ML19256E265
ML19256E265 | |
Person / Time | |
---|---|
Site: | Byron, Braidwood |
Issue date: | 09/14/1979 |
From: | Bielawski A ISHAM, LINCOLN & BEALE |
To: | Callihan A, Cole R, Mark Miller Atomic Safety and Licensing Board Panel |
Shared Package | |
ML19256E266 | List: |
References | |
NUDOCS 7911020034 | |
Download: ML19256E265 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217P6171999-10-21021 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed 05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed1999-05-21021 May 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206T3351999-05-17017 May 1999 Provides Written follow-up of Request for NOED Re Extension of Shutdown Requirement of TS Limiting Condition for Operation 3.0.3.Page 9 of 9 of Incoming Submittal Not Included ML20206N7861999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Braidwood Station. Rept Contains Info Associated with Stations Radiological Environ & Meteorological Monitoring Programs ML20206Q8521999-05-13013 May 1999 Submits Rept on Numbers of Tubes Plugged or Repaired During SG Inservice Insp Activities Conducted During Plant Seventh Refueling outage,A2R07,per TS 5.6.9 ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20210C7221999-05-0303 May 1999 Forwards Initial License Exam Matls for Review & Approval. Exam Scheduled for Wk of 990607 ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS 1999-09-08 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20055E8111990-03-26026 March 1990
[Table view]FOIA Request for Records Re Indemnification Agreements Between Util & AEC or NRC & Public Liability Insurance ML20247P1701989-05-26026 May 1989 FOIA Request for Documents Re Allegations Against Licensee, (P Getschow or K Kranz,Formerly Site QA Manager for Philips Getschow Co at Facility) Arising Out of K Kranz Conduct ML20148D2591988-01-11011 January 1988 Requests That NRC Svc Lists & Meeting Lists Revised to Include Change of Address of Author to Listed Address. Related Correspondence ML20235A7881988-01-0707 January 1988 Informs That Mi Miller & Author Moved to Another Law Firm, Sidley & Austin,Effective on 880101.Author & Mi Miller Will Continue to Represent Util.New Addresses & Telephone Numbers Listed.W/Certificate of Svc ML20205R9361987-04-0202 April 1987 Forwards Affidavits of Jt Louden & at Simile & Attachment a Containing All Joint Weld Specs,Welding Procedure Qualification Test Records & Other Welding Procedure Records by Lk Comstock,Per 870330 Order ML20207R7741987-03-11011 March 1987 Forwards Exhibit List Which Counsel for Applicant Prepared During Course of Hearings.Braidwood Exhibit List Does Not Detail Transcript Pages at Which Given Exhibit Identified or Admitted Into Evidence.W/O Exhibit List ML20211L3011987-02-12012 February 1987 Forwards Settlement Agreement W/State of Il,Consisting of Draft Testimony & Petition ML20215K8811986-10-23023 October 1986 Forwards Seven Affidavits of Nondisclosure on Behalf of Applicant Per ASLB 851206 Order ML20215H7391986-10-21021 October 1986 Forwards Testimony of Jm Dominique,Pg Kosieniak & If Dewald Re Custody of Weld Test Coupons.Guild Requested to Stipulate Admissibility of Applicant Exhibit 5 & to Waive cross- Examination.Related Correspondence ML20211C5811986-10-16016 October 1986 Requests,On Behalf of Util,Reevaluation of Finding That No Significant Changes Occurred in Licensee Activities or Proposed Activities Since Completion of Previous Antitrust Review Re Cp,Based on Listed Reasons ML20214S8591986-09-24024 September 1986 Forwards Rv Laney Rebuttal Testimony on Behalf of Applicant. Filing of Addl Rebuttal Testimony in Future Anticipated. Related Correspondence ML20214S8671986-09-24024 September 1986 Forwards Addl Csr Documents Re Items CDP-034,CPH-104 & EIN-144.W/o Encls.Related Correspondence ML20214P9171986-09-17017 September 1986 Forwards C Reed to HR Denton Identifying Change in Util Estimated Fuel Load Date for Unit 1.Fuel Can Be Loaded on or About 861015.Related Correspondence ML20214L5861986-09-0808 September 1986 Forwards