Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000397/LER-1985-003, Forwards LERs 85-003 & 85-004 Submitted on 850131 W/O Appropriate Signatures.W/O LER 85-00314 February 1985Forwards LERs 85-003 & 85-004 Submitted on 850131 W/O Appropriate Signatures.W/O LER 85-003
05000397/LER-1987-031, Forwards LER 87-031,per 10CFR50.7321 December 1987Forwards LER 87-031,per 10CFR50.73
05000397/LER-1992-042, Forwards Public Version of LER 92-042,Rev 0.Root Cause Is Inadequate Policy Re Free Release of Potentially Contaminated Liquids.Conclusions of Ongoing Mort Analysis Will Be in Suppl to LER11 December 1992Forwards Public Version of LER 92-042,Rev 0.Root Cause Is Inadequate Policy Re Free Release of Potentially Contaminated Liquids.Conclusions of Ongoing Mort Analysis Will Be in Suppl to LER
GO2-78-267, Forwards Data Tape Numbers 3030 & 3048,mailed Separately, Containing Onsite Meteorological Data for April 1974 Thru March 1975 & April 1975 Thru March 1976,respectivley.Tapes Have Been Reformatted Per NRC Ltr of 7808158 December 1978Forwards Data Tape Numbers 3030 & 3048,mailed Separately, Containing Onsite Meteorological Data for April 1974 Thru March 1975 & April 1975 Thru March 1976,respectivley.Tapes Have Been Reformatted Per NRC Ltr of 780815
GO2-80-209, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/80-08.Corrective Actions:Memo Issued to Clearly Establish & Reaffirm Qa/Qc Independence from Const19 September 1980Responds to NRC Re Violations Noted in IE Insp Rept 50-397/80-08.Corrective Actions:Memo Issued to Clearly Establish & Reaffirm Qa/Qc Independence from Const
GO2-82-380, Forwards Final Response to NRC IE Bulletin 79-02,Revision 214 April 1982Forwards Final Response to NRC IE Bulletin 79-02,Revision 2
GO2-82-412, Forwards Final Deficiency Rept Re Cracks in Welds at Corner Joints21 April 1982Forwards Final Deficiency Rept Re Cracks in Welds at Corner Joints
GO2-82-521, Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements10 June 1982Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements
GO2-82-554, Forwards Interim Rept Per IE Bulletin 82-01,Revision 1 Re Radiographs of Welds in Piping Subassemblies.Rept Describes Findings & Corrective Actions Taken.Final Rept Will Be Submitted Upon Completion of All Corrective Actions22 June 1982Forwards Interim Rept Per IE Bulletin 82-01,Revision 1 Re Radiographs of Welds in Piping Subassemblies.Rept Describes Findings & Corrective Actions Taken.Final Rept Will Be Submitted Upon Completion of All Corrective Actions
GO2-82-615, Advises That Amend to License Condition 14 for License NPF-21 Initiated by Working W/Nrr to Obtain SER on Fire Protection Program.Util Expects to Submit Final Response to NRC Question During Wk of 8606301 July 1986Advises That Amend to License Condition 14 for License NPF-21 Initiated by Working W/Nrr to Obtain SER on Fire Protection Program.Util Expects to Submit Final Response to NRC Question During Wk of 860630Fire Protection Program
GO2-82-723, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/82-14.Corrective Actions:Bechtel Procedures Reviewed to Ensure That Ae Approvals Obtained & QC Administrative Instruction 15 Issued31 August 1982Responds to NRC Re Violations Noted in IE Insp Rept 50-397/82-14.Corrective Actions:Bechtel Procedures Reviewed to Ensure That Ae Approvals Obtained & QC Administrative Instruction 15 Issued
GO2-82-764, Forwards Interim Deficiency Repts 208 Re Remote Shutdown Panel & 209 Re Pump Discharge Pressure Switch8 September 1982Forwards Interim Deficiency Repts 208 Re Remote Shutdown Panel & 209 Re Pump Discharge Pressure Switch
GO2-82-830, Forwards Application for Ol,Consisting of Fsar,Environ Rept (Filed in PDR Category C),Emergency Preparedness Plan (Filed in Central Files),Fire Protection Sys Info (Filed in PDR Category F) & Antitrust Info (Filed in PDR Category M)20 August 1982Forwards Application for Ol,Consisting of Fsar,Environ Rept (Filed in PDR Category C),Emergency Preparedness Plan (Filed in Central Files),Fire Protection Sys Info (Filed in PDR Category F) & Antitrust Info (Filed in PDR Category M)
GO2-82-858, Submits Clarification to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. As-built Drawings Given Addl Piping & Support Checks by Contractor Field Engineers Rather than by Qa/Qc Inspectors19 October 1982Submits Clarification to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. As-built Drawings Given Addl Piping & Support Checks by Contractor Field Engineers Rather than by Qa/Qc Inspectors
