O'~'
One First National Plaza. Chicago lihnois Commonwealth Edison
-p'
%,]}
i
" Address Reply to: Post Omce Box 767 Chicago, lihr.ais 60690 r
May 29, 1979 Mr. James G. Keppler, Director Directorate of Inspection and 1 Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Response to I.E.
" Incorrect Weights for Swing Check Valves Manufactured by Velan Engineering Corporation" NRC Docket Nos. 50-454/455 and 5_o-456/457 Reference (a):
J.
G.
Keppler letter to B.
Lee, Jr.
dated March 30, 1979
Dear Mr. Keppler:
Reference (a) transmitted I.E.Bulletin 79-04 which required a response by all holders of operating licenses or construction permits for power reactor facilities.
We have reviewed the piping systems at Byron and Braidwood Stations and determined that a small number of 3, 4,
or 6 inch swing check valves manufactured by Velan Engineering Corporation were furnished by the NSSS vendor -- Westinghouse.
Correct weights have not been received from Velan as yet but are expected within 30 Jays.
Currect weights will be used in the piping analyses and action will be taken to provide additional supports if indicated by the analyses.
No Velan swing check valves were purchased for the balance of plant piping systems.
a50 307 1 311979 s
7 9 0716 015ff~
Commonwealth Edison NRC Docket Nos. 50-454/455 50-456/457 i
Mr. James G. Keppler: May 29, 1979 Please direct any questions you may have concerning this matter to this office.
Very truly yours,
>W Y
/41 Cordell eed Assistant Vice-President cc:
Director, Division of Reactor Construction Inspoetion
,~ 1 7 fi s b' J [J a j