Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000454/LER-1984-043, Forwards LER 84-043-00,replacing LER 84-042-00, Failure to Perform ASME Section XI Testing. No Changes Made in Text or Abstract22 April 1985Forwards LER 84-043-00,replacing LER 84-042-00, Failure to Perform ASME Section XI Testing. No Changes Made in Text or Abstract
05000454/LER-1994-005, Informs That for Docket 50-454,LER 94-005 from Byron Generating Station Will Not Be Used16 August 1994Informs That for Docket 50-454,LER 94-005 from Byron Generating Station Will Not Be Used
05000454/LER-1997-011, Provides Addl Info Recently self-identified by Station Personnel Re Corrective Actions Identified in Original LER 97-011.Info Contained in Licensee Re SI Lube Oil Cooler Remain Valid & Basis for Cancelling LER Is Unchanged6 January 1999Provides Addl Info Recently self-identified by Station Personnel Re Corrective Actions Identified in Original LER 97-011.Info Contained in Licensee Re SI Lube Oil Cooler Remain Valid & Basis for Cancelling LER Is Unchanged
05000454/LER-1998-005, Forwards Revised LER 98-005-00 Which Corrects Errors Involving Incorrect LER Number on Pages 2 Through 5.No New Commitments Made within Submittal11 August 1998Forwards Revised LER 98-005-00 Which Corrects Errors Involving Incorrect LER Number on Pages 2 Through 5.No New Commitments Made within Submittal
05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER12 August 1999Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER
05000454/LER-1998-020, Forwards LER 98-020-00 IAW 10CFR50.73(a)(2)(v).Actions to Address Cause of Event Listed17 December 1998Forwards LER 98-020-00 IAW 10CFR50.73(a)(2)(v).Actions to Address Cause of Event Listed
05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed21 May 1999Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed
05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed8 June 1999Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed
05000455/LER-1987-019, Forwards Corrected LER 87-019-00.LER Originally Issued W/ Error in LER Number in Codified Field (Block 6)29 October 1987Forwards Corrected LER 87-019-00.LER Originally Issued W/ Error in LER Number in Codified Field (Block 6)
ML1112303814 June 1980Forwards Revision 1 to Draft Emergency Plan.Emergency Plan Station Annexes Also Encl
ML17252A76013 July 1993Forwards Rev 63b to Topical Rept CE-1-A, QA Program for Nuclear Generating Stations.Safe Shutdown
Shutdown Margin
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
ML19207A48716 August 1979Forwards Security Personnel Training & Qualification Plan. Plan Withheld (Ref 10CFR2.790)
ML19207B96330 August 1979Forwards Generic Groundwater Monitoring Program for Nuclear & Fossil Plants & Groundwater Monitoring Program for Byron Station
ML19208A97314 September 1979Forwards Fsar,Amend 22.Amend Contains Util Responses to 790515 & 0601 First Round Questions
ML19208B39310 August 1979Responds to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co. Status of Findings & Completion Date Will Be Submitted by 790907
ML19208D8564 September 1979Revises Original 790705 Response to IE Bulletin 79-02 Re Installation of Concrete Expansion Anchors Per Approved Qa/Qc Procedures
ML19209A0825 September 1979Responds to IE Bulletin 79-03.Since Fabricator Research Will Not Be Complete Until Late Sept,Response Will Be Delayed Until Oct 1979 Re SA-312 Type 304 Stainless Steel Pipe
ML19209A45613 September 1979Responds to NRC 790818 Ltr Re Violations Noted in IE Insp Repts 50-454/79-12 & 50-455/79-12.Corrective Actions: Procedure Suppls Redistributed,Site Implementation Procedure Revised & Nonconformance Rept Issued
ML19210C0882 April 1979Requests Info Re Citizen Participation in Licensing Hearings
ML19210E29126 November 1979Forwards Revision 1 to Physical Security Plans.Revision Withheld (Ref 10CFR2.790)
ML19211D11528 December 1979Submits Supplemental Response to IE Bulletin 79-09 Re Failures of GE Type AK-2 Cicuit Breaker.Remains Committed to Implementation of Maint Program Before Fuel Loading.Plans Completion of Program by Apr 1980
ML19224D70929 May 1979Responds to IE Bulletin 79-04, Incorrect Weights for Swing Check Valves Mfg by Velan Engineering Corp. Some Valves Have Been Identified.Correct Weights Will Be Used in Piping Analysis & Addl Supports Will Be Added
ML19224D75217 May 1979Responds to NRC 790420 Ltr Re Violations Noted in IE Insp Repts 50-454/79-06 & 50-455/79-06.Corrective Actions:Storage Surveillance Increased
