ML20054K944
| ML20054K944 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/16/1982 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Houston M Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8207060322 | |
| Download: ML20054K944 (3) | |
Text
_
DISTRIBUTION:
JUN 16 1982 See next page 5eelistIIIUi[MS N8k415]NY MEMORANDUM FOR:
A. Schwencer, Chief Licensing Branch No. 2, DL FROM:
D. Houston, Project Manager, Licensing Branch No. 2. DL
SUBJECT:
SUlmARY OF MAY 27, 1982 MEETING WITH MP&L ABOUT HUMPHREY'S MARK II CONTAINMENT CONCERNS On May 27,1982, a meeting was held in Bethesda, Maryland to discuss Mr. John Humphrey's concerns about the Grand Gulf Mark III containment system. Mr.
Humphrey was a former Containment Systems Engineer at General Electric and had contacted Mississippi Power and Light on May 8,1982 about potential safety issues with the Mark III containment system. On May ll,1982, Mr.
Humphrey met with MP&L in Jackson, Mississippi and discussed his concerns with them. The purpose of this meeting (May 27) was to review MP&L's s
responses to Mr. Htuphrey's concerns and to discuss with Mr. Humphrey the details of his concerns. The MP&L responses are included in a draft letter (Attachment 1) and their handout prepared for the meeting (included in the transcript). A transcript of the meeting was prepared by Alderson Reporting (Attachment 2).
The meeting was attended by representatives of NRC, MP&L, GE, other Mark III plant owners, A-Es, consultants and Mr. Humphrey. A list of those in attendance is given on page 1, 2 and 3 of the transcript. The MP&L discussion covers pages 9-96 in the transcript and Mr. Ilumphrey's discussion from 96-269.
At the conclusion of the meeting, MP&L was requested to provide additional analyses and information in regard to these concerns. Also, the other Mark III plants were requested to address these issues on a plant by plant basis. These issues did not appear to need resolution for a low power license but should have resolution or justification for going beyond 5%
of full power. General Electric was also requested to respond to certain issues.
M. D. Houston, Project Manager Licensing Branch No. 2 Division of Licensing Attachments :
As Stated 8207060322 820616 PDR ADOCK 05000416 P
PDR D
D K '#2 omer >
su m ur>............o........
AS neer DH n:cc 6fM/,82,,,,,
.,6/
, /,8,2,,,,,,,
omy
'f OFFIClAL RECORD COPY owm a.i-mm mc ronu me no-soi mcu ono
-(S
'9.5/Iir.'J. P. McG:ughy ($
f Ass'istant Vica Pr sid;nt li._le
- f..
a Nuclear Production
]l Mississippi Power & Light Company
?
P. O. Box 1640 Jackson, Mississippi 39205 cc: ~ Robert B. McGehee, Esquire Wise, Carter, Child, Steen and Caraway P. O. Box 651 Jackson, Mississippi 39205 Troy B. Conner, Jr., Esquire Conner and Wetterhahn 1747 Pennsylvania Avenue, N. W.
Washington, D. C. 20006 Dr. D. C. Giobs, Vice President
' Middle South Energy, Inc.
~'
225 Baronne Street
~~ ~
Newbr
~~
n, ouisiana 70161 Mr. John Richardson
~
~
, Nississippi Power & Light Company P. O. Box 1640 Jackson, Mississippi 39205 fir. R. Trickovic, Project Engineer Grand Gulf Nuclear Station Bechtel Power Corporation Gaithersburg, Maryland 20760 Mr. Alan G. Wagner Resident Inspector --
Route 2, Box 150 Port Gibson, Mississippi 391,50 l
1 l
l l
mm,e-
.4L.:.%[3 '*!ld
=1 Q::v. Q Q..h -
Q q'
p 2
Mp$$gf MEETING
SUMMARY
' DISTRIBUTION:
DATE:
16 1R y n 7,.
W.J Document Control (50-
)
'DV
.NRC PDR lY Local PDR PRC NSIC LB#2 Reading File NRC PARTICIPANTS _:
EHylton Pro ect Manager D. Houston J. K d ck.
D. Eisenhut/R. Purple A. Fields R. Tedesco M. Haughey J. Youngblood A. Schwencer F. Miraglia E. Adensam SSPB G.-Lainas W. Russell D. Crutchfield T. Ippolito J. P. Knight W. Johnston D. Muller cc: See next page T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst J. Kramer Attorney, OELD Wagner 01&E Region II Reside ~nt Inspector 4
ACRS (16)
OSD (7)
O h
o
-e e