GO2-82-905, Advises That IE Bulletin 82-01,Suppl 1 Re Itt Grinnell Supplied Matls,Is Not Applicable to Facility12 November 1982Advises That IE Bulletin 82-01,Suppl 1 Re Itt Grinnell Supplied Matls,Is Not Applicable to Facility
GO2-82-956, Confirms 821123 Telephone Request for Extension Until 821203 to Provide Response to IE Insp Rept 50-397/82-212 December 1982Confirms 821123 Telephone Request for Extension Until 821203 to Provide Response to IE Insp Rept 50-397/82-21
GO2-82-958, Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Electrical Separation Project Engineering Directives Reviewed to Identify Cables Affected by 6-inch Separation Requirements2 December 1982Responds to NRC Re Violations & Deviations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Electrical Separation Project Engineering Directives Reviewed to Identify Cables Affected by 6-inch Separation Requirements
GO2-82-992, Forwards Final Rept on Onsite Review of Radiographs,Per IE Bulletin 82-01,Rev 1, Alterations of Radiographs of Welds in Piping Subassemblies. All Corrective Action Completed21 December 1982Forwards Final Rept on Onsite Review of Radiographs,Per IE Bulletin 82-01,Rev 1, Alterations of Radiographs of Welds in Piping Subassemblies. All Corrective Action Completed
GO2-83-104, Provides 120-day Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Investigation Revealed No Usage of Tube-Line Supplied Matls in Const of Project11 November 1983Provides 120-day Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Investigation Revealed No Usage of Tube-Line Supplied Matls in Const of Project
GO2-83-105, Responds to IE Bulletin 80-06, ESF Reset Controls. Preoperational Loss of Power Testing Identified Addl balance-of-plant Valves Not in Compliance W/Bulletin,Per .Reset Control Logic Will Be Modified15 November 1983Responds to IE Bulletin 80-06, ESF Reset Controls. Preoperational Loss of Power Testing Identified Addl balance-of-plant Valves Not in Compliance W/Bulletin,Per .Reset Control Logic Will Be Modified
GO2-83-108, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Sampling Plan Developed to Provide 95% Confidence Level That Less than 5% Defects Exist in Sample Lot21 November 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Sampling Plan Developed to Provide 95% Confidence Level That Less than 5% Defects Exist in Sample Lot
GO2-83-118, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Matl,Equipment,Parts & Supplies Procurement Procedure Revised to Preclude Ordering Obsolete Spare Parts30 December 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Matl,Equipment,Parts & Supplies Procurement Procedure Revised to Preclude Ordering Obsolete Spare Parts
GO2-83-154, Forwards Final Deficiency Repts Re Skewed T Joints & Interim Deficiency Repts Re RHR Relief Valve Vents & LPCS & RHR Support Pin Receptacles18 February 1983Forwards Final Deficiency Repts Re Skewed T Joints & Interim Deficiency Repts Re RHR Relief Valve Vents & LPCS & RHR Support Pin Receptacles
GO2-83-178, Forwards Emergency Plan Implementing Procedures,W/Exception of EPIP 13.1.1, Classification of Emergency. EPIP 13.1.1 Will Be Submitted by 830315.W/o Encl1 March 1983Forwards Emergency Plan Implementing Procedures,W/Exception of EPIP 13.1.1, Classification of Emergency. EPIP 13.1.1 Will Be Submitted by 830315.W/o Encl
GO2-83-237, Forwards Emergency Classification Procedure PPM 13.1.1, Classifying Emergency, Per NUREG-0696.Use of Safety Parameters in symptom-based Methodology More Functional Approach than event-based Methodology15 March 1983Forwards Emergency Classification Procedure PPM 13.1.1, Classifying Emergency, Per NUREG-0696.Use of Safety Parameters in symptom-based Methodology More Functional Approach than event-based Methodology
GO2-83-241, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-03.Corrective Actions:Task Force Team Leaders Instructed to Review Letterbooks to Assure No Unanswered Quality Concerns Exist.Ir 3674 Addressed in Overall Review18 March 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-03.Corrective Actions:Task Force Team Leaders Instructed to Review Letterbooks to Assure No Unanswered Quality Concerns Exist.Ir 3674 Addressed in Overall ReviewNondestructive Examination
GO2-83-254, Notifies That Util Deferring Indefinitely,Plans to Install Continuous Nitrogen Supply Sys to Containment Electrical Penetrations,In Response to IE Bulletin 77-07,based on Industry Experience24 March 1983Notifies That Util Deferring Indefinitely,Plans to Install Continuous Nitrogen Supply Sys to Containment Electrical Penetrations,In Response to IE Bulletin 77-07,based on Industry Experience
