NL-03-0120, Inservice Inspection Summary Report

From kanterella
Jump to navigation Jump to search
Inservice Inspection Summary Report
ML030410264
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/04/2003
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-0120
Download: ML030410264 (207)


Text

{{#Wiki_filter:JeffreyT. Gasser Southern Nuclear Vice President Operating Company, Inc. 40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7721 Fax 205 992.0403 _k SOUTHERN Nk February 4, 2003 COMPANY Energy to Serve Your World' Docket No: 50-425 NL-03-0120 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Vogtle Electric Generating Plant Inservice Inspection Summary Report Ladies and Gentlemen: Southern Nuclear Operating Company (SNC) submits herewith the Vogtle Electric Generating Plant Unit 2, Interval 2, Period 2, Outage 1 Inservice Inspection Summary Report (Enclosure 1). This report describes and summarizes the inservice inspection activities performed during its Fall 2002 maintenance/refueling outage. Paragraph IWA 6230 of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, 1989 Edition requires submittal of the enclosed report. Also included in the report are inspection results required by Vogtle Electric Generating Plant Technical Specification 5.6.1O.b for submittal to the NRC within 12 months following completion of the steam generator tube examinations. The supporting inservice inspection documentation, e.g., examination plans and schedules, examination results and reports, examination methods and procedures, evaluation results, and corrective action and repairs, is available for review upon request at Vogtle Electric Generating Plant. The signed original and one copy of the subject report are provided for your review. If there are any questions, please advise. Sincerely, JffreyT. Gasser JTG/DRG

Enclosure:

Inservice Inspection Summary Report Vogtle Electric Generating Plant Unit 2 - Refueling Outage (2R9) A o97

U. S. Nuclear Regulatory Commission NL-03-0120 Page 2 cc: Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President (w/o Enclosure) Mr. G. R. Frederick, General Manager - Plant Vogtle (w/o Enclosure) Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle (w/o Enclosure) Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator (w/o Enclosure) Mr. F. Rinaldi, NRR Project Manager - Vogtle (w/o Enclosure) Mr. J. Zeiler, Senior Resident Inspector - Vogtle (w/o Enclosure)

Enclosure 1 Inservice Inspection Summary Report Vogtle Electric Generating Plant Unit 2 - Refueling Outage (2R9)

Vogtle Electric Generating Plant Unit 2 Ninth Maintenance/Refueling Outage (2R9) Owner's Report for Inservice Inspection Southern Nuclear Operating Company the southern electric system

TITLE Letter NL-03-0120 to NRC and 2R9 Inservice Inspection Summary Report 4 46 MGR. ENG. SUPPORT

                           / /.17-02 DATE                MGR. SECURITY NA DATE NA                                                    NA     /

NSAC SUPERVISOR DATE MGR. MAINTENANCE DATE NA / NA I MGR. ADMINISTRATION DATE MGR. OPERATIONS DATE NA NA / MGR. TRAINING DATE MGR. OUTAGE/PLANNING DATE NA NA / ASST. GEN. MGR.-SUPPORT DATE MGR. HP/CHEMISTRY DATE Meetig-# Meeting # '/ 2 -/oý D/a e3 RB Chairman Date General Manager Date PLEASE REVIEW, SIGN WHERE APPROPRIATE AND RETURN TO John Churchwell IFTHERE ARE ANY QUESTIONS, PLEASE CALL John AT EXTENSION 3191

ITEM: NI( ,_ETTER: NL-03-0120 PRB COMMENT RE( W SHEET PAGE 1 OF11 2R9 INSERVICE INSPECT.

SUMMARY

REPORT TO: W. L. BURMEISTER PRB 2003 - 04 DATE: 01-22-03 The PRB has reviewed the attached document and recommends approval with comments as noted below. Mandatory (M) comments shall be incorporated prior to approval of the document. If not incorporated, the document shall be resubmitted to the board. You have the responsibility to determine whether Optional (0) comments should be included at this time, saved for later inclusion, or otherwise resolved. This document does not constitute an unreviewed safety question. NO. SECTION M/O PRB COMMENTS RESOLUTION INITIALS I 1 _________ M TET EVALUATE THE NEED TO PUT BALANCE OF PLANT EXAMS , - . FOR FLOW-ACCELERATED CORROSION IN THE REPORT, - - 4Z " AS IT IS NOT AN ISI REQUIREMENT (PAGE 4-3 THRU 4-5). / , 2 M TET RE-EVALUATENERIFY COMMITMENT TO REPLACE PIPINGI "4, IN2tR10 OUTLINED ON PAGE 4-5 BASED ubita ON AS FOUND to theBoard. reouto of/-ift CONDITION OF PIPING REPLACED DUE TO FLOW- Z61*

                                                                                                                                          "(*,'!

ACCELERATED CONDITION IN 2139. rhanne..sto this* doc~ument, other than those addressina the Board's comments, will reauire re-submittal to the Board. Up3on resolution of the above comments, the document should be forwarded to the General Manager for approval.

OWNER'S REPORT FOR INSERVICE INSPECTIONS for the NINTH MAINTENANCE/REFUELING OUTAGE of VOGTLE ELECTRIC GENERATING PLANT, UNIT 2 (7821 River Road, P. 0. Box 1600, Waynesboro, Georgia 30830) COMMERCIAL OPERATION DATE: May 20,1989 DOCUMENT COMPLETION DATE: January 2003 Prepared by SOUTHERN NUCLEAR OPERATING COMPANY (40 Inverness Center Parkway, P. 0. Box 1295, Birmingham, Alabama 35201) as LICENSEE AND OPERATING AGENT for GEORGIA POWER COMPANY (241 Ralph McGill Boulevard, N.E., P. 0. Box 4545, Atlanta, Georgia 30308-3374) as OWNER

TABLE OF CONTENTS Page Introduction 1-1 ASME Form NIS-I with Abstract - ASME Class I and 2 2-1 ASME Class 3, MC, and CC Examinations and Tests 3-1 Augmented Inspections 4-1 Examination Summary Listings Introduction to Summary Listings 5-1 ASME Class 1 Equipment Examinations 6-1 Piping Examinations 7-1 ASME Class 2 Equipment Examinations 8-1 Piping Examinations 9-1 Supports Introduction and Equipment Support Examinations 10-1 Introduction and Piping Support Examinations 11-1 Snubber Functional Examinations Introduction to Snubber Functional Testing and Results 12-1 Pressure Tests 13-1 Indication Notification Forms 14-1 NIS-2 Forms 15-1 i

LIST OF ABBREVIATIONS ACC Acceptable AD Anchor/Darling AFW Auxiliary Feedwater System Al GPC Action Item (followed by unique no. denoting Action Item number) ANII Authorized Nuclear Inservice Inspector ASME American Society of Mechanical Enginers ASNT American Society for Nondestructive Testing ASTM American Society for Testing and Materials BC Branch Connection CCSS Centrifugally Cast Stainless Steel CCW Component Cooling Water CE Combustion Engineering CH Closure Head CS Containment Spray CVCS Chemical and Volume Control System CR VEGP Condition Report (followed by unique number denoting CR number) DS Downstream ET Eddy Current Examination EVAL Evaluation FAC Flow-Accelerated Corrosion (may also be referred to as "erosion/corrosion") FB Flange Bolting FNR FAC Notification Report FW Feedwater System FSAR VEGP Final Safety Analysis Report (includes updates thereto) GEO Geometric Indications GPC Georgia Power Company HHSI High Head Safety Injection HL Hanger Lug HX Heat Exchanger HYD Hydraulic Snubber IEN NRC Information Notice (may also be shown as "IN" followed by unique no. denoting notice number) IND Indication INF Indication Notification Form ISI Inservice Inspection IST Inservice Testing ITS VEGP Improved Technical Specification ID Inside Diameter IR Inside Radius LB Large Bore LD Longitudinal Seam Weld Extending Downstream LD-I Longitudinal Seam Weld Downstream Inside of Elbow LMT Lambert, MacGill and Thomas LU Longitudinal Seam Weld Extending Upstream LU-O Longitudinal Seam Weld Upstream on Outside of Elbow MECH Mechanical Snubber MS Main Steam System MT Magnetic Particle Examination NCI Nonconformance Item NDE Nondestructive Examination ii

LIST OF ABBREVIATIONS - (continued) NI No Indication NRC United States Nuclear Regulatory Commission NRC-B NRC Bulletin (followed by unique no. denoting Bulletin number) NRI No Recordable Indication NSCW Nuclear Service Cooling Water System OR Outside Radius PL Pipe Lug PM Paul-Munroe ENERTECH PR Pipe Restraint PROF Profile PS Pipe Support PSA Pacific Scientific PSI Preservice Inspection PT Liquid Penetrant Examination RCS Reactor Coolant System RCP Reactor Coolant Pump RHR Residual Heat Removal System RI Recordable Indication RLW Refracted Longitudinal Wave RL Restraint Lug RPV Reactor Pressure Vessel RR Relief Request (followed by unique no. denoting relief request number) RWST Refueling Water Storage Tank SAT Satisfactory Examination Results SB Small Bore SCS Southern Company Services SI Safety Injection System SSI Sonics Systems International SNC Southern Nuclear Operating Company SUP Supplemental Data T&C Thickness and Contour TDAFW Turbine Driven Auxiliary Feedwater (Pump) UNSAT Unsatisfactory Examination Results US Upstream UT Ultrasonic Examination VEGP Vogtle Electric Generating Plant (common unless followed by "-1" or "-2" to designate a specific plant unit) VT Visual Examination W Westinghouse iii

INTRODUCTION This report documents the examinations and tests performed at Vogtle Electric Generating Plant, Unit 2 (VEGP-2) and between May 1,2001 (date of last examination performed during the eighth maintenance/refueling outage, 2R8) ninth maintenance/refueling outage, 2R9) to November 11, 2002 (date of last examination performed during the Boiler and meet the requirements of Article IWA-6000 of the American Society of Mechanical Engineers (ASME) Pressure Vessel Code, Section XI, 1989 Edition (Code). In addition, a summary of the following augmented examinations are included in this report:

    "* VEGP Technical Specification 5.5.9 - Steam Generator Tube Inspections,
    "* VEGP Technical Specification 5.5.16 - Main Steam'and Feedwater Volumetric Examinations,
    "* VEGP Technical Requirement 13.7.2 - Snubber Visual Inspections and Functional Tests,
    "     Westinghouse WCAP No. 12907 - "Alloy 600 PWSCC Susceptibility Assessement of Vogtle Unit 1 and 2 Primary Components".

since the last This report also addresses Code-applicable repairs and/or replacements, which were documented the completion of the ninth maintenance/refueling outage in maintenance/refueling outage at VEGP-2 through for Repairs and Replacements (Form NIS-2) are included herein. November 2002. The Owner's Reports associated with In addition to the list of "augmented" examinations provided above, Class MC and CC components ninth maintenance/refueling outage and are documented in this report. containment were also examined during the in accordance with the requirements of the 1992 Edition of ASME The MC and CC components were examined by 10 CFR 50.55a) except where relief has been granted by the NRC. Section XI with 1992 Addenda (as amended was performed in response to the rulemaking to 10 CFR 50.55a that The examination of MC and CC components became effective September 9, 1996 (Ref: FederalRegister Notice 61 FR 41303). 1-1

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner: Georgia Power Company, 241 Ralph McGill Blvd., N. E.

P. 0. Box 4545, Atlanta, Georgia 30308-3374

2. Plant: Vogtle Electric Generating Plant, 7821 River Road P. 0. Box 1600, Waynesboro, Georgia 30830
3. Plant Unit: Two
4. Owner Certification of Authorization: N/A
5. Commercial Service Date: 05/20/89
6. National Board Number for Unit: N/A
7. Components Inspected:

Component or Manufacturer or Manufacturer or Installer State or Province National Board Appurtenance Installer and Address Serial Number Number Number Reactor Combustion Eng. 7372 N/A 22004 Pressure Vessel Inc., Chattanooga, TN Steam Westinghouse Elec., GBGT 1884 (77743), N/A 36, Generators 1 Pensacola, FL GBGT 1881 (77744) 33 K,... and 4 Pressurizer Westinghouse Elec., 77749 N/A 24 Pensacola, FL Reactor Coolant Westinghouse Elec., 5-9744D35G01 N/A 37 Pump 4 Cheswick, PA Residual Heat Joseph Oat Corp., 2322-2D N/A 1051 Removal Heat Camden, NJ Exchanger, Train "B" Selected Piping, Pullman Power System Numbers 1201, 1202, N/A N/A Components, Products, 1204, 1205, 1206, 1208, and Supports Williamsport, PA 1301, 1302, 1305, & 1501. 2-1

FORM NIS-1 (Back)

8. Examination Dates: May 1.2001 to November 11, 2002
9. Inspection Period Identification: Second Period
10. Inspection Interval Identification: Second Inspection Interval
11. Applicable Edition of Section XI 1989 Addenda None
12. Date/Revision of Inspection Plan: October 23, 2001 / Revision 5, Including Scope Changes SC 1 & 2
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. (See Abstract and Examination Summary Listings)
14. Abstract of Results of Examinations and Tests. (See Abstract)
15. Abstract of Corrective Measures. (See Abstract)

We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI. Certificate of Authorization No. (if applicable) N/A Expiration Date N/A Date: 0/Z 25' 20_3 Signed: Southern Nuclear Operating By: Company, Inc. for Georgia Power Company Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Georgia and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period May 1, 2001 to November 11, 2002, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or onnected with this inspection. Inor Commission: rvA ;7o3 Inspector*s Signature National Board, State, Province, and Endorsements Date: /- '20-, 2-2

ABSTRACT - ASME CLASS I AND 2 Introduction/Status for conducting The ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition (Code), is the applicable code during the second ten-year inspection interval at VEGP-2. Examinations and tests inservice inspection activities paragraphs IWB required by the Code are scheduled in accordance with "Inspection Program B" as defined in Code period 2412 and IWC-2412. This "Owner's Report for Inservice Inspection" is for those second inspection performed during the examinations and tests which were performed between May 1, 2001 (date of last examination performed during the eighth maintenance/refueling outage, 2R8) and November 11, 2002 (date of last examination ninth maintenance/refueling outage, 2R9) Implementation of By FederalRegister Notice 64 FR 51370 dated September 22, 1999, 10CFR 50.55a(g)(6)(ii)(C), of Appendix VIII. The Appendix VIII to Section XI, was incorporated into the rule to expedite implementation Vessel Code, 1995 Edition with specific Supplements of Appendix VIII to Section XI, ASME Boiler and Pressure the 1996 Addenda were implemented prior to the 2R9 maintenance/refueling outage as required. repairs and In addition to the summary of inservice inspection activities, this report addresses Code-applicable the end of 2R9. The Owner's Reports for Repairs or replacements documented at VEGP-2 since 2R8 through Replacements (Form NIS-2) are provided herein. provided for those It should be noted that Authorized Nuclear Inservice Inspector (ANII) inspection services were ASME Section XI examinations and tests are itemized in the examinations and tests required by the Code. Category. Examinations which do not meet the Code-required applicable sections by reference to Examination coverage either reference request(s) for relief or indicate that additional relief is required. Class I Examinations personnel utilizing Selected Class I components were examined by Southem Nuclear Operating Company (SNC) testing (VT) methods, ultrasonic testing (UT), dye penetrant testing (PT), magnetic particle testing (MT), and visual of this document. as applicable. Specific components and examination areas are itemized in the applicable portions A summary of those components examined are listed below:

      "*  Reactor Pressure Vessel (RPV) Closure Head and Interior Surfaces,
      "*  RPV Closure Head Studs, Nuts and Washers,
      "*  RPV Flange Ligaments,
      "*  Reactor Coolant Pump Bolts,
      "*  Steam Generator Primary Nozzle Inner Radii,
      "*  Pressurizer Nozzle Welds and Inner Radii, and
      "*  Valve and Piping Flange Bolting.

to have either During the scope of VEGP-2 examinations conducted, no Class I components were observed in one Class I component having unacceptable reportable UT, PT, or MT indications. Visual examinations resulted conditions as follows: FB). During visual Safety Injection System Piping Line 076 - 3" Flange Bolting 32B FB (21204-076-32B to INF I02V2002 located in this report for resolution. examination, evidence of "past leakage" was noted Refer 5.5.9, The Eddy Current (ET) examinations of steam generator tubing, as required bý, VEGP Technical Specification Inspections" portion of this document. were performed by Westinghouse and are discussed in the "Augmented 2-3

Class 1 Pressure Test Table IWB-2500-1, Examination Category B-P, of ASME Section XI requires the performance of a system leakage test (IWB-5221) each refueling outage. This system leakage test (LT-l) was performed prior to plant startup following the refueling outage. These visual examinations revealed minor boron residue at mechanical connections, which were considered acceptable for continued system operation, and one leak at a valve body to bonnet seal weld. The body to bonnet seal weld on valve 21208U4033 was observed leaking. This valve had been disassembled during the 2R9 refueling outage. The valve body to bonnet seal weld was repaired and subsequently VT-2 examined and found acceptable. ASME Section XI, Subparagraph IWA-5242(a) requires removal of insulation from pressure-retaining bolted connections for VT-2 examination during system pressure testing for systems borated for the purposes of controlling reactivity. Relief was requested from this Code requirement and subsequently approved as documented by NRC letters dated October 24, 1997, for Class I components and December 31,1998, for Class 2 and 3 components. The approved alternative allows insulation to be removed while the connections are at atmospheric or static pressures. With the insulation removed a direct visual examination is performed to detect previously occurring leakage through the presence of boric acid crystals. The test boundary of the system leakage test includes both Class I and Class 2 components. The Class 2 components comprise part of the reactor coolant pressure boundary but are not required to be classified as Class I per IOCFR50.55a(c)(2). The frequency for removal of insulation and direct visual examination for Class I pressure retaining bolted connections is once each refueling outage (refer to Table IWB-2500-1, Examination Category B-P) and as such those activities occurred during the refueling outage. The frequency for removal of insulation and direct visual examination for Class 2 pressure-retaining bolted connections is once each inspection period (refer to Table IWC-2500-1, Examination Category C-H). For the "secondinspection period those activities occurred either before or during the 2R9 refueling outage. Those activities performed prior to the outage were performed with the components at nominal operating pressure. Those activities performed during the outage occurred while the components were at atmospheric or static pressures. Class 2 Examinations Selected Class 2 components were examined utilizing MT, PT, and UT, as applicable. Specific components and examination areas are itemized in the applicable portions of this report document. A summary of those components examined are listed below:

      "* Steam Generator 4 Shell Welds and Integral Attachments,
      "* Residual Heat Removal Heat Exchanger Shell Welds, and
      "* Piping Welds.

During the scope of VEGP-2 manual examinations conducted, no Class 2 components were observed to have either reportable UT, PT, MT indications. In addition to components already identified in current requests for relief, one (1) equipment weld had limited of volumetric coverage during UT examinations because of physical limitations due to the geometric configuration in ASME the welded areas. More than ninety percent (90%) of the required volume must be examined as addressed attained. Section XI Code Case N-460 for adequate ASME Section XI Code-required examination coverage to be As noted herein, the subject code case has been approved by the NRC for use as documented in NRC Regulatory Guide 1.147. It is impractical to achieve the ASME Section XI Code-required coverage due to the geometric "configurationof the welded areas. Relief from the ASME Section XI Code requirements will be requested from the welds NRC for the affected welds through the relief request process as allowed by 10 CFR 50.55a. The applicable are indicated by "Relief Required" in the Class 2 weld tables. 2-4

Class 2 Pressure Tests pressure testing each inspection ASME Section X1, Table IWC-2500-1, Examination Category C-H requires system are itemized in the "Pressure Tests" portion of this report period. The specific system pressure tests performed during these system pressure tests found only minor leakage at document. The visual examinations performed and at flanged connections. These leaks were either corrected or mechanical joints such as valve stem packing evaluated and determined acceptable for continued system operation. pressure-retaining bolted ASME Section XI, Subparagraph IWA-5242(a) requires removal of insulation from pressure testing for systems borated for the purposes of controlling connections for VT-2 examination during system requirement and subsequently approved as documented by NRC reactivity. Relief was requested from this Code and December 31,1998, for Class 2 and 3 components. The letters dated October 24, 1997, for Class I components removed while the connections are at atmospheric or static pressures. approved alternative allows insulation to be examination is performed to detect previously occurring leakage through With the insulation removed a direct visual alternative was implemented on applicable pressure-retaining the presence of boric acid crystals. This approved test pressure. bolted connections that were not uninsulated and examined while at the Code required Class 1 and 2 Component Supports components: Visual examinations were performed on supports for the following Class I and 2

  "*   Reactor Coolant System Equipment and Piping (1201),
  "*   Nuclear Service Cooling Water Piping (1202),
  "*   Safety Injection System Equipment and Piping (1204),
  "*   Residual Heat Removal System Equipment and Piping (1205),
  "*   Containment Spray System Piping (!206),
  "*   Chemical and Volume Control System Equipment and Piping (1208),
  "*   Auxiliary Feedwater System Piping (1302),
  "*   Feedwater System Piping (1305), and
   "*  Containment Heat Removal System Piping (1501)

The visual examinations resulted in no supports having unacceptable conditions. 2-5

ASME CLASS 3. MC AND CC EXAMINATIONS AND TESTS Class 3 Supports and Integral Attachments Visual examinations were performed on the supports and/or the integral attachments for the Class 3 components listed below:

   "*  Nuclear Service Cooling Water Piping (1202),
   "*   Component Cooling Water System Equipment (1203),
   "*   Spent Fuel Pit Heat Exchanger System Equipment and Piping (1213),
   "*   Auxiliary Feedwater System Piping (1302), and
   "*   ESF Chilled Water System Equipment (1592).

The visual examinations resulted in no supports having unacceptable conditions. Class 3 Pressure Tests ASME Section XI, Table IWD-2500-1, Examination Categories D-A, D-B, and D-C require system pressure testing each inspection period. The specific system pressure tests performed are ifemized in the "Pressure Tests" portion of this report document. The visual examinations performed during these system pressure tests found only minor leakage at mechanical joints such as valve stem packing and at flanged connections. These leaks were eiler corrected or evaluated and determined acceptable for continued system operation. ASME Section XI, Subparagraph IWA-5242(a) requires removal of insulation from pressure-retaining bolted connections for VT-2 examination during system pressure testing fcr systems borated for the purposes of controlling reactivity. Relief was requested from this Code requirement and subsequently approved as documented by NRC letters dated October 24, 1997, for Class I components and December 31,1998, for Class 2 and 3 conponents. The approved alternative allows insulation to be removed while the connections are at atmospheric or static pressures. With the insulation removed a direct visual examination is performed to detect previously occurring leakage through the presence of boric acid crystals. This approved alternative was implemented on applicable pressure-retaining bolted connections that were not uninsulated and examined while at the Code required test pressure. Class MC Containment Examinations and Tests OWE) Category E-A, Containment Surfaces During the VEGP-2 Fall 2002 maintenance/refueling outage, containment examinations were performed in response to the NRC rulemaking to 10 CFR 50.55a in which the requirements of Subsections IWE and IWL to the 1992 Edition of ASME Section XI with 1992 Addenda were invoked. VT-3 examinations were attempted for each of the Residual Heat Removal and Containment Spray sumps. A 4" ring of metal Containment pressure boundary surrounds the process pipe and is flush with the bottom of these sumps. This surface is normally inaccessible due to obstruction by permanent plant equipment (the concentric sump cages and mesh screens). During 2R9, the tops of the sump cages were removed to perform a modification of the sump cage bolting (MlVOs 20201377 through 20201380). As the Containment pressure boundary may have then become visually accessible due to this work, a VT3 visual examination was attempted of each sump. However, as documented by QC Inspection Reports 26305 through 26308 (ASME Test Verification Forms 02083 through 02086 respectively) the ring could not be visually examined due to metal grating that covers the bottom of the sumps, including the metal ring, within the inner cage. This area remains inaccessible. The areas of bare metal caused by rubbing Containment lighting equipment identification tags identified by Containment Liner General Visual Examination Anomaly Data Sheets 99R-3-4 and 99-R-3-5 were cleaned and coated during 2R9 to prevent future degradation. MWO 20101615 documented this work. Four of the 32 identified anomalies were found to be surface stains only during cleaning. The remaining 28 locations were coated using the VEGP qualified coating system. As the surface preparation and film thickness could not be verified 3-1

due to the physical location (Containment dome above the polar crane), the 15.5 square feet of coatings applied were unqualified. A VT-3 visual examination (ATVF 02064 and QC Inspection Report 23597) was performed to document the preservice condition ofthe newly applied coatings. The areas identified by 99-R-3-4 and 99-R-3-5 have been coated satisfactorily and no anomalies were identified by the preservice examination. Optical aids such as flashlights and binoculars were used when performing the visualexaminations that included both direct and indirect, i.e., remote, visual examination methods. Category E-B, Pressure-Retaining Welds The rulemaking contains a modification that makes examinations of Subsection IWE, Category EB optional. SNC has chosen to not examine category E-B welds at VEGP. Category E-C. Containment Surfaces Requiring Augmented Examination Any surface areas likely to experience accelerated degradation and aging, should such areas exist, need to be identified. Such areas (if identified) require the performance of augmented examinations as defined in Examination Category E-C. There are no existing areas in VEGP-2 requiring Category E-C examination. Category E-D, Seals, Gaskets, and Moisture Barriers SNC has chosen to implement Request for Relief (RR)-E-1 to allow leak tightness to be verified by 10 CFR 50, Appendix J Type B testing (LLRT). The NRC approved SNC's use of RR-E-1 in its June 16, 2000, letter to SNC. The Type B test results, along with the Type A and Type C test results, are maintained at the plant site per 10 CFR 50 Appendix J Option B and are available for review upon request. Category E-F. Pressure-Retaining Dissimilar Metal Welds The rulemaking contains a modification that makes examinations of Subsection IWE,Category E-F optional. SNC has chosen to not examine category &-F welds at VEGP. Category E-G, Pressure-Retaining Bolting One hundred percent (100%) of the accessible pressure-retaining bolting (bolts and studs) are required to be examined during the interval using a VT-1 visual examination method. No VT-1 examinations of the accessible containment boundary and pressure-retaining bolting for electrical penetrations were scheduled or performed during 2R9. One hundred percent (100%) of the pressure retaining bolting within the scope of IWE that was disassembled during 2R9 was examined. Penetrations 5, 55 and 90 were disassembled during the course of the outage. The bolting and sealing surfaces of each penetration were visually examined (VT-1) upon reassembly under MWO #20102488. All examinations of these mechanical penetrations were completed with satisfactory results. Class CC Containment Examinations and Tests (IWL) No Class CC examinations or tests were performed during VEGP-2 Maintenance/Refueling Outage 2R9. 3-2

AUGMENTED INSPECTIONS VEGP Technical Requirements Manual - TR 13.7.2 Snubbers Visual Inspections VEGP Technical Requirements Manual (TRM), Technical Requirement (TR) 13.7.2, and Technical Requirement Surveillance (TRS) 13.7.2.1 requires each snubber to be visually inspected. During the VEGP-2 seventh maintenance/refueling outage (2R7), one (I) of the snubbers that comprise the total snubber population was found to have unsatisfactory visual inspection results. Based upon Tables 13.7.2-1 and 13.7.2-2, Note 3 in the VEGP TRM, the next inspection interval may be twice the previous interval, i.e., 36 months vs. 18 months, but not exceed 48 months. Therefore, a visual inspection of snubbers was not required during the eighth VEGl12 maintenance/refueling outage (2R8). The next TRM Visual Inspection was performed during the ninth maintenance/refueling outage (2R9) at VEGP-2 per TR 13.7.2, Table 13.7.2-2, Note 3. No snubbers inspected were found to have unsatisfactory conditions. The visual inpections did reveal sixteen (16) degraded conditions such as rusted spherical bearings. These conditions were evaluated and determined not to adversely affect operability; however, appropriate corrective actions were taken to correct the degraded conditims. In addition, two (2) restraints were found to have rotated pipe clamps, though no indications of damage to the snubbers were present. These snubbers were removed, satisfactorily functionally tested, and replaced with spare snubbers to ensure operabilty. Since there were no visual failures identified during 2R9 among the eighteen (18) degraded conditions discovered, the next TRM Visual Inspections shall be conducted during the eleventh maintenance/refueling outage (2R1 1) at VEGP-2 per TR 13.7.2, Table 13.7.2-2, Note 3. Functional Testine VEGP TR 13.7.2, TRS 13.7.2.3 also requires functional testing of snubbers. The snubbers were categorized into six types as follows: Type I Pacific-Scientific mechanical snubbers (Models PSA-1/4 and PSA- 1/2) Type II Pacific-Scientific mechanical snubbers (Models PSA-l, PSA-3, and PSA-10) Type III Pacific-Scientific mechanical snubbers (Model PSA-35 and PSA-100) Type IV Anchor/Darling mechanical snubbers (Model series AD-40 through AD-500) Type V Anchor/Darling mechanical snubbers (Model series AD-1600 through AD-12500) Type VI Paul-Munroe ENERTECH 1000 kip steam generator hydraulic snubbers. Each snubber type was functionally tested utilizing a test plan (as detailed in VEGP TRS 13.7.2.3 in accordance with Table 13.7.2-4) which requires that an initial representative random sample often percent (10%) of the population to be functionally tested. Given that a snubber of a certain type did not meet the appropriate acceptance criteria when tested, an additional five percent (5%) of that type snubber would be tested until no more failures were found or until all snubbers of that type were tested. In addition, snubbers may be functionally tested as part of an augmented scope that are in a similar plant location or a tandem partner to a failed snubber. Augmented scope snubbers may also include those identified during the TRM Visual Inspections to have degraded conditions that could potentially affect operability of the component. The specific Types I through VI snmtbers that were functionally tested in response to VEGP TR 13.7.2 are itemized in the Snubber Functional Testing Listings of this report document. The result of the functional testing of the snubber types is as follows: 4-1

Snubber Type I II III IV V VI Total Total Population 21 59 26 236 111 8 461 10% Initial Representative Sample 3 6 3 24 12 1 49 Quantity Failed in Previous Outage 0 1 0 0 2 0 3 Total Original Outage Test Scope 3 7 3 24 14 1 52 Total Tested Which Passed Acceptance Criteria 3 7 3 24 14 1 52 Total Tested Which Failed Acceptance Criteria 0 0 0 0 0 0 0 Expanded or Augmented Snubbers Tested during 0 1 0 0 0 0 1 Outage (Details Provided Below) __ __ _8 _t _2 _ 14 1_53 Total Tested 3 8 3 24 14 1 53 Augmented Snubber Tested During 2R9 Type II During the TRM Visual Inspections, a rotated pipe clamp was noted at 21203-021-11006. The snubber was removed and functionally tested to prove operability. The functional test results for the PSA-3 were satisfactory. Type IV A rotated pipe clamp was also discovered at 21202-004-H056 (AD-1601) during the TRM Visual Inspections. The snubber was already selected to be tested and replaced as part of the original functional test scope. Functional Test Failure Analysis In accordance with VEGP TR 13.7.2, Table 13.7.2-4, paragraph 4, engineering evaluations are to be performed for any snubber functionally tested that fails to meet the appropriate acceptance criteria. Since no failures were experienced, no engineering evaluations were required. 2R9 Snubber Reduction Scope Per DCP 00-V2N0002 It should be noted that nine (9) snubbers were deleted, while twentyeight (28) snubbers were deleted and replaced with rigid struts per Design Change Package (DCP) 00-V2N0002 during 2R9. The ISI Plan document will be revised to reflect these changes. The population of Unit 2 snubbers will change from 461 snubbers to 424 snubbers for 2RI0. The following listing includes all snubbers affected by DCP 00-V2N0002 during 2R9. Type I Not within scope of DCP 00-V2N0002 Type II Snubber Deleted and Replaced With Rigid Strut: 21305-061-11004 Type III Snubbers Deleted: 21305-056-H004 T & B Snubber Deleted and Replaced With Rigid Strut: 21305-061-H001 Type IV Snubbers Deleted: 21301-010-H040 T & B 21301-012-HO13 N & S 21301-012-H020 21301-118-HOII 21301-126-H034 Snubbers Deleted and Replaced With Rigid Struts: 21301-010-H039 21301-108-1-1003 21301-109-H003 21301-110-H003 4-2

21301-11 -H003 21301-120-H008 21301-120-H010 21301-126-H024 21301-126-H029 21301-128-H006 21301-128-H078 T & B 21301-128-H080 21301-128-H096 21301-128-H102 21301-191-H005 21301-213-HOOI 21302-110-H014 21302-110-H015 21302-110-H016 21322-052-H025 22402-022-HOO1 22402-024-HOO1 22402-024-H005 22402-025-H003 Type V Snubber Deleted and Replaced With Rigid Strut: 21305-061--H005 Type VI Not within scope of DCP 00-V2N0002 VEGP Technical Specification 5.5.16 - Main Steam and Feedwater Volumetric Examinations In accordance with VEGP Technical Specification 5.5.16, four Main Steam welds and five Main Feedwater welds located from the containment penetration flued head outboard welds to the first five way restraint were ultrasonically examined. No reportable indications were observed. The examinations are itemized in the Class 2 Piping section of this report. Westinghouse WCAP No. 12907 - "Alloy 600 PWSCC Susceptibility Assessment of Vogtle Unit 1 and 2 Primary Components" In accordance with recommendations found in Section 6 of Westinghouse WCAP No. 12907, a visual examination was performed on the channel head partition plate on Steam Generator 1. No reportable indications were observed. The specific welds examined are itemized with the Class I equipment welds. Technical Specification 5.5.9 - Steam Generator Tube Inspections NOTE The following discussion on the steam generator tubing inspections, in addition to fulfilling the reporting requirements of ASME Section XI for Inservice Inspection activities, constitutes the report required by VEGP Technical Specification 5.6.10.b to be submitted to the NRC within twelve (12) months following completion of the steam generator tube inspections. Accordingly, a separate submittal is not being made to the NRC on the inspection of the steam generator tubes performed during the ninth maintenance/refueling outage (2R9) at VEGP-2. 4-3

Introduction During 2R9, the Steam Generator Maintenance Services Group of the Westinghouse Nuclear Services Division performed eddy current testing of two (2) Westinghouse Model F steam generators (SGs), numbers I and 4, in parallel from October 9, 2002 to October 20th, 2002. At the start of 2R9 each generator had 5626 tubes with four (4) plugged tubes in SG I and seventeen (17) plugged tubes in SG 4. The inspection scope for SGs 1 and 4 follows:

  • 100% full length bobbin (except for Rows I and 2, which are inspected from tube end to TSP#7 from both HL and CL U-bends)
  • Hot leg TTS, +/- 3", mid-range +Point examination of SGs I and 4: 50% including any tubes not examined in 2R7.

6 Small radius (Row 1 and Row 2) U-bend +Point (mid-range and/or combination high frequency/mid-range) examination of SGs 1 and 4: 60% - include any tubes not inspected in 2R7 0 Special interest, mid-range +Point tests at hot leg and cold leg bobbin possible flaw locations (including U-bends), 100% of the U-bend dents > 5 volts (by bobbin), mid-range +Point,

  • Visual inspection of tube plugs In addition to the above 2R9 data collected, a review was performed of all 2R7 Bobbin data for SG 1 and 4 to look for an artifact that indicated susceptibility to SCC found at Seabrook. There were no similar indications found in the Vogtle Unit 2 Bobbin data for SGs I and 4.

This report satisfies the 12-month NRC report required by VEGP Technical Specification 5.6.10.b, in addition to fulfilling the ASME Section XI report for Inservice Inspection activities. Note that personnel qualifications, test equipment certifications, and calibration data are not in this report, but are contained in the Westinghouse Electric Company, Nuclear Service Division, Steam Generator Maintenance Services Field Service Report, MRS-FSR-1 187 GBE "Steam Generator Eddy Current Inspection ". That report is available at the plant site for review upon request. Tube Inspection Plan Steam generator tube inspections conducted during 2R9 met or exceeded tie recommendations made in the EPRI report TR-107569-VlR5, "PWR Steam Generator Examination Guidelines", which were adopted by SNC, for steam generator tube inspections.. The VEGP inspection plan requires that 100% of the tube population be inspected from two steam generators each outage in which steam generator tubing inspections are performed rather than twenty percent (20%) of the tube population from four steam generators each cycle or forty percent (40%) of the tube population from two steam generatots each cycle. The Eddy Current inspection program was conducted in accordance with Westinghouse Field Procedure MRS 2.4.2 GPC-3 Rev. 10, "Eddy Current Inspection of Preservice and Inservice Heat Exchanger Tubing." Inspection probes used were in accordance with Probe Authorization Rev. 0. The test configurations and acquisition rates were in accordance with the Eddy Current Acquisition Technique Sheets (ACTS). 4-4

Data Evaluation Data collection was performed by Westinghouse using the ROSA and TC6700 tester. Data was sent from the site via a T-1 line in the ANSER software format to the Westinghouse Waltz Mill, Pennsylvania facility. Westinghouse and its subcontractors performed the primary analysis of the eddy current data using Automated Data Screening(ADS) and ST2000 software for Data Management. Zetec performed the secondary analysis of the eddy current data at their Issaquah, Washington facility. Resolutions were performed jointly by Westinghouse and Zetec at the Vogtle site. In addition, a SNC Level III was located at the Vogtle site to facilitate the resolution of eddy current data and to perform the duties of the independent qualified data analyst (QDA). All analysis was performed using ANSER software. SNC site-specific Data Analysis Guidelines and procedure MRS 2.4.2 GPC-37, Rev. 8, "Steam Generator Eddy Current Data Analysis Techniques for Vogtle Units I and 2", were used to perform the analysis. Tube Wear Tables I and 2 list the location and percent through-wall of all tubes identified as having indications during the 2R9 inspection. Tube Pluzzine Two plugs were installed in SG 4 during 2119. The first tube plugged ( Row 43, Column 83) was required due to a 45% wear indication and the second tube (Row 44, Column 48) was administrativelyplugged with a 39% indication. Mechanical tube plugging was performed in accordance with Westinghouse Field Procedure MRS 2.3.2 GPG13 Rev. 2, "Mechanical Plugging of Steam Generator Tubes With ROSA IIITM.'" Pursuant to Vogtle Technical Specification 5.6.10.a, a 15-day report was submitted to the NRC and identified the number of steam generator tubes plugged during 2R9. The subject report was submitted to the NRC by SNC letter LCV-1640 dated October 31, 2002. Final Results Anti-Vibration Bar (AVB) wear is the only systematic degradation mechanism that was observed during 2R9. Based on application of conservative prior AVB wear growth rates, the condition of the SG 1 and 4 tubes ha been analyzed with respect to continued operability of the SGs until the end of Cycle (EOC) 11, without exceeding the structural integrity recommendations of draft NRC Regulatory Guide 1.121. Conservative projection of the AVB wear inSGs 1 and 4 to EOC I1indicates that all structural criteria will continue to be satisfied until the next planned inspection at 2R11. Similarly, based on the current data from 2R9 and from 2R8, projections for SGs 2 and 3 to EOC1O indibate that all structural criteria will continue to be satisfied for these SGs until their next inspection at 2R10. 4-5

( ( i . S- .= *'1 % = I,* 3! 44 W9.. i--i-.lm .- '--a-, S I..

                                                                                                                                                                                                                .4 "I.      .4.4   macpe em                            0    e       ft N -     %-
  • U as '.4 I-I I

MUM=.. 44 £4.

                                                                                                                                                           -I.."

Ii

                          .4" 600             Wm*                                            we
                                                                                                                                        ,b       00e4 4
                                                                                                                                                                         %RW      WO
                   *4      .4.4 W*4.4.44UW444***                                        r.alr 2-0;:.4*4        =;N uua                63                                    U.                S.                                                                                                                            a AA1. ZZNi 9..-'-             U                                                                                                                    zz23
                                                                 .4.4              .4.4 Is    bI        0 w0                CCI'                                                                                                                          0 I

4*49. il-l-M lat 11 ma-LL. a *I*Y hi. U

                                                                                                                                                                                                                  .4 94*l.4.
                                                                                                                                                                                                            *4 01 4.4.

4- no 01 4-em.in 1=1. K W,.

                                                                                                                                        .. z !                :z    z:             I
IK 22 . ii .  : ...: ...:? .:2
                                                                                                     .4.4-4.44-4M "eqP9
                                                                                                      =3=

p.

                                                                                                                   =     3301                              nalf Nllff no                      non PA           NAA           anR"PC
                                                                                                     ""-4-4"4.444H44.

it 51 mgmg kkEII~ .4j*.44 a

                                                                                                                                                                                                             *4 a

40161 ' fno go a0 WO 00, ~ u ~ h .4

                                          ""a                    O'Q'b             we                                                                                                                        I" a-Inn2
                                                                                                     ""Dowfnninom                                                         nnflfilgnl onoo9E            on          onn                   omnn,         "m   i   n

( (..

                                    - ------ - --------                                                                                ""9.4 4-'        4 4~-P4
                                       %;      4.
62" v:U c s s am t
                                                                                        -. 5-e emnn..

00mm:

                                                                                                 %%%%S.S.=S.S.                   ISM          a5        S
                   'b-AH,            IScMe     m  M      inm    SE      ISa-                            tPfl
                                                                                                                                       'z   ."      am      e zzmzz.z.                                   Z--Z-       a   *WCW*WC*m                                                        eec mu         me ecu me 4      9
  • U.
  • n.

99S99aak9IQ

  • 4
xC ~ttt + 4 44 k i6 a- 61!

4 4 000 OO CE 0m 0 mmcc 00*o&=. UA U43. mA4a -AIBR *aa4 - 14 ea 3

                                                                 *e     t re                                                                                               4      4 144 a-a-.       - r.
  • U a 4 4.

4 4.

  • 5.4
                                                                   -4                                  MI                -M            Mi        11ag            Av        ii 4 OF
4. 4.
                                                                                                                                                                            * -a.
                                                                                                                                                                            *=      C 4 4.
  • faa
                                                                                                                                                                           ** U,    *
                                                                                                                                                                               -4 a
  • 4 non.

gga

  • a,, .

ag g 4 - 9 -9 -9 - A40 gg4.4 g4m4.A.9 f.4-am094 14..4.1.4 -4.4.

  • za
                              'RSS09SRoowM"         rbn         n2no 'a                 on     On6n          n        V    on          RON1      93;A            Nnon E;Imcmmm I511E1                                *       ~           EEI
                                                                             @g~afC IEWE111IE 0~C                                                  1                 IN
                                                                                                                                                                            . a a 4

a

                                                                                                                                                                                       .9
                                                                                                                                                                            * .v.
  • 9
                                                                       *0 T                                    Z-    401                                         a a au C

a.. a a a non .44a a- a noonno nnnon2 oft' aRow2 no -- "noo no an~n~nOnfl no -------------------- - ----nOOO 600"m M00066

4~--------------

.Vo M M toe 0mW"f `0 O

00em0 me

                                *           *~   C~M 4C woemw" CCNM fl weZ,,- cess*p CMCNMNN0M                   m
                                                                                                             ~~         M a;;:;   !;

teem w MMN40M -

                                                                                                                                                                    ; sseae z305t'J-oz zc-MN4I;;Mi;;
                                                                                                                                                                                    -   -M      M - ~ NMp !!m;~ ;g
                                                                                                                                                                                                        -                           tW2 em.....t~a             U....:              9n.

em*!mý

                                                                                                                                                     ------------------------------------------------------                   3b 0                                                om         94~tt 0+/-tt0                                                                     595        ftt N.cbf         mEWWWmoqc                                          0       min@
                                                                 $                                                                                                                                                                        -4 005         - 04   ~                  to      -     .      0A          C                       0        O                            44    4       -40
                                                                ýjo~~                          ---        a         . 0   .                           ,-4            1s                                                        .J~

0-4ý~ ~ ~ oq~ . ~ 4 ~ && ~ aOes ~ o a~ 04W ~ D(

                                                                                                                                                                                   &4             ~          ~               0 4                                                                                          *m                -0
       .f.bu~.4in5n0                             nu          se                m   ame*.                  ud4                      m
  • cuc m :1 4Y 4.C, N .4I ?1 p ZN11 1 0 5
                                                      .I954z                                              1*-110 44 ow                                                                                                                                                                                                       .0.
                                                                                                                                                   ,         N            aODD6*-6                  ý,64      6    6.           ,           N 04"g
                                                                                                                                                                                                                          . r, 2.

of-aeN M0944 *0q 0* p.4 9--. 4- sWI 4 - N1 -4 Opt-o21 NN&4021 s'OZp N4 ;14Uflh.'- .4-0 &4 4 Ii...

     .s .    . ae.. ..   ..      z.,.                                        .    . .t .~.05. .4 gptm403    cm    p  6"P,              +vc 13                   03    1F;F                    -H mm..      n~P9nnl9m           6i9M      i3cCmm             0      MmN1if ftM                              St.

r#6-uOnI~sP. om1ri- 94h955115Y m'iinonfl - mqin Otnrfi

  - - - - - - - -S mmmOnctcnx99
                           - - - - - -           - - -    - - - - -          - -    - - - - - - - - - -                2            - - - - - - - - - - - - - - - -h-- - - - - - - - - - - - - - - -

2 1--

.an: ~ ~ am Z"'z. SEA11;
j. **

4 ztz Tz 4;~ 4: Z;4a 4+7 4 emm

                       -4a44        se tO 1)lW 4L#44              ,   p#U
                                    ~

4~~~~ ~~ m4 tp 0Smwwt m4  %, sW 4,asal t on uao m Me am tme 40. t -It a t-t -4+ tt.4

                                .4..~~

U0NJ~44 tW~t0

                                               ~      tat I-MOOne~ttW ISA uU CU!      te 4NH.

mmci'tI W, as t nt

                                                                                                                      )a    ~ I
                                                                                               -     g  -4        4g      4 tetY)      ;      ;,n non.,                            mm g,      T g-4 44     .o. 6    2 tifilO      f~fuif                  Onno0         non                    noflj                   0.20f
           . .9
        ." 4         .1.  .9 .4 .4.M .4.       . .4.4.-.

44 41- NOVkrlr g5 V.Md ej thmt ' am h4 a a .4 4t4.C.x_ *n on.4 =_ n- no4 x nn on

Augmented ASME Sect. XI Examination Component or Weld No./ Exam Calibration Exam Item No./Cat. Requirement Description Procedure Block(s) Sheet No(s). Results Remarks See Note A See Note B See Note C See Note D See Note E See Note F See Note G See Note H NOTES: A. The ASME Section XI Item No. and Category of the examinaion area are listed in this column. B. The implementing document, e.g., VEGP Technical Specifications, NRC Bulletin, etc., requiring performance of augmented examinations is referenced here. is found on drawing C. Each examination area is listed in this column. The component or weld number typically is similar to the drawing number, e.g., weld number 21201005-8 number ISI-21201-005. D. This column lists the applicable NDE procedures used for the examination. E. This column lists the calibration block(s) that was/were used. F. This column references the examination data sheet(s) which records exam data, examiners, and any pertinent remarks.

                                                                                                                                 "SAT". The presence ofnonrelevant indications G. The results of the examinations are indicated in this column. The absence of indications is indicatedin the column as "NI" or (per NDE procedure) are indicated in or indications which are less than the recording level is indicated in the column as "NRI". The presence of indications deemed recordable the column as "RI" or "UNSAT" and are explained in the remarks column of the summary table.

INF section in this report for their dispoition. H. The remarks column is used to describe any pertinent features of the examination such as limitations, INFs, etc. Refer to FIGURE 1. EXPLANATION OF

SUMMARY

TABLE FORMAT 5-1

( ( VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE CLASS 1 EQUIPMENT EXAMINATIONS ASME AUGMENTED COMPONENT OR SECTION XI EXAMINATION WELD NO. I EXAMINATION CALIBRATION EXAM SHEET ITEM NO.ICAT. REQUIREMENT(S) DESCRIPTION PROCEDURE(S) BLOCK(S) NO(S). RESULTS REMARKS WWCAP 12907 21201-B6-001-104 VT-V-715 S02V2V572 SAT N/A PARTITION PLATE (WCAP 12907) B3.140 RR-6 21201-B6-001-IR-01 VT-V-715 S02V2V573 SAT VT-1 IN LIEU OF UT PER RR-6. B-D INLET NOZZLE INNER RADIUS RR-6 21201-B6-001-IR-02 VT-V-715 S02V2V574 SAT VT-I IN LIEU OF UT PER RR-6 B3.140 B-D OUTLET NOZZLE INNER RADIUS RR-6 21201-B6-004-IR-01 VT-V-715 S02V2V575 SAT VT-1 IN LIEU OF UT PER RR-6 B3.140 B-D INLET NOZZLE INNER RADIUS RR-6 21201-B6-004-IR-02 VT-V-715 S02V2V576 SAT VT17-I IN LIEU OF UT PER RR-6. B3.140 B-D OUTLET NOZZLE INNER RADIUS 21201-P6-004-B0I - B24 UT-V-482 416A S02V2U319 NRI EXAMINED IN PLACE B6.180 B-G-1 MAIN FLANGE BOLTS 21201-V6-001-B19 through B36 UT-V-482 419A S02V2U314 NRI N/A B6 30 B-G-1 CLOSURE HEAD STUDS 21201-V6-001-101 VT-V-735 s02V2V608 SAT N/A B13.10 B-N-1 VESSEL INTERIOR 21201-V6-001-102 VT-V-735 S02V2V609 SAT N/A B13 10 FSAR 5.3 3.7 B-N-1 VESSEL CLOSURE HEAD INTERIOR (FSAR 5 3 3 7) UT-V-411 401A S02V2U313 NRI N/A B6 40 21201-V6-001-L19 through L36 B-G-1 THREADS IN FLANGE VT-V-715 s02V2V540 SAT N/A B6.10 21201-V6-001-N19 through N36 B-G-1 CLOSURE HEAD NUTS VT-V-715 S02V2V541 SAT N/A 66.50 21201-V6-001-$19 through S36 B-G-1 CLOSURE WASHERS 6-1

(f VEGP- 2 NINTH MAINTENANCE ! REFUELING OUTAGE CLASS I EQUIPMENT EXAMINATIONS ASME AUGMENTED COMPONENT OR SECTION XI EXAMINATION WELD NO. I EXAMINATION CALIBRATION EXAM SHEET ITEM NO./CAT. REQUIREMENT(S) DESCRIPTION PROCEDURE(S) BLOCK(S) NO(S). RESULTS REMARKS B7.20 21201-V6-002-801 - B16 VT-V-715 S02V2V596 SAT EXAMINED IN PLACE. B-G-2 MANWAY BOLTING UT-V-416 411A S02V2U329 NRI N/A B3.120 21201-V6-002-IR-02 B-D 6" SAFETY NOZZLE INNER RADIUS UT-V-416 411A S02V2U332 NRI N/A B3.120 21201-V6-002-IR-03 B-D 6" SAFETY NOZZLE INNER RADIUS UT-V-416 411A S02V2U335 NRI N/A B3.120 21201-V6-002-1R-05 B-D 4" SPRAY NOZZLE INNER RADIUS 21201-V6-002-W12 MT-V-505 411A S02V2MOO1 NRI UT EXAM LIMITED. REFERENCE B3.110 NRI RR-7 UT-V-411 S02V2U321 B-D UPPER HEAD TO 6" SAFETY NOZZLE WELD S02V2U323 NRI S02V2U327 NRI S02V2U328 NRI MT-V-505 411A S02V2M002 NRI UT EXAM LIMITED. REFERENCE B3.110 21201 -V6-002-W13 RR-7. UT-V-411 S02V2U322 NRI B-D UPPER HEAD TO 6" SAFETY NOZZLE WELD S02V2U324 NRI S02V2U330 NRI S02V2U331 NRI MT-V-505 411A S02V2M003 NRI UT EXAM LIMITED REFERENCE B3 110 21201-V6-002-W14 RR-7. UT-V-411 S02V2U325 NRI B-D UPPER HEAD TO 4" SAFETY NOZZLE WELD S02V2U326 NRI S02V2U333 NRI S02V2U334 NRI 6-2

7 ( VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE CLASS I EQUIPMENT EXAMINATIONS ASME AUGMENTED COMPONENT OR SECTION XI EXAMINATION WELD NO. I EXAMINATION CALIBRATION EXAM SHEET REQUIREMENT(S) DESCRIPTION PROCEDURE(S) BLOCK(S) NO(S). RESULTS REMARKS ITEM NO.ICAT. B5 40 21201-V6-002-W21 PT-V-605 326A, 356A S02V2P005 NRI UT RI - GEOMETRY. RI UT EXAM LIMITED. CODE CASE 4" SPRAY NOZZLE TO SAFE END UT-V-404 S02V2U339 B-F N.460 WELD S02V2U340 NRI S02V2U341 NRI S02V2U342 NRI S02V2U343 NRI 6-3

( ( r-VEGF .- 2 NINTH MAINTENANCE I REFUELING OUTAGE CLASS I PIPING EXAMINATIONS ASME AUGMENTED COMPONENT OR EXAMINATION CALIBRATION EXAM SECTION XI EXAMINATION WELD NO. I SHEET ITEM NO.JCAT. REQUIREMENT(S) DESCRIPTION PROCEDURE(S) BLOCK(S) NO(S). RESULTS REMARKS 21201-056-6 FB VT-V-715 S02V2V509 SAT EXAMINED IN PLACE. B7.50 B-G-2 6" FLANGE BOLT ASSEMBLY FOR 21201-PSV-8010C S02V2V510 SAT EXAMINED IN PLACE. B7 50 21201-057-8 FB VT-V-715 B-G-2 6" FLANGE BOLT ASSEMBLY FOR 21201-PSV-8010B VT-V-715 S02V2V598 SAT EXAMINED IN PLACE. B7.70 21204U6129 B-G-2 VALVE BOLTING (ISI-21204-021) VT-V-715 S02V2V593 UNSAT EXAMINED IN PLACE EVIDENCE B7 50 21204-076-32 B FB OF PAST LEAKAGE. REFERENCE S02V2V610 SAT B-G-2 3" FLANGE BOLTING INF 102V2002. VT-V-715 S02V2V594 SAT EXAMINED IN PLACE B7 50 21204-077-10 FB B-G-2 1 5" FLANGE BOLT ASSEMBLY FOR FE-0927 VT-V-715 S02V2V527 SAT EXAMINED IN PLACE. B7.70 21204HV8808B B-G-2 VALVE BOLTING (ISI-21204-125) VT-V-715 S02V2V528 SAT EXAMINED IN PLACE. B7.70 21204U6086 B-G-2 VALVE BOLTING (ISI-21204-127) VT-V-715 S02V2V595 SAT EXAMINED IN PLACE. B7 50 21208-047-18 FB B-G-2 1.5" FLANGE BOLT ASSEMBLY FOR RC PUMP 004 7-1

( C VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE CLASS 2 EQUIPMENT EXAMINATIONS ASME AUGMENTED COMPONENT OR SECTION Xl EXAMINATION WELD NO. I EXAMINATION CALIBRATION EXAM SHEET ITEM NO.ICAT. REQUIREMENT(S) DESCRIPTION PROCEDURE(S) BLOCK(S) NO(S). RESULTS REMARKS C1.30 212011-B6-004-W07 UT-V-411 409A S02V2U315 NRI UT EXAM LIMITED CODE CASE S02V2U316 NRI N-460. C-A LOWER SHELL BARREL 'A'TO TUBE PLATE WELD S02V2U317 NRI S02V2U318 NRI 21201-B6-004-W25 PT-V-605 S02V2P004 NRI N/A C3.10 C-C TRUNNION TO SHELL WELD 21205-E6-002-WO1 UT-V-404 412A S02V2U301 RI UT RI / CODE ACCEPTABLE C1.10 UT EXAM LIMITED RELIEF C-A S02V2U302 RI FLANGE TO TUBE SIDE SHELL REQUIRED WELD 21205-E6-002-W02 UT-V-404 412A S02V2U304 RI UT RI / CODE ACCEPTABLE. C1.20 C-A TUBE SIDE SHELL TO HEAD S02V2U305 RI WELD 8-1

( ( VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE CLASS 2 PIPING EXAMINATIONS ASME AUGMENTED COMPONENT OR SECTION XI EXAMINATION WELD NO. I EXAMINATION CALIBRATION EXAM SHEET ITEM NO.ICAT. RFOUIIREMENTI'S* DESCRIPTION PROCEDURE(S) BLOCK(S) NO(S). RESULTS REMARKS ITEM NO /CAT REQUIREMENTfSl DESCRIPTION C3.20 21205-007-72 PT-V-605 S02V2P001 NRI N/A C-C SUPPORT H022 C3.20 21205-008-35 PT-V-605 S02V2P003 NRI N/A C-C SUPPORT H002 C3 20 21206-002-29 PT-V-605 S02V2P002 NRI N/A C-C SUPPORT H008 C5 51 TS 5 5.16 21301-004-11 UT-V-480 314A S02V2U354 NRI UT RI / GEOMETRY. C-F-2 S02V2U355 RI UT SCANS LIMITED / 100% VALVE TO 29 1/2" PIPE (TS 5 5.16) COVERAGE OBTAINED C5 51 TS 5.5.16 21301-004-13 UT-V-480 314A S02V2U356 NRI UT RI / GEOMETRY. S02V2U357 RI UT SCANS LIMITED / 100% C-F-2 29 1/2" PIPE TO VALVE (TS 5.5.16) COVERAGE OBTAINED C5 51 TS 5 5.16 21301-004-14 UT-V-480 313A S02V2U358 RI UT RI / GEOMETRY. S02V2U359 NRI UT SCANS LIMITED / 100% C-F-2 VALVE TO 28" PIPE (TS 5 5 16) COVERAGE OBTAINED C5 51 TS 55 16 21301-004-15 UT-V-480 313A S02V2U360 RI UT RI I GEOMETRY. S02V2U361 NRI UT SCANS LIMITED / 100% C-F-2 28" PIPE TO PIPE FORGING (TS COVERAGE OBTAINED 55.16) TS 5.5.16 21305-058-1 UT-V-480 311A S02V2U344 RI UT RI / GEOMETRY. C5 51 S02V2U345 RI UT SCANS LIMITED / 100% C-F-2 FORGING TO 16" PIPE (TS 5.5.16) COVERAGE OBTAINED TS 5.5.16 21305-058-2 UT-V-480 311A S02V2U346 NRI UT SCANS LIMITED / 100% C5 81 COVERAGE OBTAINED. C-F-2 16" PIPE TO 6" BRANCH S02V2U347 NRI CONNECTION (TS 5 5 16) MT-V-505 S02V2M004 NRI N/A C3 20 21305-058-3 C-C SUPPORT H001 9-1

C, VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE CLASS 2 PIPING EXAMINATIONS ASME AUGMENTED COMPONENT OR EXAMINATION WELD NO. I EXAMINATION CALIBRATION EXAM SHEET SECTION XI cIonlrun I0:CM P.I flr*Kli RESULTS REMARKS ITEM NO.ICAT. REQUIREC MbENT IS) DEiS I tiI ION vr .. .. .. ,, N.. 21305-058-4 UT-V-480 31 IA S02V2U348 RI UT RI I GEOMETRY. C5 51 TS 5 5.16 RI UT SCANS LIMITED / 100% S02V2U349 C-F-2 16" PIPE TO VALVE (TS 5 5.16) COVERAGE OBTAINED. UT-V-480 311A S02V2U350 NRI UT RI I GEOMETRY. C5 51 TS 5 5.16 21305-058-5 UT SCANS LIMITED / 100% S02V2U351 RI C-F-2 16" VALVE TO PIPE (TS 5 5 16) COVERAGE OBTAINED. UT-V-480 31 IA S02V2U352 NRI UT RI I GEOMETRY. C5 51 TS 55 16 21305-058-6 UT SCANS LIMITED / 100% S02V2U353 RI C-F-2 16" PIPE TO VALVE (TS 5 5 16) COVERAGE OBTAINED 9-2

Support No. & Examination Exam ASME Sect. Remarks ISI Class Description. Procedures Sheet No. Results XI Cat. See Note C See Note D See Note E See Note F See Note G See Note A See Note B NOTES: A. The ASME Section XI category designation for the equipment support is listed in this column. being examined is listed in this column. B. The ASME Section XI class no., e.g., 1, 2, or 3, for the system on which the equipment support C. The equipment support number and support description are listed in this column. a Class 3 support lists VT-V-715 (VT-1) in addition to VT-V-735 (VT-3), the Class D. This column lists the applicable NDE procedure(s) used during the examination. When Case N-509 (RR-20). 3 support also received a VT-i on the integral attachment per IWD-2500-1 and Code and lists the examiner, any pertinent remarks, etc. E. This column references the examination data sheet(s) which serve to document the examination F. The results of the examinations are indicated in this column. this report for such as limitations, reportable results, INFs, etc. Refer to the INF section in G. The remarks column is used to describe any pertinent features of the examination their disposition. TABLE FORMAT FIGURE 2. EXPLANATION OF EQUIPMENT SUPPORT

SUMMARY

10-1

VEGP- 2 NINTH MAINTENANCE I RERJELING OUTAGE EQUIPMENT SUPPORT EXAMINATIONS ASME SECTION SUPPORT NUMBER EXAMINATION EXAM SHEET DESCRIPTION PROCEDURE(S) OCIII T REMARKS XI CATEGORY ISI CLASS NA SAT-- VT-V-735 S02V2V566 SAT N/A 1 21201-P6-004-TO1 F-A Restraint VT-V-735 S02V2V570 SAT N/A 1 21201-P6-004-T02 F-A S02V2V571 SAT N/A 21201 -P6-004-T03 VT-V-735 F-A S02V2V536 SAT N/A 21204-P6-004-S01 VT-V-735 F-A 2 Pump support N/A 21205-E6-002-S01 V'-V-735 S02V2V505 SAT F-A Support skirt 2 N/A VT-V-735 S02V2V534 SAT 21208-P6-003-S01 F-A Support base S02V2V559 SAT N/A 21203-P4-001-S01 VT-V-735 F-A 3 Pump support N/A 21203-P4-001-S02 VT-V-735 S02V2V560 SAT F-A 3 S02V2V563 SAT N/A 21213-P6-005-S01 VT-V-735 F-A 3 S02V2V564 SAT N/A 21213-P6-005-S02 VT-V-735 F-A 3 S02V2V577 SAT N/A 21592-P7-001-S01 VT-V-735 F-A 3 S02V2V578 SAT N/A 21592-P7-001-S02 VT-V-735 F-A 3 S02V2V579 SAT N/A 21592-T7-002-SOI VT-V-735 F-A 3 Tank support N/A 21592-'7-002-S02 WA VT-V-715 102V2V580 SAT F-A 3 VT-V-735 10-2

ASME Sect. Support No. & Examination Exam XI Cat. IST Class NPS (In.) Description Procedure(s) Sheet No. Results Remarks See Note A See Note B See Note C See Note D See Note E See Note F See Note G See Note H NOTES: A. The ASME Section XI category designation for the piping support is listed in this column. B. The ASME Section XI class no., e.g., 1, 2, 3, for the systemon which the piping support being examined is listed in this column. C. This column indicates the nominal pipe size in inches for the piping on which the piping support is being examined. D. The piping support number and support description are listed inthis column. E. This column lists the applicable NDE procedure(s) used during the examination. When a Class 3 support lists VT-V-715 (VT-1) in addition to VT-V-735 (VT-3), the Class 3 support also received a VT-1 on the integral attachment per IWD-2500-1 and Code Case N-509 (RR-20). F. This column references the data sheet(s) which serve to document the examination and list the examiner, any pertinent remarks, etc. G. The results of the examinations are indicated in this column. Refer to INF section in this report for their H. The remarks column is used to describe any pertinent features of the examination such as limitations, reportable results, INFs, etc. disposition. FIGURE 3. EXPLANATION OF PIPING SUPPORT

SUMMARY

TABLE FORMAT 11-1

( ( ( VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE PIPING SUPPORT EXAMINATIONS NPS SUPPORT NUMBER EXAMINATION EXAIM ASME SECTION (IN.) DESCRIPTION PROCEDURE(S) SHE!ET RESULTS REMARKS XI CATEGORY 151 CLASS ISI 1CLASS N/A 1 2 21201-012-H601 VT-V-735 802\ /2V568 SAT F-A RESTRAINT SAT N/A 1 2 21201-012-H604 VT-V-735 S02\ /2V565 F-A VAR SPRING N/A 1 2 21201-012-H608 VT-V-735 S02' /2V531 SAT F-A MECH SNUBBER N/A 1 4 21201-030-H630 VT-V-735 S02' /2V567 SAT F-A RESTRAINT SAT N/A 1 12 21201-049-H020 VT-V-735 S02\ V2V530 F-A MECH SNUBBER SAT N/A 1 14 21201-053-HOOI VT-V-735 S02\ 12V529 F-A MECH SNUBBER N/A 16 21201-053-H006 VT-V-735 S02\ 12V524 SAT F-A MECH SNUBBER SAT N/A 6 21204-021-H002 VT-V-735 S02*V2V584 F-A STRUT SAT N/A 6 21204-021-H004 V'-V-735 S02 J2V585 F-A RESTRAINT SAT N/A 1 21204-021-H1005 Vr-V-735 S02*V2V523 F-A 6 MECH SNUBBER SAT N/A 1 21204-021-H006 V'-V-735 S02 V2V522 F-A 6 MECH SNUBBER SAT N/A I 6 21204-021-H008 Vr-V-735 S02' V2V586 F-A STRUT SAT N/A 1 21204-021-H009 VT-V-735 S02 V2V587 F-A 6 RESTRAINT SAT N/A I 21204-021-HOIl1 Vr-V-735 S02 V2V588 F-A 6 STRUT 11-2

( ( K VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE PIPING SUPPORT EXAMINATIONS NPS SUPPORT NUMBER EXAMINATION EXA M ASME SECTION (IN.) DESCRIPTION PROCEDURE(S) SHE "ET RESULTS REMARKS XI CATEGORY ISI CLASS SAT N/A 8 21204-021-H012 VT-V-735 S02*V2V589 F-A 1 STRUT N/A 8 21204-021-H014 VT-V-735 S02 J2V600 SAT F-A 1 STRUT SAT N/A 21204-021-H015 VT-V-735 S02'V2V601 F-A 1 8 STRUT SAT N/A 21204-021-H016 VT-V-735 S02'V2V602 F-A 1 8 RESTRAINT SAT N/A 21208-007-H002 VT-V-735 S02 V2V525 F-A 1 3 MECH SNUBBER SAT N/A 21202-140-H003 VT-V-735 S02 V2V582 F-A 2 8 RESTRAINT SAT N/A 21202-140-H009 VT-V-735 S02 V2V583 F-A 2 8 STRUT SAT N/A 21202-140-H013 VT-V-735 S02 V2V581 F-A 2 8 VAR SPRING SAT N/A 21204-192-HOOI VT-V-735 s02V2V507 F-A 2 8 MECH SNUBBER SAT N/A 21205-004-HOOl VT-V-735 S02V2V542 F-A 2 14 VAR SPRING SAT N/A 21205-004-H019 VT-V-735 S02 V2V508 F-A 2 14 RESTRAINT SAT N/A 21205-006-H009 VT-V-735 S02 V2V543 F-A 2 8 STRUT SAT N/A 21205-007-H022 VT-V-735 S02_V2V504 F-A 2 8 RESTRAINT SAT N/A 21205-007-H025 VT-V-735 S02 V2V544 F-A 2 8 STRUT 11-3

(

                                                                                                    /

VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE PIPING SUPPORT EXAMINATIONS ASME SECTION NPS SUPPORT NUMBER EXAMINATION EXA M XI CATEGORY ISI CLASS (IN.) DESCRIPTION PROCEDURE(S) SHE ET RESULTS REMARKS ISI 2 N/A F-A 2 8 21205-008-H002 VT-V-735 S02\/2V503 SAT RESTRAINT/LUGS VT-V-735 S02\/2V532 SAT N/A F-A 2 8 21205-008-H023 RESTRAINT 21205-008-H039 VT-V-735 S02\/2V506 SAT N/A F-A 2 8 VAR SPRING VT-V-735 S02\/2V597 SAT N/A F-A 2 12 21206-002-H002 MECH SNUBBER VT-V-735 S02o12V569 SAT N/A F-A 2 12 21206-002-H004 VAR SPRING S02)V2V545 SAT N/A F-A 2 12 21206-002-H008 VT-V-735 STRUT S02' V2V533 SAT N/A F-A 2 12 21206-002-1009 VT-V-735 UNDERSUPPORT S02o 12V561 SAT N/A F-A 2 12 21206-002-H022 VT-V-735 RESTRAINT S02' V2V535 SAT N/A F-A 2 10 21206-004-H006 VT-V-735 RESTRAINT N/A 2 21206-008-H096 V'-V-735 S02' V2V599 SAT F-A 8 STRUT SAT N/A 2 6 21302-107-H011 VT-V-735 S02*V2V520 F-A MECH SNUBBER SAT N/A 2 6 21302-107-H012 VT-V-735 S02 V2V521 F-A MECH SNUBBER SAT N/A 2 6 21302-109-H024 VT-V-735 S02 V2V513 F-A MECH SNUBBER SAT N/A 2 16 21305-058-HOOI VT-V-735 S02oV2V547 F-A RESTRAINT/LUGS 11-4

(

                                                           /

( Q VEGP- 2 NINTH MAINTENANCE ! REFUELING OUTAGE PIPING SUPPORT EXAMINATIONS ASME SECTION NPS SUPPORT NUMBER EXAMINATION EXAM XI CATEGORY ISI CLASS (IN.) DESCRIPTION PROCEDURE(S) SHEET RESULTS REMARKS ISI 2 F-A 2 6 21501-038-H002 VT-V-735 S02V2V590 SAT N/A RESTRAINT F-A 2 6 21501-038-H004 VT-V-735 S02V2V591 SAT N/A UNDERSUPPORT F-A 2 6 21501-038-HOO6 VT-V-735 S02V2V592 SAT N/A RESTRAINT F-A 3 8 21202-005-H007 VT-V-735 S02V2V539 SAT N/A D-A RESTRAINT/LUGS F-A 3 21202-005-HO10 VT-V-735 S02V2V538 SAT N/A 8 D-A RESTRAINT 3 21202-006-H031 VT-V-735 S02V2V553 SAT N/A F-A 24 D-A RESTRAINT 21202-006-H034 WA VT-V-715 S02V2V554 SAT N/A F-A 3 24 D-A UNDERSUPPORT VT-V-735 3 21202-006-HO35 WA VT-V-715 S02V2V555 SAT N/A F-A 24 D-A RESTRAINT VT-V-735 21202-006-H039 WA VT-V-715 S02V2V556 SAT N/A F-A 3 24 D-A RESTRAINT VT-V-735 21202-072-H027 WA VT-V-715 S02V2V537 SAT N/A F-A 3 8 D-A RESTRAINTILUGS VT-V-735 21202-072-H038 VT-V-735 S02V2V558 SAT N/A F-A 3 8 D-A RESTRAINT/LUGS 11-5

C ( t, VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE PIPING SUPPORT EXAMINATIONS NPS SUPPORT NUMBER EXAMINATION EXAIM ASME SECTION SHE ET RESULTS XI CATEGORY ISI CLASS (IN.) DESCRIPTION PROCEDURE(S) REMARKS ISI 3CLASS SAT N/A 3 10 21213-002-HOOI WA VT-V-715 S02\ /2V562 t2V562 SAT N/ F-A D-A RESTRAINT VT-V-735 3 10 21302-007-HOOI VT-V-735 S02o/2V603 SAT NIA F-A D-A VAR SPRING N/A 10 21302-007-H004 VT-V-735 S02o/2V511 SAT F-A 3 MECH SNUBBER SAT N/A 10 21302-010-H006 VT-V-735 S02\12V512 F-A 3 D-A MECH SNUBBER SAT N/A 3 21302-011-H034 VT-V-735 S02*V2V607 F-A 4 RESTRAINT SAT N/A 4 21302-012-HOOl VT-V-735 S02'V2V546 F-A 3 RESTRAINT SAT NIA 4 21302-014-H002 VT-V-735 S02'V2V604 F-A 3 RESTRAINT SAT N/A 21302-014-H009 VT-V-735 S02'V2V605 F-A 3 4 RESTRAINT SAT N/A 4 21302-014-H013 VT-V-735 S02 V2V606 F-A 3 RESTRAINT SAT N/A 21302-015-H003 VT-V-735 S02 V2V514 F-A 3 2.5 RESTRAINTILUGS D-A NIA 8 21302-016-H002 VT-V-735 S02 V2V515 SAT F-A 3 STRUT D-A N/A 21302-017-H005 WA VT-V-715 S02 V2V516 SAT F-A 3 8 RESTRAINT VT-V-735 D-A 11-6

( ( VEGP- 2 NINTH MAINTENANCE I REFUELING OUTAGE PIPING SUPPORT EXAMINATIONS ASME SECTION NPS SUPPORT NUMBER EXAMINATION EXA M XI CATEGORY ISI CLASS (IN.) DESCRIPTION PROCEDURE(S) SHE ET RESULTS REMARKS SAT N/A F-A 3 4 21302-019-H004 VT-V-735 S02\ /2V548 RESTRAINT SAT N/A F-A 3 4 21302-019-H012 VT-V-735 S02o/2V549 RESTRAINT SAT N/A F-A 3 4 21302-020-H036 VT-V-735 S02o12V517 RESTRAINT SAT N/A F-A 3 10 21302-023-H002 VT-V-735 S02\ 12V551 D-A RESTRAINT F-A 3 10 21302-023-H003 VT-V-735 S02*V2V518 SAT N/A D-A RESTRAINT SAT NIA 3 10 21302-025-H004 VT-V-735 S02'V2V519 F-A D-A RESTRAINT N/A 3 25 21302-027-H004 VT-V-735 S02o12V552 SAT F-A RESTRAINT SAT N/A 3 25 21302-027-H008 V'-V-735 S02' !2V550 F-A STRUT 11-7

Tag Number ISI Class Snubber Mfgr/Size Scope Examined Results See Note A See Note B See Note C See Note D See Note E NOTES: A. The unique tag number for the snubber being examined is listed in this column B. The ASME Section XI class no., e.g., 1, 2, 3, for the system on which the snubber being examined is listed in this column. C. This column lists the name of the manufacturer of any snubbers functionally tested and the size of the snubber, e.g., PSA-1/4. Manufacturer designations are abbreviated and can be found in the List of Abbreviations. D. This column lists the scope of examination in which the snubber is functionally tested, i.e., original scope or expanded scope. Snubbers included in the expanded scope of examinaton are generally as a result of other snubber functional test failures. E. The results of the functional test of the snubber tested is listed in this column. FIGURE 4. EXPLANATION OF SNUBBER FUNCTIONAL TEST RESULTS

SUMMARY

TABLE FORMAT 12-1

VEGP-2 NINTH MAINTENANCE/REFUELING OUTAGE SNUBBER FUNCTIONAL TESTS TYPE I SNUBBERS TAG SNUBBER SCOPE NUMBER ISI CLASS MFGRISIZE EXAMINED RESULTS 21208-002-HOOI 2 PSA-1/2 ORIGINAL PASS 21208-131-H016 3 PSA-1/2 ORIGINAL PASS 21210-037-H003 - PSA-1/2 ORIGINAL PASS TYPE II SNUBBERS TAG SNUBBER SCOPE NUMBER ISI CLASS MFGR/SIZE EXAMINED RESULTS 21201-048-H002 I PSA-3 ORIGINAL PASS 21201-064-H612A - PSA-3 ORIGINAL PASS 21201-064-H612B - PSA-3 ORIGINAL PASS 21203-021-H006 3 PSA-3 AUGMENTED PASS 21204-024-H029 1 PSA-3 ORIGINAL PASS 21204-042-H006 1 PSA-10 ORIGINAL PASS 21301-094-H002 - PSA-10 PREV FAILURE PASS 21305-081-H006 - PSA-1 ORIGINAL PASS TYPE III SNUBBERS TAG SNUBBER SCOPE NUMBER ISI CLASS MFGR/SIZE EXAMINED RESULTS 21301-008-HO09A - PSA-35L ORIGINAL PASS 21301-008-HO09B - PSA-35L ORIGINAL PASS 21305-055-H003 - PSA-35 ORIGINAL PASS TYPE IV SNUBBERS TAG SNUBBER SCOPE NUMBER ISI CLASS MFGR/SIZE EXAMINED RESULTS 21201-029-H603A 1 AD-501 ORIGINAL PASS 21201-029-H603B 1 AD-501 ORIGINAL PASS 21206-001-H021 2 AD-501 ORIGINAL PASS 21208-488-H015 2 AD-501 ORIGINAL PASS 12-2

TAG SNUBBER SCOPE NUMBER ISI CLASS MFGR/SIZE EXAMINED RESULTS 21208-488-H021 2 AD-151 ORIGINAL PASS 21301-010-H038 3 AD-501 ORIGINAL PASS 21301-010-H039 3 AD-151L ORIGINAL PASS 21301-012-HO19 3 AD-153 ORIGINAL PASS 21301-012-H028 3 AD-153 ORIGINAL PASS 21301-119-HOIO 2 AD-503 ORIGINAL PASS 21301-126-H024 2 AD-503 ORIGINAL PASS 21301-126-H029 2 AD-153 ORIGINAL PASS 21301-128-H078T 2 AD-153 ORIGINAL PASS 21301-138-H002 2 AD-153L ORIGINAL PASS 21301-157-H020 AD-153L ORIGINAL PASS 21301-168-H023 AD-153L ORIGINAL PASS 21302-001-H009 AD-151 ORIGINAL PASS 21302-108-H003 2 AD-501 ORIGINAL PASS 21302-108-H019 2 AD-501 ORIGINAL PASS 21302-109-H011 2 AD-503 ORIGINAL PASS 21302-109-H012 2 AD-501 ORIGINAL PASS 21302-1 10-H014 2 AD-501 ORIGINAL PASS 21302-11O-H-016 2 AD-501 ORIGINAL PASS 22402-024-H002 AD-153 ORIGINAL PASS TYPE V SNUBBERS TAG SNUBBER SCOPE NUMBER ISI CLASS MFGR/SIZE EXAMINED RESULTS 21201-064-H607B AD-1603 ORIGINAL PASS 21201-064-H609A AD-1601 ORIGINAL PASS 21201-064-H609B AD-1601 ORIGINAL PASS 21202-004-H056 3 AD-1601 ORIGINAL PASS 21208-009-H002 1 AD- 1603 ORIGINAL PASS 21301-008-H002B AD-5501L ORIGINAL PASS 12-3

21301-015-H004 2 AD-1603 PREV FAILURE PASS 2 AD-5501 ORIGINAL PASS 21301-105-H005 2 AD-12501 ORIGINAL PASS 21301-106-H003 2 AD-5501 PREV FAILURE PASS 21301-106-H005 2 AD-5503 ORIGINAL PASS 21301-107-H002 2 AD-1603 ORIGINAL PASS 21302-109-H025 AD-5501 ORIGINAL PASS 21305-055-H004 AD-1601 ORIGINAL PASS 21305-057-HOOIB TYPE VI SNUBBERS TAG SNUBBER SCOPE NUMBER ISI CLASS MFGR/SIZE EXAMINED RESULTS 212011-B6-001-S06 2 PM-25701 ORIGINAL PASS 12-4

SYSTEM PRESSURE TESTS The following pressure tests were included in the scope of the ninth maintenance/refuelingoutage at VEGP-2. These pressure tests included system functional tests, system hydrostatic tests, system inservice tests, and system leakage tests. Boundaries for these pressure tests are described in the VEGP-2 Inservice Inspection Plan - Second 10-Year Interval document. Examination results are discussed in the applicable sections of the "NIS1 Abstract" and the "Class 3 Examinations" portions of this report document. The examination data for these pressure tests is available at the plant site for review upon request. System Functional Test Schedule (FTs) FT Exam. Test Number Cat. Description I C-H Reactor Head Vent Functional Test 3 C-H Penetration 32 (HHSI to Cold Legs) Functional Test 4 C-H Safety Injection Pump 1204-P6-003 Discharge Functional Test 5 C-H Safety Injection Pump 1204-P6-004 Discharge Functional Test 6 C-H Penetration 33 (SI to Hot Legs 1 & 4) Functional Test 7 C-H Penetration 31 (SI to Hot Legs 2 & 3) Functional Test 8 C-H Penetration 30 (SI to Cold Legs) Functional Test 9 C-H Penetration 56 (RHR Hot Leg Injection) Functional Test 10 C-H Safety Injection (SI) Pump Suction Functional Test 11 C-H Residual Heat Removal System (RHRS) to Chemical and Volume Control System (CVCS) Suction Functional Test 12 C-H Containment Spray Train "A" Functional Test 13 C-H Containment Spray Train "B" Functional Test 14 C-H Turbine Driven Auxiliary Feedwater (TDAFW) Pump 1302-P4-001 Functional Test (See D-B Note 1) 15 D-B Main Steam (Valve HV-5106) to TDAFW Pump Turbine Functional Test 17 C-H Line 1208-133 (HV-8104 to Valve 185 Flow Test) Functional Test System Hydrostatic Test Schedule (HTs) HT Exam. Test Number Cat. Description _1 C-H Containment Spray Train "A" Open Flow Path Test 12 C-H Containment Spray Train "B" Open Flow Path Test 73 C-H AFW Pump Train C Discharge Hydrostatic Test (See Note 1) D-B 76 D-B Auxiliary Feed Pump Turbine Flow Test System Inservice Test Schedule (ITs) IT Exam. Test Number Cat. Description I C-H Charging Line Inside Containment Inservice Test 2 C-H Letdown Line Inside Containment Inservice Test 3 C-H Reactor Coolant (RC) Pumps 1, 2, 3, and 4 Seal Leakoff Inside Containment Inservice Test 4 C-H RC Pump I Seal Injection from Penetration 54 to Valve 006 Inservice Test 5 C-H RC Pump 2 Seal Injection from Penetration 53 to Valve 359 Inservice Test 13-1

IT Exam. Test Number Cat. Description 6 C-H RC Pump 3 Seal Injection from Penetration 52 to Valve 360 Inservice Test 7 C-H RC Pump 4 Seal Injection from Penetration 51 to Valve 361 Inservice Test 8 C-H Reactor Coolant System (RCS) Hot Leg Sample Lines to Penetration 24 Inservice Test 9 C-H Sample Line from Valve 101 to Valve HV-3514 Inservice Test 10 C-H CVCS Inservice Test with Normal Charging Pump Operating (Outside Containment) 11 C-H Centrifugal Charging Pump 1208-P6-002 (Train "A") Discharge Inservice Test 12 C-H Centrifugal Charging Pump 1208-P6-003 (Train "B") Discharge Inservice Test 13 D-B Boric Acid Transfer Pump Suction Inservice Test 14 C-H Accumulator Tank 1 (1204-V6-002) Inservice Test 15 C-H Accumulator Tank 2 (1204-V6-003) Inservice Test 16 C-H Accumulator Tank 3 (1204-V6-004) Inservice Test 17 C-H Accumulator Tank 4 (1204-V6-005) Inservice Test 18 C-H RHRS Train "A" Inservice Test 19 C-H RHRS Train "B" Inservice Test 20 D-C Spent Fuel Cooling Train "A" Inservice Test 21 D-C Spent Fuel Cooling Train "B" Inservice Test 23 C-H Refueling Water Storage Tank (RWST) Inservice Test 24 C-H Sample Line from Valve 097 to Valve HV-3508 Inservice Test 25 C-H Penetration 24 Outside Containment Inservice Test (Post-Accident Sampling) 26 C-H Nuclear Service Cooling Water (NSCW) Train "A" Inservice Test (Outside Containment) D-B 29 D-B NSCW Line 184 Inservice Test (Train "A" Tower Bypass) 30 C-H NSCW Train "B" Inservice Test (Outside Containment) D-B 33 D-B NSCW Line 185 Inservice Test (Train "B" Tower Bypass) 34 C-H Containment Coolers 1501-A7-001 and 1501-A7-002 Inservice Test 35 C-H Containment Coolers 1501-A7-003 and 1501-A7-004 Inservice Test 36 C-H Containment Coolers 1501-A7-005 and 1501-A7-006 Inservice Test 37 C-H Containment Coolers 1501-A7-007 and 1501-A7-008 Inservice Test 38 C-H Cooling Coils 1511 -E7-002 and 1515-A7-001 Inservice Test 39 C-H Cooling Coils 151 I-E7-001 and 1515-A7-002 Inservice Test 40 D-B Component Cooling Water (CCW) Train "A" Inservice Test With Pumps 1203-P4-001 and 1203-P4-003 Operating 41 D-B CCW Pump 1203-P4-005 Inservice Test 42 D-B CCW Train "B" Inservice Test With Pumps 1203-P4-002 and 1203-P4-004 Operating 43 D-B CCW Pump 1203-P4-006 Inservice Test 45 C-H Steam Generator 1201-B6-001 Inservice Test 46 C-H Steam Generator 1201-B6-002 Inservice Test 47 C-H Steam Generator 1201-B6-003 Inservice Test 48 C-H Steam Generator 1201-B6-004 Inservice Test 49 C-H Penetration 7 Inservice Test (Outside Containment Steam Generator 1 Blowdcwn to Heat Exchanger) 50 C-H Penetration 8 Inservice Test (Outside Containment Steam Generator 2 Blowdown to Heat Exchanger) 51 C-H Penetration 9 Inservice Test (Outside Containment Steam Generator 3 Blowdown to Heat Exchanger) 52 C-H Penetration 10 Inservice Test (Outside Containment Steam Generator 4 Blowdown to Heat Exchanger) 53 C-H Penetration 1 B Inservice Test (Outside Containment Steam Generator 1 Blowdown to Sample) 13-2

IT Exam. Test Number Cat. Description 54 C-H Penetration 1IC Inservice Test (Outside Containment Steam Generator 2Blowdown to Sample) 55 C-H Penetration 12B Inservice Test (Outside Containment Steam Generator 3 Blowdown to Sample) 56 C-H Penetration 12C Inservice Test (Outside Containment Steam Generator 4 Blowdown to Sample) 57 C-H Main Steam Loop 2 Inservice Test (Outside Containment) 58 C-H Main Steam Loop 2 Inservice Test (Outside Containment) 59 C-H Main Steam Loop 3 Inservice Test (Outside Containment) 60 C-H Main Steam Loop 4 Inservice Test (Outside Containment) 61 D-A Condensate Storage Tank 1302-V4-001 Inservice Test 62 D-A Condensate Storage Tank 1302-V4-002 Inservice Test 64 C-H Auxiliary Feedwater (AFW) Inservice Test With Pump 1302-P4-002 (Train "B") D-A Operating 65 C-H AFW Inservice Test With Pump 1302-P4-003 (Train "A") Operating D-A 66 D-B Main Steam to TDAFW Pump Turbine Isolation Valve HV-5106 Inservice Test 67 D-B Essential Chilled Water System Train "A" Inservice Test 68 D-B Essential Chilled Water System Train "B" Inservice Test (See Note 2) 71 C-H Main Feedwater Loop I Inservice Test (Outside Containment) 72 C-H Main Feedwater Loop 2 Inservice Test (Outside Containment) 73 C-H Main Feedwater Loop 3 Inservice Test (Outside Containment) 74 C-H Main Feedwater Loop 4 Inservice Test (Outside Containment) 79 C-H Excess Letdown Heat Exchanger Inservice Test 80 C-H RHRS Cleanup Inservice Test 81 D-B NSCW Pump 1202-P4-001 Inservice Test 82 D-B NSCW Pump 1202-P4-002 Inservice Test 83 D-B NSCW Pump 1202-P4-003 Inservice Test 84 D-B NSCW Pump 1202-P4-004 Inservice Test 85 D-B NSCW Pump 1202-P4-005 Inservice Test 86 D-B NSCW Pump 1202-P4-006 Inservice Test 87 D-B NSCW Pump 1202-P4-007 and Piping Inservice Test 88 D-B NSCW Pump 1202-P4-008 and Piping Inservice Test 93 D-A Boric Acid Transfer System Inservice Test with Pump 1208-P6-007 Operating 94 D-A Boric Acid Transfer System Inservice Test with Pump 1208-P6-006 Operatingj System Leaka2e Test Schedule (ILT LT Exam. Test Description Number Cat. I B-P Class I System Leakage Test Notes:

1. The HT-73 test boundary is within the boundary of FT- 14. In order to comply with the once per ten-year requirements of Code Case N-498-1 insulated components are required to be pressurized for four hours prior to VT-2 examination. The HT-73 test boundary is insulated. The remaining portions of theFT-14 boundary are not insulated. The non-insulated portions of the FT-14 boundary were VT-2 examined with the TDAFW Pump operating in miniflow after being pressurized for ten minutes. The HT-73 test boundary was pressurized via a hydro pump to TDAFW Pump miniflow pressures and VT-2 examined after being pressurized for four hours.

13-3

2. Portions of IT-68 boundary were not examined. Portions of the test boundary were isolated by closed valves because of Temporary Modification T-MOD 2001-V2T025.

13-4

INDICATION NOTIFICATION FORMS The following Indication Notification Form(s) (INFs) were issued by Inspection and Testing Services of Southern Nuclear Operating Company (SNC) due to reportable indications or conditions being observed during the examination of Class 1,2, or 3 components during the ninth maintenance/refueling outage at VEGIP2 (referenced attachments are available at the VEGP plant site for review upon request): INF No. Affected Component/Area INF Disposition BEvidence of past leakage at the flange mating surface. The affected area was cleaned and re-examined. Copies of the INF(s) are provided in this report document. Refer to the respective INF(s) for details on the nature of the indications. The INF(s) in this section constitute only those reportable indications observed during the SNC Inspection Testing Services Department (ITS) scope of work. Any reportable indications observed by VEGP Site personnel or outside contractors during their scope of work should be identifiedby/to the VEGP site in report document(s) which are referenced herein. 14-1

OWNER'S REPORTS FOR REPAIRS OR REPLACEMENTS (FORM NIS-2) The following Owner's Reports for Repairs or Replacements (Form NIS-2) are provided for work activities documented at VEGP-2 since the last maintenance/refueling outage (2R8) through the completion of the ninth maintenance/refueling outage (2R9) in November 2002. Reports are identified by their respective traveler number which is denoted on each of the NIS-2 reports. The originals of the NIS-2 reports are filed with their respective traveler packages at the plant site. Only those NIS-2 reports applicable to VEGP-2 are included in this report document. Any attachments, e.g, code data reports, etc., referenced in the NIS2 reports will be made available for review upon request at the plant site. The NIS-2 reports for the following travelers are included herein: 99180 00168 01007 01040 02032 02057 99203 00169 01008 01041 02033 02058 00091 00171 01009 01042 02034 02060 00143 00172 01010 01043 02035 02061 00144 00173 01012 01045 02036 02062 00145 00174 01013 01046 02037 02063 00146 00175 01014 01047 02038 02065 00147 00176 01015 01048 02039 02066 00148 00177 01016 01049 02040 02070 00149 00178 01020 01050 02041 02071 00150 00179 01021 01051 02042 02072 00151 00,80 01022 01052 02043 02073 00152 00181 01023 01053 02044 02074 00153 00182 01024 01054 02045 02076 00154 00183 01026 01055 02046 02077 00155 00184 01027 01056 02047 02078 00156 00185 01029 01057 02048 02079 00158 00186 01030 01058 02049 02080 00159 00187 01031 01059 02050 02081 00160 00188 01033 01060 02051 02082 00161 00191 01034 01061 02052 02083 00163 00194 01035 01062 02053 02084 00164 01002 01036 01063 02054 02087 00165 01004 01037 01064 02055 02092 00166 01005 01038 01065 02056 02093 00167 01006 01039 15-1

UhIiUINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 99180

1. Owner Southern NuclearOperatingCompany Date 05/09/01 Name 40 Inverness Center Parkway,Birmingham,AL Sheet 1 Of I
2. Plant Vogtle Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 29901322 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant VSytle Name Address
4. Identification Of System 1818 / Containment Building Electrical Penetration System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Summer 1979 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1992
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

ELECTRICAL CONAX 1703 1703 2-1818-H3-P31 1981 REPLACEMENT YES PENETRA- CORPORATION TION

7. Description Of Work Installed two permanent flow-through tubes in spare Ports of Electrical Penetration No 31 to use as ILRT pressure and flow taps This modification was completed in accordancewith DCP94-V2NO035 A Type B leakage test was successfully nerformed after installation,
8. Test Conducted: Hydrostatic E] PneumatIcx] Nominal Operating Pressure[]

N/AL Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Z* -. c3i " Date / (i- / 7 200/ kJ Owner or Owner's Designee, Title" CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford,Connecticuthave Inspected the components described in this Owner's Report during the perlod 06/01/99 to " / , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any ma er for any personal Injury or property damage or a loss of any kind arising from or connected with this ir _ _*_ I*-_ __ Commissions GA.

                   "Inspector'sSignature                                           National Board, State, Province and Endorsements Date           -.f'   /2                        20o_.l

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 99203

1. Owner Southern Nuclear Operabng Company Date 05/17/01 Name 40 Inverness Center Parkway,Birmnngham, AL Sheet I Of 4
2. Plant Vog/te Electnc GeneratngPlant Unit Z- t=-I hI; r Waynesboro, GA 30830 MWO # 29902073 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance PlantVogtte Name Address
4. Identification Of System 1208/ Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC III 1971 Edition, Winter 1971 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Pump was replaced A copy of FormNPV-1 for the replacementpump Is attached
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure []

NIA [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Z-wn) ojrw- Me's- A Te208e Date L owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georcia and employed by Hartford Steam Boiler Inspection and Insurance Co of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 06/22/99 to 01".-.., and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma e or any personal injury or property damage or a loss of any kind arising from or connected with this in __ _ _ Commissions G,/A -5" lnspect~i's Signature National Board, State, Province and Endorsements Date ,46- 6;'7 20 0/

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00091

1. Owner Southern Nuclear Operatng Company Date 09/10/02 Name Of 3 Sheet I 40 Inverness CenterParkway, Bim'ngham, AL 2
2. Plant VogUe Electic Generaftn Plant' Unit MWO # 20002111 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.
                                                                                                         -      Plant VogSte
3. Work Performed by Nuclear OperabonsMaintenance Name Address
4. Identification Of System 1208 /Chemical and Volume Control System ASME SEC I/1 1971 Edition, Summer 1972 Addenda, N/A Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL TTREPAIRED, ASME CODE NAME OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT j (YES OR NO)

COMPONENT FISHER 5697040 2109 2FV-O110A 1976 REPLACEMENT YES VALVE CONTROLS CO. __________ I .1

7. Description Of Work Vatve Plug was replaced in accordance with QCP 00-VANO007. A copv of Form NPV-1 for the replacement #Mue Serial number AH7361-1, is attached

' ~ 8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressurefl

 \4N/A[~                                      Other []          Pressure      NIA    PSI     Test Temp.             NIA           "T CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this                         REPLACEMENT                      conforms to the rules of the ASME Code, Section XI.                                                          Repair or replacement Type Code Symbol Stamp                                                                      N/A Certificate o0 Autmrzation No.                        It   A.A                         Expiration Date                          N/A Signed,,,_                        ____                   _       __"      A.,___-    Date                 /o          oC   I,-

Ownerb; Owneris esprnee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of GeorgLa and employed by HartfordSteam Boiler Inspecton and Insurance Co. of Connechcui of Hartford. Connectcuthave inspected the components described in this Owner's Report during the period 073 1/O0 to -- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken XI. corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations with this be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected

          -        ,.     (           .   ...      .             Commissions         GA 903 Inspectorryignature                                               National Board, State, Province and Endorsements Date
  • 0-/I2

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00143 Date 04/22/01

1. Owner Southern Nuclear OperatingCompany Name Sheet  ! of 40 Invemess Center Parkway,Birmingham, AL Unit 2
2. Plant Vogtle Electnc GeneratingPlant MWO # 20002807 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant Voqtle

3. Work Performed by Nuclear Operations Maintenance Name Address
4. Identification Of System 1201 / Reactor Coolant System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 A,ddenda, N/A Code Case (b)Appllcable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1201-030-H611 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-3. senal# 29042 was replacedwith PSA-3, serial# 28059 to Support surveillancetesting.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureEl N/A [] OtherE] Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed " E-. Date Signe t4- J-**?r-,..- 20 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford. Connecticut have Inspected the components described in this Owner's Report during the period 01/09/01 to , 3 - J, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any maper for any personal injury or property damage or a loss of any kind arising from or connected with this

   ,__________                __________Commissions                           GA.;70.
                  "Insp ctor's Signature                                        National Board, State, Province and Endorsements Date       *-3                            20.0

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00144 Date 04/22/01

1. Owner Southern Nuclear Operabng Company Name Sheet 1 of 1 40 Inverness Center Parkway, Birmingham,AL Unit 2
2. Plant Vogtle ElectricGeneratingPlant MWO # 20002806 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant VogtRe Name Address
4. Identification Of System 1201 / Reactor Coolant System
5. (a) Applicable Construction Code ASME SECIII 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN NIA N/A V2-1201-030-H608 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-3. senal # 28736 was replacedwith PSA-3. senal # 29360 to support surveillancetesting
8. Test Conducted: Hydrostatic [] Pneumaticj] Nominal Operating Pressure[]

N/A j] Other [] Pressure N/A PSI Test Temp. N/A RF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi. repair or replacement Type Code Symbol Stamp N/A c Certificate of Authorization No. N/A Expiration Date N/A 9 Signed

                       ýOwner or Owner's Des       ee bt".t'{J ile Date rOwrrO      e'DineTt20l CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                Georola               and employed by HartfordSteam Boiler Inspection and InsuranceCo. of Hartford, Connecticut have      Inspected        the components         described     in this     Owner's      Report     during the       period      01/09/01 to              -             and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannej.rfor any personal Injury or property damage or a loss of any kind arising from or connected with this I *n p , Po (. _ /1 Commissions G A .203 "ins-pectVr'sSignature National Board, State, Province and Endorsements Date .4;_- 3 2001

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00145

1. Owner Southern NuclearOperabngCompany Date 04/20/01 Name 40 Inverness CenterParkway, Birrmngham,AL Sheet ] of
2. Plant Vogtfe Electrc GeneraftngPlant Unit 2 20002808 Waynesboro, GA 30830 MWO #

Address Repair Organization P.O. No., Job No., etc.

3. Work Performed by Nuclear OperatonsMaintenance Plant VogUe Name Address
4. Identification Of System 1201 / Reactor Coolant System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN NIA N/A V2-1201-051-H006 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS F

7. Description Of Work SnubberAD-41, serial# 1510 was replacedwith AD-41, senal# 888 to support survefllance testing.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

NIA []I Other LI Pressure N/A PSI Test Temp. N/A GF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date NIA Signed Date Z 20 Sine Owner or Owner's Designee, Title L CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspecfton and Insurance Co of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 01/09/01 to ._-'7-70/ -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any nner for any personal injury or property damage or a loss of any kind arising from or connected with this Commissions 6(A

                "-n.iecor's Signature                                          National Board, State, Province and Endorsements Date          .57- 7                        2D0O/

UnI 11 L I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00146

1. Owner Southern NuclearOperabngCompany Date 05/18/01 Name 40 Inverness CenterParkway, Birmngham, AL Sheet ] Of 1
2. Plant VogUe Electric GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20002809 and A0001233 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Vogte Name Address
4. Identification Of System 1201 / Reactor Coolant System
5. (a) Applicable Construction Code ASME SEC IXI 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1201-053-HO05 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-35. senal # 11504 was replaced with PSA-35. serial # 11508 to support surveillance tesbno. Also replacedtelescoping cylinderon snubber,senal# 11508, under Traveler# 00140 and MWO # A0001233
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureE]

NIA Other nl Pressure NIA PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XL repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA Signed " yjV 4 Iq'r\lbDate \'/& I, 20 0 k Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georura and employed by HartfordSteam BoilerInspechon and Insurance Co. of Hartford,Connectfcut have inspected the components described in this Owner's Report during the period 11/09/00 to _ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any m~n r for any personal injury or property damage or a loss of any kind arising from or connected with this Commissions GA to-3 "Inspepotr'sSignature National Board, State, Province and Endorsements Date ,'1 1;? 20 0/

UKIUINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 00147

1. Owner Southern NuclearOperatnqCompany Date 04/22101 Name 40 Inverness CenterParkway, Birmingham, AL Sheet I of 1
2. Plant VogUe Electric GeneratngPlant Unit 2 Waynesbom, GA 30830 MWO # 20002812 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabonsMaintenance Plant Vootfe Name ' Address
4. Identification Of System 1202! Nuclear Service Cooling Water System
5. (a) Applicable Construction Code - ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1202-004-H073 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-1601. senal # 148 was replacedwith AD-1601, senal# 55 to supportsurveillance testing.
8. Test Conducted: Hydrostatic E] Pneumatic-] Nominal Operating PressureU N/A E] Other ni Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A C0l Signed {' t v\ -, A r, Date A 200 i or Owner's Designee, TitleL aOwner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Botler Inspectfon and Insurance Co. of Hartford, Connecftcut have inspected the components described In this Owner's Report during the period 01/09/01 to .,!5- 7 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any maer for any personal injury or property damage or a loss of any kind arising from or connected with this Ins 3 on I /. - Commissions Insp'c-tor' Sig-n-ature National Board, State, Province and Endorsements Date " 7 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00148 Southern NuclearOperaningCompany Date 04/20/01

1. Owner Name 40 Inverness Center Parkway,Birmingham, AL Sheet of Unit 2
2. Plant Vogte Electnc GeneratingPlant Wavnesboro. GA 30830 MWO # 20002813 Address Repair Organization P.O. No., Job No., etc.

Plant Vogtle

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 12021 Nuclear Service Cooling Water AdSystem Addenda, N-249-1 Code Case
6. (a) Applicable Construction Code ASME SEC I1I 1977 Edition, Winter 1977 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1202-231-H030 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAQ-153, senal # 405 was replacedwith AD-153. serial# 420 to supoRrt surveilancetesting.
8. Test Conducted: Hydrostatic [] Pneumatic-] Nominal Operating Pressure-N/A ii Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A

( 'C . M'k I A Signed 6%r. Date 20 0 S)Owner or Owner's Designee, Titlei CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geor.ia and employed by HartfordSteam Boiler Inspecthon and Insurance Co. of Hartford, Connecticuthave inspected the components descnbed In this Owner's Report during the period 01/09/01 to .7- Z-, -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any maner for any personal injury or property damage or a loss of any kind arising from or connected with this

     ,_           ____*_.___*_-*___--__                          Commissions          GA -705 "insppdor'sSignature                                              National Board, State, Province and Endorsements Date          .5"-      7                          20°L-

ULiIUINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS I 1. Owner As Required By The Provisions Of The ASME Code Section XI Southern NuclearOperatingCompany Name Date Traveler # 05/18/01 00149 40 Inverness CenterParkway, Birmingham,AL Sheet / Of 1

2. Plant Vogtie Electric Generabng Plant Unit 2 Waynesboro, GA 30830 MWO# 20002814 and A9801491 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperations Maintenance Plant Vogqffe Name Address
4. Identification Of System 1204 / Safety Injection System
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR' REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPESUPPORT PULLMAN N/A NIA V2-1204-023-HOOI 1989 REPLACEMENT YES "POWER PRODUCTS

7. Description Of Work SnubberAD-5501. senal# 446 was replacedwith AD-5501. serial# 428 to suponrt surveiflance teshng. Also replaced support sleeve: telescopng sleeve: ball nut retainer and bearing shaft on snubber, senal # 428, under Traveler #
                                    .9191 andMWO# A9B01491
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureE]

N/A

  • Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed A 4 (Date _ _ __ 20
                 - . Owner or Owner's Designee, Titler CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                 Georgia                and employed by HartfordSteam Boiler Inspection andInsurance Co of Hartford, Connecticut have inspected         the      components         described      in     this      Owner's      Report        during     the       period 05/18/99 to 5-,-p          I        . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME -Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man r for any personal injury or property damage or a loss of any kind arising from or connected with this In spe -~on. /

                     .nspaetor's Signature                                            National Board, State, Province and Endorsements Date       1.                               2001 20,2

ORIGINAL 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00150

1. Owner Southern NuclearOperahngCompany Date 04/24/01 Name 40 Inverness CenterParkway, Birningham,AL Sheet 1 Of 1
2. Plant Vogtle Electrc GeneraftngPlant Unit 2 Waynesboro, GA 30830 MWO # 20002815 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperatbonsMaintenance PlantVootle Name Address
4. Identification Of System 1204) Safety Injection System
5. (a) Applicable Construction Code ASME SEC II/ 1977 Edition, Winter 1977 J,ddenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPE PULLMAN N/A N/A V2-1204-023-H009 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1600 senal # 644 was replaced wTth AD-1600, serial# 57 to suporrt surveillance testhn.

R. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating PressureE N/A[] Other El Pressure NIA PSI Test Temp. NWA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the "rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A Signed M,e Z'e 20D owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georqia and employed by Hartford Steam Bofler Inspection and Insurance Co of Hartford. Connecthcuthave inspected the components described In this Owner's Report during the period 01/09/01 to 3-2 - 0/, , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this

 ,nsP*4                b6-7w
                       ,;                                Commissions                   414     ft,
  • Inspector's Signature National Board, State, Province and Endorsements Date 20 01

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00151 Date 04/22101

1. Owner Southern NuclearOperating Company Name Sheet 1 of 40 Inverness Center Parkway, Birmingham, AL Unit 2
2. Plant Vogtle Electric GeneratingPlant MWO # 20002816 Wavnesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant Vogtle

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 1204 /Safety Injection System
5. (a) Applicable Construction Code ASME SEC ill 1977 Edition, Winter 1977 kddenda, N/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A NIA V2-1204-057-H019 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS ______ I I I I ________ I _______ I

7. 'Description Of Work Snubber PSA-1/2. serial # 18540 was replacedwith PSA-1/2. serial # 18893 to suoportsurveillance testinq.
8. Test Conducted: Hydrostaticj] Pneumaticl] Nominal Operating Pressure[]

N/A [] Other [] Pressure N/A PSI Test Temp. N/A RF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A A i'Date qý' Signed ,;-e. 7 20 t-) owner or Owner's Deslgnee, Title I CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Hartford,Connecticut have inspected- the components described In this Owner's Report during the period 01/09/01 to J.- "7-f I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inlqection..,/ _,5 1A1 Commissions GA .967

      .    "           'lrp-ector'sSignature                                         National Board, State, Province and Endorsements Date       5-- 7                            20

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00152

1. Owner Southern NuclearOperatngCompany Date 04/29/01 Name 40 Inverness Center Parkway,Birmingham,AL Sheet I of 1
2. Plant Vogte Electnc Genera1ng Plant Unit 2 Waynesboro, GA 30830 MWO # 20002817 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperatbonsMaintenance PlantVogtle Name Address
4. Identification Of System 12041 Safety Injection System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 1Addenda, N/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A NIA V2-1204-126-H020 1969 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-35. senal# 11499 was replacedwith PSA.35. senal # 11506 to supportsurveillance teshnj.
8. Test Conducted: Hydrostatic [] Pneumatic[-] Nominal Operating Pressure[]

NIA [] Other E] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed Owners D OwerOwner's Designee, Title '

                                                               ,  Date     _        _          _         _20                 1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of                Georia             and employed by HartfordSteam Boiler Inspecton and Insurance Co. of Hartford.Connecbcut have inspected         the     components      described      in     this     Owner's     Report      during        the     period     01/09/01 to        '-7-6Z           _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this

  • ns//n : "---* 9 Commnisslons (A 2 3 "Ins;;cor'sSignature National Board, State, Province and Endorsements Date .4- 7 2061

UNIU6INAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00153

1. Owner Southern NuclearOperatingCompany Date 04127/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet I Of ]
2. Plant VogUe Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002818 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Voqtle Name Address
4. Identification Of System 1205/ Residual Heat Removal System
5. (a) Applicable Construction Code ASME SEC I1/ 1977 Edition, Wrinter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work SnubberAD-1603 serial# 86 was replacedwith AD- 1603, senat# 656 to support surveillance tesbrna.

S. Test Conducted: Hydrostatic [] PneumaticE] Nominal Operating Pressuref-J NIA [] Other U Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed o ý>nr Ow nea, 20 kýn~e~r or Owner's Designee, Title ip CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspechon and Insurance Co. of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 01/09/01 to . 5 7. p I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl, By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner pr any personal injury or property damage or a loss of any kind arising from or connected with this inp-.,,**/ Commissions (* ,,' R "Insp4eto*SI nature National Board, State, Province and Endorsements Date .- T-

                            -7f 2001

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00154 Date 04/23/01

1. Owner Southern Nuclear OperatingCompany Name Sheet I Of I 40 Inverness Center Parkway, Birmingham, AL
2. Plant Vogt/e Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002819 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Vogtle Name Address
4. Identification Of System 1206 1Containment Spray System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1206-005-HO08 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-3. serial # 26777 was replacedwith PSA-3. serial# 26803 to support surveillancetesting.
8. Test Conducted: Hydrostatic [] Pneumatic-] Nominal Operating Pressure[

N/A Other j] Pressure N/A PSI Test Temp. N/A F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed z .> Date . Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Hartford,Connecti have Inspected the components described In this Owner's Report during the period 01109/01 to .6--*4-0 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma er for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions 6 V,03 InspeCtor's Signature 20<31 National Board, State, Province and Endorsements 5"-

  • Date Date -5. ý4 200/

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00155

1. Owner Southern NuclearOperatingCompany Date 04129/01 Name 40 Inverness CenterParkway,Binnngharn,AL Sheet ] of
2. Plant Vogtle Electnc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20002820 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperatfonsMaintenance Plant Voade V

Name Address-

4. Identification Of System 1208/ Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1208-001-H026 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-3. senal # 28715 was replacedwith PSA-3. serial# 28344 to supoortsurveilfance tesbng. Also installed replacement transtion kit bolt on reolacement snubber serial# 28344
8. Test Conducted: Hydrostatic [] Pneumaticr-1 Nominal Operating PressureE]

N/A X1 Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NIA cQ Certificate of Authorization No. N/A Expiration Date NIA Signed k.,...MAL/ at

                                                                  ,                              Z-                     20
                %, I Owner or Owner's Designee, Title         I CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of              Geomia               and employed by HartfordSteam Boil7er Inspection and Insurance Co. of Hartford,Connecticuthave inspected       the     components       described        in      this      Owner's     Report      during    the      period     01109/01 to      5'-- 7-0'         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XL.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any maner for any personal injury or property damage or a loss of any kind arising from or connected with this insp in. /*j _____________. _____,,_____,__._ Commissions _G_ 4 _S'0; Inseor's Signature National Board, State, Province and Endorsements Date A' 7 20,0

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00156 04/22/01

1. Owner Southern NuclearOperabngCompany Date Name 40 Inverness CenterParkway, Bjrmingham, AL Sheet I of I
2. Plant Vogffe Electric Generaffng Plant Unit 2 Waynesboro, GA 30830 MWO # 20002821 and A9701076 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatons Maintenance PlantVogUe Name Address
4. Identification Of System 1208 1 Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC II/ 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1208-007-H002 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-501 serial# 568 was repLaced wdh AD-501. serial# 412 to support surveillance tesbng. The rack stop was also replaced on the replacementsnubberserial# 412 under Section X7 Traveler# 99122 and MWO# A9701076
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[]

WA1 Other [] Pressure N/A PSI Test Temp. NIA CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed f'* r . Date * & 20 O " k ) Owner or Owner's Designee, Title u CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geo.ta and employed by HartfordSteam Boil7er Inspection and Insurance Co. of Hartford,Connecticuthave inspected the components described In this Owner's Report during the period 05/18/99 to .*"- -/-OV t , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any m nner for any personal injury or property damage or a loss of any kind arising from or connected with this i* n_ _ _ _ Commissions &A .70" SInsfoector's Signature National Board, State, Province and Endorsements Date ____ __ __ 20_

ORIGINAL 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00158

1. Owner Southern NuclearOperatingCompany Date 04122/01 Name 40 Inverness CenterParkway, Birmingham, AL Sheet I of ]
2. Plant Vogtle Electinc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002822 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance Plant Vogtle Name Address
4. Identification Of System 12081 Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1208-008-H025 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-73, serfal# 364 was replacedwith AD-73, senal # 491 to support surveillance testng.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/A [F] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ADate Ownr rwn20 01 kowner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georpta and employed by HartfordSteam Boiler Inspecbon and Insurance Co. of Hartford, Connecticuthave Inspected the components described in this Owner's Report during the period 01/09/01 to ._I'-LW- -[ -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liaye in any maper for any personal Injury or property damage or a loss of any kind arising from or connected with this ____ Commissions 4A 5A c03 lnsptctoi's Signature National Board, State, Province and Endorsements Date 6:. 4 200L

I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00159

1. Owner Southern NuclearOperaftngCompany Date 04/27/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet I Of 1
2. Plant Vogtie EJectdc GeneraningPlant Unit 2 Waynesboro, GA 30830 MWO # 20002823 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperatbonsMaintenance Plant Vontle Name Address
4. Identification Of System 1208 / Chemical and Volume Control System
6. (a) Applicable Construction Code ASME SEC ItI 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPESUPPORT PULLMAN N/A N/A V2-1208-011-H045 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-41, senal# 772 was replacedwth AD-41, senal#541 to support surveilance testing.
8. Test Conducted: Hydrostatic E] Pneumatic[:] Nominal Operating PressureE' NIA [ Other LI Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed e ese ewoO 20Tt

( I wneror owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by HartfordSteam Boffer Inspection and Insurance Co of Hartford, Connectcut have inspected the components described In this Owner's Report during the period 01/09/01 to -- O , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma n for any personal Injury or property damage or a loss of any kind arising from or connected with this S2ý'., . Commissions GA',4,73 Inspeafor's Signature National Board, State, Province and Endorsements Date 5---l 20 01

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI TIraveler # 00160

1. Owner Southern Nuclear OperatingCompany Date 0 /22/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet I of I
2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002824 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vogtle Name Address
4. Identification Of System 1208 / Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC Ill 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1208-047-l-1604 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-1/2, serial# 14117 was replaced w.th PSA-1/2, serial # 19832 to support surveillance testino.
8. Test Conducted: Hydrostatic ] PneumaticE] Nominal Operating Pressure[]

N/A E] Other [] Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 'Date

             &J      Owner or Owner's Designee, Title       -                            t CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                Georota             and employed by Hartford Steam Boiler Inspection and Insurance Co. of Hartford. Connect=c have       Inspected the        components       described    in    this    Owner's       Report     during the period            01/09/01 to        -J            ,    and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Cede, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mann, for any personal injury or property damage or a loss of any kind arising from or connected with this Commissions -,4A 6 1ý"

                   "Inspeclr'sSignature                                          National Board, State, Province and Endorsements Date          T--   7                      20 0/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00161

1. Owner Southern NuclearOperatingCompany Date 04/22/01 Name 40 Inverness CenterParkway, Birmungham, AL Sheet of I
2. Plant Vogde Electnc Generating Plant Unit 2 Waynesboro, GA 30830 MWO # 20002825 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperations Maintenance Plant Vogfue Name Address
4. Identification Of System 1208/ Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC IIf 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1208-055-H046 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-153, senal/# 226 was replaced with AD-153, senal# 418 to support surveillance testing.

B. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating Pressure[] N/A Other El Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A q \ Signed

  • O eo nDate (sDslnTte 20 c1).

S)owner or Owner's Designee, Title (o CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Boder Inspection and Insurance Co. of Hartford. Connecticuthave inspected the components described In this Owner's Report during the period 01/09/01 to - and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any aner for any personal injury or property damage or a loss of any kind arising from or connected with this _ _ _ _ _ _ _ _ Commissions GA y o, Inspectors Signature National Board, State, Province and Endorsements Date 5 4' 200 /

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00163

1. Owner Southern NuclearOperatingCompany Date 04/22101 Name 40 Inverness CenterParkway.Birminghham, AL Sheet I of I
2. Plant Vogtie EJectnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002827 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatbonsMaintenance Plant VotUe If Name Address
4. Identification Of System 12081 Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PiPE PULLMAN NIA N/A V2-1208-255-HO04 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-41, serial # 891 was replaced with AD-41, senal # 893 to suoport surveillance testng. Also Installed a replacementbolt on the transitiontube.
8. Test Conducted: Hydrostatic [] Pneumatic[-] Nominal Operating Pressure-0 N/AFX' Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed . Date A1-, 2-. 20C(t I Owner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boi7er Inspection and Insurance Co of Hartford.Connechcut have inspected the components described in this Owner's Report during the period 01/09/01 to 5-4-01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME .Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man r for any personal Injury or property damage or a loss of any kind arising from or connected with this s ,K _*- Commissions 5A A:a3 Inspeeor's Signature National Board, State, Province and Endorsements Date 6 4 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00164 Southern NuclearOperabngCompany Date 04/22101

1. Owner Name 40 Inverness CenterParkway, Birmingham, AL Sheet of Unit 2
2. Plant VogUe Electnc GeneratngPlant Waynesboro, GA 30830 MWO # 20002829 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Voatle V

Name Address

4. Identification Of System 1217 / Auxiliary Component Cooling Wa ter System ASMESEC IIl 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
6. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPE PULLMAN N/A N/A V2-1217-071-H628 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-41, serial# 750 was replacedwith AD-41, senal# 543 to support survefllance tesbng.
8. Test Conducted: Hydrostatic LI PneumaticU] Nominal Operating Pressure E NIA Other jJ Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed orAowe' D ne k _ wner or Owner's Designee, Title *
                                                         ., -r". Date             /   "-7                          20 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of                Geormia             and employed by Hartford Steam Boler Inspecton and InsuranceCo of Hartford, Connectcut have inspected          the     components        described     In    this     Owner's      Report       during     the       period 01/09101 to           .'                and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XL By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mapner for any personal Injury or property damage or a loss of any kind arising from or connected with this i     =s t ,n..                          -Commissions                        GA ,2 g!

I-/sctor's Signature National Board, State, Province and Endorsements Date i; _ 'v 2001(

ORIGINAL J FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 00165 Southern NuclearOperatingCompany Date 04/29101

1. Owner Name 40 Inverness CenterParkway, Birrmngham,AL Sheet IofI
2. Plant VogUe Electnc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20002830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Vogie Name Address
4. Identification Of System 1217 1 Auxiliary Component Cooling Water System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, W/A Code Case (b)Applicable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1217-073-H623 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-1/4 senal# 26460 was replacedwith PSA-1/4, senal# 37661 to supportsurveillance teshng.
8. Test Conducted: Hydrostatic [] Pneumatic,'] Nominal Operating Pressure[l NIA [] Other [] Pressure NIA PSI Test Temp. NIA 9F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed (- Owne o s e Date __20 Ot (Owner or Owner's Designee, Title U CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georrgia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 01109101 to -,6-- 7-0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any m~qner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection, ./V_ (Av7o Z A

      *.,,__, _________-               ____Commissions "Ins, ctor's Signature                                           National Board, State, Province and Endorsements Date          .'-      7                       200L

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00166

1. Owner Southern NuclearOperatngCompany Date _, 4/22/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet of I
2. Plant Vogfte Electnc GeneratingPlant Unit 2 Waynesbom, GA 30830 MWO # 20002831 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Voatie Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASMESEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-015-HO04 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1603. serial# 684 was replacedwith AD-1603. serial# 75 to supportsurvefflance testin.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure["]

N/A [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed NA*-. Date _ 1--.tt. _ _20 ýl{.

                    \     *)wner or Owner's Designee, Title                                I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                   Geomia              and employed by HartfordSteam BoilerInspection and Insurance Co of Hartford,Connecticut have inspected            the      components       described      In    this      Owner's       Report        during     the     period 01/09/01 to .5--              !         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manqr for any personal injury or property damage or a loss of any kind arising from or connected with this M IZ)' ,-,- Commissions GA 203 Inspelr's Signature National Board, State, Province and Endorsements Date ,5.,- "7 2001

UrlI UII JML I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required ByThe Provisions Of The ASME Code Section Xl Traveler # 00167

1. Owner Southern Nuclear OperatingCompany Date 04/22/01 Name 40 Inverness Center Parkway, Birmingham, AL Sheet I of 1
2. Plant Vogtle Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002832 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant VogUe Name Address
4. Identification Of System 1301 I Main Steam System
5. (a) Applicable Construction Code ASME SEC II 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PiPE PULLMAN N/A N/A V2-1301-015-H007 1989 REPLACEMENT YES SUPPORT POWER PRonUCTS

7. Description Of Work Snubber PSA-3. serial # 15238 was replaced with PSA-3, serial# 26940 to support surveillance testing.
8. Test Conducted: Hydrostatic [] PneumaticE] Nominal Operating Pressure[]

N/A[] Other j] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Cede Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed *. MC* 3 tDate z 20 C)

                           '(*ner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                        Georgia              and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford,Connecticut have          Inspected          the components           described     in this Owner's           Report     during   the period         01/09/01 to         .       -, t           , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma er for any personal Injury or property damage or a loss of any kind arising from or connected with this Insoe ln'1 o~n.-//

                '*,n. *"             .     .-.. /Commissions                              @4      :
                         "fsigctor's 1         Signature                                          National Board, State, Province and Endorsements Date             .5-7-e f                           2001

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00168

1. Owner Southern NuclearOperatingCompany Date 05124101 Name 40 Invemess CenterParkway,Birmingham,AL Sheet 1 Of
2. Plant Vogtfe Electinc GenerabngPlant Unit 2 Waynesbom, GA 30830 MWO # 20002835 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance PlantVogUe Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME SEC II/ 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF COMPONENT OF MANUFACTURER ER SERIAL BOARD NO. OTHER IDENTIFICATION YEAR BUILT REPLACED OR REPLACEMENT STAMPED (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1301-105-H003 1989 REPLACEMENT YES POWER PRODUCTS ____________ S S a a & a

7. Description Of Work Snubber AD-12501, senal # 23 was replaced wyth AD-12501, serial # 187 to support surveillance test/nq. Also replacedload stud and nuts: fixed end lug:,paddle end adapter,socket end and transitiontube kt pwpe . °
8. Test Conducted: Hydrostatic E] Pneumatic[:] Nominal Operating Pressure L]

N/AN Other E] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A ISigned OweZ) or O e e e Tn Date I 20 L

             %-,j       Owner or Owner's Desicinee, T,7tl-eIJ                                I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of                Georgia                and employed by Hartford Steam Bofler Inspectfon and Insurance Co of Hartford, Connecbcut have inspected         the      components         described         in     this     Owner's       Report       during       the       period 01109/01 to               L.-...../ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manr r for any personal injury or property damage or a loss of any kind arising from or connected with this In _ _____ 141Z _,*___ _-Commissions _A,_ _ _ _ _ _ Inspeo(or's Signature National Board, State, Province and Endorsements Date " V 0 2001/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00169 Date 04127/01

1. Owner Southern NuclearOperabngCompany Name 40 Inverness CenterParkway,Birmingham, AL Sheet 1 Of 1 Unit 2
2. Plant Voqtle Electnc GeneratingPlant MWO # 20002836
                     .Waynesboro. GA 30830 Address                                                Repair Organization P.O. No., Job No., etc.

PlantVootle

3. Work Performed by NuclearOperabons Maintenance Name Address
4. Identification Of System 1301 / Main Steam System ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN A/A N/A V2-1301-107-H004 1989 REPLACEMENT YES POWER PRODUCTS _

7. Description Of Work SnubberAD-5501. serfal # 443 was replacedwtth AO-5501, serial#232 to supportsurve7llance tesbng.

B. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating Pressure E' N/A [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 6 \ A 4!d M4 2- 20 61 ( owner or Owner's Designee, Title U u CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georoia and employed by HartfordSteam Boder Inspection and Insurance Co of Hartford. Connecbtcuthave inspected the components described In this Owner's Report during the period 01/09/01 to S-?,- 0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspe t -,p a W Commissions e4M/ 7 Inspector's Signature National Board, State, Province and Endorsements Date 20 47/

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00171

1. Owner Southern NuclearOperabngCompany Date 04/22101 Name 40 Inverness CenterParkway. Birmingham,AL Sheet I of
2. Plant Voqtle Electnc Generaftng Plant Unit 2 Waynesboro, GA 30830 MWOI# 20002838 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperaftonsMaintenance Plant Vogtle Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME SEC 1/1 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-118-HO11 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-151, senal # 138 was replacedwith AQ- 151, sefnal# 426 to supportsurvefllance tesbng.

B. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating PressureE] N/A [F] Other F1 Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed wne or Ower Te20 Date 0 k4) owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georria and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartfor,. Connecticut have inspected the components described in this Owner's Report during the period 01/09/01 to 5-o -,I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma ner for any personal injury or property damage or a loss of any kind arising from or connected with this ins , ,nCommissions (7A,*,793 "Insp ctor's Signature National Board, State, Province and Endorsements Date q-5--I 2001

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00172 Date 04/22/01

1. Owner Southern NuclearOperatngCompany Name Sheet of 40 Inverness CenterParkway,Birmrngham,AL Unit 2
2. Plant Vogtle Electnc GenerabngPlant Waynesboro, GA 30830 MWO # 20002839 Address Repair Organization P.O. No., Job No., etc.

Plant Vogfte

3. Work Performed by NuclearOperabonsMaintenance Name Address
4. Identification Of System 1301 I Main Steam System 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC Ill (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-121-HO04 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS _

7. Description Of Work Snubber AD-43, senal # 1530 was replacedwith AD-43, senal # 716 to supportsurvei~lance tesftng.
8. Test Conducted: Hydrostatic E] Pneumatic ] Nominal Operating Pressure []

N/A Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Expiration Date N/A A7CCertificate of Authorization No.

ý.

N/A Signed or . Date /VJLr).1 20 6 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford.Connectcut have inspected the components described In this Owner's Report during the period 01/09/01 to 5-1-01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any ma er for any personal Injury or property damage or a loss of any kind arising from or connected with this ir~p~flon., 041;1 _ Commissions G'A ;7,*0-1 nslSignature National Board, State, Province and Endorsements Date .5-- V 200L

ORIGINAL I~ FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00173 04/22/01

1. Owner Southem NuclearOperahngCompany Date Name 1 Sheet I of 40 Inverness CenterParkway, Birmingham, AL g" I Unit 2
2. Plant Vogte Electfic GeneratngPlant MWO # 20002840 Wavnesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant Vogtle

3. Work Performed by NuclearOperationsMaintenance Name Address
4. Identification Of System 13011 Main Steam System Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC INI 1977 Edition, Winter 1977 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 19899
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-127-H024 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-503, senal# 221 was replacedwth AD-503, senal# 659 to supportsurveilance testng.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

NIA N Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. NIA Expiration Date N/A Signed 4t(. Date /fld / 20 0O k, pwner or Owner's Designee, Title V CERTIFICATE OF INSERVICE INSPECTION State or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the Georgia and employed by Hartford Steam Boiler Inspecton and Insurance Co. of Hartford Connecticut have Province of the components described In this Owner's Report during the period 01/09/01 inspected to . -L , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, his employer shall examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor or connected with this be liable in any manner for any personal Injury or property damage or a loss of any kind arising from Ins*',, - Commissions 6,A *"

            "-      Inspbeor's Signature                                          National Board, State, Province and Endorsements Date           &--. 1                     20 0

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi T"raveler # 00174

1. Owner Southern NuclearOperatingCompany Date 0 5/11/01 Name 40 Inverness Center Parkway, Birmingham, AL Sheet I Of 1
2. Plant Vogtle Electric Generating Plant Unit 2 Waynesboro, GA 30830 MWO # 20002841 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant VoQle Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-128-H006 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS I I III1

7. Description Of Work SnubberAD-501, serial# 546 was replaced with AD-501, senal # 532 to support surveillancetestin.
8. Test Conducted: Hydrostatic ] PneumaticE] Nominal Operating PressureE]

N/A [] Other [] Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ,*- 10 ,Aý r* Date 20

               \     Owner or Owner's Designee, TitRe'-2 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of              Georcia               and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford. Connecticut have Inspected        the      components         described      In     this       Owner's      Report     during     the      period 01/0/0 to _                         and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mannerlor any personal Injury or property damage or a loss of any kind arising from or connected with this I4- Commissions 6,C,',9.5 Inspe,~r's Signature National Board, State, Province and Endorsements Date 3-1 /2 20 121__

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00175 04122/01

1. Owner Souther NuclearOperabngCompany Date Name of Sheet ]

40 Inverness CenterParkway, Birmingham, AL Unit 2

2. Plant Vogfe Electnc GenerabngPlant MWO # 20002842 Wavnesbom, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant Vogtfe

3. Work Performed by Nuclear OperatonsMaintenance Address Name
4. Identification Of System 1301 / Main Steam System Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE NAME OF ER BOARD OTHER YEAR REPLACED OR STAMPED OF MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT NO. PULLMAN N/A N/A V2-1301-129-H016 1989 REPLACEMENT YES PIPE SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-151, senal# 524 was repLacedwith AD-151. senal# 499 to supportsurveillance teshng.
8. Test Conducted: Hydrostatic E] Pneumatic[E Nominal Operating Pressure[]

NIA [K Other Li Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed h*% .A.- A/.- ?N. Date Y't*.( Z-. 20 0) k Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION the State or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and Georgia and employed by Hartford Steam Boler Inspechon and Insurance Co of Hartford. Connectcut have Province of inspected the components described In this Owner's Report during the period 01/09/01 to ..5"-- O ..- and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl. implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or employer shall examinations and corrective measures described in this Owners Report. Furthermore,, neither the Inspector nor his for any personal injury or property damage or a loss of any kind arising from or connected with this be liable in any manner insp efion. a a Commissions-______________________ insZin. l< Inspector's Signature Nationil'*oard, State, Province and Endorsements Date 6.5- a 20

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 00176 Date 04/22101

1. Owner Southern NuclearOperahngCompany Name 40 Inverness CenterParkway, Birmingham.AL Sheet of Unit 2
2. Plant Vogtle Eiectdc GeneraftngPlant Waynesboro, GA 30830 MWO # 20002843 Address Repair Organization P.O. No., Job No., etc.

PlantVootle

3. Work Performed by Nuclear Operaftons Maintenance Name Address
4. Identification Of System 1301 / Main Steam System 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC I1I (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPE PULLMAN NIA N/A V2-1301-136-H003 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-71, sedal# 615 was replacedwith A Q-71. serial# 484 to supportsurveilance tesbno
8. Test Conducted: Hydrostatic [] PneumaticE] Nominal Operating Pressure NIA I] Other L] Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Oweror Owner Dinee, Ti e20 Date
                  '.J owner or Owner's Designee, Title         Q CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                 Geormia             and employed by Harford Steam Boiler Inspecfton and InsuranceCo. of Hartford Connechcuthave inspected          the      components       described      In    this     Owner's      Report       during    the      period 01/09101 to             -               and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this insp)i*tion. ,,  ;/ / ____________________ Commissions e'1.7

                     -inspector's -signature                                      National Board, State, Province and Endorsements Date         S- ;2                           20 01

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 00177

1. Owner Southern NuclearOperat'ngCompany Date 04122101 Name 40 Inverness CenterParkway,Birmingham,AL Sheet J of 1 Unit 2
2. Plant VogUe Electnc GeneratngPlant Waynesbom, GA 30830 MWO # 20002844
                                      . Address                                                 Repair Organization P.O. No., Job No., etc.

Plant Voatle

3. Work Performed by Nuclear OperatonsMaintenance Name Address
4. Identification Of System 1301 /Main Steam System 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC III (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-137-HO04 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-151L. senal#698 was replacedwith AD- 151L. senal # 256 to supportsurveillance testsno.

B. Test Conducted: Hydrostatic [] Pneumaticf] Nominal Operating Pressure-NIA E] Other L] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed o UJn D n Te Date

                                                                  .                          i.                  20
                           )Onrorwner's Designee, Title Vj\.c                           L CERTIFICATE OF INSERVICE INSPEC-TIIUN I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of               Georgia             and employed by HartfordSteam Bolter fnspecton and Insurance Co of Hartford.Connecbcut have inspected        the      components       described      In    this     Owner's       Report      during     the      period 01109/01 to .J4-3-/         --      , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manppr for any personal injury or property damage or a loss of any kind arising from or connected with this In "I- Inspp6tor's Signature National Board, State, Province and Endorsetnents Date 5-- 3 200J

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00178 04/22/01

1. Owner Southern NuclearOperatfngCompany Date Name Sheet I of 40 Inverness CenterParkway, Birrnrngharn,AL Unit 2
2. Plant Vogfte Electnc GenerabngPlant MWO # 20002845 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address Plant Vogtle

3. Work Performed by Nuclear OperabonsMaintenance Name Address
4. Identification Of System 1301 1 Main Steam System Addenda, N-249-1 Code Case S. (a) Applicable Construction Code ASME SEC IA/ 1977 Edition, WVnter 1977 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-139-H003 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-71, senal#321 was replacedwith AD-71, senal# 362 to support surve llance testng.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure l N/A [] Other El Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Sowned ororwner's Designee, Title v CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georqia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 01/09101 to -,S*.e.c I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this ins ion. Commissions GA z2.*

                      "P7p "I"por's Signature                                      National Board, State, Province and Endorsements Date _        _     _      _     _       _    200/

ORIGINAL J FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00179

1. Owner Southern NuclearOperatrngCompany Date 04/22/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet of
2. Plant VogUe ElectricGeneratng Plant Unit 2 Waynesboro, GA 30830 MWO # 20002B46 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabons Maintenance PlantVogUe Name Address
4. Identification Of System 1301 / Main Steam System
6. (a) Applicable Construction Code ASME SEC II 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1301-213-H003 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-73. senal# 258 was replacedwrth AD-73. senal# 183 to support surveillance testing.

B. Test Conducted: Hydrostatic ] Pneumatic-] Nominal Operating Pressure E N/A [F] Other [] Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A V Signed ) y*wer or Owner's Designee, Title

                                                      .        Date               A          /                  20 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of               Geomia             and employed by HartfordSteam Bofer Inspection and Insurance Co of Hartford,Connecbcut have inspected        the      components      described      in    this     Owner's      Report       during    the       period 01/09101 to     6ý6- '/- 0/         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section X.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mnner for any personal injury or property damage or a loss of any kind arising from or connected with this insp tion. /Z/ Instgctor's Signature National Board, State, Province and Endorsements Date 6'1-1 20eý

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00180

1. Owner Southern NuclearOperatngCompany Date 04/22/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet 1 of 1
2. Plant Vogfle Electnc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20002847 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance PlantVootle Name Address
4. Identification Of System 1302/ Auxiliary Feedwater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Ad Idenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT {YES OR NO)

NO. PIPE PULLMANV N/A N/A V2-1302-108-H005 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-503, senal# 202 was replacedwith AD-503. serial# 512 to supportsurveilance tesbng.
8. Test Conducted: Hydrostatic Ei PneumaticE] Nominal Operating Pressure' N/A[ OtherE] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed <Z:> *- , fW) l* Date 20 CI (9 Owner or Owner's Designee, Title (

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geornia and employed by HartfordSteam Boiler Inspecbon and Insurance Co of Hartford, Connecticu have inspected the components described in this Owner's Report during the period 01/09/01 to 5'- 0O , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manppr for any personal injury or property damage or a loss of any kind arising from or connected with this Commissions GA .23 I Inspeafor's Signature National Board, State, Province and Endorsements Date 5.- 3. 20oL

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00181

1. Owner Southern NuclearOperatinqCompany Date 04124/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet  ! Of _
2. Plant VogUe Electnc Generating Plant Unit 2 Waynesbom, GA 30830 MWO # 20002848 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperations Maintenance Plant Vogtle Name Address
4. Identification Of System 13021 Auxiliary Feedwater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE SUPPORT PULLMAN N/A N/A V2-1302-109-H013 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-503. senal #358 was replacedwith AD-503. seral##362to supportsurveillance testfna.
8. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating Pressure[]

NIA [F] Other j] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code. Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed AX(JA "InS'-C=-=Date /f lt 2- 20 e15 Owner or Owner's Designee, Title V( CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geo.roa and employed by Hartford Steam Boaer Inspection and Insurance Co of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 01/09/01 to '5--2-61 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man r for any personal Injury or property damage or a loss of any kind arising from or connected with this ____/ Insa_._

                            ?Y..,/,*J~,,.Ar.*"

f/. ,*. /Commissions */,O*

        *  *   , f£ ,t"  -,   ..............

Inspeofor's Signature National Board, State, Province and Endorsements Date 200O/ Date v w 20 /

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 00182 04/23/01 Souther NuclearOperabngCompany Date

1. Owner Name I Of I Sheet 40 Inverness CenterParkway, Bimungham, AL I m Unit 2
2. Plant Vogtfe Electnc GeneratngPlant MWO # 20002850 and A9701075 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant VogUe

3. Work Performed by Nuclear Operations Maintenance Address Name Address
4. Identification Of System 130u I 4uxidiary reeUVrYIro emll 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASMESEC II/

(b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989

6. Identification Of Components Repairs Or Replacement Components MANUFACTUR NATIONAL REPAIRED, ASME CODE NAME NAME ER BOARD OTHER YEAR REPLACED OR STAMPED OF OF SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT MANUFACTURER NO. NIA N/A V2-1302-109-H015 1989 REPLACEMENT YES PIPE PULLMAN SUPPORT POWER PRODUCTS surveilance tesbno. The veme

7. Description Of Work Snubber AD-501, serial# 544 was replaced with AD-501. senal # 178 to support pi~non was also replacedon the replacement snubber senal # 178 under Section X7 Traveler# 99212 and MWO#

A970 1075 Test Conducted: Hydrostatic ] Pneumatic'] Nominal Operating Pressuref-] 8. N/AN] Other [] Pressure NIA PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made In the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A N/A Expiration Date NIA Certificate of Authorization No. Sowner or Owner's Designee, Title V D CERTIFICATE OF INSERVICE INSPECTION vessel Inspectors and the State or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure Geormia and employed by Hartford Steam Boiler Inspechon and Insurance Co of Hartford,Connecticuthave Province of described In this Owner's Report during the period 0910/99 ispected the components examinations and taken to .. zQ-.-.. and state that to the best of my knowledge and belief, the Owner has performed of the ASME Code, Section Xl. corrective measures described in this Owners Report in accordance with the requirements expressed or Implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, the Inspector nor his employer shall examinations and corrective measures described in this Owners ReporL Furthermore, neither in any mann, for any personal injury or property damage or a loss of any kind arising from or connected with this be liable0 inseOJ* 4 d/)i/ Commissions . Ins... n oer's Signature National Board, State, Province and Endorsements Date ,- g 2001

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00183 04122101

1. Owner Southern NuclearOperabngCompany Date Name of  !

40 Inverness Center Parkway, Birmingham,AL Sheet Unit 2

2. Plant Vogie Electnc GeneraningPlant MWO # 20003100 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant VogUe

3. Work Performed by Nuclear OperationsMaintenance Address Name
4. Identification Of System 1302 / Auxiliary Feedwater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1302-109-H018 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-1603, senal#672 was replacedwith AD-1603, serfal # 677 to supportsurveillance teshng.
8. Test Conducted: Hydrostatic El PneumaticE] Nominal Operating Pressure N/A E] Other ] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed S z->Mt rDae2 Ower o we' eine il CERTIFICATE OF INSE.RVlI;E INSP"I:: I ION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georia and employed by HartfordSteam Boiler Inspechon andInsurance Co of Hartford. Connectcuthave inspected the components described In this Owner's Report during the period 01109/01 to 5.,'3-/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the shall examinations and corrective measures described In this Owners ReporL Furthermore, neither the Inspector nor his employer be liable In any manne, for any personal Injury or property damage or a loss of any kind arising from or connected with this lns*.. /, Commissions 6A , 2 e;S Insect6 r's Signature National Board, State, Province and Endorsements Date .'5- . 20, /!

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 00184

1. Owner Southern NuclearOperabngCompany Date 04/22101 Name 40 Inverness CenterParkway,Birmingham, AL Sheet J of
2. Plant Vogtle Electric GeneraningPlant Unit 2 Waynesboro, GA 30830 MWO # 20002852 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabfonsMaintenance PlantVoofle Name Address
4. Identification Of System 1302 /Auxiliary Feedwater System ASMESEC I/I 1977 Edition, Winter 1977 Ad denda, N-249-1 Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1302-110-H013 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1601, senal# 337 was replaced with AD-1601, seria # 109 to supportsurveil7ance testng.
8. Test Conducted: Hydrostatic [] Pneumatic[-] Nominal Operating Pressure L NIA [] Other E] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed . \.., \" _-- MA. Date A - 20 61 J Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspecton and Insurance,Co. of Hartford.Connechcut have inspected the components described in this Owner's Report during the period 01/09101 to A*-.Ol , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report Furthermore, neither the Inspector nor his employer shall be liable in any mner for any personal injury or property damage or a loss of any kind arising from or connected with this ______ _II Commissions GA ;2 V Insp ctor's Signature National Board, State, Province and Endorsements Date -,4- - -2 200

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 0018B5 Southern NucfearOperatng Company Date 04/22/01

1. Owner Name 40 Inverness CenterParkway, Birnmngharn, AL Sheet I of I
2. Plant Vogtfe Electnc Generabng Plant Unit 2 Waynesboro, GA 30830 MWO # 20002554 Address Repair Organization P.O. No., Job No., etc.

PlantVogtde

3. Work Performed by NuclearOperabonsMaintenance Name Address
4. Identification Of System 1302/ AUxiliary I-eeawater SysteAddress em Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC I// 1977 Edition, Winter 1977 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1302-110-H019 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-501, senal# 654 was replacedwith AD-501, senal # 525 to supportsurveillance testinl.
8. Test Conducted: Hydrostatic f] PneumaticLE] Nominal Operating PressureEl N/A [g] Other E] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Siged fj*--*.* owner or*Owner's
                                     *'       Designee, Title      -

CERTIFICATE OF INSERVICE INSPECTION or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State Province of Georqia and employed by HartfordSteam Bolfer Inspecton and Insurance Co of Hartford,Connecbcut have inspected the components described In this Owner's Report during the period 01/09/01 to .5- 1 -0 ( , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning described in this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective measures this be liable In any r 4 anner for any personal injury or property damage or a loss of any kind arising from or connected with ____________________________Commissions 15A ,403 lnp;ector's Signature National Board, State, Province and Endorsements Date .-- - 20.0

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00186 Date 04/30/01

1. Owner Southern NuclearOperatbngCompany Name I Of /

40 Inverness CenterParkway,Birrrmngham,AL Sheet Unit 2

2. Plant Vogle Electfric Generantng Plant MWO # 20002857 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant Vogtle

3. Work Performed by Nuclear Operations Maintenance Name Address
4. Identification Of System 1305 1Condensate and Feedwater system
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1305-058-H005 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-12501* senat# 44 was replacedwith AQ-12501 senal# 185 to support surveillance tesbnq.
8. Test Conducted: Hydrostatic -] Pneumatic-- Nominal Operating PressureE N/A f] Other LI Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement N/A Type Code Symbol Stamp Certificate of Authorization No. N/A Expiration Date N/A An Date.20f01 Signed S*

A ver or Owner's Designee, Title " CERTIFIC;ATE: OF INSE1RVICE, INSPEX. I ION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georila and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford.Connecbcut have inspected the components described in this Owner's Report during the period 01Q09/01 and taken to 3--7-0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations Section XI. corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning shall examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer be liable In any mann95 for any personal Injury or property damage or a loss of any kind arising from or connected with this Ins ~t*J , 7ns ./c/,AK

                       /
                                     -Commissions                                 6,X ,_-k
                     - Inp'ec::' Signature                                          National Board, State, Province and Endorsements Date               - 7                      200L_

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 00187

1. Owner Southern NuclearOperatnmg Company Date 04/27/01 Name 40 Inverness CenterParkway, Birnmngham, AL Sheet ] Of 1
2. Plant VogfUe Electnc Generatng Plant Unit 2 Waynesboro, GA 30830 MWO # 20002859 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance PlantVoatle Name Address
4. Identification Of System 13051 Condensate and Feedwater S ystem
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1305-062-H006 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-12501, senal# 26 was repaced wth AD-12501, seral #130 to supportsurvefflance testin.
8. Test Conducted: Hydrostatic [] PneumaticF] Nominal Operating Pressuref]

N/A Other Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed *

  • k
  • Hi r. Date _ _ _ _ 20 01 k, Jhner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georia and employed by Hartford Steam Boier Inspechon and Insurance Co of Hartford,Connecticut have inspected the components described In this Owner's Report during the period D109/0!

to -- and state that to the best of my knowledge and belief, the Owner has performed examinations and taken correctie measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any nrer for any personal injury or property damage or a loss of any kind arising from or connected with this i2ns XI ((** ,..Commissions GA.,?o, Insfictor's Signature National Board, State, Province and Endorsements Date *4- 7 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler# 00188

1. Owner Southern Nuclear Operatng Company Date 04/22/01 Name 40 Inverness Center Parkway,Birmingham, AL Sheet I of
2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002863 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Voat/e Name Address
4. Identification Of System 1305 / Condensate and Feedwater System
5. (a) Applicable Construction Code ASME SEC Ilt 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Appllcable Edition of section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1305-155-H003 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber PSA-3. serial# 28730 was replaced with PSA-3. serial# 26800 to supportsurveillancetesting
8. Test Conducted: Hydrostatic [] PneumaticF] Nominal Operating PressureEJ N/A [] Other [ Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed A4 *It'- Date m I 20 1
              \.. Owner or Owner's Designee, Title                              I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of              Georgia              and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford.Connecticu, have      Inspected the components              described   In this      Owner's    Report during       the    period      01/09/01 to      "-             , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mp ner for any personal Injury or property damage or a loss of any kind arising from or connected with this ______________________ Commissions GA2o -' Insp6ctor's Signature National Board, State, Province and Endorsements Date 3 200)

I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00191

1. Owner Southern Nuclear Operabng Company Date Of 05/04/01 Name Sheet 40 Inverness Center Parkway,Birnmngham, AL Sheet IOf
2. Plant Vogie Electric GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20002969 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabonsMaintenance Plant Vogt/e Name Address
4. Identification Of System 1204/ Safety Injection System
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Summer 1975 A*ddenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. VALVE ROCKWELL BR140 NIA 2-1204-U4-143 1983 REPLACEMENT YES INTERNATIONAL

7. Description Of Work Replaced locking weld on body-to-bonnet aftermaintenance acbvity.

B. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[] N/A [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed '--.a2 t A t (Date r "Z 5 20 o0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Insoection and Insurance Co of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 12/15/00 to / and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this In s j _.*4 / Com m issions A41--v t Dnspeatr's Signat2ure National Board, State, Province and Endorsements Date o/"20,0/

I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 00194

1. Owner Southern NuclearOperatngCompany Date 04127101 Name 40 Inverness CenterParkway,B&rmingham, AL Sheet Of
2. Plant Voajte Electnc Generabno Plant Unit 2 Waynesboro, GA 30830 MWO # 20002828 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatonsMaintenance PlantVogUe Name Address
4. Identification Of System 1204 / Safety Injection System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 A,ddenda, N-249-l Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN ALA N/A V2-1204-192-HOOI 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberA0-503, senal # 535 was replaced with AD-503. serial# 371 to support surve~lance testbnl.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/A [] Other E] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A Signed Ownerte &tr 20X0 Oeror Owner's Designee, Title Q L CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georoia and employed by Hartford Steam Boiler Inspecbon and Insurance Co of Hartford.Connectcut have inspected the components described in this Owner's Report during the period 01/09/01 to s5--,2 1 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this in 2s1Z - Commissions GA .,O3 Inspectof's Signature National Board, State, Province and Endorsements Date _ ;7- 20 0 /

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01002 Date 04/24/01

1. Owner Southern NuclearOperatnrgCompany Name 40 Inverness CenterParkway, Birmingham, AL Sheet Of 1 Unit 2
2. Plant Vog/te Electnc GenerabngPlant Waynesboro, GA 30830 MWO # 20002833 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabons Maintenance PlantVogtle Name Address
4. Identification Of System 1301/ Main Steam System S. (a) Applicable Construction Code ASME SEC 1// 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE SUPPORT PULLMAN N/A N/A V2-1301-105-H002 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-5503, sena/# 327 was replaced with AD-5503. serial# 408 to supportsurveillance tesbng.
8. Test Conducted: Hydrostatic E] PneumaticE] Nominal Operating Pressure E N/A [F] Other E] Pressure N/A PSI Test Temp. N/A @F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA Signed c3r DesineeTit20 mO rr Date 1C)

()Ower or Owner's Designe, Title W-I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Inspecton and Insurance Co, of Hartford, Connectcut have inspected the components described in this Owner's Report during the period 01/09/01 to -_---7-0/ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mann for any personal injury or property damage or a loss of any kind arising from or connected with this

        /__________"______Commissions                                             G     12,,,3:

Insp'ec)rs Signature National Board, State, Province and Endorsements Date -7 - ) / 20,0/

ORIGINAL / FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01004

1. Owner Southern NuclearOperating Company Date 05/14/01 Name 40 Inverness CenterParkway. Birminaham.AL Sheet I Of 1
2. Plant Vogtle Electnc Generating Plant Unit Waynesboro, GA 30830 MWO # 20000565 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance PlantVoatle Name Address
4. Identification Of System 1592/ Essential Chilled Water System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989 and Code Case N-416-1
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1592 PIPING PULLMAN N/A N/A 2K2-1592-033-04 1989 REPLACEMENT YES SYSTEM POWER
7. Descript PRODUCTS Work Valve 2TV_12740 w o o s awt cr i__
7. Description Of Work Valve 2TV-12740 was removed from the system andreplaced with pipe If accordance with DCP 97-VA NO044.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressurer' Per N-416-1 Other [] Pressure N/A PSI Test Temp. N/A -F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Mr- MA r Date I V 20 0 1 k Owner or Owner's Designee, Title '-'

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford,Connecticut have Inspected the components described in this Owner's Report during the period 02/05/01 to !5-/7-01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this M, - ....

                         --                              Commissions              e-7A 7e) T "I -'p**ior's Signature                                         National Board, State, Province and Endorsements Date __         _ /: _         _ _       20

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01005

1. Owner Southern NuclearOperatingCompany Date 05/14/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet I Of 1
2. Plant Vogtle Electnc GeneratingPlant Unit 2 cc f0 Waynesboro, GA 30830 MWO # 20000564 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Voatle Name Address
4. Identification Of System 1592/ Essential Chilled Water System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989 and Code Case N-416-1
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Valve 2TV-12725 was removed from the system and replaced with pipe in accordance with DCP 97-VANO044.

This modification also included the deletion of the bypass line around2TV-12725

8. Test Conducted: Hydrostatic [] PneumaticE[ Nominal Operating Pressurer' Per N-416-1 N/A [] Other j] Pressure N/A PSI Test Temp. N/A RF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed On o k'< s Desi nee,"rt20le Date (I owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georqta and employed by Hartford Steam Boiler Inspection and Insurance Co, of Hartford, Connecticut have Inspected the components described in this Owner's Report during the period 02/05/01 to 16 -()-/ ", and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be manW for any personal Injury or property damage or a loss of any kind arising from or connected with this Ins*liable In any /on. __ _ _)% #fI__ - Commissions 6A A. 3 Inspecthr's Signature National Board, State, Province and Endorsements Date 5-- /61 20 0._L_..

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01006 05101/01

1. Owner Southern Nuclear Operabng Company Date Name Of 3 Sheet 40 Inverness CenterParkway, Birmingham, AL Unit
2. Plant Vogtle Electric GeneratngPlant MWO # 20002572 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

PlantVogfle

3. Work Performed by Nuclear OperabonsMaintenance Address Name Address
4. Identification Of System 2301 I Fire Protection water system
5. (a) Applicable Construction Code ASME SEC//I 1974 Edition, Summer 1975 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989 and Code Case N-416-1
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME STAMPED OF OF SERIAL BOARD OTHER YEAR REPLACED OR MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT FLOWSERVE E798A-3-2 N/A 2-2301-U4-036 1999 REPLACEMENT YES VALVE CORP. 7 Description Of Work Installed replacement valve with dual seat in accordance with DCP 98-V2NO014, A copy of Form NPV-1 for the replacement valve is attached, S. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure [K Per N-416-1 NIA [ "] Other EL Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A N/A Expiration Date N/A Certificate of Authorization No. Signed Date 20

                      )Oner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors Georgia               and employed   by Hartford Steam  Boil7er Inspection and Insurance  Co. of Hartford, Connecticut have Province of components         described      In    this     Owner's        Report       during     the      period     0p.26/01 inspected         the to 5-'- ?-0OI                . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken the ASME Code, Section X1.

corrective measures described in this Owners Report In accordance with the requirements of or implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed nor his employer shall examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector or connected with this be liable In any gnner for any personal Injury or property damage or a loss of any kind arising from

    ,n       SA                                            Cominissions        ('FA,1 Instector's Signature                                           National Board, State, Province and Endorsements Date       ,5-    8                            20 61

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By the Provisions Of The ASME Code Section XI Traveler# 01007

1. Owner Southern Nuclear Operatnng Company Date 04130/01 Name 40 Inverness CenterParkway, Birnmngham, AL Sheet Of 3
2. Plant Vogtle Electric Generabng Plant Unit -I- Z jle Waynesboro, GA 30830 MWO# 20002573 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabtons Maintenance Plant Voq0le Name Address
4. Identification Of System 2401 / Service Air System
6. (a) Applicable Construction Code ASME SEC III 1974 Edition, Summer 1975 Addenda, l/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989 and Code Case N-416-1
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

VALVE FLOWSERVE E798A-2-2 N/A 2-2401-U4-034 1999 REPLACEMENT YES CORP.

7. Description Of Work Installed replacement valve with dual seat in accordance with DCP 98-V2NO014, A copy of Form NPV-1 for the replacement valve is attached,
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[E] Per N-416-1 N/A LI Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A 4ýbCertificate of Authorization No.

Signed iý ro r J) wner or Owyner's Designee, Title it. N/A "ate D--OZr Expiration Date

                                                                                          .                           20     0)

N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georaqa and employed by HartfordSteam Boiler Inspection and InsuranceCo of Hartford. Connectcut have inspected the components described in this Owner's Report during the period 03/26/01 to S,-OI , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any maner for any personal Injury or property damage or a loss of any kind arising from or connected with this in~~%~)l~Commissions &A -r-o Ingpeplor's Signature National Board, State, Province and Endorsements Date ,5"-'-c/ 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01008 05/02101

1. Owner Southern Nuclear Operabng Company Date Name Sheet I Of 3 40 Inverness CenterParkway, Birmingham,AL
2. Plant Voglte Electnc GeneratingPlant Unit 20002575 Waynesbom, GA 30830 MWO #

Address Repair Organization P.O. No., Job No., etc. Plant Votfte

3. Work Performed by Nuclear OperationsMaintenance W Name Address
4. Identification Of System 1418/ Plant Deminerahzed Water System
5. (a) Applicable Construction Code ASME SEC ItI 1974 Edition, Summer 1975 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989 and Code Case N-416-1
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

VALVE FLOWSERVE E798A-1-2 N/A 2-1418-U4-038 1999 REPLACEMENT YES CORP.

7. Description Of Work Installed replacement valve with dual seat in accordance with DCP 98-V2N0014 A copy of Form NPV-1 for the replacementvalve Isattached,
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[] Per N-416-1 N/A E Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A S A %^ Date 20 Signed Oner or Owner's Designee, Title 20 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HartfordSteam Boiler Inspecbon and Insurance Co. of Hartford, Connecbcut have inspected the components described In this Owner's Report during the period 03/26/01 to .- 5301. I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mapper for any personal Injury or property damage or a loss of any kind arising from or connected with this Inf a / / , _ Commissions GA,-3'ý

                   "**sp0r's Signature                                               National Board, State, Province and Endorsements Date         ý'    J -cdc"                     20    Ld

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler # 01009

1. Owner Southern Nuclear Operabrng Company Date 04/30/01 Name Of 3 Sheet  !

40 Inverness CenterParkway, Birrngtham,AL Unit

2. Plant Vogftle Electnc GenerabngPlant MWO # 20002576 Waynesbom, GA 30830 Repair Organization P.O. No., Job No., etc.

Address

3. Work Performed by NuclearOperabonsMaintenance lant VogIte Name Address
4. Identification Of System 2420 / Instrument Air System ASME SEC I/f 1974 Edition, Summer 1975 Addenda, N/A Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989 and Code Case N-416-1
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF (YES OR NO)

COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT VALVE FLOWSERVE E798A-1-4 N/A 2-2420-U4-049 1999 REPLACEMENT YES CORP.

7. Description Of Work Installed replacement valve with dual seat in accordancewith DCP 98-V2NO014 A copy of Form NPV-1 for the replacement valve Is attached S. Test Conducted: Hydrostatic E] Pneumatic-- Nominal Operating Pressurex' Per N-416-1 N/A -I Other E] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed , gwrat, 20 eD 2wner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HartfordSteam Boiler Inspecton and Insurance Co. of Hartford,Connechcut have inspected the components described In this Owner's Report during the period 03/26/01 to -.- o / _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken Code, Section Xl.

corrective measures described in this Owners Report in accordance with the requirements of the ASME concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, nor his employer shall examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector or connected with this be liable In any manner for any personal Injury or property damage or a loss of any kind arising from i-__ ,________, .. __,_,..* __ Commissions GA, -oY Insptor's Signature National Board, State, Province and Endorsements Date 4 3 20

FMSORIGINAL 6 FORM NIS-2 OWNER'S As Required ByREPORT The Provisions FOROf The ASME CodeOR REPAIRS REPLACEMENTS Section XI Traveler # 01010

1. Owner Southern NuclearOperaffng Company Date 06/25/01 Name
                                                                             " Sheet                      1                Of               3 40 Inverness Center Parkway,Birmdngham, AL Unit                                       2
2. Plant Vog*e Electric GenerabngPlant Waynesboro, GA 30830 MWO N 20=452 Plant0Vo52 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant VogS e Name Address
4. Identification Of System 1208/1Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC III 1971 Edition, Summer 1972 Addenda, . N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacerments 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT HEAT SENTRY 786098 1274 2-1208-P6-0O3-MOf 1978 REPLACEMENT YES EXCHANGER EQUIPMENT CORR, HEAT SENTRY 786099 1275 2-1208-PE6-03-MO1 1978 REPLACEMENT YES EXCHANGER EQUIPMENT

7. Description Of Work Instafled replacement water boxes (plenums) on motor heat exchangers Per REA S/! 98-VAA600. Also. installed one m,.=m-nt ho't on ,unehm R/IV 1274 and a reflacement bolt and nut on Menum 1275-1 (CR# 2001000378).

r.nnv nf FInnm 1.-2 for the mplacement waterboxes is attachedS/N 1274-1, 1274-2, 1275-1 and 1275-2.

8. Test Conducted: Hydrostatic [] Pneumatic[-] Nominal Operating Pressure[o' N/AE Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT Conforms to the rules of the ASME Code, Section XL repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A
                                         -N&J,            O         Date                i.j-.-                           20 6(

Signed _ owner or-=ý,V or Owner's Designee, "ile; CERTIFICATE OF INSERVICE INSPECTION State or 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the Province of Georgca and employed by HartfordSteam Soffar Inspection and Insurance Co. of Hartford.Connecticut have inspected the components described in this Owner's Report during the period 01/29101 to '7-.9o-0/ , and state that to the best of my knowledge and belief, the Owner has performed ixaminations and taken Code, Section X1. corrective measures described In this Owners Report In accordance with the requirements of the ASME the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning shall examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer or connected with this be liable in any mann, for any personal Injury or property damage or a loss of any kind arising from 1725!w- le _ 1"L Commnissions GA 'a3 Inspectpts Signature National Board, State, Province and Endorsements Date 1_ _9_ 20

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01012 05/02/01

1. Owner Southem Nuclear OperabngCompany Date Name 40 Inverness CenterParkway,Birmingham,AL Sheet I Of 3
2. Plant Vogte EJectnc GeneratingPlant Unit 2Z~

Waynesboro, GA 30830 MWO # 20000456 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed by Nuclear OperatfonsMaintenance Plant Vogde Name Address
4. Identification Of System 1205 / Residual Heat Removal System
5. (a) Applicable Construction Code ASME SEC III 1971 Edition, Summer 1972 Addenda, AVA Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

HEAT SENTRY 796015 1304 2-1205-P6-002-MO1 1987 REPLACEMENT YES EXCHANGER EQUIPMENT CORP. HEAT SENTRY 796017 1306 2-1205-P6-002-MO0 1987 REPLACEMENT YES EXCHANGER EQUIPMENT CORP.

7. Description Of Work Installed replacementwater boxes (plenums) on motor heat exchangers per REA 98-VAA600 Copy of Form N-2 for the replacement waterboxes is attached SIN 1304-1. 1304-2. 1306-1 and 1306-2
8. Test Conducted: Hydrostatic [] Pneumaticf] Nominal Operating Pressure[ ]

N/AE] Other [J Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT Conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed k _I or0 Owner or Owner's Designee, AAt4 -.," Title Gate 20 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by HartfordSteam Boiler Inspecton and Insurance Co. of Hartford Connectcut have inspected the components described in this Owner's Report during the period 01/29/01 to --L/- __, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manqer for any personal injury or property damage or a loss of any kind arising from or connected with this 7ns/ ,, , Commissions (A" ,23 Tnspntor's Signature National Board, State, Province and Endorsements Date W 20Z)

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The AS ME Code Section XI Traveler # 01013 Date 04/29/01

1. Owner Southern Nuclear OperabrngCompany Name Sheet ] Of 3 40 Inverness CenterParkway, Birniingham,AL Unit .-+---2 U1.*.43 1.10
2. Plant Vogde Electnc GenerabngPlant MWO # 20000455 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

Plant Vogie

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 12051 Residual Heat Removal System 1971 Edition, Summer 1972 Addenda, NIA Code Case
5. (a) Applicable Construction Code ASME SEC III (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NATIONAL REPAIRED, ASME CODE NAME NAME MANUFACTURER STAMPED SERIAL BOARD OTHER YEAR REPLACED OR OF OF REPLACEMENT (YES OR NO)

MANUFACTURER NO. NO. IDENTIFICATION BUILT COMPONENT YES 727026 3227 2-1205-P6-O01-MOI 1987 REPLACEMENT HEAT SENTRY EXCHANGER EQUIPMENT CORP. YES 727027 3228 2-1205-P6-001-MO1 1987 REPLACEMENT HEAT SENTRY EXCHANGER EQUIPMENT

                    -- CORP,         I____I_

Copy of Form N-2 for

7. Description Of Work Installedreplacement waterboxes (plenums) on motor heat exchangers PerREA 98-VAA600 the repLacement water boxes is attached S/NV 3227-1. 3227-2. 3228-1 and 3228-2
8. Test Conducted: Hydrostatic-' Pneumatic[] Nominal Operating Pressure []

Pressure N/A PSI Test Temp. N/A OF NIA OtherE] CERTIFICATE OF COMPLIANCE REPLACEMENT Conforms to the We certify that the statements made in the report are correct and this repair or replacement rules of the ASME Code, Section XI. N/A Type Code Symbol Stamp N/A Expiration Date N/A Certificate of Authorization No. De n Tpate & 20 Signed 1:Z) wero wrs of boiler and Pressure vessel Inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board Georola and employed by Hartford Steam Boler Inspecton and Insurance Co, of Hartford, Connecticuthave Province of the period 01/29/01 components described in this Owner's Report during Inspected the and state that to the best of my knowledge and belief, the Owner has performed examinations and taken to - . -40( . with the requirements of the ASME Code, Section XI. corrective measures described In this Owners Report in accordance makes any warranty, expressed or implied, concerning the By signing this certificate, neither the Inspector nor his employer Furthermore, neither the Inspector nor his employer shall examinations and corrective measures described In this Owners Report. any personal injury or property damage or a loss of any kind arising from or connected with this be liable in any mann, for Insnc(r..,Kf Commissions (--,A 2,13 Injspect r's Signature National Board, State, Province and Endorsements Date-- 200-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 01014 4

1. Owner Southern Nulear Operati Company Date 08/28/01 Name 40 Inverness CenterParkwaV. Birrninham.AL Sheet I Of I Unit 2
2. Plant Vogte Electric GeneralingPlant MWO # 20100259 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant V00e6 Name Address
4. Identification Of System 12021/ Nuclear Service Cooling Water System ASME SEC III 1974 Edition, VInter 1975 Addenda, N/A Code Case
6. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
5. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT SAFETY CROSBY VALVE N67951-00-0002 N/A 2PSV-11750 1984 REPLACEMENT YES VALVE & GAGE CO.

7. Description Of Work Reief valve SfNvN67951-0O0-=04 was removed for inservfce testng and was replacedby reief valve S7/N N67951 00-0002 Refef vatve SN/ 67951-00-0002 was oritonav Instafted dudng construction as IPSV-11750 and fs now being utfzed as a rotaftn spare, S. Test Conducted: Hydrostatic [ Pneumatic[] Nominal Operating Pressure NA [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Expiration Date N/A Certificate of Authorization No. APPROVED BY N/A Sine 11 ne_-.NANCE MANAGER Date 2 /&*ca 20 Signed - (oe "Oe.r.s Title Date I1 2 OwnroOwner's Designee, Title
  • a.. -.

CERTIFICATE OF INSERVICE INSPECTION or i, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State of Geomia and employed by Hartford Steam Boler Inspectron and Insurance Co. of Harfford Connecdcut have Province Inspected the components described in this Owner's Report during the period 01/29/01

                            ,__and   state   that   to the  best  of my   knowledge      and    belief,  the  Owner   has   performed     examinations and taken to     '-.5.OQ1.

In this Owners Report In accordance with the requirements of the ASME Code, Section Xi. corrective measures described implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or in this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective measures described with this be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected ______________________Commissions CZA ;2-'

                  "InspectorsSignature                                                     National Board, State, Province and Endorsements Date           g5-                                20,/

ORIGINAL 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01015 05/04101 Southern NuclearOperafibn Company Date

1. Owner Name Of 40 Inverness CenterParkway,Birnrngham,AL Sheet Unit 2
2. Plant Vog*le Electnc GenerabngPlant MWO # 20002488 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.

PlantVogte

3. Work Performed by NuclearOperationsMaintenance Address Name
4. Identification Of System 1208 / Chemical and volume Control *ystem Addenda, N/A Code Case
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Summer 1975 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components MANUFACTUR NATIONAL REPAIRED, ASME CODE NAME NAME STAMPED OF ER BOARD OTHER YEAR REPLACED OR OF REPLACEMENT (YES OR NO)

MANUFACTURER SERIAL NO. IDENTIFICATION BUILT COMPONENT NO. N/A 2-1208-U4-463 1985 REPLACEMENT YES VALVE ROCKWELL BX844 INTERNATIONAL

7. Description Of Work Replaced locking weld on body-to-bonnet after maintenance actiity.
8. Test Conducted: Hydrostatic [] Pneumatic[-] Nominal Operating Pressure[]

N/A E] Other E] Pressure N/A PSI Test Temp. N/A OF CERTIF ICAT Or UI LUrLAUMrI-I' REPLACEMENT conforms to the We certify that the statements made in the report are correct and this repair or replacement rules of the ASME Code, Section XI. N/A Type Code Symbol Stamp N/A Expiration Date N/A Certificate of Authorization No.

                                                   .   -       t    Date                                  5               20    0 Signed          \L Owner or Owner's Designee, Title        JI CERTIFICATE OF INSERVICE INSPECTION vessel inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure Province of                 Georia               and employed by Hartford Steam Boiler Inspection and Insurance Co, of Hartford, Connectcut have described       in    this     Owner's         Report        during      the      period 02/05/01 inspected         the       components and  belief,   the  Owner    has  performed     examinations and taken to            ,-/             , and state that to the best of my knowledge the requirements of the ASME Code, Section Xl.

corrective measures described In this Owners Report in accordance with expressed or implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, Jn this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective measures described or a loss of any kind arising from or connected with this be liable In any manp~r for any personal injury or property damage ins n &A, Commissions GA .e

                     "/nsp~dtor's Signature                                          National Board, State, Province and Endorsements Date -        .-     /5                    20(g)

ORIGINAL I FORM NIS-2 OWNER'S REPORT As Required By The FOR REPAIRS OR REPLACEMENTS Provisions Of The ASME Code Section XI Traveler # 01016 Date 05/11/01

1. Owner Southern Nuclear OperatingCompany Name Sheet I Of - I 40 Inverness CenterParkway, Birmingham, AL Unit 2
2. Plant Vogtle Electric GeneratingPlant MWO # 29900893 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address Plant Vootle

3. Work Performed by Nuclear OperationsMaintenance Name 1203 Coponntoolng AdderSsse 1203 / Component Cooling Watear System
4. Identification Of System
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Winter 1976 Addenda, N/A Code Case 1989 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements
6. Identification Of Components Repairs Or Replacement Components REPAIRED, ASME CODE NAME NAME MANUFACTURER NATIONAL REPLACED OR STAMPED OF SERIAL BOARD OTHER YEAR OF BUILT REPLACEMENT (YES OR NO)

COMPONENT MANUFACTURER NO. NO. IDENTIFICATION 2-1203-E4-002 1980 REPLACEMENT YES HEAT MCQUAY- 915901-2 6254 EXCHANGER PERFEX, INC. end cover,

7. Description Of Work Installed three replacement nuts on heat exchanger
8. Test Conducted: Hydrostatic [] Pneumatic] Nominal Operating PressureE]

Test Temp. N/A N/A [] Other [] Pressure N/A PSI CERTIFICATE OF COMPLIANCE this REPLACEMENT conforms to the We certify that the statements made In the report are correct and Repair or replacement rules of the ASME Code, Section XL N/A Type Code Symbol Stamp Expiration Date N/A certificate of Authorization No. N/A CRFTOwner or Owner's -Designee, Title CERTIFICATE OF INSE-RVIUEMP-. ifIzz iiN Board of boiler and Pressure vessel Inspectors and the State or I, the undersigned, holding a valid commission Issued by the national of Hartford, Connectict have Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. described In this Owner's I Report during the period 02/05/01 inspected the components has performed examinations and taken to 1 " , and state that to the best of my knowledge and belief, the Owner with the requirements of the ASME Code, Section Xl. corrective measures described in this Owners Report In accordance makes any warranty, expressed or implied, concerning the By signing this certificate, neither the Inspector nor his employer Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective measures described In this Owners with this damage or a loss of any kind arising from or connected be liable In any mannr for any personal Injury or property In speIn., ZII/ I. ,*R. - - Commissions 6i7A oAV3 "Inspec):r'sSignature National Board, State, Province and Endorsements Date - /17 20)1I6

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01020 I 1.Owner Southem NuclearOperatnngCompany Date 04/29/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet Of

2. Plant Vogtie Electnc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO N 20003212 Aaaress Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Vogfte Name Address
4. Identification Of System 1515/ Containment Cooling System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

I _NO. 1515 PIPING PULLMAN N/A N/A 2V4-1515-008-01 1989 REPLACEMENT YES SYSTEM POWER PRODUCTS

7. Description Of Work Replacement studs and nuts were installed on ContainmentBuilding Auxuliary Coolerinlet andoutlet header plping flanges.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[L N/A Other [] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed 1 J Z) or Owner's Designee,6t-,ý wer Title J Date
  • 220 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HartfordSteam Boiler Inspecbon and Insurance Co. of Hartford. Connecbcut have inspected the components described in this Owner's Report during the period 02/27/01 to _5 01 -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner or any personal injury or property damage or a loss of any kind arising from or connected with this Inspecon._

                                                .......-              Commissions            AZi                                                     _

inspectcfs Signature National Board, State, Province and Endorsements Date -i"- -; 2001

ORlIINAL FOR REPAIRS OR REPLACEMENTS FORM NIS-2 OWNER'SByREPORT The Provisions Of The ASME Code Section Xi 01021 As Required Traveler#_ o5104101 Date !O Company Sheet 14Name Owner Southern Nuclear operabng AL Sheet -------- _2-------------Of 40 Inverness CenterParkway, Birmingham, Un0t21

2. Plant Volue Electric GeneraingPlant 2 13 MWO #.

Waynesboo, GA 30830 Organization P.O. No., Job No., etc. GAddressRepair

                           --                 Addresspl                                                                                n o it And        oe
3. Work Performed by Nuclear - NameMaintenance Operations Containment Cooling Sstem 1515!
4. Identification of System N/A Code Case 1977 Addenda, ASME SEC III 1977 Edition, Winter Construction Code 198
5. (a)Applicable Or Replacements Section XI Utilized For Repairs (b)Applicable Edition of Components Repairs Or Replacement (YES ORNO)
6. Identification Of Components ASMECOPE OF NAME OFME E.

MANUFAUR .,o.pEENT NATIONE REPLACED OR STAP OTHER YEAR BUILT REPLACEM R BOARD NO. IDENTIFICATION OFO SERIAL 6 YES COMPONENT MANUFACTURER 1L 2V4-1515-00 -01 1989 REPCEMENT " YSTE POVER PRODUCTS n

                                                                                                                                 "     arvoolr inlet and ouVeth~ead~er S       *              -------

Budin Aux C d nutswere instafed on Containment studs and

7. Description Of Work Regacement PneumaticE] Nominal Operating Pressure[--j Hydrostatic 0 es ep.riS NIA O Test Conducted:

NIAOther Q

a. Pressure CRIIAEOCOPINCE hpae conforms to the towNr RePie, morret and this made in the reporctf "-"--'-'-'

We certify that the statements Code, Npi rules of the ASME Section Xl. BNc and.Endorsements Code IType Stamp symbol Expiration Date N/A 20.J

Date Sigeod At Pressure vessel inspectors Co the State o andnetcthv boiler andand Board of Isnecion nsurance-0ofHrod cmission isudby the national odSemBdr com  : ý__nLVI ake1 1,the undersigned, holding a valid ~and;4 employed by Hr ow.... Reor urng.*ner's ted peraaio 02127ns eo *. .... in this h SEc taetin .

inaion deanko~deadbnt Province of ýdecrbe euwl,,*t^ med-uS *-,-.. the Onre ha ..... prfr i,,nspeted -the componens jand state that to the e~st eof"mynowleodgeandcewief,

              *O'-*-i,.O                                                        eot,,acodn in this Owes                                                                                                                        the corrective measures described                                                                                                                              o his concerning or implied,     emplo~yer shall
                                                                                                                                                                               ~,

i mlyrmksa~l~, nelhrteInpco emloyr maes ny arranty, expressed nornce e r h npco ithe th nro hi Insectr aneindharishegnspector By sinn thi crica in this owners. Re port. Furthermore o on e t d v~h t i examignaionn d corr.ectficave- measures described damage or a. .... ay kn a ii g fr m bexla b einahn any ~ jorr-v ,,ny perso.nal Injury or property cm n Edreet Iins "Commissionsic orSae rvneadEdreet Ntoa

                   -I- : npector' Signature 20 e Date

ORIUINAL REPORT FOR REPAIRS OR REPLACEMENTS OWNER'S FORM NIS-2 As Required By The Provisions Of The ASME Code Section XIl0102Traveler # 05/16/01 Date Name Sheet \q OwerSouthern Nuclear opea... Cmpn Snet

                                                                , Birrin ham, AL 40 Inverness Center Parkwa 20166            ---

Unit

2. Plant Vogi Ele~tlenrtfgPlant Repair Organization P.O. No., Job Wa esboro, GA 30830 Address Plantdd Address
                                       --                   Name Maintenance Work 3. performed by Nuclear Operations c
                                                                                                          ..1201/ Reactor Coolant Sydstem                                     code Case
4. Identification O0System 1974 Edition, Wnter 1975 Addenda,
      . (a                                                       ASME SEC Replacements 1989 Xl Utilized For Repairs Or (IJ)Appllcable Edition of Section
6. identitication Of Components Repairs Or Replacement Components n.PLACED OR ASME COD REoAIRED,
                                                                                                                                                                                   -801v' 0A  a..

ehef~~~.,.

  • f3tn ~~

n aeric ,W.... vaviu ... andti*r W4 6 I N -

                                                                                           - ,elSNývae      a
7. Description Of Work is: Tbeing n:ow uti~lize~d as aýro atn na oeaare.esu~g2 Hydrostatic [] Pneumatic[] Nominal Oper ting Pressure--N
8. Test CnductedA Other Pressure N/A PSI Test Temp. _ A__ F
             '1                                                       ....                                      O   O     IANCEcof                                           r st th Repair or replacement                cofrsoth In the report are coretadti We certify that the statements made MIA rules of the ASME code, Section X .

Type Code Symbol Stamp NA Certificate of Authorization SNo.. Date 20 he .eld, ,kn r1 - signed es neb

                                                                                                                                                                      -0 .*   t d .S         ci       nx.
                                                                                                    "'       ..              -,^     h     w e has PC u,,
  • c net

_omp described

           /,rProvince Of*                                                                                                                                                                 ad t tions the peEforde,           n of my" knowledge          and belief, the owner                                                              .

haveannspeted thed d that iand thati the best Reor to owne in cordance with the requirements Of correive *mu*rs mn any ,sed or implied, concerning the Bto sn th "scrltiiae,It this owners Report r n i h r t e g f o m nor r c n e... t r-yd wth th thisis examinationsadco ec tt f , n i h r the dthis measures rrective in s p ecto r n o r,thsha employwers t F u tanye m oep warranty,kin eihre inspector his employer shall e, e det

                                                                        . sr  ...

i e , owners Report 1., stigning this cerifca arising mann orrece man n fr anpsol any peso a Inuyc mmsi ndamage or a loss._ of any kind yor property [ be liable In any bexiaeinatny *3A lnsp 0 /**Commissions u National Board, State, Province and Endorsements npe r S inspe ' Signature

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler # 01023

1. Owner Southern Nuclear Operating Company Date 05/16/01 Name 40 Inverness CenterParkway, BirmIngham, AL Sheet Of 1
2. Plant Vogtle Electrc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20001696 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operations Maintenance Plant Voglie Name Address
4. Identification Of System 1201 /Reactor Coolant System
5. (a) Applicable Construction Code ASMESEC III 1971 Edition, Winter 1972 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

SAFETY CROSBY VALVE N56964 N/A 2PSV-8010B 1976 REPLACEMENT YES VALVE 8 GAGE CO. 0036

7. Description Of Work Relief valve S/N N60446-00-0028 was removed for inservice testing and was replaced by relief valve S/N N56964-00-0036 Rehef valve S/AV 56964-00-0036 was originally installed dunnq constructionas 1PSV-8010B and Is now being utilized as a rotatingspare.
8. Test Conducted: Hydrostatic [] Pneumatic[-] Nominal Operating Pressure[Z N/A-- Other [] Pressure N/A PSI Test Temp. N/A 12F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization N/A Expiration Date N/A No.

Signed rate

                                                                     /Dk                   M,-4                          20 O!

Sge Owner or Owner's Designee, TItle2 0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Hartford,ConnectIcul have Inspected the components described In this Owner's Report during the period 02/08/01 to ._I- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma er for any personal injury or property damage or a loss of any kind arising from or connected with this ____ _ ____ _ _- _ _ _ Commissions GA/fcz.

                .... "       tobr's Signature                                            National Board, State, Province and Endorsements Date             ,.-     g9                      20 0/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 01024

1. Owner Southern Nuclear Operaftng Company Date 05/09101 Name 40 Inverness Center Parkway,Birmingham, AL Sheet Of
2. Plant Vogtie Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20001706 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operafions Maintenance Plant Voot/e Name Address
4. Identification Of System 1205 / Residual Heat Removal System
5. (a) Applicable Construction Code ASME SEC Ill 1971 Edition, Summer 1972 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO NO IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

RELIEF CROSBY N56904-00-0017 N/A 2PSV-8708B 1975 REPLACEMENT YES VALVE

7. Description Of Work Relief valve SIN N56904-00-0065 was removed for Inservice tesbnq and was replaced by relief valve SmI N56904 00-0017, Relief valve S1IV 56904-00-0017 was ofiinaNl installedas 2PSV-8708B dunna construction
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[A]

N/A5 Other F1 Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASM E Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Date /_20 0__ () Owner or Owner's Designee, Title 'J CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Bolier Inspecton and Insurance Co. of Hartford Connecbcuthave inspected the components described in this Owner's Report during the period 02/12/01 to 65--a-vo( _ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man er for any personal Injury or property damage or a loss of any kind arising from or connected with this ___________, __________.___"Commissions G "

                   "Inspp*or's Signature                                            National Board, State, Province and Endorsements Date      67*- I2                           2001L_

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01026

1. Owner Southern Nuclear OperabnngCompany Date 05/22/01 Name 40 Inverness CenterParkway, Birningham,AL Sheet ) Of
2. Plant Vogtfe Electnc Generabnng Plant Unit 2 Waynesboro, GA 30830 MWO # 20001871 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatbonsMaintenance PlantVoqtle Name Address
4. Identification Of System 1202 / Nuclear Service Cooling Water System
5. (a) Applicable Construction Code ASME SEC II1 1974 Edition, Winter 1975 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Relef valve SIN N67936-00-0005 was removed for Inservfce testhng and was replacedby relief valve S/IN N67936 00-0001 Relief valve SIN N67936-00-0001 was odioinallyinstalled dunna construcbon as IPSV-11759 and Is now being utlized as a rotabng s;are.
8. Test Conducted,: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure [

NIAL Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XL. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed OwnerorOwns- ate -3 20 e) CI owner or Owner's Designee, Title ( CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of GeoMia and employed by Hartford Steam Boiler Inspection andInsurance Co of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 03112/01 to -*-/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspe.'on.,,*/7 ________________ ___ Commissions GA90? lnsppttor's Signature National Board, State, Province and Endorsements Date .5- -'p 200/

UKMiINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 01027

1. Owner Southern NuclearOperabngCompany Date 05/04101 Name 40 Inverness CenterParkway, Birrmngham,AL Sheet 1 Of 1
2. Plant Vogde Electnc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20100712 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Voct/e Name Address
4. Identification Of System 2101/Containment(CMNT) Bui7iding
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Summer 1975 Addenda, 1713 Code Case (b)Applicable Edition of section XI Utilities For Repairs Or Replacements 1992
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

CMNT CHICAGO B5297 4478 2-2101-R2-014 1982 REPLACEMENT YES PERSONNEL BRIDGE & IRON AIRLOCK CO

7. Description Of Work Installed tour replacement upperandlower handwheel shaft seals on the inner and outer bulkheads
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

NIA [] Other F] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA Signed *, * ,..- L.4.r*/ Date fvl.ý/ C7 2001 Owner or Owner's Designee, Title 0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geo.rla and employed by HartfordSteam BoilerInspecbon and Insurance Co of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 04-11-01 to .5- Ic) / . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins

  • t ,. . Commissions GA..7o3 Inslfector's Signature National Board, State, Province and Endorsements Date '-/O 200/

FORM NIS-2 OWNER'S REPORT F FRI OR AIRS OR REPLACEMENTS As Required By The Provisior a ASME Code Section Xi Travelerl# 01029

1. Owner Southern NuclearOperatingCompany 12103/2001 Name JDat 40 Inverness Center Parkway,Birmingham, AL Sh I Of 3
2. Plant Vogile Electric GeneratingPlant nit Waynesboro, GA 30830 MWO# 20100917 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance PlantVogtle Name Address
4. Identification Of System 1202/NuclearService Cooling Water System
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Winter 1975 Addenda, N/A Code Case (b)Appllcable Edition of section XI Utilities For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED,' ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

REUEFVALV CROSBYVALVE& N697951 N/A 2PSV-11752 1984 REPLACEMENT YES E GAGECO. 0007

7. Description Of Work Relef valve S/N N67951-00-0006 was replaced with valve S/N N67951-00-0007. A copy of Form NV-1 for the replacement valve is attached
8. Test Conducted: Hydrostatic nI Pneumatic[-] Nominal Operating PressureoJ WAD Other [] Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and REPLACEMENT conforms to the this rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization N/A Expiration Date N/A No.

Signed O r ' i eItatece ' Owner or Owner's Designee, Title W~-T7e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and InsuranceCo of Hartford.ConnectictA have Inspected the components described in this Owner's Report during the period 03/21/2001 to /,;- 4.-l V , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any ma for any personal Injury or property damage or a loss of any kind arising from or connected with this inCommissions

                         /A203 Inspect/'s Signature                                         National Board, State, Province and Endorsements Date            /2 - 4                     190L

ORIGINAL ( FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 01030

1. Owner Southern Nuclear OperabngCompany Date 05/31/01 Name 40 Inverness Center Parkway,Birmingham, AL Sheet ] Of I
2. Plant Vog*e Electnc GeneratngPlant Unit 2 Waynesboro, GA 30830 MWO # 20100713 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance PlantVoTt/e Name Address
4. Identification Of System 12081 Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1208 PIPING PULLMAN N/A N/A 2K3-1208-144-01 1989 REPLACEMENT YES SYSTEM POWER 2F0-10123 PRODUCTS
7. Description Of Work Fabncatedand Installed replacement onfice plate (1,4821"bore) in 2FO-10123
8. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating Pressure N*

NIA El Other [] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT Conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed e,) k'_t."Aý.- C Date ,,...J. 4 20 " t.6L Owner or Owner's Designee, Title I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Boder Inspecton and Insurance Co of Hartford. Connecbcut have inspected the components -described in this Owner's Report during the period 04/03101 to r,-e'-6/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mannerfor any personal Injury or property damage or a loss of any kind arising from or connected with this Ins '8 Commissions GA Z;c De sgnature National Board, State, Province and Endorsements Date e",-!; 20,_.1:)

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01031

1. Owner Southern NuclearOperabngCompany Date 05131/01 Name 40 Inverness CenterParkwav. Birmingham.AL Sheet Of I
2. Plant VogUtle Electnc Generabng Plant Unit 2 Waynesbom, GA 30830 MWO # 29901798 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabons Maintenance Plant Vogfe Name Address
4. Identification Of System 1204 I Safety Injection System
5. (a) Applicable Construction Code ASME SEC II/ 1977 Edition, Winter 1977 Addenda, NIA Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components I I1
7. Description Of Work Instated replacementstuds and nuts on the oic&ng flanges (line 2-1204-241-31 at the Refue/ing Water Storage Tank.
8. Test Conducted: Hydrostatic E] PneumaticE] Nominal Operating Pressure[l N/A fj Other El Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed '"4.-* V In f Date A ... '. V 20 26 a
                -I          Owner or Owner's Designee, Title        d                  t CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                    Georgia                and employed by Hartford Steam Boiler Inspechon and Insurance Co of Hartford, Connecticuthave inspected          the         components          described    In     this    Owner's       Report         during      the      period 04/03/01 to 6-4-01                     , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable )n any manner r any personal injury or property damage or a loss of any kind arising from or connected with this __ _._._ ,,_ Commissions (6A -,a3

         "- °          Inspecto/s Signature                                           National Board, State, Province and Endorsements Date           'l -    e                        206/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 01033

1. Owner Southern NuclearOperatngCompany Date 04/27101 Name 40 Inverness CenterParkway, Birmincham, AL Sheet J Of J
2. Plant Vogtte EJectnc GeneratngPlant Unit 2 Waynesbom, GA 30830 MWO # 20101088 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance PlantVoatle Name Address
4. Identification Of System 1204/ Safety Injection System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 , ,ddenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1204-023-HO05 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-1603, senaf # 659 was replacedwTh AD-1603. senal # 100 to supportsurvefflance testnE.
8. Test Conducted: Hydrostatic E] PneumaticE] Nominal Operating Pressurefn NA[] Other E] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA Signe

_Owner or Owner's Designee, Title k L2 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by Hartford Steam Boiler Inspoecbon and Insurance Co. of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 04/10/01 to 5-.3-0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes, any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manni for any personal injury or property damage or a loss of any kind arising from or connected with this inspz **--*, Commissions 6149d3 "Inspec r's Signature National Board, State, Province and Endorsements Date '6** ' 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01034

1. Owner SouthernNuclearOperabngCompany Date 04/27/01 Name 40 Inverness CenterParkway,Birmrngham,AL Sheet Of
2. Plant Vogqte Electinc GeneratingPlant Unit 2 Waynesbom, GA 30830 MWO # 20101089 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperations Maintenance PlantVogfe Name Address
4. Identification Of System 1204/ Safety Injection System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 1lddenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1204-024-H038 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-160 1. senaf # 653 was replaced wth AD-1601 senal # 353 to supportsurvefflance testng.
8. Test Conducted: Hydrostatic [] Pneumatic[- Nominal Operating Pressure[]

N/A RX Other [ Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement "TypeCode Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed nOwner_-f. AkL-. -A t,ý*or Owner's Designee, Title MItk Date _-_ _ _2___20___ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford, Connectcut have inspected the components described In this Owner's Report during the period 04/10/01 to .5- / , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall lnspet . be liable in any manner/)or any personal injury or property damage or a loss of any kind arising from or connected with this inspe/*, 4 ,

  • Commissions (*A .*2W' lnspect/rk's Signature National Board, State, Province and Endorsements Date 6_- S 20 _.0

ORIGiINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01035

1. Owner Southern NuclearOperatngCompany Date 05/21/01 Name 40 Inverness Center Parkway,Bjrningham, AL Sheet I Of
2. Plant Vogt/e Electnc GeneraingPlant Unit 2 Waynesboro, GA 30830 MWO # 20101090 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabonsMaintenance Plant Voatle Name Address
4. Identification Of System 1301 / Main Steam System S. (a) Applicable Construction Code ASME SEC II/ 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1301-104-HO04 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-5501, senal# 230 was replacedwith AD-5501, senal #303 to supportsurveiance testing.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/Am Other E] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp WA Certificate of Authorization No. N/A Expiration Date N/A Signed r  !!IMrDate 202 C 2oot

                \J        Owner or Owner's Designee, Title     'J                          I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of                  Georqia             and employed by Hartford Steam Boiler Inspecbon and Insurance Co. of Hartford, Connecticut have inspected          the       components      described     in      this     Owner's      Report       during     the       period 04/10/01 to          .                   and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mann}p" for any personal injury or property damage or a loss of any kind arising from or connected with this Inslcn . In* P,,3t.A".*_ ,/ Commissions GA 103 Inslec)r's Signature National Board, State, Province and Endorsements Date .5-.15) 2001/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01036

1. Owner Southern NuclearOperatingCompany Date 05/01/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet  ! Of
2. Plant Vogte Electnc Generating Plant Unit 2 Waynesboro. GA 30830 MWO # 20101092 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperatonsMaintenance Plant Vogtle Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Snubber AD-5501. senal # 431 was replaced with AD-5501, seral # 820 to support surveillance tesbng. A replacement loadstud nut was also Installed
8. Test Conducted: Hydrostatic E] PneumaticE] Nominal Operating Pressurefl
'14                            NA~              Other n]         Pressure      N/A   PSI     Test Temp.           N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this                    REPLACEMENT                    conforms to the rules of the ASME Code, Section XI.                                                         repair or replacement Type Code Symbol Stamp                                                                     N/A Certificate of Authorization No.                           N/A                   Expiration Date                              N/A Signed       ______________,,___________                               ate                     -3                   20    r)
                \   )       Owner or Owner's Designee, Title        I.J CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of                 Geormia               and employed by HartfordSteam Boffer Inspecton and Insurance Co. of Hartford, Connecticut have inspected          the      components         described      in     this     Owner's     Report      during     the       period 04/10/01 to      .j,                    and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannp" for any personal Injury or property damage or a loss of any kind arising from or connected with this insp ectijiF.

                                   ~          ..-               Commissions         GAAOS, "Inspedor'sSignature                                          National Board, State, Province and Endorsements Date-           v

_5-- -3

                               -                     206/

ORIGINAL J FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01037

1. Owner Southern NuclearOperatfngCompany Date 04/30/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet ] Of
2. Plant Vogqte Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20101091 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabons Maintenance Plant Voacte Name Address
4. Identification Of System 1301 / Main Steam System S. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPE SUPPORT PULLMAN N/A N/A V2-1301-104-H006 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-5503, senal# 291 was replaced with AD-5503. senal # 237 to suyoort surve7llance tesbnq.

S. Test Conducted: Hydrostatic E] Pneumatic] Nominal Operating Pressure N/A [] Other [] Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed " ' Date r. 20 01

                      )ThOwner  or Owner's Designee. Title    '-'

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geomia and employed by HartfordSteam Boiler Inspecthon and Insurance Co. of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 04/10/01 to J*-'5Qo . , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma/ ner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins'P,. , Commissions GA, 2eC' Insp6ctor's Signature National Board, State, Province and Endorsements Date 5'-

                 %                              20 6/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01038

1. Owner Southern NuclearOperabngCompany Date 05/01/01 Name 40 Inverness CenterParkway,Birmingham, AL Sheet i Of
2. Plant Vogtle Electnc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20101093 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperations Maintenance Plant Voctfe Name Address
4. Identification Of System 1301 I Main Steam System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work SnubberAD-5501. senal # 445 was replacedwith AD-5501. senal # 233 to support survelancetesting.
8. Test Conducted: Hydrostatic 5 Pneumaticfl Nominal Operating Pressure[]

N/A [] Other [] Pressure N/A PSI Test Temp. NIA 9F CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A gned M21 r-- Date __20 1 L Owner or Owner's Designee, Title"' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boler Inspecbon and Insurance Co. of Hartford.Connecbcut have inspected the components described in this Owner's Report during the period O4/!0/01 to - - /S'- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manrpqr for any personal injury or property damage or a loss of any kind arising from or connected with this InsCommisiong//" *'/f. *.'/**.*--*Commissions fA4 -:7^ Inspeptor's Signature National Board, State, Province and Endorsements Date .5- r 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01039 Southern NuclearOperatingCompany Date 04/30/01

1. Owner Name 40 Inverness Center Parkway, Birmingham, AL Sheet i Of
2. Plant VogUe Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20101094 Address Repair Organization P.O. No., Job No., etc.

Work Performed by Nuclear OperabonsMaintenance Plant VogUe 3. Name Address

4. Identification Of System 13051 Condensate and i-eeowater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components I
7. Description Of Work Snubber AD-12501. serial# 42 was replacedwith AD-12501, serial# 188 to support surveillance tesbng.
8. Test Conducted: Hydrostatic LI PneumaticE] Nominal Operating PressureE N/A [] Other LI Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A signed \ \A JrUDate 20 2 4?

Owner or Owner's Designee, Title - CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by HartfordSteam Bofer Inspecbon and Insurance Co of Hartford, Connectfcut have inspected the components described in this Owner's Report during the period 01/09/01 to .5"-91/-01 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xt. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this i n, Com m issions 6 4.. _20 _

                      "/nspedtor's Signature                                      National Board, State, Province and Endorsements Date    -'5--     9-                        20o

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01040

1. Owner Southern NuclearOperatngCompany Date 04/30/01 Name 40 Inverness Center Parkway, Birmrngham,AL Sheet Of
2. Plant Vogde Electnc GeneratngPlant Unit 2 Waynesboro, GA 30830 MWO # 20101095 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Vogde Name Address
4. Identification Of System 1305/ Condensate and Feedwater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components I I
7. Description Of Work Snubber AD-12503, senal # 132 was repLaced with AD-12503, serial# 186 to supportsurveillance testbn.
8. Test Conducted: Hydrostatic E] Pneumatic-] Nominal Operating Pressure[--]

N/A [] Other LI Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A Signed I~~ ~ r Date

                                                ~ I we(rOnrsDsgeTl~             I             2-                    20    61 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of               Geormia             and employed by HartfordSteam Boiler Inspecton and Insurance Co of Hartford, Connecttcu have inspected       the       components       described      in    this      Owner's      Report       during      the      period 04/10/01 to .5 Y-0 I               _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man er for any personal injury or property damage or a loss of any kind arising from or connected with this lnsp ec" V pec________________-_Commissions G,4 4:12," Inspe6tor's Signature National Board, State, Province and Endorsements Date ,5'- -,ý 20 0/

I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler#- 01041

1. Owner Southern Nuc/earOperabngCompany Date 05/03/01 Name 40 Inverness CenterParkway,Birmnngham, AL Sheet I Of 1
2. Plant Vogdte Electrc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20101096 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatonsMaintenance PlantVogue Name Address
4. Identification Of System 1305/ Condensate and Feedwater System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1305-064-H006 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-12503, seral# 81 was replacedwyth AD-12503, serial# 20 to support surveillancetesting. Also rep/aced socket end by weldin on transitiontube
8. Test Conducted: Hydrostatic F] Pneumatic[:] Nominal Operating PressureE]

N/AF Other [] Pressure NlA PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed Onko wners Des-ne eTie20 Date l (~ w e rOnrsDesignee, Title" CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georia and employed by HartfordSteam Boier Inspecbon and Insurance Co. of Hartford, Connecticut have Inspected the components described In this Owner's Report during the period 04/10101 to 5 /5 4/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mann r for any personal Injury or property damage or a loss of any kind arising from or connected with this insp n _______ A_____________Commissions GA c ,3 Inspegor's Signature National Board, State, Province and Endorsements Date '.. 206/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01042 Date 05/07/01

1. Owner Southern NuclearOperatingCompany Name 40 Inverness CenterParkway, Birmingham,AL Sheet Of Unit 2
2. Plant Vogde Electric Generatng Plant Waynesboro, GA 30830 MWO # 20003403 Address Repair Organization P.O. No., Job No., etc.

Plant Voctfe

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 1302 1Auxiliary Feedwater Syst em
5. (a) Applicable Construction Code ASME SEC I// 1974 Edition, Summer 1975 Addenda, N/A Code Case (b)Applicable Edition of section XI Utilities For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PUMP INGERSOLL- 1280235 724 2-1302-P4-002 1981 REPLACEMENT YES RAND CO.

7. Description Of Work Installedreplacementmechanical seal gland nng on pump outboard end Gland nnq was removed from pump 1-130?

P4-003 under MWO# 10001777 and mechanicalseal refurbishedunder MWO# A0001317,

8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure x]

NIA ] Other [ Pressure NIA PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A wsigned ate roI 20 0l e PT owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georqia and employed by HarfordSteam Boffer Inspection and Insurance Co. of Hartford,Connecticut have Inspected the components described in this Owner's Report during the period 04/10/01 to . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any m ner for any personal injury or property damage or a loss of any kind arising from or connected with this

             *' I. 9 ,                --                    Commissions            rA,*    o3 Inslifector's Signature                                       National Board, State, Province and Endorsements Date            6-    /                     200/

ORIGINAL 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01043

1. Owner Southern NuclearOperatngCompany Date 05/09/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet 1 Of 1
2. Plant VogtUe Electinc Generahng Plant Unit 2 Wavnesboro, GA 30830 MWO # 20O03404 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Vogtle Name Address
4. Identification Of System 1302 /Auxiliary Feedwater System
5. (a) Applicable Construction Code ASME SEC IlI 1974 Edition, Summer 1975 Ad Idenda, N/A Code Case (b)Applicable Edition of section XI Utilities For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PUMP INGERSOLL- 1280236 725 2-1302-P4-003 1982 REPLACEMENT YES RAND CO.

7. Description Of Work Installedreplacementmechanical seal gland nng on pump outboardend Gland nng was removed from pump 1-1302 P4-003 underMWO# 10001777 andmechanicalsealrefurbished underMWO# A00013 17,
8. Test Conducted: Hydrostatic E] PneumaticE] Nominal Operating Pressure[l NIA E] Other E] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A ne Owner or Owner's Designee, Title 2 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by HartfordSteam Boiler Inspechon andInsurance Co. of Hartford,Connecticuthave inspected the components described in this Owner's Report during the period 04/10/01 to b-o17-6o j , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XL.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any, nanner for any personal Injury or property damage or a loss of any kind arising from or connected with this _n ______ ___.. __ Commissions 2t4

                                                                                  '6A Ir)npector's Signature                                      National Board, State, Province and Endorsements 20 Date             17 1*.                              1l

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01045

1. Owner Southern NuclearOperating Company Date 05/23/01 Name 40 Inverness CenterParkway,Birminnham. AL Sheet 1 Of
2. Plant Vogue EJectnc GenerabtngPlant Unit 2 Waynesboro, GA 30830 MWO # 20101138 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperafionsMaintenance Plant Voatle Name Address
4. Identification Of System 1201! Reactor Coolant System
5. (a) Applicable Construction Code ASME SEC III 1971 Edition, Summer 1972 Addenda, 1484-2 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989 Code Case N-496-1
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. STEAM WESTINGHOUSE 1981 33 2-1201-B6-004 1982 REPLACEMENT YES GENERATOR

7. Description Of Work Installedreplacement bolt and a helical threadedInsert on the manway side upoer handhole. bolt hole #6
8. Test Conducted: Hydrostatic [] Pneumatic[o Nominal Operating Pressure-]

N/A [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the AS ME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed-r iV.¢ t&T*I ..* fA Date a 20 0

            \. )        Owner or Owner's Designee, Title      -                         I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of                 Georqa                and employed by HartfordSteam Botier Inspect'on and Insurance Co, of Hanford, Connecticut have inspected          the      components         described      in    this      Owner's       Report      during      the       period 04/15/01 to         4-f-/            . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any m for any personal injury or property damage or a loss of any kind arising from or connected with this ln4 W( Commissions GA.76 *, Inspe~or's Signature National Board, State, Province and Endorsements Date * - 4 2001

ORIGINAL / FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01046 Date 05/22/01

1. Owner Southern Nuclear Operatnng Company Name Sheet J Of 40 Inverness CenterParkway, Birmingham,AL Unit 2
2. Plant Vog*le E/ectnc GeneratngPlant Waynesboro, GA 30830 MWO # 20101119 Address Repair Organization P.O. No., Job No., etc.

PlantVogt/e

3. Work Performed by NuclearOperat'onsMaintenance Name Address
4. Identification Of System 12041 Safety Injection System
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Summer 1975 - Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. VALVE ROCKWELL CC296 N/A 2-1204-U4-026 1985 REPLACEMENT YES INTERNATIONAL

7. Description Of Work Replaced locking weld on body-to-bonnet after maintenance actvity
8. Test Conducted: Hydrostatic E] Pneumaticf] Nominal Operating Pressure[j]

NIA [] Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A I Signed O r e Desi(neeate 22tl20e owner or Owner's Designee, Title ý CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 04/16/01 to .*-;?- 0 1 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any man for any personal injury or property damage or a loss of any kind arising from or connected with this

      ,      '                           "Commissions                         (A         .

Inspq'tor's Signature National Board, State, Province and Endorsements Date <--.. Iq 200 /

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 01047

1. Owner Southern NuclearOperabngCompany Date 05/03/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet 1 Of
2. Plant Vogtfe Electnc GenerabrngPlant Unit 2 Waynesboro, GA 30830 MWO # 20001108 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance PlantVogtle Name Address
4. Identification Of System 1208 1 Chemical and Volume Control S. (a) Applicable Construction Code ASME SEC II/ 1971 Edition, Summer 1972 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO VALVE FISHER 9318723 4443 2HV0182 1985 REPLACEMENT YES CONTROLS INTL INC

7. Description Of Work Valve plu& was replaced A copy of Form N-2 for the replacementplug is attached
8. Test Conducted: Hydrostatic ] Pneumatic[] Nominal Operating Pressure[]

N/A j3 Other LI Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA Signed Oe "0 On r'r Tie20 Date 6 k-) Owner or Owner's Designee, Title - CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georqia and employed by HartfordSteam Boiler Inspecbon and Insurance Co of Hartford, Connecticut have inspected the components described In this Owner's Report during the period 04/17101 to le-v I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall insr -e itn be liable in any manylr for any personal injury or property damage or a loss of any kind arising from or connected with this i _s.y.y(,., -- Commissions C= .? Inspetor's Signature National Board, State, Province and Endorsements Date L*

                     '-   in R V 20i)/

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01048

1. Owner Southern Nuclear OperatingCompany Date 515/2001 Name 40 Inverness Center Parkway,Birmingham, Sheet Of Ala.
2. Plant Vogtle Electric GeneratingPlant Unit 2 20100597 Waynesboro, GA 30830 MWO #

Address Repair Organization P.O. No., Job No., etc.

3. Work Performed by Nuclear OperationsMaintenance Plant Voatle Name Address
4. Identification Of System 1202 / Nuclear Service Coolina Water
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Winter"75 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Removed mechanicaldamage from gasket sealing surface and restoredphonographicfinish..

Work

8. Test Conducted: Hydrostatic Ej Pneumatic[] Nominal Operating Pressurern N/A[: Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPAIR Conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed VOn r Ow esi-(V Aers Datenee,

( ) Owner or Owner's Designee, Tlti6 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Hartford, Connecticut have Inspected the components described In this Owner's Report during the period to , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken

                       ,'-/o-ol corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man er for any personal Injury or property damage or a loss of any kind arising from or connected with this In p 01"r 77

   =*"                                 -                     Commissions        GA ,;t/=2 Inpectr's        Signature            *.--0/9O/O1                National Board, State, Province and Endorsements Z-       _ _  d__

D a te /6

                                              ;4/ý11

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01049

1. Owner Southern NuclearOperatingCompany Date 04/29/01 Name 40 Inverness CenterParkway,Brmingham, AL Sheet 1 of 1
2. Plant Vogte Electnc Generabng Plant Unit 2 Waynesboro, GA 30830 MWO # 29903225 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Voctle Name Address
4. Identification Of System 1205 / Residual Heat Removal System
5. (a) Applicable Construction Code ASME SEC II 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. 1205 PIPING PULLMAN N/A N/A 2K3-1205-008-01 1989 REPLACEMENT YES SYSTEM POWER PRODUCTS

7. Description Of Work Installed replacement studs and nuts In piping flanges at 2FO-10443A.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/A E] Other 0 Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Signed &t, ý *%, . *i,,t r e L.q -- 20 kJ Owner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State of Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford, Connecticut have inspectqd the components described in this Owner's Report during the period 04/20/01 to . Z-, -4 /- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this insý 40 14" e Commissions .i 7 Inspector's Signature National Board, State, Province and Endorsements Date 220 id

Ur11UII'J-AL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01050

1. Owner Southern NuclearOperatingCompany Date 05/23/01 Name 40 Inverness CenterParkway, Birmingham,AL Sheet I Of  !
2. Plant Vogtfe Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20002014 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance Plant Voctle Name Address
4. Identification Of System 12011 Reactor Coolant System
5. (a) Applicable Construction Code ASME SEC III 1971 Edition, Summer 1972 Addenda, 1484-2 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989 Code Case N-496-1
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. STEAM WESTINGHOUSE 1982 34 2-1201-B6-003 1982 REPLACEMENT YES GENERATOR

7. Description Of Work Installedhelical threadedinserts on the manway side upper handhole, bolt holes #2 and #5 Also instal replacement bolts in bolt holes #1. #2. #4, #5 and #8.

B. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressuret-'] N/A Other [] Pressure NIA PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XL repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date NIA h Signed rori*",.. .¶,4 f14i-Date -? 0 20 Z 0 i. b' ýOwner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Hartford, Connecticuthave inspected the components described In this Owner's Report during the period 04/21/01 to !e--/-4 01 -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any nqner for any personal injury or property damage or a loss of any kind arising from or connected with this lnspcton. ___________________ ____________________Commissions (,A '70.3 i " spneqto's Signature National Board, State, Province and Endorsements Date 20 Q/_

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01051

1. Owner Southern Nuclear OperabngCompany Date 05122101 Name 40 Inverness CenterParkway, Birmingham, AL Sheet J Of 1
2. Plant VogUe Electnc GeneratngPlant Unit 2 Waynesboro, GA 30830 MWO # 20001157 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabons Maintenance Plant Vocite Name Address
4. Identification Of System 1305/ Condensate and Feedwater System
5. (a) Applicable Construction Code ASME SEC IIt 1974 Edition, Summer 1975 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

VALVE ANCHOR/ E9001-97-8 N/A 2-1305-U4-077 1984 REPLACEMENT YES DARUNG VALVE CO

7. Description Of Work Replaced one hinge Frn coverstud
8. Test Conducted: Hydrostatic E] PneumaticE] Nominal Operating Pressure[n NIA Other U Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. Repair or replacement Type Code Symbol Stamp N/A V Certificate of Authorization No.

Signed

          ¶  ;

U_ ) kW* ,'. (V.j .N N/A evr. Owner or Owner's Designee, Title U Date Expiration Date

  • 20 20 N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georma and employed by HartfordSteam Boiler Inspecgbon and Insurance Co of Hartford,Connectfcut have inspected the components described in this Owner's Report during the period 04/22/01 to 'ý 1-4?/ _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man r fr any personal Injury or property damage or a loss of any kind arising from or connected with this in_____ /_______ __________Commissions e.A lo 5 I Inspeetor's Signature National Board, State, Province and Endorsements Date 200/

UfI1t.31PNb-L I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01052

1. Owner Southern Nuclear Operating Company Date 05/21101 Name 40 Inverness Center Parkway,Birmingham, AL Sheet 1 Of 4
2. Plant Voqtle Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20000286 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperaftonsMaintenance Plant Vogtle Name Address
4. Identification Of System 1301 I Main Steam System
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Winter 1975 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

VALVE FISHER 9009437 6127 2HV-15212A 1984 REPLACEMENT YES CONTROLS INT'L INC

7. Description Of Work Valve plug was replaced A copy of Form N-2 for the replacement Plugis attached,
8. Test Conducted: Hydrostatic E] Pneumaticf] Nominal Operating Pressure[--]

N/A [] Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed A = czz> w /,L.Ak ft"Date /A Z-3 20 Cl N Owner or Owner's Designee, Title d CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HarfordSteam Boiler Inspecton and Insurance Co. of Hartfordc Connecticut have inspected the components described In this Owner's Report during the period 04122/01 to . O and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any nner for any personal injury or property damage or a loss of any kind arising from or connected with this l,*Jo 2*.* .- r -T Commissions G1A ;20

                - -ns-okt'or's Signature                                         National Board, State, Province and Endorsements Date          5- 30O                         200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 01053

1. Owner Southern Nuclear OperatingCompany Date 05/10/01 Name 40 Inverness Center Parkway, Birmingham,AL Sheet I Of 1
2. Plant Voqtle Electnc Generating Plant Unit 2 Wavnesboro, GA 30830 MWO # 20002997 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Voqtle Name Address
4. Identification Of System 1204 /Safety Injection System
5. (a) Applicable Construction Code ASMESEC III 1974 Edition, Summer 1974 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

VESSEL SOUTHWEST 0089 469 2-1204-V6-003 1978 REPLACEMENT YES FABRICATING & WEDING CO.

7. Description Of Work Installed two replacementstuds on vessel manway
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/A [] Other [] Pressure N/A PSI Test Temp. N/A 91= CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. Repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed V*.,,&..4UA /631-Date it'L /V 20 I (J Owner or Owner's Designee, Title %J ( CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georola and employed by Hartford Steam Boiler Inspection and InsuranceCo. of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 04/24/01 to L.5L-1:-01 _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mann j for any personal Injury or property damage or a loss of any kind arising from or connected with this Ins___________________ enon C Commissions G4,, *; ' Inspefotr's Signature National Board, State, Province and Endorsements Date .5-'- 1 20 0/

                  --     r'lF

UMIUINIAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01054

1. Owner Southem NuclearOperabngCompany Date 05121/01 Name 40 Inverness CenterParkway, Birmingham, AL Sheet I Of
2. Plant Vogt/e EJectnc GenerabngPlant Unit 2 Waynesbom, GA 30830 MWO # 20101394 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatons Maintenance Plant Voatle Name Address
4. Identification Of System 1305 1 Condensate and Feedwater SSystem
5. (a) Applicable Construction Code ASME SEC I// 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1305-058-H003 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-12501, senal # 21 was replacedwith AD-12501, senat #26 to support surveillance teshng.
8. Test Conducted: Hydrostatic [] Pneumatic-] Nominal Operating PressureEl N/A Other 5 Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A Signed W A'L-A. (t qAr. 'Date /!1 7Z.3 20 0 1 (9 Owner or Owner's Designee, Title t CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford,Connecticut have inspected the components described In this Owner's Report during the period 04/25/01 to J c--3001 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man r for any personal injury or property damage or a loss of any kind arising from or connected with this ins n. ____,____________________-______Commissions GAae-Y,

                     "            Signature
                         /nsp-/or's                                                 National Board, State, Province and Endorsements Date         .56-   ,1o                   20 0/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xf Traveler # 01055 Southern NuclearOperatingCompany Date 06/04/01

1. Owner Name 40 Inverness CenterParkway,Birmingham, AL Sheet I Of J VogUte Electric Generating Plant Unit 2
2. Plant Waynesboro, GA 30830 MWO # 20101393 and A9900730 Address Repair Organization P.O. No., Job No., etc.

Work Performed by Nuclear OperatonsMaintenance Plant Vootle 3. Name Address

4. Identification Of System 12041 Safety Injection System
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO PIPE SUPPORT PULLMAN N/A N/A V2-1204-125-HO07 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-5501, senal# 231 was replacedwith AD-5501, serial# 772 to supportsurveillance tesingq. Also installed bal screwr load member key and support sleeve on replacementsnubber serial # 772 under MWO # A9900730 and Traveler# 99214 S. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure 5 NIA Other [] Pressure NIA PSI Test Temp. NIA CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed VYV M &;A n r Date 20 I S(I Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HartfordSteam Boler Inspecton and Insurance Co of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 09110199 to /--'7-0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any man r for any personal Injury or property damage or a loss of any kind arising from or connected with this 7//,,,0A L(-_.4*- - Commissions (r*A2*7.

                    "InspeXor's Signature                                           National Board, State, Province and Endorsements Date          ,-,7                          200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 01056

1. Owner Southern NuclearOperattngCompany Date 05/11/01 Name 40 Inverness Center Parkway, Birmingham,AL Sheet I Of  !
2. Plant Vogtle Electric GeneratingPlant Unit 2 Wavnesboro. GA 30830 MWO # 20101392 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Vogt/e Name Address
4. Identification Of System 1208 1 Chemical and Volume Control System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACT'UR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1208-008-HO18 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1603, serial# 528 was replaced with AD-1603, serial # 133 to support surveillancetesting.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureD NIA E] Other LI Pressure N/A PSI Test Temp. N/A 9F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed e r.*-t J* -- t&*-.L-Al, (t Date _ _ _ _20 0_

Owner or Owner's Designee, Title-CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and InsuranceCo of Hartford. Connecticuthave Inspected the components described In this Owner's Report during the period 04/25/01 to -/_4 .7-el -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any ma ner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins,,2*_,__,_ Commissions f*,42g', Insp6ctor's Signature National Board, State, Province and Endorsements Date 5. 17 2061/

                                                            .UK6IUNAL I                      FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required ByThe Provisions Of The ASME Code Section XI Traveler#         01057 Date                                     05/11/01
1. Owner Southem Nuclear~peratingCompany Name 40 Inverness CenterParkway, Birmingham, AL Sheet I Of I Unit 2
2. Plant Vogtle Electric GeneratingPlant 20101391 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address Plant Vogtle

3. Work Performed by Nuclear OperatbonsMaintenance Address Name
4. Identification Of System 1301 /Main Steam System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE NAME STAMPED OF OF ER BOARD OTHER YEAR REPLACED OR SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT MANUFACTURER NO. PULLMAN N/A N/A V2-1301-107-HO05 1989 REPLACEMENT YES PIPE SUPPORT POWER POnUCTS surveillance testnq.

7. Description Of Work Snubber AD-5501. serial # 444 was replacedwith AD-5501. senal# 844 to support
8. Test Conducted: Hydrostatic E] Pneumatlcr- Nominal operating PressureE N/A E] Other [] Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A N/A Expiration Date N/A Certificate of Authorization No.

Signed '3V- -. /V.,- Titl - Date 1 / I '- 20 h} Owner or Owner's Designee, Title v CERTIFICATE OF INSERVICE INSPECTION and the State or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Co of Hartford, Connectict have Province of Georgia components described In this Owner's Report during the period 04/25/01 Inspected the examinations and taken to s'-/7-6/ , and state that to the best of my knowledge and belief, the Owner has performed Report In accordance with the requirements of the ASME Code, Section XI. corrective measures described in this Owners or implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed in this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective measures described or a loss of any kind arising from or connected with this be liable in any mg ner for any personal Injury or property damage in Commissions ,A,,03 "Ins*fector's Signature National Board, State, Province and Endorsements Date /7 200 I

ORIGINAL / FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01058 Date 06/01/01

1. Owner Southem NuclearOperatngCompany Name 40 Inverness CenterParkway, Birmingham,AL Sheet I Of I r¸ w Unit 2
2. Plant Vogte Electnc Generahng Plant Wavnesboro, GA 30830 MWO # 20101390 and A0001 374 Address Repair Organization P.O. No., Job No., etc.

PlantVogtle

3. Work Performed by Nuclear Operaftons Maintenance Name Address
4. Identification Of System 1301 I Main Steam System
6. (a) Applicable Construction Code ASMESEC II/ 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPESUPPORT PULLMAN N/A N/A V2-1301-106-HO06 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-5501, senal# 280 was replaced with AD-5501, senal# 243 to supportsurveillance testnq. Also Installed socket on replacement snubbersenal# 243 under MWO #fA0007374 and iraveler# u0uu., f
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[:]

WA1 Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. rep,air or replacement Type Code Symbol Stamp N/A N/A N/A Expiration Dat e NIA Certificate of Authorization No. _-S 20 01 Signed 6r.2Z*-*--"J U-:- M f.A- ate -lk I Owner or Owner's Designee, Title 0 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geor.ia and employed by HartfordSteam Boiler Inspecbon andInsurance Co. of Hartford, Connectcut have inspected the components described in this Owner's Report during the period 03/09/01 to 6- 7-0/ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In /any 7mann for any personal Injury or property damage or a loss of any kind arising from or connected with this inspe _* Commissions GA ,ae*S Inspec)r's Signature National Board, State, Province and Endorsements Date t"-7 200/

UKIiIINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01059 05130/01

1. Owner Southern NuclearOperabngCompany Date Name Sheet I Of 40 Inverness CenterParkway,Birmningham, AL Unit 2
2. Plant Vogte Electnc GeneratingPlant MWO # 20101389 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address PlantVootie

3. Work Performed by NuclearOperatbons Maintenance Name Address
4. Identification Of System 1301 / Main Steam System Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC I1I 1977 Edition, Winter 1977 (b)Applhcable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF ER BOARD OTHER YEAR REPLACED OR STAMPED OF SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT MANUFACTURER NO. PIPESUPPORT PULLMAN N/A N/A V2-1301-106-H002 1989 REPLACEMENT YES POWER PRODUCTS _______ ________ L L L ________ a ________ &

7. Description Of Work Snubber AD-5503, senal # 236 was replaced wth AD-5503, senal # 439 to supportsurveillance testing. Also installed rear bracket assemby (fixed-end paddle) on replacementsnubbersenal# 439
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure -"

NIA FA] Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed ,nerA it (A r Date \ _ L. 20 K. Oý%Cwner or Owner's Designee, Title" CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georraa and employed by Hartford Steam Boiler Inspection and InsuranceCo. of Hartford, Connecbcut have inspected the components described in this Owner's Report during the period 04/25/01 to < 0 I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective XI. measures described in this Owners Report in accordance with the requirements of the ASME Code, Section examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall with this be liable in any manr*" for any personal injury or property damage or a loss of any kind arising from or connected Ins -, 2 p., -Com m issions 9A ,; 0,3 Inspectot's Signature National Board, State, Province and Endorsements Date  :- 7 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler # 01060

1. Owner Southern NuclearOperatingCompany Date 05/11/01 Name 40 Inverness Center Parkway, Birmingham, AL Sheet 1 Of
2. Plant Voqtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20101388 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vogtle Name Address
4. Identification Of System 1301 I Main Steam System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A A/A V2-1301-105-HO06 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-5501. serial# 281 was replacedwith AD-5501, senal# 407 to support surveillance testing.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureL]

N/A [] OtherE] Pressure N/A PSI Test Temp. N/A 2= CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed /A Date 20 0 / ( Owner or Owner's Designee, Title " I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georoia and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford. Connecticuthave Inspected the components described In this Owner's Report during the period 04/25/01 to 7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any man r for any personal Injury or property damage or a loss of any kind arising from or connected with this inspf~tp*/ '/ insp*F {Cy , commissions GA,7a'j "Inspe r's Signature National Board, State, Province and Endorsements Date 3 -/7 200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 01061 05111/01

1. Owner Southern NuclearOperatingCompany Date Name 1 Of 40 Inverness CenterParkway, Birmingham, AL Sheet _

2

2. Plant Vogtle Electric GeneratingPlant Unit 101387 Waynesboro, GA 30830 MWO # 2C n P.O. No., Job No., etc.

Address Repair Organizatio tie

3. Work Performed by Nuclear OperationsMaintenance Plant Vog; Name Address
4. Identification Of System 10ui1 Main S[eam OyS~em Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT NO. PIPE PULLMAN N/A N/A V2-1301-104-HO05 1989 REPLACEMENT YES SUPPORT POWER PROQUAM"T

7. Description Of Work Snubber AD-5501, serial#289 was replaced with AD-5501. senal #845 to suort surveillance testina.
8. Test Conducted: Hydrostatlc E] PneumaticE] Nominal Operating Pressure-]

N/A [] Other ] Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed Z) O 'Jor lker - Ds .Ownr4eTile20 ate 01 (I owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford, Connecticuthave Inspected the components described' In this Owner's Report during the period 04/25101

                           -, and   state that  to  the  best  of   my knowledge    and   belief,  the  Owner   has  performed       examinations and taken to -5,-/7-o/

corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. the By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective with this be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected lnsp M 21 Commissions cA 2o3 4nnnp-*tor's Signature National Board, State, Province and Endorsements Date 17 u-15 2001

U I-I1NAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01062

1. Owner Southern NuclearOperatingCompany Date 05111/01 Name 40 Inverness CenterParkway,Birmingham,AL Sheet I Of
2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20101386 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Voatle Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN A/A N/A V2-1301-014-H005 1989 REPLACEMENT YES SUPPORT POWER _________ PRODlUCTS ____

7. Description Of Work Snubber AD-1603. senal # 683 was replaced with AD-1603. serial# 148 to supportsurveillance testing
8. Test Conducted: Hydrostatic [] Pneumatic[j Nominal Operating PressureL N/A [] Other [] Pressure N/A PSI Test Temp. N/A 9F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed e T r-Date / 20 o t SOwner or Owner's Designee, Title %J CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 04/25/01 to S-/7.0t , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this

                                    ..      - -               Co m m issio ns          G A ;7,o I s-ec76Ps'-SIgnature ii                                                             National Board, State, Province and Endorsements Date           .5-    /7                      200/

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required ByThe Provisions Of The ASME Code Section XI Traveler # 01063 Date 05/11/01

1. Owner Southern NuclearOperatingCompany Name I Of 1 40 Inverness Center Parkway, Birmingham,AL Sheet 2
2. Plant Vogtle Electric GeneratingPlant Unit Waynesboro, GA 30830 MWO # 20 101385 etc.

Address Repair Organizatioin P.O. No., Job No.,

3. Work Performed by NuclearOperations Maintenance Plant Vogtle Name Address
4. Identification Of System 1204 / Safety Injection System
5. (a) Applicable Construction Code ASME SEC II 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1204-043-H013 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1601. senal#364 was replaced with AD-1601, senal # 136 to supportsurveillance testing.
8. Test Conducted: Hydrostatic LI Pneumatic[] Nominal Operating Pressure5 N/A [] Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A rp4oSigned or1 Designee, ,tleA, I Date I/V4 /5y 20 O U. Owner or Owner's Desiglnee, Title 4 CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspectton and Insurance Co. of Hartford,Connecticuthave inspected the components described in this Owner's Report during the period.._04/25101 to 5!"-/ / -, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this insp? ,*.A t L *- .i Commissions 6; ; ,A . Inspectges Signature National Board, State, Province and Endorsements Date ,6- /4 20 0L

ORIGINAL I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler # 01064

1. Owner Southern NuclearOperatingCompany Date 05/11/01 Name 40 Inverness Center Parkway,Birmingham,AL Sheet I Of  !
2. Plant Vogtle Electnc GeneratingPlant Unit 2 Wa4yesboro, GA 30830 MWO # 20101384 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Voqtle Name Address
4. Identification Of System 1204 /Safet Injection System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A N/A V2-1204-025-HO06 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-1601, serial # 106 was replacedwith AD-1601, senal # 163 to supportsurveillance testing.
8. Test Conducted: HydrostatIc f] Pneumatic[] Nominal Operating Pressure[-]

N/A [] Other [] Pressure N/A PSI Test Temp. N/A 9F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed -ý.*--' i. 4 ,'A rsi 1 CDate * /

  • 20 ()

U Owner or Owner's Designee, Title 6/ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georqia and employed by HartfordSteam Boiler Inspection and Insurance Co of Hartford,Connecticuthave Inspected the components described in this Owner's Report during the period I to . J , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any man pr for any personal Injury or property damage or a loss of any kind arising from or connected with this _____Inse.I_ IF __ Commissions .'o = InspoEtor's Signature National Board, State, Province and Endorsements Date 4'- // 200/

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 01065

1. Owner Southern NuclearOperatingCompany Date 05/11/01 Name 40 Inverness Center Parkway,Birmingham, AL Sheet Of
2. Plant Vogtle ElectricGenerating Plant Unit 2 Waynesboro, GA 30830 MWO # 20101395 Address Repair Organization P.O. No., Job No., etc.

Plant Voqtle

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 1302 /Auxiliary Feedwater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUR NATIONAL REPAIRED, ASME CODE OF OF ER BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

NO. PIPE PULLMAN N/A NIA V2-1302-109-H024 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1603, serial # 676 was re=lacedwith AD-1603, serial # 114 to supportsurveillance testing.
8. Test Conducted: Hydrostatic ] Pneumatic-] Nominal Operating PressureE]

N/A [] Other U Pressure N/A PSI Test Temp. N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A ]SIgned ( M Date ___,______20 O01

             "*.J      Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of                Georgia              and employed by Hartford Steam Boiler Inspectionand Insurance Co, of Hartford, Connecticuthave Inspected         the       components        described        in     this     Owner's           Report       during     the      period 04/25/01 to .-5/7-01               _,  and state  that  to  the  best  of  my  knowledge      and    belief, the  Owner   has  performed     examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any maner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins7 ý i4**/ .._- Commissions GA,:,lc' "Inspeor'sSignature National Board, State, Province and Endorsements Date _6'6 / -7 20 el

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02032

1. Owner Southern Nuclear OperatingCompany Date 11/03/02 Name 40 Inverness Center Parkway,Birmingham, AL Sheet Of Plant Voatle Electric GeneratinaPlant Unit 2 2.

Waynesboro, GA 30830 MWO # 20200651 Address Repair Organization P.O. No., Job No., etc.

3. Work Performed by Nuclear OperationsMaintenance Plant Vog3Fe Name Address
4. Identification Of System 1302/A uxilialy Feedwater Systemn
5. (a) Applicable Construction Code ASME SEC Ill 19.. Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE PULLMAN NIA N/A V2-1302-110-H014 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work SnubberAD-501. serial# 119 was replaced with a riqid strut in accordancewith DCP00-V2NO002
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/A[] Other [L_ Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of uthorization No. N/A Expiration Date N/A Signed - 4 Date "0 r or Owner's Defignee, Title (i- I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford. Connecticu have , Inspected the components described in this Owner's Report during the period08/19/02 to /-.- A-o.z , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this _w_ _ _ _ _ _ _ _ _ _ Commissions (e A 2 &'*'

           /      ,     - InsOec)6r's Signature                                               National Board, State, Province and Endorsements Date        //-_'"-p*

-.. A 1W

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02033 Date 10131/02 Owner Southern Nuclear Operating Company Name I Sheet Of 40 Inverness CenterParkway, Birmingham, AL 2

2. Plant Vogtle Electnc GenerabngPlant Unit MWO # 20200652 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address

3. Work Performed by Nuclear OperationsMaintenance Plant Vog1Se Name Address
4. Identification Of System 1301 1Main Steam System
5. (a) Applicable Construction Code ASME SEC IMI 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
                                           ,MANUFACTURER NATIONAL                                                      REPAIRED,          ASME CODE NAME                   NAME SERIAL          BOARD            OTHER                YEAR            REPLACED OR           STAMPED OF                    OF NO.             NO.        IDENTIFICATION           BUILT          REPLACEMENT           (YES OR NO)

COMPONENT MANUFACTURER PULLMAN N/IA N/A V2-1301-126-H024 1989 REPLACEMENT YES PIPE SUPPORT POWER PRODUCTS* _______ .1 1 .1 £ £

7. Description Of Work SnubberAD-503, serial# 660 was repaced with a nMid strutIn accordance with DCP00-V2NO002,
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure ]

NIAJ Other [J Pressure N/A PSI Test Temp. N/A "Nd CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NIA N/A Expiration Date NIA Certificate of A horization No.

                      -Owner~r Owner's Designefe, Title           -4,'C ,  44f*--

CERTIFICATE OF INSERVICE INSPECTION and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors Province of Georgia and employed by HartfordSteam Bofler lnspecbon and Insurance Co of Connectcut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 08/19/02 corrective to //-.I - 0;2 - and state that to the best of my knowledge and belief, the Owner has performed examinations and taken the ASME Code, Section XI. measures described in this Owners Report In accordance with the requirements- of concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall from or connected with this be liable in any manner for any personal injury or property damage or a loss of any kind arising inspe ti* *' , Commissions (PA,, .3 i7ns Za "Inspecto Signature National Board, State, Province and Endorsements Date //-,o.; -0OL

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02034 Owner Southern Nuclear Operating Company Date November 2, 2002 Name 40 Inverness Center Parkway,Birmingham,AL Sheet 1 of 1 Address

2. Plant Vogtle ElectricGenerating Plant Unit 2 Plant Waynesboro, GA 30830 MWO # 20200653 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vogtle Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME Section 1ii 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE PULLMAN N/A N/A V2-1301-128-H078 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubbers AD-153. serial #269 (TOP) and serial #192 (BOTTOM) were replaced with rigid struts In accordance with DCP 00-V2NO002.

Tests Conducted: Hydrostatic [I Pneumatic [I Nominal Operating Pressure 0 NIA 19 Other 0 Pressure N/A PSI Test Temp. N/A F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. ,P- N/A Expiration Date N/A -Signed te  ;/ L. 2 "qdr&Zlwner's w Desidn~ee,"fitie zjp. /*, CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Bolier Inspection and InsuranceCo of Connecticut of Hartford Connecticut have inspected the components described in this Owner's Report during the period , August 20, 2002 to /- -, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manr for any personal Injury or property damage or a loss of any kind arising from or connected with this Iser Sture Commissions GAtevo Inspeslor's Signature National Board, State, Province and Endorsements

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required ByThe Provisions Of The ASME Code Section XI Traveler # 02035 Date November 2, 2002 "vid* Owner Southern Nuclear OperatingCompany

  'U IV                                       Name Sheet                      1                of               I 40 Inverness CenterParkway, Birmingham,AL Address                                                                             2
2. Plant Vogtle Electric GeneratingPlant Unit Plant 20200654 Waynesboro, GA 30830 MWO #

Address Repair Organization P.O. No., Job No., etc. Plant Vogcte

3. Work Performed by Nuclear OperationsMaintenance Address Name
4. Identification Of System 1301 1 Main Steam System ASME Section III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code (b)Appllcable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME NAME STAMPED OF SERIAL BOARD OTHER YEAR REPLACED OR OF REPLACEMENT (YES OR NO)

MANUFACTURER NO. NO. IDENTIFICATION BUILT COMPONENT N/A N/A V2-1301-010-H039 1989 REPLACEMENT YES PIPE PULLMAN SUPPORT POWER PRODUCTS with DCP 0O-V2NO002.

7. Description Of Work SnubberAD-151L. serial #915 was replaced with a riqld strut In accordance
  • Tests Conducted: Hydrostatic [I Pneumatic E0 Nominal Operating Pressure 0]

Test Temp. NWA 1F NA 0 Other Pressure NWA PSI CERTIFICATE OF COMPLIANCE replacement conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A horizatlon No. A Expiration Date N/A Certificate Signed O_ to

  • ( Owner o ner's Desln , Title/ C..

CERTIFICATE OF INSERVICE INSPECTION Vessel Inspectors and the State I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure HartfordSteam Boiler Inspection and InsuranceCo of Connecticut of Hartford or Province of Georgla and employed by the components described in this Owner's Report during the period August 20,2002 Connecticut have inspected and tests and to / and state that to the best of my knowledge and belief, the Owner has performed examinations this Owners Report in accordance with the requirements of the ASME Code, Section XI. taken corrective measures described In expressed or Implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, Furthermore, neither the Inspector nor his employer shall examinations and corrective measures described In this Owners Report. for any personal Injury or property damage or a loss of any kind arising from or connected with this be liable In any manper Insp Iln: ,// _______________________ Commissions GA

  • 70-3 Inspe or's Signature National Board, State, Province and Endorsements Date - Io&,: L
\

14W

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02036

1. Owner Southern NuclearOperatnig Company Date 10131/02 Name 40 Inverness CenterParkway,Birrmingham, AL Sheet 1 Of 1
2. Plant Vogtde Electnc Generatfng Plant Unit 2 Waynesboro, GA 30830 MWO # 20200655 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operabons Maintenance Plant Vogtfe Name Address
4. Identification Of System 1301/Main Steam System
5. (a) Applicable Construction Code ASME SEC III 19.7 Edition. Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-126-H029 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber A 0-153, serial# 408 was replacedwrth a naidstrut in accordancewith DCP 00-V2NO002
8. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating Pressure-N/A [] Other [] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp NIA Certificate ofuthorizatlon No. N/A Expiration Date N/A Signed ,J Date2 a 69*.

er's e Te Sor CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Lnspecbon and Insurance Co of Connecftcut of Hartford. Connecffcut have inspected the components described in this Owner's Report during the period 08)20/02 to //- , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements. of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mann, for any personal injury or property damage or a loss of any kind arising from or connected with this ins 1 4.12.1 . - "_.A Com m issions "A Z'1' Inspect(r's Signature National Board, State, Province and Endorsements Date / - ;7 -- ,

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02037

1. Owner Southern Nuclear Operabng Company Date 11/06/02 Name 40 Inverness Center Parkway, Birmingham,AL Sheet 1 Of ]

Unit 2

2. Plant Vogfe Electric GeneratngPlant 20200656 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address

3. Work Performed by Nuclear OperatonsMaintenance Plant VdeSe Name Address
4. Identification Of System 1302/Auxilary Feedwater System 19L7 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC III (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME STAMPED OF OF SERIAL BOARD OTHER YEAR REPLACED OR MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT IYES OR NO)

COMPONENT PULLMAN N/A N/A V2-1302-110-H016 1989 REPLACEMENT YES PIPE SUPPORT POWER PRODUCTS A replacement

7. Description Of Work Snubber AD-501, serial # 526 was reptaced with a ftgid strut in accordance with DCP 00-V2NO002 load stud with nuts was also instaled With the Mqid strut Test Conducted: Hydrostatic [] PneurnaticU Nominal Operating Pressure U N/Am Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF INSERVICE INSPECTION and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and employed by Hartford Steam Boger Inspecton and Insurance Co of Connectcut of Hartford, Connectcut have Province of Georuia components described in this Owner's Report during the period 08f20/02 Inspected the
                         ,  and state that to the  best of my  knowledge    and belief,  the Owner  has  performed   examinations  and taken corrective to //- ,- 0         ?-

ASME Code, Section XI. measures described In this Owners Report In accordance with the requirements of the concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described in this Owners from or connected with this be liable in any manner for any personal injury or property damage or a loss of any kind arising inspecti7 . Commissions ( 1e3 Insplegtor's Signature National Board, State, Province and Endorsements I Date ./1- _d-0-52--

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02038 Date 10/31/02

1. Owner Southern Nuclear OperabngCompany Name  ! Of Sheet 40 Inverness CenterParkway,Birmingham, AL 2
2. Plant Vogfte Electric GeneratingPlant Unit MWO # 20200657 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address Plant VogSSe

3. Work Performed by NuclearOperaffons Maintenance Address Name
4. Identification Of System 1301 /Main Steam System 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
6. (a) Applicable Construction Code ASME SEC ill (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME NAME STAMPED OF SERIAL BOARD OTHER YEAR REPLACED OR OF REPLACEMENT (YES OR NO)

MANUFACTURER NO. NO. IDENTIFICATION BUILT COMPONENT N/A N/A V2-1301-111-H003 1989 REPLACEMENT YES PIPESUPPORT PULLMAN POWER PRODUCTS 00-V2N0002

7. Description Of Work SnubberAD-41, senal # 1034 was replacedwith a ngLd strut in accordance with DCP
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureEl N/A Other [] Pressure N/A PSI Test Temp. N/A F v

CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this repair or replacement rules of the ASME Code, Section XI. Type Code Symbol Stamp N/A N/A Expiration Date N/A Certificate of Authorization No.

    "Signed                        ror             Dl        /ers            -e                 Date CERTIFICATE OF INSERVICE INSPECTION Pressure vessel inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and of      Georata          and  employed     by  Hartford Steam    Soler Inspection  and  Insurance Co of Connectcut of Hartford. Conneclicuf have Province described        in      this      Owner's         Report      during      the     period   08120/02 inspected         the       components i-..-.2-               and   state that to  the best   of my  knowledge    and   belief, the  Owner  has performed examinations and taken corrective to                          ,

of the ASME Code, Section XI. measures described in this Owners Report in accordance with the requirements, expressed or implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, in this Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described damage or a loss of any kind arising from or connected with this be liable in any manner for any personal Injury or property Inse ct 7;nw ( *__

                              ,       -                                   Commissions           GA    .7,03 Inspect*'s Signature                                                     National Board, State, Province and Endorsements Date____________

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02039 10131/02 Owner Souther NuclearOpera'ng Company Date

1. Name Of ]

Sheet 40 Invemess Center Parkway, Birmingham, AL Unit 2

2. Plant VogUe Electnc Generatng Plant MWO # 20200658 Waynesboro, GA 30830 Address
3. Work Performed by Nuclear OperabonsMaintenance Plant Vogde Address Name
4. Identification Of System 1301 IMain Steam System Addenda, N-249-1 Code Case
6. (a) Applicable Construction Code ASME SEC I/I 197Z Edition, Winter 1977 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME NAME SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF OF COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

N/A N/A V2-1301-109-H003 1989 REPLACEMENT YES PIPESUPPORT PULLMAN POWER PRODUCTS, with DCP 00-V2NO002

7. Description Of Work Snubber AD-41, serial# 694 was replacedwith a ngid strutIn accordance
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureEl

[] Other [] Pressure N/A PSI Test Temp. N/A OF N/A CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made In the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A N/A Expiratiqn Date N/A Certificate of A C horizat~on No. Expiratiq ae N/A Sge NIA Zo t v C*ff-r or Owner's Desielnee, Title 1,,4*-,rýcf1., CERTIFICATE OF INSERVICE INSPEC I IUN vessel Inspectors and the State or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure a and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford, Connecticut have Province of Georia inspected the components described in this Owner's Report during the period 2 08/9/0_ to the best of my knowledge and belief, the Owner has performed examinations and taken corrective to /-- . and state that of the ASME Code, Section XI. measures described in this Owners Report in accordance with the requirements, or implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described in this Owners liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this be inspect* ,* / Commissions 0,4,203 Inspector'stignature National Board, State, Province and Endorsements Date I 1 -;2 -0 (;

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02040 Date 10)29102

1. Owner Southem Nuclear Operabng Company Name 1 Of I 40 Inverness Center Parkway,Birnnngham,AL Sheet 2
2. Plant Vogde Elect=c Generabtng Plant Unit MWO # 20200659 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address

3. Work Performed by Nuclear OperationsMaintenance Plant Vog/te Name Address
4. Identification Of System 1301 /Main Steam System ASME SEC III 1977 Edition, WVnter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME STAMPED OF OF SERIAL BOARD OTHER YEAR REPLACED OR MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT N/A N/A V2.1301-110-H003 1989 REPLACEMENT YES PIPESUPPORT PULLMAN POWER PROf U.Ti

7. Description Of Work Snubber AD-41, serial# 612 was replaced with a &1qdstrut in accordancewith DCP O0-V2NO002
8. Test Conducted: Hydrostatic E] Pneumatic[] Nominal Operating Pressure[]

N/A0 Other [] Pressure N/A PSI Test Temp. N/A 9F CERTIFICATE OF COMPUANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A thoriztion No. NIA Expiration Date N/A Certificate of Signed 4 rs e'p.1 Date O ~er or Owner's Ddsi nee, Title a44.5.. CERTIFICATE OF INSERVICE INSPECTION and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and employed by Hartford Steam Bofer Inspecton and Insurance Co of Connectcut of Hartford,Connectcut have Province of Georoia components described In this Owner's Report during the period 08/19/02 inspected the corrective to 0./O -0.3"/ _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken the ASME Code, Section XI. measures described in this Owners Report in accordance with the requirements- of concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall from or connected with this be liable ip any mann* for any personal injury or property damage or a loss of any kind arising inspec ;9ý,, in SCommissions ,Ag3.. Inspect9' s Signature National Board, State, Province and Endorsements Date /1 -'/-0:

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02041 Owner Southern Nuclear Operating Company Date 11/03/02 Name 40 Inverness Center Parkway, Birmingham,AL Sheet I Of I

2. Plant Vogte Electnc Generat'ngPlant Unit 2 Waynesboro, GA 30830 MWO # 20200660 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabtonsMaintenance Plant Vogtle Name Address
4. Identification Of System 1302 lAuxilary FeedWater System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1302-110-H015 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-501. serial# 139 was replacedwTth a rfiadstrut in accordancewith DCP 00-V2NO002
  ~ 8.      Test Conducted:                 Hydrostatic []    Pneumatic[]         Nominal operating PressureD]
    "I-Id                    N/Am           Other []          Pressure       N/A     PSI     Test Temp.             N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this                     REPLACEMENT                    conforms to the rules of the ASME Code, Section XI.                                                           repair or replacement Type Code Symbol Stamp                                                                      N/A Certificate of Authorization No.                        N/A                      Expiration Date                                NIA ISigned                                                                      -        Date            Z     ~      f2 owpd'r Owner's Desigert                 4C11           h2 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of        Geormia         and employed by HartfordSteam Boier Inspecthon and Insurance Co of Connecftcut of Hartford. Connecbcut have inspected        the       components       described       in      this      Owner's      Report        during      the     period 08120/02 to     I            2 -. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements 'of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _____________-__ Commissions GA,203 Inspeafor's Signature National Board, State, Province and Endorsements Date / /-56-02 40 1-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02042 Date 10/31/02 Owner Southern Nuclear OperahngCompany Name I Of Sheet 40 Inverness CenterParkway, Birmingham, AL Unit 2

2. Plant Vogtfe ElectricGeneratingPlant 20200661 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address Plant Voetie

3. Work Performed by Nuclear OperabonsMaintenance Name Address Identification Of System 1301/IMain Steam System 4.

1977 Edition, Winter 1977 Addenda, N-249-1 Code Case

5. (a) Applicable Construction Code ASME SEC III (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME NAME STAMPED OF SERIAL BOARD OTHER YEAR REPLACED OR OF (YES OR NO)

MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT COMPONENT N/A N/A V2-1301-128-HO06 1989 REPLACEMENT YES PiPESUPPORT PULLMAN POWER PRODUCTs with OCP O0-V2NO002

7. Description Of Work Snubber AD-501. senal# 532 was mplaced with a tngid strut in accordance
a. Test Conducted: Hydrostatic [] Pneumatic[] Nominal operating Pressure ]

NIA] Other [] Pressure NIA PSI Test Temp. NIA CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A

                                                        , N/A                      Expiration Date                                 NIA Certificate of Authorization No.

Signed wnr , - Date Z, Owno% r Owner's Desic nde, Title &AC CERTIFICATE OF INSERVICE INSPECTION vessel inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure

                                 . and  employed    by Hartford  Steam  Boiler Inspection  and Insurance  Co  of Connecticut   of Hartford, Connectcut have Province of        Georr'ia components         described       in     this       Owner's        Report       during       the      period 08/20)02 inspected         the
                         ,  and  state that to the best  of my  knowledge    and  belief,  the Owner   has  performed examinations and taken corrective to ,//-...7-0.,*

of the ASME Code, Section XI. measures described in this Owners Report In accordance with the requirements, or implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described in this connected with this be liable in any manner for any personal injury or property damage or a loss of any kind arising from or inspecin.. ,f/ c5Z 070._ insect994,,y" f,*Commissions Inspectoy's Signature National Board, State, Province and Endorsements Date //-2-e,

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02043 Owner Southern Nuclear OperatingCompany Date November 2, 2002 Name 40 Inverness CenterParkway,Birmingham, AL Sheet 1 of 1 Address Unit 2

2. Plant Vogtle Electric GeneratingPlant Plant MWO # 20200662 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vogtle Name Address
4. Identification Of System 1301 / Main Steam System
5. (a) Applicable Construction Code ASME Section ill 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE PULLMAN N/A N/A V2-1301-128-H080 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

                                                                     .,,.L,,.A          .. ,hh e .lnbi          *,.,,*    In     nfnn      with flf'D flflV9AJflflfl
7. Description Of Work Snubber PID-50 P. serto I v , all - reg O1UUAJC c I- PILrUu,. mu.,, --w,.,cL!U c,,a, ... c.,

Wa. .. .,. .,. DCPOO-V2NO002 ,J. Tests Conducted: Hydrostatic [I Pneumatic [] Nominal Operating Pressure [I N/AI Other [1 Pressure N/A PSI Test Temp. N/A 9F CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed //7/-{* r /4A. 4J,*nate. , Owneror Owner's Dei nee, Tlit&4- /.; t CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period August 20, 2002 to .L g., and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ________________________ Commissions GA ,OS Inspeo(Or's Signature National Board, State, Province and Endorsements 1ate // - 457"-);z 141W

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02044 Owner Southern Nuclear Operaffng Company Date 10/31/02 Name 40 Inverness CenterParkway,Birningham,AL Sheet ]__ _ _ Of I

2. Plant Vogt/e Electric Generahng Plant Unit 2 Waynesboro. GA 30830 MWO # 20200663 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabonsMaintenance Plant Vogte Name Address
4. Identification Of System 1301/IMain Steam System
5. (a) Applicable Construction Code ASME SEC Ill 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-128-H096 1989 REPLACEMENT YES POWER PRODUCTS __

7. Description Of Work Snubber AD-153, senal# 194 was replacedwith a ngid strutin accordancewith DCP00-V2N0002
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureU N/Am Other [] Pressure N/A PSI Test Temp. N/A 1-4 CERTIFICATE OF COMPLUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of uthorization No. N/A Expiration Date NIA Signed " 0OnIo &4-- Date

(, Own ~or owner's Desidnee, Title ,t. CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georia and employed by HartfordSteam BoaerInspection and InsuranceCo of Connecticut of Hartford. Connectcut have inspected the components described in this Owner's Report during the period 08/19/02 to 1. a-. -o 1 -., and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements. of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this insp* ,*__ Commissions (5A ? o3

                    -nspecor's Signature                                             National Board, State, Province and Endorsements Date          /-2c0-*.7

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02045 Owner Southern Nuclear OperatingCompany Date 10131/02 Name Sheet 1 Of 1 40 Inverness CenterParkway, Birrmngham, AL 2

2. Plant Vogtle Electric Generating Plant Unit MWO # 20200664 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address

3. Work Performed by Nuclear OperabonsMaintenance Plant VogUe Name Address
4. Identification Of System 1301 /Main Steam System
5. (a) Applicable Construction Code ASME SEC Il7 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 19899
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE SUPPORT PULLMAN N/A N/A V2-1301-128-H102 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work SnubberAD-151, serfial # 168 was rep/acedwith a rgid strut in accordancewith DCP 00-V2NO002 a8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure '

N/A OF w N/A FA] Other [] Pressure N/A PSI Test Temp. CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of horization No. 1, N/A Expiration Date N/A SignedOWfier or owner's Deefg(nee, Title I/,'- I **** X CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Bo#er Inspection and Insurance Co of Connectcut of Hartford. Connectcut have inspected the components described In this Owner's Report during the period 08/19/02 to 4, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements 'of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this _______________________Comrmissions (54,7 3 "Inspe(t6r'sSignature National Board, State, Province and Endorsements Date /I- e- .

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS Xl As Required By The Provisions Of The ASME Code Section Traveler # 02046 Date 10131102 Owner Southern Nuclear Operating Company Name 1 Of 40 Inverness Center Parkway, Birmingham,AL Sheet 2

2. Plant Vogte Electdc GeneratingPlant Unit 20200665 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address Plant Voatle

3. Work Performed by NuclearOperations Maintenance Name Address 1301 /Main Steam System
4. Identification Of System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME NAME STAMPED OF SERIAL BOARD OTHER YEAR REPLACED OR OF REPLACEMENT (YES OR NO)

COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT N/A N/A V2-1301-120-H008 1989 REPLACEMENT YES PIPESUPPORT PULLMAN POWER OPRODUCTS S_#3 e i g i rt_ 7.__Descri

7. Description Of Work SnubberAD-153, serial# 431 was replaced with a rigid strut in accordance with DCP 00-V2N0002
8. Test Conducted: Hydrostatic U] Pneumatic[] Nominal Operating PressureEU N/A N/A OtherE] Pressure NIA PSI Test Temp.

CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the-statements made in the report are correct and this repair or replacement rules of the ASME Code, Section XI. N/A Type Code Symbol Stamp N/A Expiration Date N/A Certificate ofA horization No. if Date I/ ý,112CAf/' ." Signed CERTIFICATE OF INSERVICE INSPECTION vessel inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure

                                 . and employed by Hartford     Steam Boffer Inspection   and    Insurance   Co. of Connectcut    of Hartford, Connectcut have Province of        Georgia described       in     this      Owner's           Report         during        the      period_ 08/19/02 inspected         the      components that to the best of my   knowledge    and   belief, the   Owner    has   performed     examinations   and taken corrective to 1/-.,J2              - and state with     the     requirements.       of   the   ASME      Code, Section XI.

measures described In this Owners Report in accordance expressed or implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall connected with this any personal injury or property damage or a loss of any kind arising from or be

  • in any manner ins liable ,/ for (57A .,0 ,

6 1p4a,,e. . Commissions lnspectors Signature National Board, State, Province and Endorsements Date //-Z-e,1

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02047 Date 10)29/02

1. Owner Southern Nuclear Operating Company Name Sheet I Of J 40 Inverness CenterParkway,Birmingham, AL 2
2. Plant Vogtle ElectricGeneratngPlant Unit MWO # 20200666 Waynesbom, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vog/ee Name Address
4. Identification Of System 1301 / Main Steam System ASME SEC IN 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-120-HO1O 1989 REPLACEMENT YES POWER p ROn U.TC

7. Description Of Work Snubber AD-151, serial# 864 was reLdaced with a rfqid strutin accordancewrth DCP O0-V2NO002
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/Ar Other [] Pressure NIA PSI Test Temp. N/A T CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. ,, N/A Expiration Date N/A Signed ,,,. L Daee 0eo "Ow r or Owner's Ddsignee, Title fl//! L CERTIFICATE OF INSERVICE INSPECTION the State or 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and and employed by Hartford Steam Bofter Inspecbon and Insurance Co of Connechcut of Hartford. Connectcut have Province of Georo.a inspected the components described in this Owner's Report during the period08/19/02

                                , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective to /0-/T1A'I-i Section XI.

measures described in this Owners Report In accordance with the requirements, of the ASME Code, the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described in this with this be liable in any manne for any personal injury or property damage or a loss of any kind arising from or connected inspt5n*.*z.d 77 -Commissions C(-A 7 e Inspectof's Signature National Board, State, Province and Endorsements Date /a-3 -1. / -eg I

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02048

1. Owner Southem Nuclear Operaftng Company Date 10131/02 Name 40 Inverness Center Parkway, Birmingham, AL Sheet I Of Unit 2
2. Plant Vogtle E/ectnic GenerabngPlant Waynesboro, GA 30830 MWO # 20200667 Address Repair Organization P.O. No., Job No., etc.

Plant VooUe

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 1301 IMain Steam System
5. (a) Applicable Construction Code ASME SEC XII 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 19819
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-108-H003 1989 REPLACEMENT YES POWER PRODUCTS ________ .1 I .1 1. & ________ -

7. Description Of Work Snubber AD-43, serial# 438 was replaced with a figid strut in accordancewith DCP00-V2N0002 Hydrostatic ] Pneumatic[] Nominal Operating Pressure[]

N/A [E] Other [] Pressure NIA PSI Test Temp. N/A w0 Test Conducted: CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of A orization No. ,e N/A Expiration Date N/A Signed .. L r' ye6 Date owner's Desigyee,lTitle I-Ae-c t, , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geor.ia and employed by HartfordSteam Boiler inspection and Insurance Co of Connecticut of Harfford, Connecbcut have inspected the components described in this Owner's Report during the period 08119/02 to 4L-;2- OZ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measu'res described In this Owners Report in accordance with the requirements' of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this insp - #11 e 2wd.. - Commissions GA ;2 Inspec(or's Signature National Board, State, Province and Endorsements Date /f-,z-oz

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02049 Owner Southern NuclearOperatng Company Date 10/31102 Name 40 Inverness Center Parkway,Birmingham, AL Sheet I Of I

2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesbom, GA 30830 MWO# 20200668 Address Repair Organization P.O. No., Job No., etc.

Work Performed by Nuclear OperationsMaintenance Plant Vogite 3. Name Address

4. Identification Of System 1301/IMain Steam System
5. (a) Applicable Construction Code ASME SEC 11 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE SUPPORT PULLMAN A/A N/A V2-1301-213-HOO1 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-43, senal # 1529 was replaced with a nigd strutin accordancewith DCP 00-V2NO002
11. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[]

ý_4 NIA n Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Expiration Date N/A Certificate of Afthorization No. sged 7,;Jl- N/A Date ýO

                   - "Owr~for Owner's Oesifinee, Title          A*Cf*         (f I

CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boier fnsApecoron and Insurance Co of Connecticut of Hartford.Connecticut have inspected the components described In this Owner's Report during the period 08/19/02 to //-. .C2_% and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements. of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this D- iass Commissionso B lnspectoff Signature National Board, State, Province and Endorsements Date 1/-a-aa

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02050 Owner Souther NuclearOperafng Company Date 10131/02 Name 1 Sheet i Of 40 Inverness CenterParkway,Birrningham,AL Unit 2

2. Plant VogrUe Electn'c GeneratingPlant MWO # 20200669 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Vog/e Name Address
4. Identification Of System 1301 1/Main Steam System ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN NIA NWA V2-1301-191-H005 1989 REPLACEMENT YES POWER pRMODUCTS

7. Description Of Work Snubber AD-43, senal 1531 o was rempaceawnn a 17gL tsfut ,uaccudnV u* u,:-v
8. Test Conducted: Hydrostatic [] Pneumaticf] Nominal Operating PressureEm N/A [ Other [] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Authorization No. NIA Expiration Date N/A Certificate Qner or Owner'sBesignee, Title j*," /151**'/*

CERTIFICATE OF INSERVICE INSPECTION or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State Geormia and employed by Hartford Steam Boffer lnspechon and Insurance Co of Connecticut of Hartford. Connectcut have Province of inspected the components described in this Owner's Report during the period 08/19102 to , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective Section XI. measures described -in this Owners Report in accordance with the requirements. of the ASME Code, the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall connected with this be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or IninssSgaueain Commissions ' C'A 0-o25orSatPoineadE lnspecr' Signature National Board, State, Province and Endorsements Date Date /I/-.7- V

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02051 Owner Southern NuclearOperatng Company Date 10/28&02 Name 40 Invemess CenterParkway.Birmingham, AL Sheet I Of 1

2. Plant Vogde Electnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200671 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vootle Name Address
4. Identification Of System 1208 / Chemnical and Volume Control System
5. (a) Applicable Construction Code ASME SEC Il ' 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1208-131-HO16 1989 REPLACEMENT YES POWER PRODUCTS _

7. Description Of Work Snubber PSA-1t2. senial # 14108 was replaced wyth PSA-112, senal# 14130 to support surveiance testing, Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureE]

.* 8. N/A [ Other [] Pressure N/A PSI Test Temp. NIA CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the "rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of A rization No. N/A Expiration Date N/A Sign Owners "1d1e2_,, - Date2 Datenee_ / ' OwnorOwers eýI'gee Tit-le f f~1 7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georqia and employed by HartfordSteam Boiler Inspecbon and InsuranceCo of Connectcut of Hartford,Connecbcut have inspected the components described in this Owner's Report during the period 0821/02 to 16-3/-., and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements, of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mann~er for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions &~o Inspec or's Signature National Board, State, Province and Endorsements Date 1i'-31-09,*

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02052

1. Owner Southern Nuclear Operabng Company Date 10131/02 Name 40 Inverness Center Parkway,Burmingham, AL Sheet 1 Of
2. Plant Vogt/e EJectnc GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200672 Address Repair Organization P.O. No., Job No., etc.

Plant Voctle

3. Work Performed by NuclearOperabonsMaintenance Name Address
4. Identification Of System 1301 IMain Steam System
5. (a) Applicable Construction Code ASME SEC IIl 1977 Edition, -Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-106-H003 1989 REPLACEMENT YES POWER PRODUCTS,

7. Description Of Work SnubberAD-12501, senal # 31 was replacedwrth AD-12501, sena # 82 to supportsurveilTance testing
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressurei]

4NA[ Other n Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of 4horization No. NIA Expiration Date N/A Signed wno ne a 4- Datl - Own Kor owner's Dqrgnee Title If-i ('t~ ~. CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geor.a and employed by HartfordSteam Boler Inspecbon and Insurance Co of Connectcut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 08&20/02 to .-- 0 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements - of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this

      -n        -    n                                          Commissions         NiA -4e        dT Inspedlor's Signature                                            National Board, State, Province and Endorsements Date         /-o'-- ',

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02053

1. Owner Southern Nuclear Operabng Company Date 10131102 Name 40 Inverness CenterParkway, Birrningham,AL Sheet Of
2. Plant Vogi/e Electric GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20200673 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operatbons Maintenance PlantVogUe Name Address
4. Identification Of System 1301/Main Steam System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE SUPPORT PULLMAN N/A N/A V2-1301-105-H005 1989 REPLACEMENT YES POWER PRODUCTS__

7. Description Of Work SnubberAD-5501, serial # 766 was repLaced wrth AD-5501. serial# 291 to supRort surveillance testng
8. Test Conducted: Hydrostatic-] Pneumatic[] Nominal Operating PressureL]

N/A [A] Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Au horization No. J N/A Expiration Date N/A Signed o/- wnrerr Mwerls DsIE

                                           ý    nee, Titl*     /i/t(.£*i.d/__

Date

                                                                                                 -°         /

er CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, valid commission holding a and issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georia employed by HartfordSteam BoilerInspecton and Insurance Co. of Connectcut of Hartford, Connectcut have inspected the components described in this Owner's Report during the period 08120/02 to " -. 2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements , of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspee Commissions g'* '

                   "Inspecto"'sSignature                                               National Board, State, Province and Endorsements Date       //- . -o-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02054 Southern NuclearOperating Company Date 10122102

1. Owner Name I Of Sheet 40 Inverness CenterParkway,Birmingham, AL Unit S2
2. Plant Vogtte Electnc Generaftng Plant 20200674 Waynesboro, GA 30830 MWO#

Repair Organization P.O. No., Job No., etc. Address Plant VogFte

3. Work Performed by Nuclear Operabons Maintenance Address Name
4. Identification Of System 1302 1 Auxiliary Feedwater System 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC III (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components REPAIRED, ASME CODE NAME NAME MANUFACTURER NATIONAL SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF OF IYES OR NO)

NO. NO. IDENTIFICATION BUILT REPLACEMENT COMPONENT MANUFACTURER NIA WA V2-1302-109-H025 1989 REPLACEMENT YES PIPESUPPORT PULLMAN POWER PRO*DUCTS_ testing.

7. Description Of Work SnubberAD-1603. serial # 85 was replacedwith AD-1603, senal# 672 to support surveillance

"\* 8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[] Other [] Pressure N/A PSI Test.Temp. NIA OF NIA CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A NIA Expiration Date NIA Certificate of Authorization No. Signed D. Oesig ne ,t , Date CERTIFICATE OF INSERVICE INSPECTION and Pressure vessel Inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler of Georgia and employed by Hartford Steam Boiler Inspecton and Insurance Co, of Connectcut of Hartford. Connectcut have Province in this Owner's Report during the period 08/22(02 inspected the components described and taken corrective to . and state that to the best of my knowledge and belief, the Owner has performed examinations of the ASME Code, Section XI. measures described in this Owners Report In accordance with the requirements-expressed or Implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, in this Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described damage or a loss of any kind arising from or connected with this be liable in any manner for any personal injury or property Inspmfi,, 4 Commissions GA2eo3 "Inspectof'sSignature National Board, State, Province and Endorsements Date /0 z'-02-e

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02055 Owner Souther Nuclear OperafingCompany Date 10/25/02 Name 40 Inverness CenterParkway,Birnnham,AL Sheet I Of Unit 2

2. Plant Vogfe Electric Generaftng Plant MWO # 20200677 Wavnesbore, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant VogtSe Name Address
4. Identification Of System 1301 /Main Steam System
6. (a) Applicable Construction Code ASME SEC Il/ 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE SUPPORT PULLMAN IVA N/A V2-1301-138-H002 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-153L sedal # 746 was replacedwith AD-153L. sedal# 704 to supportsurveillance test/na B. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

NIA1 Other [] Pressure N/A PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi. repair or replacement Type Code Symbol Stamp N/A Certificate of Aut orization No. N/A Expiration Date N/A "Signed T7Z (O-n..rOwe'

                                                                     /          ,/ Date Owne or Owner's Desi=e           Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of        Geomia          and employed by Hartford Steam BoNer Inspection and Insurance Co of Connecticut of Hartford. Connechcu have inspected        the        components        described       In     this      Owner's       Report       during      the      period 08/22/02 to /O-=7e. p2.            ,  and state that to the best of  my  knowledge    and belief, the Owner  has  performed    examinations   and taken corrective measures described In this Owners Report In accordance with the requirements, of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this insP*&t1,,* Commissions GAy2o3 lnspectdr's Signature National Board, State, Province and Endorsements Date /0 -e, -cfJ

ORIGINAL J FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02056

1. Owner Southern NuclearOperabng Company Date 10)25/02 Namle 40 Inverness CenterParkway, inrringham.AL Sheet I Of _
2. Plant VogVe EBectdc GenerabngPlant Unit 2 Waynesboro, GA 30830 MWO # 20200678 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance Plant Vogce Name Address
4. Identification Of System 1206 / ContainmentSpray Syste en Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC III 19ZZ Edition, Wntor 1977 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work SnubberAD-,501 serial 370 was rei#Aced wilth AD-501, sedal# 654 to supoort surve&ance testina
a. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[]

N/A [g] Other j] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code. Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorzation No. NI. Expiration Date NIA _ _ _ _ _ _ _ De_ a Dte CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Gev and employed by HartfordSteam Saler Insoecton and Insurance Co. of Connectbcut of Hartford.Connecticut have Inspected the components described In this Owner's Report during the period 08121/02 to O-2*;. 02 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective meastures described In this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins _______________4 L_____ Commnissions GA 10 Inspectdr's Signature National Board, State, Province and Endorsements Date /e--7L .-9 ;2Z

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02057 Owner Southern NuclearOperahng Company Date 10125102 Name Sheet j Of 1 40 Inverness CenterParkway,Birmingham,AL 2

2. Plant Vogite Electric GeneratingPlant Unit MWO # 20200683 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address PlantVoatte

3. Work Performed by Nuclear Operations Maintenance Name Address
4. Identification Of System 1208 / Chemnical and Volume Contro System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PULLMAN N/A N/A V2-1208-009-H002 1989 REPLACEMENT YES PIPESUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-1603. serial# 82 was replacedwith AD-1603, serial # 528 to supoortsurveillance testing S. Test Conducted: Hydrostatic [-] Pneumatic[:] Nominal Operating Pressure[]

NIA Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of uthorization No. e NIA Expiration Date N/A Signed Date Dat ZA.CZOOweorw Idee,Al.u. Owneeor Owner's 'esigiee, Title 64<Cd CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid conmnission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam Boffer Inspechon and InsuranceCo. of Connectcut of Hartford.Connecffcut have inspected the components described in this Owner's Report during the period 08/22/02

             -02          , and state that to the best of my  knowledge   and  belief, the Owner   has performed   examinations   and taken corrective to le-n XI.

measures described in this Owners Report In accordance with the requirements. of the ASME Code, Section examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall with this be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected inspe ~/ Commissions GA,7,3 Inspectorrs Signature National Board, State, Province and Endorsements Date /,0- ;?4-O 2-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 02058 Southern Nuclear OperatngCompany Date 10/25/02

1. Owner Name Sheet I Of 40 Inverness CenterParkway, B&rmnngham, AL Unit 2
2. Plant Vogtle Electfic GenerabngPlant 20200680 Waynesbom, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address PlantVoatue

3. Work Performed by Nuclear Operaftons Maintenance Name Address
4. Identification Of System 1204 ISa fet Injection System 1877 Edition, Winter 1977 Addenda, N/A Code Case
5. (a) Applicable Construction Code ASME SEC I/I (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1204-042-H006 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber PSA-1O. senal# 16100 was replacedwith PSA-IO. senal # 15474 to suportsurveilance testing

\> 8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[] NAR Other [] Pressure NIA PSI Test Temp. N/A

  '11-4 CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this                      REPLACEMENT                   conforms to the rules of the ASME Code, Section X1.                                                          repair or replacement Type Code Symbol Stamp                                                                      N/A Certificate of A      orization No.                       NIA                   Expiration Date                               NIA Signed              ,.-J      ',        .,     -                         £.",       Date       !           /         i Own    or Owner's Mesigftee, Title           C. 40/..

CERTIFICATE OF INSERVICE INSPECTION the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and Province of Geormia and employed by HartfordSteam Boiler Inspection and Insurance Co of Connecticut of Hartford. Connechcut have the components described In this Owner's Report during the period 08/22102 inspected to /._-3/.c'21_. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective Section Xl. measures described In this Owners Report in accordance with the requirements. of the ASME Code, examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective this be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with

             °2~
               "NtnBatrienEoCommissions                                               GA 2me3 lnspectbr's Signature                                            National Board, State, Province and Endorsements Date      /0-         0.,-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02060 Owner Southern Nuclear Operating Company Date 11/01/02

1. Name 40 Inverness Center Parkway, Birmngham,AL Sheet Of Unit 2
2. Plant Vogte Elect=c GenerahngPlant Waynesboro, GA 30830 MWO # 20200682and A0000578 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant VogIoe Name Address
4. Identification Of System 1204 1Safety Injection System
6. (a) Applicable Construction Code ASME SEC Ill 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1204-024-H029 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber PSA-3. senal# 27622 was replacedwith PSA-3. serial# 28058 to supportsurveillance testing A telescoping cylinder was replacedon snubber PSA-3. serial # 28058 under MWO# A0000578 and Traveler# 01104,
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

WANDAIj Other [] Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of orization No. N/A Expiration Date NIA V7-/i gn inTl' Date er Owner's Isicanee, Title f*or C~' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State ot Province of Georgia and employed by HartfordSteam Boiler Inspectbon and Insurance Co of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 09/10/01 to 11-.2 oOx and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins "-A Comm issions g o 3 Inspect6r's Signature National Board, State, Province and Endorsements Date ///-. 4Z IL W

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02061 Date 10,28/02 Owner Southern Nuclear Operabng Company Name I Of I 40 Invemess CenterParkway, Biningham,AL Sheet 2

2. Plant Vogtte Electric Generabng Plant Unit MWO #

20200684 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc. Address

3. Work Performed by NuclearOperations Maintenance Plant VogSte Name Address
4. Identification Of System 1208 / Chermcal and Volume Control System ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case
5. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME STAMPED OF OF SERIAL BOARD OTHER YEAR REPLACED OR MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT PULLMAN N/A N/A V2-1208-002-HOOI 1989 REPLACEMENT YES PIPESUPPORT POKER PRODUCTS to supoyrt survellance tesbng

7. Description Of Work Snubber PSA-112. serial# 17545 was replacedwth PSA-1/2, senal# 8755
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal operating Pressure[]

Other [] Pressure NJA PSI Test Temp. NIA OF v CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A y NIA Expiration Date NIA Certificate of Authorization No. Signd oeesen- I Date V e 0 eror On er's nee, Title 4 C CERTIFICATE OF INSERVICE INSPECTION Inspectors and the State or I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Georoia and employed by Hartford Steam BoNer Inspecton and Insurance Co of Connecticut of Hartford, Connecticut have Province of the components described in this Owner's Report during the period 08121102 inspected the Owner has performed examinations and taken corrective to ] 3J

            -*      Z*.., and state that to the     best  of my  knowledge   and  belief, ASME Code, Section Xl.

measures described in this Owners Report In accordance with the requirements, of the concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall with this be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected S . - Cormnissions GA ;o.L InspectoV§ Signature National Board, State, Province and Endorsements Date /6_-3/-02,

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS Xl As Required By The Provisions Of The ASME Code Section Traveler # 02062 Date 10/31/02 Owner Southern Nuclear Operabng Company Name Sheet Of 40 Inverness CenterParkway, Birmingham, AL 2 Unit

2. Plant Vogle Electric GeneratingPlant 20200685 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address Plant Vog0Fe

3. Work Performed by Nuclear Operabons Maintenance Address Name 1302/IAuxiliary Feedwater System
4. Identification Of System Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC /II 1977 Edition, 1989 (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements
6. Identification Of Components Repairs Or Replacement Components REPAIRED, ASME CODE NAME NAME MANUFACTURER NATIONAL BOARD OTHER YEAR REPLACED OR STAMPED OF OF SERIAL NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

COMPONENT MANUFACTURER N/A V2-1302-109-H012 1989 REPLACEMENT YES PIPESUPPORT PULLMAN N/A POWER PRODUCTS serial# 989 to supportsurveilance testng

7. Description Of Work SnubberAD-501, senal # 405 was replacedwith AD-501.
a. Test Conducted: Hydrostatic [] Pneumatic -' Nominal Operating Pressure[:]

Other [] Pressure N/A PSI Test Temp. NIA OF N/A[] CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made In the report are correct and this repair or replacement rules of the ASME Code, Section XI. N/A Type Code Symbol Stamp 01 N/A Expiration Date NIA Certificate of A horization No. Signed - ,i ,'U, leeJiL,*. &A/f Date,,

                                                                                           .O,-           /   -

Title Owner ,r Owner's Designet, CERTIFICATE OF INSERVICE INSPECTION boiler and Pressure vessel inspectors and the State or I, the undersigned, holding a valid commission Issued by the national Board of Georia and employed by Hartford Steam Boler Inspectfon and Insurance Co of Connectcut of Hartford, Connectcut have Province of 08/20/02 described In this Owner's Report during the period inspected the components

      //-      -_O.?          and state that to the  best of my  knowledge     and  belief, the  Owner   has performed examinations and taken corrective to                           ,

the requirements. of the ASME Code, Section Xl. measures described in this Owners Report In accordance with warranty, expressed or implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described in this or a loss of any kind arising from or connected with this be liable in any manner for any personal injury or property damage nnspect sp,, ts CommiNossions GA -7at T Inspector's Signature National Board, State, Province and Endorsements Date /H-.10-10,-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02063 Owner Southern NuclearOperatng Company Date 11/01/02 Name 40 Inverness CenterParkway,Birningham, AL Sheet ] Of 1

2. Plant Vogtle Electric GeneratngPlant Unit 2 Waynesboro, GA 30830 MWO # 20200689 andA0O100809 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant Vogiue Name Address
4. Identification Of System 1301 iMain Steam System
6. (a) Applicable Construction Code ASME SEC Il/ 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN NIA N/A V2-1301-107-H002 1989 REPLACEMENT YES POWER PRODUCTS_

7. Description Of Work SnubberAD-5503, serial # 244 was replacedwith AD-5503, senal # 236 to supportsurveillance tesbno The fixed end paddle on snubber AD-5503. senal # 236 was also replaced A socket was replaced on snubber AD-5503, serial #

236 under Traveler# 01108 and MWO # A0100809. Test Conducted: Hydrostatic [:] Pneumatic[:] Nominal Operating Pressure] N/AN1 Other [] Pressure NIA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the AS ME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of "horization No. NIA Expiration Date NIA 6 Signed , ;1:&q, c Je, . Date f/"e

                                                                             /
                              "ror Owner's D6signee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of         Geomia           and employed by HartfordSteam Boiler Inspection and Insurance Co of Connecticut of Hartford.Connecticut have inspected         the        components        described      in      this      Owner's       Report       during      the      period 09/10/01 to     "- -0       7       _, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this ins* ,* *< 4 / Commissions C;A4 1Z

                    ""nsp$Etor's Signature                                            National Board, State, Province and Endorsements Date

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The AS ME Code Section Xl Traveler # 02065 '-*I. Owner Southern Nuclear Operatng Company Date 10t29102 Name 40 Inverness CenterParkway, Birmingham, AL Sheet j Of I

2. Plant Voctfe Electric Generafing Plant Unit 2 Waynesboro, GA 30830 MWO # 20200712 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vogffe Name Address
4. Identification Of System 1301 /Main Steam System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-106-H005 1989 REPLACEMENT YES POWER PRODUCTS _

7. Description Of Work SnubberAD-5501. senal# 820 was replacedwith AD-5501, senal# 281 to support surveillance tesbng
8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[]

NIA MX Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Ownerg Owner's esigned, itleV/ £/,' /*o.. CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georcia and employed by HarnfordSteam Boffer Inspechon and Insurance Co of Connectcut of Hartford Connecticut have inspected the components described in this Owner's Report during the period 08/20/02 to 0-. 3 0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements 'of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mann ,r for any personal injury or property damage or a loss of any kind arising from or connected with this inspe n, /J

                     ,                   ,      .                         Commissions           'A 7o _3 "Insp      Ir'sSignature                                         National Board, State, Province and Endorsements Date        /.-a,   T-    6 :2

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler# 02066 Owner Southern Nuclear OperatingCompany Date 1025/02 Name 40 Invemess Center Parkway,Birmngham, AL Sheet I Of I

2. Plant Vogte Electfic GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200713 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant VogUe Name Address
4. Identification Of System 1301/IMain Steam System
6. (a) Applicable Construction Code ASME SEC Ill 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-015-HO04 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-1603, senal # 75 was replacedwith AD-1601, serial# 329 to support survelancetesting
     . Test Conducted:                   Hydrostatic []    Pneumatic    []      Nominal Operating Pressure[]
                            "N/AIA         Other []          Pressure      N/A      PSI      Test Temp.           NIA CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this                        REPLACEMENT                   conforms to the rules of the ASME Code, Section XI.                                                              repair or replacement Type Code Symbol Stamp                                                                          NIA ofuthorization No.N/A                                                 Expiration Date      -                       N/A Owldr or Owner's Desi nee, Tite "                    Id/,      "/'-
        ,e                                             CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of          Geo.ia         - and employed by HartfordSteam BogerInspection and InsuranceCo of Connecbcut of Hartford.Connectcut have inspected           the       components        described      In     this      Owner's        Report       during     the      period 08/19/02 to /O-J* ..                  , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements' of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mane for any personal Injury or property damage or a loss of any kind arising from or connected with this ip ,!/J =.* Commissions o*3 0A Inspectdf's Signature National Board, State, Province and Endorsements Date /40 -;7.6 -o 2

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02070 Date 10125(02

1. Owner Southern Nuclear Operabng Company Name Of 1 40 Inverness CenterParkway,Birnvngham, AL Sheet Unit 2
2. Plant Vogte Electnc Generatng Plant 20200699 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address PlantVootfe

3. Work Performed by Nuclear OperationsMaintenance Name Address
4. Identification Of System 1301 IMamn Steam System ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
6. (a) Applicable Construction Code (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE NAME OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PULLMAN N/A N/A V2-1301-012-H028 1989 REPLACEMENT YES PIPESUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-153, serial # 543 was repla~cedr_wmth AQ- 153, serial# 421 to suor survefflance teshna
9. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]
ý                         N/AO            Other []          Pressure      NIA PSI         Test Temp.            N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this                     REPLACEMENT                   conforms to the rules of the ASME Code, Section Xl.                                                           repair or replacement Type Code Symbol Stamp                                                                       NIA Certificate lAuthorization No.                            N/A                    Expiration Date                               N/A Signed                                             ,    Title                       4Dat e           2Vne
                                                                                                     -    ;Zi..z/
               /-      a     er or Owner's Dsignee, Title                           eh..'(7 -

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by HartfordSteam Boffer Inspecton and Insurance Co of Connecticut of Hartford, Connechcuc have the components described in this Owner's Report during the period 08/22/02 inspected

                        ---, and state that to the best of my  knowledge   and belief,  the Owner  has performed   examinations    and taken corrective to W         4                                                                                                                                              Section Xl.

measures described in this Owners Report in accordance with the requirements, of the ASME Code, examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall with this be liable in any ma ne for any personal Injury or property damage or a loss of any kind arising from or connected e ,Commnisslons 64.90Os

  • Ii s oec)6r's Signature National Board, State, Province and Endorsements Date ,9,--.6-OZ.

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02071

1. Owner Southern Nuclear OperaftngCompany Date 10125102 Name 40 Inverness CenterParkway, Birmingham, AL Sheet ] Of I
2. Plant Vogtle EJectricGeneratmig Plant Unit 2 Waynesboro, GA 30830 MWO # 20200698 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperatbonsMaintenance Plant Vogffe Name Address
4. Identification Of System 1301/Main Steam System
6. (a) Applicable Construction Code ASME SEC Ili 1971 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. A IDENTIFCATION BUILT REPARED AE NO PIPESUPPORT PULLMAN N/A N/A V2-1301-012-H019 1989 REPLACEMENT YES POWER PRODUCTS I FE
7. Description Of Work Snubber AD-153, serial # 223 was replacedwith AD-153, serial # 189 to supportsurveillanceteshng.
  • ..4 8. Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating PressureD]

w ~N/A[] Other [] Pressure NIA PSI Test Temp. N/A CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of Authprization No. NIA Expiration Date IVA Signed(, " eo% Date Owner4 Owner'§ DekceTil I - , , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georna and employed by HartfordSteam Boiler Inspecthon and Insurance Co of Connect'cut of Hartford,Connectcut have inspected the components described in this Owner's Report during the period 08/22102 to 0'24-492 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Xy 6 4a:6t - Commissions GA ;2a3~ Inspectof's Signature National Board, State, Province and Endorsements Date /&I-;Z4.eZ

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 02072 Southern NuclearOperatng Company Date 10/25/02

1. Owner, Name 40 Inverness CenterParkway, Birmnngham, AL Sheet I Of 1 Voctle Electnc Generating Plant Unit 2
2. Plant Waynesboro, GA 30830 MWO # 20200697 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant VogCte Name Address
4. Identification Of System 1201/lReactor Coolant System
6. (a) Applicable Construction Code ASME SEC 111 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN POWER N/A N/A V2-1201-029-H603 1989 REPLACEMENT YES PRODUC*TS ________ L I I .1 .1

7. Description Of Work SnubberAD-501, serial# 160 was replacedwith AD-501, serial # 544 to supportsurvefllance testing. Also, replaced snubber AD-501, serial # 369 with AD-501, senal# 546, Hydrostatic [] Pneumatic[] Nominal Operating Pressure[-]

14 8. Test Conducted: N/AF] Other [] Pressure NIA PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of A horization No. N/A Expiration Date N/A Own0g or Owner's Des~nee, Titile 11600 /e'/ Date CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Boiler Inspectfon and Insurance Co of Connectcut of Hartford,Connecticut have inspected the components described in this Owner's Report during the period 08/20/02 to 14-.74-o0. , and state that to the best of my knowledge and belief, the Owner has perfdrmed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner f any personal injury or property damage or a loss of any kind arising from or connected with this _______________________Commissions C'4 ý70'3 Inspector'gSignature National Board, State, Province and Endorsements Date /6,16 -,, w

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02073 Date 10/31/02

1. Owner Southern Nuclear Operating Company Name Sheet Of 40 Inverness CenterParkway, Birmingham,AL Unit 2
2. Plant Vogute Electric Generating Plant MWO # 20200695 and 19702428 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address Plant VogFte

3. Work Performed by Nuclear Operatbons Maintenance Address Name 1302/lAuxiiary Feedwater System
4. Identification Of System 1977 Edition, -Winter 1977 Addenda, N-249-1 Code Case
5. (a) Applicable Construction Code ASME SEC I/I (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components REPAIRED, ASME CODE NAME NAME MANUFACTURER NATIONAL SERIAL BOARD OTHER YEAR REPLACED OR STAMPED OF OF (YES OR NO)

NO. NO. IDENTIFICATION BUILT REPLACEMENT COMPONENT MANUFACTURER N/A V2-1302-109-HOI 1989 REPLACEMENT YES PIPE SUPPORT PULLMAN N/A POWER __TS PROCI serial # 357 to support survefflance testnq The fixed end

7. Description Of Work Snubber AD-503, serial # 219 was replaced with AD-503, cap on snubberAD-503, senal# 357 was replacedunder Traveler# 01067 and MWO # 19702428, Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure 5 Test Temp. NIA 8F NIA Other [] Pressure N/A PSI CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made in the report are correct and this repair or replacement rules of the ASME Code, Section XI.

N/A Type Code Symbol Stamp N/A Expiration Date N/A Certificate of ýJthorization No. Signed .ile (_ 0 ,- -eai*

                                                                                 -.       Date
                                "_or Owner's Desi We, Title        '&'C          n-           L_

CERTIFICATE OF INSERVICE INSPECTION and Pressure vessel inspectors and the State or 1,the undersigned, holding a valid commission Issued by the national Board of boiler have Province of Georqia .and employed by HartfordSteam Boiler Inspection and Insurance Co. of Connecticut of Hartford.Connecticut Inspected the components described in this Owner's Report during the period 05/10/0! taken corrective to /.. I 6.-"-02 and state that to the best of my knowledge and belief, the Owner has performed examinations and in this Owners Report In accordance with the requirements of the ASME Code, Section Xl. measures described or implied, concerning the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed the Inspector nor his employer shall described in this Owners Report. Furthermore, neither and corrective measures arising from or connected with this property damage or a loss of any kind be liable in any manner for any personal Injury or Commissions GA .;e~j inspq d2, Inspechr's Signature National Board, State, Province and Endorsements Date /I-Ye'- W

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02074 Owner Southern NuclearOperatnng Company Date 10/31/02 Name 40 Inverness Center Parkway,Birningham, AL Sheet 1 Of I

2. Plant VogUe Electdc Genera ng Plant Unit 2 Waynesboro, GA 30830 MWO # 20200694 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operatbons Maintenance PlantVociUe Name Address
4. Identification Of System 1302/Auxziary FeedwaterSystem
6. (a) Applicable Construction Code ASME SEC /l1 1977 Edition, Winter 1977 Ad denda, N.249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1302-108-H019 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-501, serial#569 was replaced with AD-501. serial# 415 to support surveilancetesting 8*. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

F NIA [] Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of uthorization No. N/A Expiration Date N/A 74 OVer or Owner's Deignee, Title dp~ a

                                                                                 ~~~Date4442C CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of       Georgia          and employed by HartfordSteam Boder Inspechon and Insurance Co of Connectcut of Hartford. Connec6cut have inspected        the       components       described       in      this     Owner's      Report       during      the      period 08/21/02 to /1- 2-Q      0         , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this in spect-/ __'* Commissions 6A ;79 "InspectdrsSignature National Board, State, Province and Endorsements Date f/-,,-I- .

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02076

1. Owner Southern Nuclear Operahng Company Date 10/2&502 Name 40 Inverness CenterParkway, Birmingham, AL Sheet Of
2. Plant Vogt/e Electic GeneratngPlant Unit 2 Waynesboro, GA 30830 MWO # 20200693 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant VogSte Name Address
4. Identification Of System 1202/Nuclear Service Cookng Water System
6. (a) Applicable Construction Code ASME SEC III 1971 Edition, WMnter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 19899
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1202-004-H056 1989 REPLACEMENT YES POWER 7._ esriio OWPRODUCTSnub _rA sra#15 _-601 ws _aedwh_-01 seria_#_35 tospprs___a tesn__

7. Description Of Work SnubberAD-1601. sefial # 150 was repulacedwith AD-1601. serfal # 355 to supprt surveilance testing.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure 5 N/A[ Other [] Pressure NA PSI Test Temp. N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. _ N/A Expiration Date N/A Signed Y x / h / 4Date C27" OwetOwner's Designee, Title .

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State oi Province of Georgia and employed by HartfordSteam Boffer Inspechon and Insurance Co of Connecticut of Hartford.Connecticut have inspected the components described in this Owner's Report during the period 08/22/02 to -Ld-.,A -02 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements "of the ASME Code, Section Xl. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report Furthermore, neither the Inspector nor his employer shall be liable in any manne for any personal Injury or property damage or a loss of any kind arising from or connected with this inspec i on..,pll / .- - Commissions iA ,e Ins pecr's Signature National Board, State, Province and Endorsements Date /d-.6-,2

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02077

1. Owner Southern Nuclear OperatingCompany Date 10124/02 Name Sheet I Of 1 40 Inverness Center Parkway,Birn*inham, AL Unit 2
2. Plant VogUe Electric Generaftng Plant MWO # 20200692 Waynesboro, GA 30830 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear Operaftons Maintenance Plant Vogae Name Address
4. Identification Of System 1302 / Auxiliary Feedwater System ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case
6. (a) Applicable Construction Code (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements"1999
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE SUPPORT PULLMAN N/A N/A V2-1302-108-H003 1989 REPLACEMENT YES POWER PRODUCTS

7. Description Of Work Snubber AD-501, serial# 570 was replaced with AD-501. serial# 355 to support surveflance testng.
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating PressureE]

Other [] Pressure N/A PSI Test Temp. N/A OF 1-4 ~ N/AFA CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of A Zhorization No. _ N/A Expiration Date N/A Signed * / . _ ,Date Ownlr Owner's Desk_(nee, Title' b S C.h / / CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georia and employed by HartfordSteam Boiler lnspocbon and Insurance Co of Connectcut of Hartford, Connectcut have inspected the components described in this Owner's Report during the period 081W22 to /0-,,1.-oZ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements- of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner or any personal injury or property damage or a loss of any kind arising from or connected with this

    -_      _"_Inspec,"                                        Commissions         GAt        B         a Inspecto s Signature                                             National Board, State, Province and Endorsements Date Date      /v~- a2e- 0.2

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02078 Owner Southern NuclearOperatingCompany Date 11/03/02 Name 40 Inverness CenterParkway, Birmingham, AL Sheet I Of I

2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200690 and 19702331 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vog/ee Name Address
4. Identification Of System 1301/ Main Steam System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

PIPE PULLMAN N/A N/A V2-1301-119-HOIO 1989 REPLACEMENT YES SUPPORT POWER PRODUCTS

7. Description Of Work Snubber AD-503. serial # 215 was replaced with AD-503, serial # 231 to support surve/llance testing The fixed end capon snubberAD-503, sena # 231 was replaced underi Traveler # 01068 and MWO # 19702331.

19702331. end cap on snubberAD-503, serial# 231 was [Mlaced underTraveler # 01068 and MWO # Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure[] N/A] Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Signed e Ownervf wner's DisgeeT CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford, Connecticut have inspected the components described In this Owner's Report during the period 05/10/01 to /-,* and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, conceming the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Ins ", C o m m issio ns GA, - .' -I Inspecti r's Signature National Board, State, Province and Endorsements <*j Date //76--0.2 I

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02079 Owner Southern Nuclear Operabng Company Date 10131102 Name Sheet 1 Of 40 Inverness CenterParkway, Birmingham, AL Unit 2

2. Plant Vogde Electric GenerabngPlant 20200706 Waynesboro, GA 30830 MWO #

Repair Organization P.O. No., Job No., etc. Address Plant Voatle

3. Work Performed by NuclearOperatfons Maintenance Name Address
4. Identification Of System 1208 / Chemnical and Volume Control System
5. (a) Applicable Construction Code ASME SEC I/I 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL YEAR REPAIRED,OR REPLACED ASME CODE STAMPED OF OF SERIAL BOARD OTHER COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

N/A N/A V2-1208-488-H021 1989 REPLACEMENT YES PIPESUPPORT PULLMAN POWER PR*ODUCTS ____________ L I. a ____________

7. Description Of Work SnubberAD-151. serial# 142 was replacedwith AD-151. serial# 137 to suprt surve/7lance testing
8. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure-]

N/AI Other [] Pressure NWA PSI Test Temp. NIA CERTIFICATE OF COMPLIANCE REPLACEMENT conforms to the We certify that the statements made In the report are correct and this rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp NWA Certificate ofAthorization No. NIA Expiration Date N/A Signed /n=., , 11% Z 9A ZP Date et 1 Ow r or owner'Zesiglee, Tit le . , . L_ CERTIFICATE OF INSERVICE INSPECTION and the State or I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors Geor.ia and employed by Hartford Steam BoRer Inspecton and Insurance Co of Connectcut of Hartford. Connectcut have Province of components described In this Owner's Report during the period 08120/02 inspected the to I , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective Code, Section XI. measures described In this Owners Report In accordance with the requirements - of the ASME the examinations By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning in this Owners Report. Furthermore, neither the Inspector nor his employer shall and corrective measures described or connected with this be liable in any manner for any personal injury or property damage or a loss of any kind arising from insp*j~,* 6 e ..... ~ Commissions GA.;?.7e_

                     "Inspedtor'sSignature                                               National Board, State, Province and Endorsements Date        //-,1-62

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02080 Owner Southern Nuclear Operabng Company Date 11/06/02 Name 40 Inverness CenterParkway, Bitringham, AL Sheet I Of 1

2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200707 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Voatle Name Address
4. Identification Of System 1208 IChenical and Volume Gontrol Siystem
5. (a) Applicable Construction Code ASME SEC IlI 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components Description Of Work SnubberAD-501. serial# 575 was replacedwith AD-501. serial # 648 to supportsurveilance tesbno Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

NIA [] Other [] Pressure NWA PSI Test Temp. NWA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp NIA Certificate of pthorzation No. N/A Expiration Date NIA "Si"ne*dr4* 1 orO rs l UnTteL5,4 . Date ero;6=rDlisignee, Title /-- C."'4 5I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomia and employed by HartfordSteam Boiler Inspecton and Insurance Co of Connectcut of Hartford,Connecticut have inspected the components described In this Owner's Report during the period 08122/02 to //-k- 0.. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements -of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. ___________________________Cormmissions A e

            . .Inspectgfrs         Signature                                            National Board, State, Province and Endorsements Date       fI- f,-    0 -2 Imw

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler# 02081 Owner Southern NuclearOperafing Company Date 10/25/02 Nam~e 40 Inverness Center Parkway,Birmingham, AL Sheet _ Of 1

2. Plant VogUe Eectric Generabng Plant Unit 2 Waynesboro, GA 30830 MWO # 20200709 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Voatle Name Address
4. Identification Of System 13011I Main Steam System
5. (a) Applicable Construction Code ASME SEC INl 1977 Edition, Winter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT IYES OR NO)

PIPESUPPORT PULLMAN N/A N/A V2-1301-O10-H038 1989 REPLACEMENT YES POFOER PRODUCTS ____________ I .5 .5 .5 .5 5

7. Description Of Work SnubberAD-501, senal # 157 was replacedwith AD-501, seral # 130 to supportsurveillance teshngo K 8. Test Conducted: Hydrostatic [J Pneumatic[] Nominal Operating Pressure[]
 ý4                          N/A nX          Other []            Pressure        NIA PSI        Test Temp.               N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this                            REPLACEMENT                    conforms to the rules of the ASME Code, Section XI.                                                                 repair or replacement Type Code Symbol Stamp                                                                           N/A Certificate of uthorization No.                            N/A                        Expiration Date                                 N/A Sn                                    n    Title"     /      ,APC- ,,"Date ..
                           -     ror Owner's Desl'gnee,Til                 .~.       ~i, CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnnission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of         Georia           and employed by HartfordSteam BoaerInspecton and Insurance Co of Connecbcut of Harfford. Connectcut have inspected         the        components        described         in      this      Owner's      Report         during       the     period 08/22/02 to /0o-,;7/        z        , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements- of the ASME Code, Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspcin insp 4-- Commissions G_, Vo3 Inspect&'s Signature National Board, State, Province and Endorsements Date /0-g4 -e*)

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02082

1. Owner Southern Nuclear OperatngCompany Date 10/29/02 Name 40 Inverness Center Parkway,Birmingham,AL Sheet 1 Of /
2. Plant VogUe Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200710 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabons Maintenance Name Plant VogCte Address
4. Identification Of System 1201 IReactor Coolant System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Snubber PSA-3. serial# 26804 was replacedwith PSA-3, serial# 28715 to support surveiance testinq Test Conducted: Hydrostatic fl Pneumaticr] Nominal Operating Pressurefjj N/A[] Other [] Pressure NIA PSI Test Temp. NIA OF C".EPITIICIPAiTI=/%^C III ellt/*

i bTC . l INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of Province of_-_ Georcia boiler and Pressure vessel inspectors and the State or and employed by HartfordSteam BoilerInspecbon and Insurance Co of Connectcut of Hartfbrd,Connecticut have inspected the components described In this Owner's Report during the period 08/20/02 to /0 02 , and state that to the best of my knowledge and belief, the Owner measures described in this Owners Report in accordance has perforndd examinations and taken corrective with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes and corrective measures described In this Owners Report. any warranty, expressed or Implied, concerning the examinations Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this

         / s //J       t_-
  • Commissions (G'A 4, InspectesSignature National Board, State, Province and Endorsements Date /d 1_o"-0,

--A

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02083 1

     '1   . Owner        Southern Nuclear Operaftng Company                       Date                                   11103102 Name Sheet                     I                Of    _

40 Inverness CenterParkway,Birmingham,AL Unit 2

2. Plant VogUe Elecfric GeneratingPlant Waynesbom, GA 30830 MWO # 20101065 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperabonsMaintenance Plant VogSte Name Address
4. Identification Of System 1202/Nuclear Service Coolng Water System
5. (a) Applicable Construction Code , ASME SEC I1/ 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1202 PULLMAN N/A N/A 2K7-1202-228-01 1989 REPLACEMENT YES PIPING POWER 2K7-1202-232-01 SYSTEM PRODUCTS
7. Description Of Work Bnd flange drain assemblies were fabricated and Installed on the 8' blind flange connectons shown on Isometric drawinos 2K7.1202-228-01 andand 2K7-1202-232-01 in eccor~lance wirn MULW, UUJ-VZMU7JD 1 drawinas2K7-1202-228-01 2K7-1202-232-01 in accordancewith MDC# 00-V2MO54 Test Conducted: Hydrostatic [] Pneumatic[:] Nominal Operating Pressure'z

'48. N/AE Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of A horizat on No. N/A Expiration Date N/A wn r ýOwner'sl sioee, Title .6P /4o CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geor.ia and employed by HartfordSteam Boiler inspecbon and Insurance Co of Connecticut of Hartford,Connecticut have inspected the components described In this Owner's Report during the period 05f28/02 to , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measires described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Comnmissions 6 c '5a lnspeitw's Signature National Board, State, Province and Endorsements "1-14 Date //-4-O..7-

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler # 02084

1. Owner Southern Nuclear OperatingCompany Date 11/03/02 Name 40 Inverness Center Parkway,Birmingham, AL Sheet 1 Of I
2. Plant Vogtle Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20200769 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperationsMaintenance Plant Vogte Name Address
4. Identification Of System 1202/NuclearService Cooling Water System
5. (a) Applicable Construction Code ASME SEC III 1974 Edition, Winter 1975 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 198_9
6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO. NO. IDENTIFICATION BUILT REPLACEMENT (YES OR NO)

VALVE CROSBY VALVE N67936 N/A 2PSV-11759 1997 REPLACEMENT YES

                           & GAGE CO.              0005
7. Description Of Work Installed replacement valve This replacement valve is a rotating spare: originallypurchased under PO# 7029205 and received under MIR# 9700801 CR# 2002003218 was issued for not obtaining ANII Initial review for this 1-48. Test Conducted: Hydrostatic [] Pneumatic['U Nominal Operating Pressure[o NAD Other [] Pressure N/A PSi Test Temp. N/A 2F CERTIFICATE OF COMPLIANC We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization N/A Expiration Date N/A No. _________________

Signed ate Owner wner's Des/. CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period I/-5-cpo to /5 *-o,2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this in - Commissions C'.,

               ,Inspector's            Signature                                      National Board, State, Province and Endorsements Date         II-s-Z1-2

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02087 Owner Southern NuclearOperat'ngCompany Date 10/29/02 Name 40 Inverness CenterParkway, Birmingham, AL Sheet I Of

2. Plant Vogdte Electtic GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20201703 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by NuclearOperabonsMaintenance Plant VogUe Name Address
4. Identification Of System 1201/ReactorCoolant System
5. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 A,ddenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Snubber PSA-35. senal# 12256 was replacedwith PSA-35. serial# 11512 to faciTitate work under DCP00-V2A10017.
89. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure[]

N/A [] Other [] Pressure NIA PSI Test Temp. NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl. repair or replacement Type Code Symbol Stamp N/A Certificate of uthorization No. 1A Expiration Date N/A OWffr or Owner's D3'signee, Title *' f Da*te / r CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by HartfordSteam Bofler lnspecbon and Insurance Co of Connecbcut of Hartford. Connecbcut have inspected the components described in this Owner's Report during the period 08/19/02 to 0-.3 l- 02 _ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements 'of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this ins_ n.n._ _ _ _ _ _ , Commissions GA" Inspect*'r's Signature National Board, State, Province and Endorsements Date /0' -. Zr 1 -0_7_

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02092 Date 11/04/02 Owner Southem Nuclear Operabin Company Name Of Sheet 40 Inverness CenterParkway, Birmingham, AL Unit 2

2. Plant Vogde Electic Generaftng Plant MWO # 20201933 Waynesboro, GA 30830 Repair Organization P.O. No., Job No., etc.

Address Plant VogS e

3. Work Performed by Nuclear Operaftons Maintenance Address Name 1208/lChemical and Volume Control System
4. Identification Of System 1974 Edition, Summer 1975 Addenda, NIA Code Case
5. (a) Applicable Construction Code ASME SEC It/

(b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 19_

6. identification of Components Repairs Or Replacement Components MANUFACTUR NATIONAL REPAIRED, ASME CODE NAME NAME OF ER BOARD OTHER YEAR REPLACED OR STAMPED OF (YES OR NO)

COMPONENT MANUFACTURER SERIAL NO. IDENTIFICATION BUILT REPLACEMENT NO. BX844 N/A 2-1208-U4-483 1985 REPAIR YES VALVE ROCKWELL INTERNATIONAL

7. Description Of Work Completedlocking weld on body-to-bonnet after maintenance acMvity
8. Test Conducted: Hydrostatic n] Pneumaticf] Nominal operating Pressurer]

N/A Other [] Pressure N/A PSI Test Temp. N/A CERTIFICATE OF COMPLIANCE REPAIR conforms to the We certify that the statements made in the report are correct and this rules of the ASME Code, Section XL. repair or replacement Type Code Symbol Stamp N/A N/A Expiration Date /A Certificate of Authorization No. Signed O r  % Date- / Owner RfOwner's Dsign , Title A ef,- " CERTIFICATE OF INSERVICE INSPECTION vessel inspectors and the State or 1,the undersigned, holding a valid commission issued by the national Board of boiler and Pressure Connecticut Province of Georgia and employed by HartfordSteam Bol~er Inspechon and Insurance Co. of Connecticut of Hartford, described In this Owner's Report during the period L0/18/02 have inspected the components and taken to - and state that to the best of my knowledge and belief, the Owner has performied examinations described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl. corrective measures expressed or implied, concerning the By signing this certificate, neither the Inspector nor his employer makes any warranty, measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall examinations and corrective property damage or a loss of any kind arising from or connected with this be liable in any manner for any personal injury or inspection. I -- - - - Cormnissions 153A Z*.-7r Inspectoid' Signature National Board, State, Province and Endorsements

 **-*"Date          //*-W6'Z-*-

1

ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler # 02093

1. Owner Southern Nuclear Operatng Company Date 10/25/02 Name 40 Inverness CenterParkway, Birningham,AL Sheet I Of I
2. Plant Vogite Electric GeneratingPlant Unit 2 Waynesboro, GA 30830 MWO # 20202428 Address Repair Organization P.O. No., Job No., etc.
3. Work Performed by Nuclear OperationsMaintenance Plant Vogqe Name Address
4. Identification Of System 1203 /Component Cooling Water System
6. (a) Applicable Construction Code ASME SEC III 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
6. Identification Of Components Repairs Or Replacement Components
7. Description Of Work Snubber PSA-3, serial # 29745 was replaced with PSA-3. serial # 27247 as part of the rework dlsposffion to CR#

2002002706. Test Conducted: Hydrostatic [] Pneumatic[] Nominal Operating Pressure'l

9. N/AF Other [] Pressure N/A PSI Test Temp. NIA OF CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section XI. repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A iSignedi U I,"-

(jon*r-Onr's

                                                =          7,-.0 M ie,~eTitle"
                                                                          -P*
                                                                            &A I-A C.

r, Date All=. o CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid corrmission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geomra and employed by Hartforr Steam BoNer Inspecton and Insurance Co of Connecbcut of Hartford.Connecticut have inspected the components described in this Owner's Report during the period 10/07/02 to A 1 _ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspe_*_ _ _ _ _ Commissions GA 7n3 Inspector'Y Signature National Board, State, Province and Endorsements I Date /o-3Io../2 4W}}