Docket No. 50-416 LICENSEE:
Mississippi Power and Light Company (MP&L)
FACILITY:
Grand Gulf Nuclear Station (GGNS)
SUBJECT:
SUMMARY
OF APRIL 16, 1985 MEETING WITH MP&L REGARDING GRAND GULF UNIT 1 LICENSING ACTIVITIES This meeting was one of the periodic meetings that are being held to discuss the scope and scheduling of licensing activities in order to more effectively schedule MP&L and staff efforts to complete these activities. is a list of attendees. is the agenda for the meeting prepared by the staff. Enclosure 3 is a handout prepared by the licensee.
The licensee described some proposed changes to the startup test program. A major change to be submitted for staff approval is the deletion of Startup Test No. 258, Full Reactor Isolation at 100% power. An unintentional main steam isolation valve (MSIV) closure occurred at about 75 percent power.
Licensee believes data from this reactor isolation can be used to satisfy the objective of Test No. 258. Other changes described below, are not considered to be major changes, as defined in License Condition 2.C.(31) and therefore will not be submitted for prior NRC approval. These minor changes include: changing the scheduled date for running Startup Test No. 27, Turbine Stop Valve Trip and Generator Load Rejection (Test Condition 6); elimination of applicable portions of Startup Test Nos. 22 and 29 related to testing automatic load following because GGNS will not use this feature; and performing rod sequencing tests in parallel with other activities.
The licensee stated that additional personnel would be brought in during startup testing.
In the areat of secondary plant performance, for example, people with expertise in feedwater system control and calibration will be adde.d. A joint test group will be formed with GE and MP&L operations personnel. Management personnel will be on every shift during testing.
Coordination with GE will be increased; for example, an increased emphasis will be placed on feedback from Kuo Sheng and Liebstadt plants, which are BWR 6 - Mark III plants.
A six-week outage beginning October 15, 1985 is planned to complete modifications needed for environmental qualification and to perform an integrated leak rate test.
If possible, other work will be accomplished during this outage including modification of the standby service water system (License Condition 2.C.(20)),
induction heating stress improvement of the recirculation piping system, changing spent fuel storage racks to the high density design, and changing the feedwater check valve disc to one having a soft seat for better leakage characteristics.
8506260376 850607 PDR ADOCK 05000416 P
. Licensee discussed some of the near term items for licensing action (Enclosure 3).
Regarding Item B.3, licensee emphasized the desirability of having the use of the residual heat removal (RHR) steam condensing mode available.
Licensee, also gives a high priority to obtaining NRC review of the analysis of soil-structure interaction on the standby service water cooling basin.
Regarding Item C.2 licensee stated that October 15, 1985 is the scheduled date to start installa-tion of high density spent fuel racks in the containment. A submittal on the design of the high density spent fuel racks is expected to be made in April.
Regarding C.5, licensee plans to update the Fire Hazards Analysis and submit proposed revisions to the program described in the FSAR in May, prior to the Region II audit. Regarding Item C.8, licensee plans to submit maximum stroke times for valves in the IST program in May.
Licensee provided target dates for submitting technical specifications (TS) for modifications to be made prior to startup following the first refueling outage.
In June 1985, TS will be submitted for the hydrogen control system and the ADS accumulator instrumentation.
In July 1985, TS will be submitted for the scram discharge volume vent and drain valves and scram instrumentation.
In August 1985, TS will be submitted for seismic instruments, pressure isolation valves and standby service water system modifications.
In September 1985, TS will be submitted for the remote shutdown panel modification, TDI diesel generator modifications and ADS logic modifications.
In December 1985, TS will be sub-mitted for R.G. 1.97 instruments, and modifications to the emergency onsite power system.
Licensee requested information regarding the optimum date to submit technical specifications relative to the date for monthly publication of notices in the Federal Register.
Subsequent to the meeting, the NRC instituted procedures for bi-monthly publication. The optimum time for submittals (shortest time to issuance of amendment) would be on June 11, 1985 and each two week interval thereafter.
