NL-03-0088, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional Information17 January 2003Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional InformationBoric Acid
VT-2
Pressure Boundary Leakage
NL-03-0120, Inservice Inspection Summary Report4 February 2003Inservice Inspection Summary Report
NL-03-0168, Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access Authorization27 January 2003Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access AuthorizationIncorporated by reference
NL-03-0169, Licensee Response to Order for Compensatory Measures Related to Access Authorization27 January 2003Licensee Response to Order for Compensatory Measures Related to Access AuthorizationIncorporated by reference
NL-03-0200, Response to Request for Additional Information, Steam Generator Tube Inspections12 February 2003Response to Request for Additional Information, Steam Generator Tube Inspections
NL-03-0257, Technical Specification Revision Request, Integrated Leakage Rate Testing Interval Extension26 February 2003Technical Specification Revision Request, Integrated Leakage Rate Testing Interval ExtensionHigh winds
Mission time
Probabilistic Risk Assessment
Coatings
Large early release frequency
NL-03-0369, Occupational Radiation Exposure Reports19 March 2003Occupational Radiation Exposure Reports
NL-03-0390, Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant3 March 2003Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating PlantBoric Acid
Pressure Boundary Leakage
NL-03-0438, Property Insurance Coverage as of 04/01/20033 March 2003Property Insurance Coverage as of 04/01/2003
NL-03-0584, February 2003 Monthly Operating Report for Vogtle13 March 2003February 2003 Monthly Operating Report for Vogtle
NL-03-0596, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 1014 May 2003Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10Dissimilar Metal Weld
NL-03-0620, Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions14 November 2003Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident ConditionsAnchor Darling
NL-03-0636, Physical Security & Contingency Plan Revision24 March 2003Physical Security & Contingency Plan Revision
NL-03-0656, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-43107 May 2003Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310Weld Overlay
Hydrostatic
Coatings
Liquid penetrant
NL-03-0694, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))28 March 2003Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))Incorporated by reference
Decommissioning Funding Plan
NL-03-0723, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal23 April 2003Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program SubmittalUltimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
VT-2
Dissimilar Metal Weld
NL-03-0753, Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta.10 April 2003Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta.GOTHIC
NL-03-0894, Annual Non-Radiological Environmental Operating Reports for 200228 April 2003Annual Non-Radiological Environmental Operating Reports for 2002
NL-03-0999, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 20022 June 200310 CFR 50.46 ECCS Evaluation Model Annual Reports for 2002
NL-03-1047, Report of Facility Changes, Tests & Experiments14 May 2003Report of Facility Changes, Tests & ExperimentsSafe Shutdown
Turbine Missile
NL-03-1078, Cycle 11 Core Operating Limits Report13 May 2003Cycle 11 Core Operating Limits ReportShutdown Margin
NL-03-1090, Organization and Correspondence Routine Changes16 May 2003Organization and Correspondence Routine Changes
NL-03-1140, Changes to Technical Specification Bases11 June 2003Changes to Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Missed surveillance
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
NL-03-1185, Addition of Snubber Inspection Type11 June 2003Addition of Snubber Inspection Type
NL-03-1267, Report of Unsatisfactory Performance Testing23 June 2003Report of Unsatisfactory Performance Testing
NL-03-1299, Addendum to 2001 Annual Radioactive Effluent Release Report16 June 2003Addendum to 2001 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
NL-03-1347, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal20 June 2003Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal
NL-03-1384, Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors3 July 2003Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
NL-03-1499, Response to Request for Additional Information Regarding Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension25 July 2003Response to Request for Additional Information Regarding Technical Specification Revision Request Integrated Leakage Rate Testing Interval ExtensionProbabilistic Risk Assessment
Coatings
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld
NL-03-1514, 60 Day Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors for Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant7 August 200360 Day Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors for Joseph M. Farley Nuclear Plant & Vogtle Electric Generating PlantJob Performance Measure
Severe Accident Management Guideline
NL-03-1620, Response to Generic Letter 2003-01, Control Room Habitability4 August 2003Response to Generic Letter 2003-01, Control Room Habitability
NL-03-1792, Plants - Emergency Operations Facility Relocation Request for Prior Approval16 October 2003Plants - Emergency Operations Facility Relocation Request for Prior ApprovalHealth Physics Network
NL-03-1858, Cycle 12 and Unit 2 Cycle 10 Core Operating Limits Reports2 October 2003Cycle 12 and Unit 2 Cycle 10 Core Operating Limits ReportsShutdown Margin
NL-03-1958, Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.19 September 2003Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Pressure Boundary Leakage
Through-Wall Leak
NL-03-1997, Response to Regulatory Issue Summary 2003-14 Regarding Preparation and Scheduling of Operator Licensing Examination26 September 2003Response to Regulatory Issue Summary 2003-14 Regarding Preparation and Scheduling of Operator Licensing ExaminationGeneric Fundamentals Examination
NL-03-2008, Results of Reactor Pressure Vessel Head Inspections Required by Order EA-03-09913 October 2003Results of Reactor Pressure Vessel Head Inspections Required by Order EA-03-099Boric Acid
NL-03-2177, Request to Revise Technical Specifications and Pressure and Temperature Limits Report26 February 2004Request to Revise Technical Specifications and Pressure and Temperature Limits ReportHydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
Exemption Request
Fire Protection Program
Scaffolding
Affidavit
NL-03-2200, Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R1127 October 2003Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11
NL-03-2239, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1)31 October 2003Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1)
NL-03-2266, Follow-Up Written Request for Notice of Enforcement Discretion and Request to Revise Technical Specification Surveillance Requirements 3.3.1.5 and 3.3.3.2, on an Exigent Basis5 November 2003Follow-Up Written Request for Notice of Enforcement Discretion and Request to Revise Technical Specification Surveillance Requirements 3.3.1.5 and 3.3.3.2, on an Exigent BasisEnforcement Discretion
NL-03-2313, Report of Unsatisfactory Performance Testing11 November 2003Report of Unsatisfactory Performance Testing
NL-03-2383, Inservice Inspection Summary Report16 January 2004Inservice Inspection Summary ReportBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
NL-03-2394, Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-0219 December 2003Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02
NL-03-2436, Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use1 December 2003Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use
NL-03-2451, Request for Surveillance Test Interval Extensions for Components of the Reactor Protection System27 January 2005Request for Surveillance Test Interval Extensions for Components of the Reactor Protection SystemProbabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
NL-03-2459, Response to NRC Bulletin 2003-04 Rebaselining of Data in the Nuclear Materials Management and Safeguards System, for Joseph M. Farley Nuclear Plant, Edwin I. Hatch Nuclear Plant and Vogtle Electric Generating Plant22 December 2003Response to NRC Bulletin 2003-04 Rebaselining of Data in the Nuclear Materials Management and Safeguards System, for Joseph M. Farley Nuclear Plant, Edwin I. Hatch Nuclear Plant and Vogtle Electric Generating Plant
NL-03-2471, Request to Revise Technical Specifications, Administrative Controls 5.2.2.g20 February 2004Request to Revise Technical Specifications, Administrative Controls 5.2.2.g
NL-03-2510, November 2003 Monthly Operating Report for Vogtle Units 1 and 215 December 2003November 2003 Monthly Operating Report for Vogtle Units 1 and 2
NL-03-2523, NPDES Permit Renewal Application15 December 2003NPDES Permit Renewal ApplicationGrab sample
NL-03-2575, E. I. Hatch, Units 1 and 2 - Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use19 December 2003E. I. Hatch, Units 1 and 2 - Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use