GO2-83-295, Amends Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Fsar Rev & Rev 2 to Electrical Separation Practices Document Will Be Issued by 83041531 March 1983Amends Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-21.Corrective Actions:Fsar Rev & Rev 2 to Electrical Separation Practices Document Will Be Issued by 830415
GO2-83-366, Forwards WNP-2 Project Review of Completed Safety-Related Work, Fourteenth Progress Rept for Jan-Mar 1983,per Util 800717 Commitments in Response to Notice of Violation & Addl Info in Accordance w/10CFR50.54(f)26 April 1983Forwards WNP-2 Project Review of Completed Safety-Related Work, Fourteenth Progress Rept for Jan-Mar 1983,per Util 800717 Commitments in Response to Notice of Violation & Addl Info in Accordance w/10CFR50.54(f)Coatings
GO2-83-409, Amended Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-27.Corrective Actions:Reinsp of All Large & Small bore-type Bracket Installations Complete.No Addl Rework or Welding Required5 May 1983Amended Response to NRC Re Violations Noted in IE Insp Rept 50-397/82-27.Corrective Actions:Reinsp of All Large & Small bore-type Bracket Installations Complete.No Addl Rework or Welding Required
GO2-83-442, Forwards Final Response to IE Bulletin 79-02,Rev 2 Re Reliability of Pipe Support Base Plates Using Concrete Expansion Anchor Bolts in Seismic Category I Piping Sys. Approx 10,000 Seismic Category I Supports Utilized19 May 1983Forwards Final Response to IE Bulletin 79-02,Rev 2 Re Reliability of Pipe Support Base Plates Using Concrete Expansion Anchor Bolts in Seismic Category I Piping Sys. Approx 10,000 Seismic Category I Supports UtilizedHigh Radiation Area
Finite Element Analysis
GO2-83-573, Forwards Deficiency Repts Re Condition 240,loss of ESF Loads on Undervoltage Trip & Condition 258,RHR HX Installation24 June 1983Forwards Deficiency Repts Re Condition 240,loss of ESF Loads on Undervoltage Trip & Condition 258,RHR HX Installation
GO2-83-592, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Review of Nonconformance Repts Identifying Locations of Honeycombs or Voids Repaired by Contract 6426 Will Be Conducted1 July 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions:Review of Nonconformance Repts Identifying Locations of Honeycombs or Voids Repaired by Contract 6426 Will Be Conducted
GO2-83-622, Forwards Info Re as-built Seismic Category I Quality Class II Hangers,Spec Requirement & Documentation Relative to hold-down Bolts for Reactor Vessel to Assist in Resolution of Issues Raised by Const Assessment Team15 July 1983Forwards Info Re as-built Seismic Category I Quality Class II Hangers,Spec Requirement & Documentation Relative to hold-down Bolts for Reactor Vessel to Assist in Resolution of Issues Raised by Const Assessment TeamNon-Destructive Examination
Safe Shutdown Earthquake
GO2-83-665, Submits Updated Response to IE Bulletin 77-02 Re Failures of Westinghouse AR Relays W/Certain Latch Attachment or seal-in Feature.Ar Relays W/O Latch Attachments Acceptable. Relays W/Attachments Blacklisted3 August 1983Submits Updated Response to IE Bulletin 77-02 Re Failures of Westinghouse AR Relays W/Certain Latch Attachment or seal-in Feature.Ar Relays W/O Latch Attachments Acceptable. Relays W/Attachments Blacklisted
GO2-83-678, Forwards Final Response to Notice of Violation from IE Insp Rept 50-397/83-14.Corrective Actions:Review of Quality Documentation & Receiving Records Performed to Assess Potential for Inadvertent Substitution of Reinforcing Steel29 July 1983Forwards Final Response to Notice of Violation from IE Insp Rept 50-397/83-14.Corrective Actions:Review of Quality Documentation & Receiving Records Performed to Assess Potential for Inadvertent Substitution of Reinforcing SteelSafe Shutdown
GO2-83-680, Ack Receipt of IE Insp Rept 50-397/83-29.No Proprietary Info1 August 1983Ack Receipt of IE Insp Rept 50-397/83-29.No Proprietary Info
GO2-83-701, Responds to NRC Re Deviations Noted in IE Insp Rept 50-397/83-22.No Corrective Actions Planned Re Aisc/Nf Boundary.Clarification of FSAR Paragraph 3.2.3 Will Be Submitted by 8309015 August 1983Responds to NRC Re Deviations Noted in IE Insp Rept 50-397/83-22.No Corrective Actions Planned Re Aisc/Nf Boundary.Clarification of FSAR Paragraph 3.2.3 Will Be Submitted by 830901Non-Destructive Examination