Licensee also questioned whether proposed Technical Specifications could be sub-mitted for NRC review after Plant Safety Review Committee approval, but prior to the off-site Safety Review Connittee approval. Subsequent to the meeting, staff investigated this potential for shortening the review cycle time. The Technical Specifications require SRC approval of " proposed changes to the Technical Specifications" and therefore this review should be completed prior to issuance of the license amendment.
The regulations require submittal of license amend-ments under oath or affirnation that the information therein is true and correct.
Therefore, proposed changes to the Technical Specifications should receive all approvals M the licensee, including the SRC approval, prior to submittal.
There are procedures available for emergency changes to Technical Specifications should plant conditions warrant more rapid review and approval.
Lesterh.Kintner,SeniorProjectManager Licensing Branch No. 4 Division of Licensing
Enclosure:
(Kintner EAdensam W/]/85 6/3/85
GRAND GULF Mr. Jackson B. Richard Senior Vice President, Nuclear Mississippi Power & Light Company P.O. Box 23054 Jackson, Mississippi 39205 cc:
Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General J
P.O. Box 651 Department of Justice 1ackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Mr. Oliver D. Kingsley, Jr.
and Reynolds Vice President, Nuclear Operations I?00 17th Street, N.W.
Mississippi Power & Light Company Washington, D. C.
20036 P.O. Box 23054 Jackson, Mississippi 39705 Mr. Ralph T. Lally Manager of Quality Assurance Middle South Services, Inc.
P.O. Box 61000 New Orleans, Louisiana 70161 Mr. Larry F. Dale, Director Nuclear Licensing and Safety Mississippi Power & Light Company P.O. Box 23054 Jackson, Mississippi 39205 Mr. R. W. Jackson, Project Engineer Bechtel Power Corporation 15740 Shady Grove Road Gaithersburg, Maryland 20760 Mr. Ross C. Butcher Senior Resident Inspector U.S. Nuclear Regulatory Commission Route 2 Box 399 Port Gibson, Mississippi 39150 J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission, Region II 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 303?3 Mr. J. E. Cross, General Manager Grand Gulf Nuclear Station Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 L.
(
ENCLOSURE 1 ATTENDEES NRC-MP&L MEETING, APRIL 16, 1985 ATLANTA, GEORGIA NAME AFFILIATION P. T. Burnett NRC RII, Reactor Inspector
- 0. D. Kingsley, Jr.
MP&L V.P-Nuclear Operations L. F. Dale MP&L Director, Nuclear Licensing and Safety F. W. Titus MP&L Manager, Nuclear Plant Engineering J. G. Cesare MP&L Manager, Nuclear Licensing S. P. Burris NRC RII, Reactor Inspector Frank Jape NRC RII, TPS Mary Jane Wallis Sutherland, Asbill & Brennan (Atlanta)
L. L. Kintner NRC/NRR/DL/LB-4 V. L. Brownlee NRC/RII/ Projects Branch Chief V. W. Panciera NRC/RII/ Project Section Chief R. E. Carroll, Jr.
NRC/RII/ Project Engineer
ENCLOSURE 2 Tentative Agenda For l
April 16, 1985, Meeting with Mississippi Power & Light Company Re: Grand Gulf Unit 1 Licensing Actions 10:00 - 10:$0 Introductory Remarks 10:10 - 12:00 MP&L Near Term Licensing Actions
- Modifications to Startup Test Program
- Planning for November 1985 Outage
- Revision to Fire Protection Plan & other submittals related to Fire Protection
- High Density Spent Fuel Racks
- Other key items 12:00 - 1:00 Lunch 1:00 - 2:00 Licensing Action Schedule Update
- Proposed Technical Specification Submittals
- Staff Reviews
ENCLOSURE 3 (7g
/
MP&L - NRC NRR/ Region II Monthly Status Meeting April 16, 1985 I. KEY ITEMS OF INTEREST - CURRENT OR NEAR TERM A.
Plant Status B.
NRC Licensing Actions / Activities 1.
Unit 2 Licensing Fees, additional information on charges 2.
Post-LOCA Vacuum Breaker Position Indicators (OLC 2.C(35))
3.
Steam Condensing Mode (RHR)
C.
MP&L Licensing Actions / Activities 1.
DR/QR Final Report 2.
High Density Spent Puel Racks (HDSFR) 3.
Proposed Modifications to TC6 of Startup Test Program 4.
