521 to Review Proposed Rule on Shutdown Operations & Associated Reg Guide as Well as Studies on Shutdown Risk at Surry & Grand Gulf Nuclear Plants | Chernobyl |
ML20132D142 | 17 December 1996 | Summary of 960827 Meeting W/Util in Rockville,Md Re Graded Quality Assurance Initiative at Facility.W/Attendees List, Summary of Licensee Presentation & Licensee Expert Panel Guidance Document | High winds Significance Determination Process Maintenance Rule Program |
ML20132D976 | 5 July 1985 | Summary of 850531 Meeting W/Util Re Tdi Diesel Generator Design Review & Quality Revalidation Rept.Tdi Owners Group Phase I Recommendations Will Be Implemented for Div II Diesel Generator Prior to Startup Following First Refueling | |
ML20133G625 | 1 August 1985 | Summary of 850627 Meeting W/Util & General Physics Corp Re Dcrdr.Attendance List,Util Response to NRC Comments & Util Handout for Discussion of Sys Function Review & Task Analysis Attached | |
ML20134L384 | 26 August 1985 | Summary of 850729 & 30 Meetings W/Util Re Planned Outages & Licensing Activities.Licensee Handout & Lists of Participants & Plant Mods Currently Scheduled for Completion in First Refueling Encl | |
ML20134M661 | 21 November 1996 | Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl | |
ML20134N566 | 21 November 1996 | Summary of 961003 Meeting W/Licensee in Rockville,Md to Discuss Licensee Upcoming Eighth Refueling Outage for Ggns,Unit 1 | Safe Shutdown Shutdown Margin Fire Barrier Time to boil Probabilistic Risk Assessment |
ML20137F235 | 24 March 1997 | Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants | Probabilistic Risk Assessment |
ML20137K547 | 17 January 1986 | Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl | Safe Shutdown |
ML20137U133 | 10 April 1997 | Summary of 970325 Meeting W/Util in Clariborne County,Ms to Discuss Entergy Operations,Inc MOV Thrust Methodology Used for GL 95-07 for Plant.List of Attendees & Info Provided by NRC Staff Encl | Hydrostatic |
ML20137W331 | 17 April 1997 | Summary of 970407 Meeting W/Util & Transco Products,Inc Re Versawrap,New Electrical Raceway Firewrap Sys.Attachment 1 Describes Components of Typical Veraswrap Barrier & Attachment 2 Re Transco Products,Inc Test Procedure Encl | Fire Barrier |
ML20137X509 | 29 November 1985 | Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl | |
ML20138A098 | 3 December 1985 | Summary of 851024 Meeting W/Util & Exxon Nuclear Corp Re Fuel Reload Scheduled to Begin on 860520 & End on 860820. Viewgraphs of Meeting Agenda,Objectives & Proposed Schedule Encl | |
ML20138M415 | 17 October 1985 | Summary of 851004 Meeting W/B&W Owners Group Transient Assessment & Availability Committees in Bethesda,Md Re Operating Experience of Operating Reactors & Plans to Improve Experience.Viewgraphs Encl | Packing leak |
ML20138N552 | 17 December 1985 | Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl | |
ML20138P232 | 6 December 1985 | Summary of 851121 Meeting W/Util,Tdi & Failure Analysis Assoc Re Results of Exams & Analyses of Tdi Emergency Diesel Generator 11 Components Damaged in 851106 Overspeed Event. Handout & List of Attendees Encl | |
ML20138P322 | 17 December 1985 | Summary of 851025 Meeting W/Util & Sutherland,Asbill & Brennan in Bethesda,Md Re Licensing Actions.Attendance List, Handout,List of Key Submittals Since 850730 Meeting & Updated Organization Charts Encl | Safe Shutdown Stroke time Scram Discharge Volume |
ML20138Q128 | 6 December 1985 | Summary of 851114 Meeting W/Util & Tdi Re Tdi Emergency Diesel Generator 11 Damaged in 851106 Overspeed Event.List of Attendees Encl | |
ML20140B350 | 17 January 1986 | Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl | |
ML20141F046 | 30 December 1985 | Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl | |
ML20141G290 | 7 April 1986 | Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl | |
ML20141H366 | 17 July 1997 | Summary of 970710 Meeting W/Util to Discuss Licensee Emergency Plan Change 28.001-95 & to Determine If Change Reduces Effectiveness of Emergency Plan for Plant,Unit 1. List of Attendees,Agenda & Info Provided by Licensee Encl | |
ML20141N397 | 24 February 1986 | Summary of Operating Reactors Events Meeting 86-03 on 860127.Attendees,events Discussed,Significant Elements of Events & Assignments Made Listed in Encls | Power change |
ML20148D214 | 11 January 1988 | Summary of 871015 Meeting W/Util & GE Re Util Request for Relief from Inservice Insp (ISI) of Certain Reactor Pressure Vessel Welds.List of Attendees,Util ISI Requirements Handout & Relief Requests I-00015 & I-00004 Encl | Incorporated by reference Dissimilar Metal Weld |
ML20148F989 | 14 September 1978 | Minutes of the 216th ACRS Meeting on 780406-07 Re Ak Nuc 1, Unit 2 Pwr Plant,Liquid Pathway Generic Study,Mcguire Nuc Station Units 1 & 2 & Davis-Besse-1 Implementation of ACRS Recommendations from 770114 rept.pp1-35 | |
ML20148H000 | 1 November 1978 | Summary of 781031 Meeting in Bethesda Re Site Excavation Mapping & Inspec.Areas Discussed Weexcavation Mapping Done to Date,& Future Excavation & Mapping Plans, & Schedule of Excavation Inspecs W/List of Attendees | |
ML20148H662 | 15 January 1988 | Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl | |
ML20149J918 | 19 February 1988 | Summary of 871202 Meeting to Brief Director & Assistant Director for Region II Reactors in NRR on Util Operations. Meeting Attendee & Handout Encl | Safe Shutdown Post Accident Monitoring |
ML20149K029 | 19 February 1988 | Summary of 871120 Meeting W/Util & GE Nuclear Energy in Bethesda,Md Re Reactor Coolant Pressure Boundary for RWCU Sys & Standby Liquid Control Sys.W/List of Attendees & Meeting Handout |