GO2-83-731, Forwards Interim Deficiency Repts for Condition 216 Re RHR Relief Valve Vents & Condition 270 Re Indeterminate Grade Matl on ECCS Pumps11 August 1983Forwards Interim Deficiency Repts for Condition 216 Re RHR Relief Valve Vents & Condition 270 Re Indeterminate Grade Matl on ECCS Pumps
GO2-83-823, Submits Interim Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions: Quality Class I & II Peds Undergoing Reevaluation.Sample Program Expected to Be Completed by 83093012 September 1983Submits Interim Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions: Quality Class I & II Peds Undergoing Reevaluation.Sample Program Expected to Be Completed by 830930
GO2-83-839, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Honeycombed Areas in Beams 2B11 & 2B25 Excavated to Sound Concrete & Will Be Repaired.Destructive Exam & Documentation Review Conducted16 September 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Honeycombed Areas in Beams 2B11 & 2B25 Excavated to Sound Concrete & Will Be Repaired.Destructive Exam & Documentation Review ConductedEarthquake
GO2-83-847, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:All Weldolets on Six Separate Tree Risers Inspected & Found Fully Welded Out.No Deficiencies Encountered19 September 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:All Weldolets on Six Separate Tree Risers Inspected & Found Fully Welded Out.No Deficiencies Encountered
GO2-83-862, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Procedure 13 Revised to Specify Use of Controlled Bill of Matls When Reviewing Purchase Requisitions23 September 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-37.Corrective Actions:Procedure 13 Revised to Specify Use of Controlled Bill of Matls When Reviewing Purchase Requisitions
GO2-83-870, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Deficiencies Reviewed Against Required Hanger Function.Hangers Determined Adequate26 September 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Deficiencies Reviewed Against Required Hanger Function.Hangers Determined AdequateNon-Destructive Examination
Safe Shutdown Earthquake
Earthquake
GO2-83-874, Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Specific Deficiency Noted in Item D of Notice of Violation Placed in Project Tracking Sys.Deficiency Will Be Corrected by 83110129 September 1983Responds to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions:Specific Deficiency Noted in Item D of Notice of Violation Placed in Project Tracking Sys.Deficiency Will Be Corrected by 831101
GO2-83-959, Forwards Updated Const Status Repts as of 830930.One Oversize Figure Encl.Aperture Card Available in PDR23 October 1983Forwards Updated Const Status Repts as of 830930.One Oversize Figure Encl.Aperture Card Available in PDRHydrostatic
Coatings
GO2-83-973, Forwards Responses to NRC 831014 Request for Info Re Notice of Violation Transmitted W/Ie Insp Rept 50-397/83-38, Including Info Concerning Quality Class I as-built Program, Calculations & third-party Assessment of Pipe Supports26 October 1983Forwards Responses to NRC 831014 Request for Info Re Notice of Violation Transmitted W/Ie Insp Rept 50-397/83-38, Including Info Concerning Quality Class I as-built Program, Calculations & third-party Assessment of Pipe Supports
GO2-83-996, Amplifies 830916 Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions: Discrepancies from Design Requirements Evaluated.Structural Members Adequate for All Loads31 October 1983Amplifies 830916 Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-38.Corrective Actions: Discrepancies from Design Requirements Evaluated.Structural Members Adequate for All Loads
GO2-84-047, Responds to NRC Noting Unacceptability of Corrective Action Proposed for Violation a in Insp Rept 50-397/84-09.Containment Entry Will Be Made W/One Air Lock Door Closed at All Times24 August 1984Responds to NRC Noting Unacceptability of Corrective Action Proposed for Violation a in Insp Rept 50-397/84-09.Containment Entry Will Be Made W/One Air Lock Door Closed at All Times
GO2-84-049, Responds to NRC Re Violations Noted in Insp Rept 50-397/84-18.Corrective Actions:Procedure PPM 1.3.9 Revised & Automatic Depressurization Sys Permissive Annunciator Trip Setpoint Changed6 September 1984Responds to NRC Re Violations Noted in Insp Rept 50-397/84-18.Corrective Actions:Procedure PPM 1.3.9 Revised & Automatic Depressurization Sys Permissive Annunciator Trip Setpoint Changed