Planning / Support - November, 1985 Outage 5.
Appendix R Audit Preparation 6.
IST - Maximus Stroke Time 7.
Guidelines for 10CFR170 Fee Remittance II. KEY SUBMITTALS - PREVIOUS 30 DAYS (or Since Last Status Meeting)
Submittal Date 3/7/85
' Current Dutage Actions for Environmental,.
Qualification (AECM-85/0073) e 3/11/85 Response to Emergency Plan Deficiencies (AECM-85/0058) 3/11/85 Modification to Startup Test Program (AECM-85/0076) 3/13/85 Updated Service List (AECM-85/0071) 3/14/85 Transmittal of Revision 11 to Physical Security Plan (AECM-85/0057) 3/15/85 Monthly Operating Report (AECM-85/0085) 3/19/85 Emergency Plan Procedure Revision (AECM-85/0093) 3/20/85 SQRT Qualification of HPCS Service Water Pump-Test Report (AECM-85/0091) 3/22/85 Registered Use of Transport Casks (AECM-85/0089) 3/25/85 Reportable Deficiency 85/02, Interim Report - 85/02, TDI Diesel Generator Air Start Header Check Valve Failure (AECM-85/0094)
J0P13 MISC 85030701 - 1
Submittal Date 3/25/85 Groundwater Level at Grand Gulf (AECM-85/0088) 3/26/85 Reportable Deficiency 85/03, Interim Report - MSIV Failure to Remain in Closed Position Due to Failure of Dual Solenoid (ASCO) to Iransfer when De-energized (AECM-85/0096) 3/27/85 License Review Fees (AECM-85/0074) 3/27/85 Payment of Inspection Fees (AECH-85/0090) 3/29/85 Annual Report of 10CFR50.59 Safety Evaluations - Sixth Insta11mant (AECd-85/0098) 3/29/85 Additional Information en NUREG-0737 Item II.D.1 0&ECM-85/0099) 4/1/85 Submittal of PGP for the GGNS Procedure Upgrade Program (AECM-85/0110)
~%
4/1/85 Endorsement of the Hydrogen Control Owners Group Hydrogen Control Program Plan (AECM-85/0069)
III. LICENSING ACTIVITIES - FORECAST FOR NEXT 3 MONTHS 4/15/85
. Appendix ^R Support Material (i.e.. Fir,e' Protection
~
~
related drawings, procedures r~equested in NRC RII-letter, dated 2/25/85) 4/17/85 Remit Fee for SRV IPT Changes l
4/17/85 DRQR Final Report 4/25/85 Appendix R Review Summary Re' port (including revised Fire Hazards Analysis & Associated Circuits Study) 4/30/85 Annual Env. Report 4/30/85 Annual Radiological Env. Op. Report 4/30/85 HDSFR l
J0P13 MISC 85030701 - 2
Submittal Date 5/1/85 SPDS - Safety Analysis & Implementation Plan (License Amendment - Request for Extention of Due Date) 5/1/85 50.59 Installment 5/6/85 Proposed PSAR Revisions Resulting From Appendix R Review 6/1/85 Core Damage Estimate Procedure Various CL-83-28 Responses 5/14/85 - Item 2.1.1, 2.2.2 5/14/85 - Item 4.5.3 - Endorsement of NEDC-30844 Note: plant-specific response due 90 days after NRC issues evaluation of NEDC-30844.
6/13/85 - Item 4.5.2 6/28/85 - Item 2.2.1 9/27/85 - Item 3.2 Proposed Mods to TC-6
~,
Fall Outage (TS Changes & License-Amendments)-,
RF01 Relief Requests (TS Changes & License Amendments)
J0P13 MISC 85030701 - 3
b f
June 7,1985 MEETING
SUMMARY
DISTRIBUTION
+ Docket ~No(s):
50-416' NRC PDR Local PDR NSIC PRC System LB #4 r/f Attorney, OELD E. Adensam Project Manager i
vintnnr Licensing Assistant M.
nuncan NRC PARTICIPANTS P. T. Burne tt S. P. Burris F. Jape L. Kintner V. L. Brownlee V. W. Panciera R. E. Carroll bec: Applicant & Service List s