NL-03-0088, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional Information | 17 January 2003 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response, Request for Additional Information | Boric Acid VT-2 Pressure Boundary Leakage |
NL-03-0120, Inservice Inspection Summary Report | 4 February 2003 | Inservice Inspection Summary Report | |
NL-03-0168, Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access Authorization | 27 January 2003 | Southern Nuclear Operating Company, Inc., Answer to the Order for Compensatory Measures Related to Access Authorization | Incorporated by reference |
NL-03-0169, Licensee Response to Order for Compensatory Measures Related to Access Authorization | 27 January 2003 | Licensee Response to Order for Compensatory Measures Related to Access Authorization | Incorporated by reference |
NL-03-0200, Response to Request for Additional Information, Steam Generator Tube Inspections | 12 February 2003 | Response to Request for Additional Information, Steam Generator Tube Inspections | |
NL-03-0257, Technical Specification Revision Request, Integrated Leakage Rate Testing Interval Extension | 26 February 2003 | Technical Specification Revision Request, Integrated Leakage Rate Testing Interval Extension | High winds Mission time Probabilistic Risk Assessment Coatings Large early release frequency |
NL-03-0369, Occupational Radiation Exposure Reports | 19 March 2003 | Occupational Radiation Exposure Reports | |
NL-03-0390, Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | 3 March 2003 | Licensee'S Answer to February 11, 2003 Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors at Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | Boric Acid Pressure Boundary Leakage |
NL-03-0438, Property Insurance Coverage as of 04/01/2003 | 3 March 2003 | Property Insurance Coverage as of 04/01/2003 | |
NL-03-0584, February 2003 Monthly Operating Report for Vogtle | 13 March 2003 | February 2003 Monthly Operating Report for Vogtle | |
NL-03-0596, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10 | 14 May 2003 | Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10 | Dissimilar Metal Weld |
NL-03-0620, Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions | 14 November 2003 | Additional Information Concerning GL 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions | Anchor Darling |
NL-03-0636, Physical Security & Contingency Plan Revision | 24 March 2003 | Physical Security & Contingency Plan Revision | |
NL-03-0656, Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310 | 7 May 2003 | Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant - Request for Technical Alternative to ASME Section XI, IWA-4120(a) and IWA-4310 | Weld Overlay Hydrostatic Coatings Liquid penetrant |
NL-03-0694, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) | 28 March 2003 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1)) | Incorporated by reference Decommissioning Funding Plan |
NL-03-0723, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | 23 April 2003 | Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment VT-2 Dissimilar Metal Weld |
NL-03-0753, Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta. | 10 April 2003 | Request to Revise Technical Specifications Reactor Trip System Instrumentation Over Temperature Delta. | GOTHIC |
NL-03-0894, Annual Non-Radiological Environmental Operating Reports for 2002 | 28 April 2003 | Annual Non-Radiological Environmental Operating Reports for 2002 | |
NL-03-0999, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2002 | 2 June 2003 | 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2002 | |
NL-03-1047, Report of Facility Changes, Tests & Experiments | 14 May 2003 | Report of Facility Changes, Tests & Experiments | Safe Shutdown Turbine Missile |
NL-03-1078, Cycle 11 Core Operating Limits Report | 13 May 2003 | Cycle 11 Core Operating Limits Report | Shutdown Margin |
NL-03-1090, Organization and Correspondence Routine Changes | 16 May 2003 | Organization and Correspondence Routine Changes | |
NL-03-1140, Changes to Technical Specification Bases | 11 June 2003 | Changes to Technical Specification Bases | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Missed surveillance Power Operated Valves Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
NL-03-1185, Addition of Snubber Inspection Type | 11 June 2003 | Addition of Snubber Inspection Type | |
NL-03-1267, Report of Unsatisfactory Performance Testing | 23 June 2003 | Report of Unsatisfactory Performance Testing | |
NL-03-1299, Addendum to 2001 Annual Radioactive Effluent Release Report | 16 June 2003 | Addendum to 2001 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
NL-03-1347, Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | 20 June 2003 | Response to Request for Additional Information Regarding Risk Informed Inservice Inspection Program Submittal | |
NL-03-1384, Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | 3 July 2003 | Withdrawal of Request for Relief Contained in Answer to the Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | |
NL-03-1499, Response to Request for Additional Information Regarding Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension | 25 July 2003 | Response to Request for Additional Information Regarding Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension | Probabilistic Risk Assessment Coatings Moisture barrier Liquid penetrant Dissimilar Metal Weld |
NL-03-1514, 60 Day Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors for Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | 7 August 2003 | 60 Day Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors for Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | Job Performance Measure Severe Accident Management Guideline |
NL-03-1620, Response to Generic Letter 2003-01, Control Room Habitability | 4 August 2003 | Response to Generic Letter 2003-01, Control Room Habitability | |
NL-03-1792, Plants - Emergency Operations Facility Relocation Request for Prior Approval | 16 October 2003 | Plants - Emergency Operations Facility Relocation Request for Prior Approval | Health Physics Network |
NL-03-1858, Cycle 12 and Unit 2 Cycle 10 Core Operating Limits Reports | 2 October 2003 | Cycle 12 and Unit 2 Cycle 10 Core Operating Limits Reports | Shutdown Margin |
NL-03-1958, Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | 19 September 2003 | Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Pressure Boundary Leakage Through-Wall Leak |
NL-03-1997, Response to Regulatory Issue Summary 2003-14 Regarding Preparation and Scheduling of Operator Licensing Examination | 26 September 2003 | Response to Regulatory Issue Summary 2003-14 Regarding Preparation and Scheduling of Operator Licensing Examination | Generic Fundamentals Examination |
NL-03-2008, Results of Reactor Pressure Vessel Head Inspections Required by Order EA-03-099 | 13 October 2003 | Results of Reactor Pressure Vessel Head Inspections Required by Order EA-03-099 | Boric Acid |
NL-03-2177, Request to Revise Technical Specifications and Pressure and Temperature Limits Report | 26 February 2004 | Request to Revise Technical Specifications and Pressure and Temperature Limits Report | Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Exemption Request Fire Protection Program Scaffolding Affidavit |
NL-03-2200, Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11 | 27 October 2003 | Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11 | |
NL-03-2239, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1) | 31 October 2003 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1) | |
NL-03-2266, Follow-Up Written Request for Notice of Enforcement Discretion and Request to Revise Technical Specification Surveillance Requirements 3.3.1.5 and 3.3.3.2, on an Exigent Basis | 5 November 2003 | Follow-Up Written Request for Notice of Enforcement Discretion and Request to Revise Technical Specification Surveillance Requirements 3.3.1.5 and 3.3.3.2, on an Exigent Basis | Enforcement Discretion |
NL-03-2313, Report of Unsatisfactory Performance Testing | 11 November 2003 | Report of Unsatisfactory Performance Testing | |
NL-03-2383, Inservice Inspection Summary Report | 16 January 2004 | Inservice Inspection Summary Report | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
NL-03-2394, Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02 | 19 December 2003 | Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02 | |
NL-03-2436, Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | 1 December 2003 | Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | |
NL-03-2451, Request for Surveillance Test Interval Extensions for Components of the Reactor Protection System | 27 January 2005 | Request for Surveillance Test Interval Extensions for Components of the Reactor Protection System | Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
NL-03-2459, Response to NRC Bulletin 2003-04 Rebaselining of Data in the Nuclear Materials Management and Safeguards System, for Joseph M. Farley Nuclear Plant, Edwin I. Hatch Nuclear Plant and Vogtle Electric Generating Plant | 22 December 2003 | Response to NRC Bulletin 2003-04 Rebaselining of Data in the Nuclear Materials Management and Safeguards System, for Joseph M. Farley Nuclear Plant, Edwin I. Hatch Nuclear Plant and Vogtle Electric Generating Plant | |
NL-03-2471, Request to Revise Technical Specifications, Administrative Controls 5.2.2.g | 20 February 2004 | Request to Revise Technical Specifications, Administrative Controls 5.2.2.g | |
NL-03-2510, November 2003 Monthly Operating Report for Vogtle Units 1 and 2 | 15 December 2003 | November 2003 Monthly Operating Report for Vogtle Units 1 and 2 | |
NL-03-2523, NPDES Permit Renewal Application | 15 December 2003 | NPDES Permit Renewal Application | Grab sample |
NL-03-2575, E. I. Hatch, Units 1 and 2 - Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | 19 December 2003 | E. I. Hatch, Units 1 and 2 - Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | |