NL-03-0584, February 2003 Monthly Operating Report for Vogtle

From kanterella
Jump to navigation Jump to search
February 2003 Monthly Operating Report for Vogtle
ML030760259
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/13/2003
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-0584
Download: ML030760259 (5)


Text

Jeffrey T. Gasser Vice President March 13, 2003 Docket Nos.:

50-424 50-425 Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.7721 Fax 205 992 0403 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:

Enclosed are the February 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.

If you have any questions, please advise.

Sincerely, Jeffrey T. Gasser JTG/NJS

Enclosures:

E 1 - VEGP Unit 1 Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle SOUTHERN N.

COMPANY Energy to Serve Your Worldw NL-03-0584

33?0-q

OPERATING DATA REPORT Docket No, Unit Name Date Completed By Telephone:

50-424 VEGP UNIT 1 March 1, 2003 Andrew R Cato (706) 826-3823 Operating Status Reporting Period Design Electrical Rating (Net MWe)

Maximum Dependable Capacity (Net MWe)

Number Of Hours Reactor Was Critical.

Hours Generator On Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWHe)

February 2003 1169 1152 This Month 672 0 672 0 00 798,565 Year To Date 14160 14160 00 1,668,980 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No Event Description N/A N/A N/A E1-1

1.

2 3

4 5

6 7.

Cumulative 123,5886 122,0393 00 136,753,804

UNIT SHUTDOWNS Reporting Period:

Docket No:

Unit Name Date Completed By Telephone 50-424 VEGP UNIT 1 March 1, 2003 Andrew R. Cato (706) 826-3823 February 2003 Type Method of F. Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A NIA N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)

E - Operator Training/License Examination I Manual

4. Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT CAUSE CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT February 01 0000 Unit at 100% power with no significant operating problems February 28 2359 Unit at 100% power with no significant operating problems E1-2

OPERATING DATA REPORT Docket No:

Unit Name Date Completed By Telephone 50-425 VEGP UNIT 2 March 1, 2003 Andrew R Cato (706) 826-3823 Operating Status

1. Reporting Period 2 Design Electrical Rating (Net MWe) 3 Maximum Dependable Capacity (Net MWe) 4 Number Of Hours Reactor Was Critical 5 Hours Generator On Line 6

Unit Reserve Shutdown Hours*

7. Net Electrical Energy Generated (MWHe)

February 2003 1169 1149 This Month 672 0 672 0 00 799,174 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No Event Description N/A N/A N/A E2-1 Year To Date 14160 14160 00 1,685,177 Cumulative 109,8598 108,9849 00 122,896,543

UNIT SHUTDOWNS Reporting Period:

Docket No*

Unit Name Date*

Completed By Telephone 50-425 VEGP UNIT 2 March 1, 2003 Andrew R Cato (706) 826-3823 February 2003 Type Method of F. Forced Duration Shutting Cause/Corrective Actions No Date S" Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A NIA N/A N/A N/A N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)

E - Operator Training/License Examination 1 Manual 4 Continuation B - Maintenance or Test F - Administrative 2 Manual Trip/Scram 5 Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT CAUSE CORRECTIVE ACTION CRITICAL PATH WAS NARRATIVE REPORT February 01 00 00 Unit at 100% power with no significant operating problems February 28 23.59 Unit at 100% power with no significant operating problems E2-2