ML19224D7849 July 1979Notifies That ASME Code Case N-240 Will Be Referenced in Fsar.Code Exempts Certain Piping from Hydrostatic TestingHydrostatic
ML19225C86321 June 1979Responds to IE Bulletin 78-12.Plant Evaluations Were Submitted by GE & Westinghouse.Evaluation of LaSalle Unit 2 Will Be Submitted by 790817.Forwards Summary of Documentation for Each Plant
ML19242A47519 June 1979Supplements 790529 Response to IE Bulletin 79-04.Correct Velan Valve Weights Used in Piping Analyses
ML19242A61628 June 1979Responds to NRC 790530 Ltr Re Violations Noted in IE Insp Repts 50-454/79-08 & 50-455/79-08.Corrective Actions:End Caps Were Removed & Instrumentation Tube Ends Were Reprotected.Rags & Debris RemovedNondestructive Examination
ML19242B39229 May 1979Submits Addl Response to IE Insp Repts 50-454/78-09 & 50-455/78-09.Forwards Util 790125 Ltr Requesting ASME Code Committee Interpertation of Procedure Qualification Test Specimen Requirements & ASME 790514 Response
ML19246B89218 June 1979Responds to IE Bulletin 79-09.GE Type AK-2 Circuit Breakers Are Not Used at LaSalle, But Are Used at Byron & Braidwood as Main Supply Air Operated Circuit Breakers
ML19247B00931 July 1979Forwards Affidavit of Distribution of Amend 21 to FSAR
ML19247B75919 July 1979Responds to IE Bulletin 79-11.Westinghouse DB-50 & DB-75 Circuit Breakers Not Used at Plants
ML19248C83927 June 1979Advises of Decision to Delay Fuel Load Dates by One Year as Result of NRC Suspension of Licensing Review Until Jan 1980
ML19248D22816 July 1979Responds to IE Bulletin 79-04.Sixty Glove Valves Per Station Have Incorrect Weights When Compared to Drawings.Deficiency Reported as RO & Affected Drawings Corrected in Light of Recalculation of Valves
ML19250A66920 September 1979Responds to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Stools Mfg by Youngstown Welding & Engineering Co. Spools Not Presently Installed
ML19253A11520 July 1979Forwards FSAR Amend 21 Revising CP & OL
ML19254B16717 September 1979Forwards Affidavit Stating That Fsar,Amend 22 Distribution Is in Accordance W/Rs Boyd 781020 Ltr to C Reed Re Results of Byron & Braidwood Acceptance Review
ML19254F1672 November 1979Forwards Amend 23 to Fsar,Containing Responses to Addl First Round Questions Generated by NRC 790905 Ltr
ML19254F91314 November 1979Forwards Affidavit & Certificate of Svc Re FSAR Amend 23
ML19256E26514 September 1979Advises of Bob Neiner Farms,Inc Intention to Withdraw Contention 9.Data Used by Applicant in Analysis Is Most Recent
ML19257A49328 November 1979Forwards Response to NRC 791024 Ltr Re Violation Noted in IE Insp Repts 50-454/79-15,50-455/79-15,50-456/79-13 & 50-457/79-13.Violation Considered Unwarranted.Improvements to Handling Region 3 Correspondence to Be Started
ML19257A5956 December 1979Responds to NRC 791107 Ltr Re Violations Noted in IE Insp Repts 50-454/79-16 & 50-455/79-16.Corrective Actions: Welding Procedure Specs to Be Reviewed & Revised to Incorporate Weld End Preparation,Weld Gap & Fitup Criteria
ML19257B7044 January 1980Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Westinghouse Bfd Relays Used or Planned for Use in safety-related Applications at Facility
ML19257C00115 January 1980Forwards FSAR Section 1.2 Drawings,Per NRC Request.W/O Encl
ML19257D05628 January 1980Forwards Addl Response to Structural Engineering Branch 790515 Questions 130.06 & 130.49.Contains Response Spectra for Containment & Auxiliary/Fuel Handling Bldg.Response Will Be Included in Feb 1980 FSAR AmendEarthquake
ML19259A7425 January 1979Forwards Interim Rept Re Deficiency in Tendons Used to pre-stress Primary Containment.Final Rept Will Be Submitted by 790415
ML19259B38122 January 1979Responds to NRC 781226 Ltr Re Violations Noted in IE Insp Repts 50-454/78-09 & 50-455/78-09.Corrective Actions:Revised Insp Procedures for Valves Stored Outside or Inside Unheated Enclosures;Welding Procedures Revised
ML19260C52526 November 1979Responds to NRC 791025 Ltr Re Violations Noted in IE Insp Repts 50-454/79-14 & 50-455/79-14.Corrective Actions:Util & Contractor Personnel Performing Insp & Testing Activities Being Evaluated as to Qualifications
ML19260D7878 February 1980Forwards Amend 24 to FSAR
ML19261B9653 February 1979Forwards Proof of Svc for Petition for Leave to Intervene
ML19262C11429 December 1979Forwards Comments on NUREG-0553, Beyond Defense-In-Depth, Supports Funding of Emergency Plans by Imposition of User Fee.Contentions 5 & 8 Re League of Women Voters of Rockford Petition to Intervene Encl