Util Request for Exemption from Requirements of 10CFR50,App E,Section IV,F.1.Certificate of Svc Encl. Related Correspondence ML20203L4251986-08-25025 August 1986 Forwards Applicant Response to Emergency Preparedness Appraisal Insp Repts 50-456/86-21 & 50-457/86-19.Related Correspondence ML20203L4441986-08-21021 August 1986 Advises That on Page 14,Line 19 of Applicant 860818 Motion for Authorization of Fuel Loading & Precritical Testing Filed on 860818,word Below Should Read Above ML20203L1701986-08-20020 August 1986 Forwards Rj Slember 860819 Affidavit,Constituting Attachment C of Applicant Motion for Authorization for Fuel Loading & Precritical Testing,Per Author .Related Correspondence ML20203L2191986-08-19019 August 1986 Forwards Listed Documents Re QC Inspector Reinsp Program,Per Request.Protective Order Concerning Confidential Treatment to Info Disclosed, W/Affidavits of Nondisclosure, Also Encl.Related Correspondence ML20214K7251986-08-18018 August 1986 Forwards Util Motion for Authorization of Fuel Loading & Precritical Testing,Kd Brienzo & Tj Maiman Affidavits & Rj Slember Unexecuted Affidavit.Rj Slember Affidavit Will Be Executed & Served as Soon as Possible ML20205C5841986-08-0707 August 1986 Forwards First Installment of Util Rebuttal Testimony Which Describes Two Extensive Repeat Insp Programs,Const Sample Reinsp & Pittsburg Testing Lab Overinsp Program.Related Correspondence ML20203F8741986-07-28028 July 1986 Forwards Computer Printouts Reflecting Results of Reinsp Programs.Data Will Be Used in Rebuttal Case as Addl Evidence Re Effectiveness of Lk Comstock QC Insps.W/O Encl.Related Correspondence ML20202F9191986-07-10010 July 1986 Forwards Gm Orlov Affidavit of Nondisclosure Re Terms & Conditions of 851206 Protective Order.Related Correspondence ML20199K5701986-07-0707 July 1986 Forwards Author to Business & Prof People for Public Interest & 13 Affidavits of Nondisclosure on Behalf of Applicant & Per ASLB 851206 Order.Related Correspondence ML20195E9321986-05-27027 May 1986 Denies Illinois Municipal Electric Agency (Imea) Allegations of Activities W/Antitrust Implications.Facts Misstated.Refusal to Sell Power to Imea Denied Per Encl .Related Correspondence ML20197G7931986-05-13013 May 1986 Informs That on 860509,G Krone,Foreman for Comstock Const Co,Terminated from Employment Due to Derogatory Comments & Actions Re R Martin Insp Practices.Related Correspondence ML20203N1291986-04-29029 April 1986 Forwards Ds Hefter 860429 Affidavit of Nondisclosure Re Protective Info,Per Terms of Encl Agreed Protective Order. Related Correspondence ML20205N6001986-04-28028 April 1986 Informs ASLB & Parties of Listed Developments Which Pertain to Subcontention Item 2.C Re Alleged Harassment & Intimidation of Comstock QC Inspectors.Related Correspondence ML20210L3531986-04-25025 April 1986 Forwards Applicant 860425 Motion in Limine Puckett Settlement Agreement ML20141J5321986-04-22022 April 1986 Forwards Index of Attachments for Applicant Prepared Testimony,Per Mi Miller 860411 Commitment Forwarding Prepared Testimony.Certificate of Svc Encl.Related Correspondence ML20141J3291986-04-22022 April 1986 Forwards Gf Marcus Affidavit of Nondisclosure Per ASLB 851206 Order.Related Correspondence ML20141J4861986-04-21021 April 1986 Forwards Proposed Agreed Protective Order for ASLB Approval. Intervenors to Supply Applicant Atty W/Documents Previously Sent in Sealed Envelopes to Commission on 860403.Related Correspondence ML20141H1281986-04-21021 April 1986 Forwards J Schimmels Corrected Testimony Re QA Subcontention 10.B.Matl Printed Out of Sequence & Omitted & in One Instance Substantial Duplication Occurred.Certificate of Svc Encl.Related Correspondence ML20155F5951986-04-15015 April 1986 Forwards Applicant 860415 Motion to Require Bl Rorem Et Al to File Offers of Proof & Notice of Appearance in Proceeding.Related Correspondence ML20202J6941986-04-14014 April 1986 Forwards Direct Testimonies of M Wallace on Subcontention Item 1 & JW Gieseker for Subcontention Items 4.A & 4.B. Testimony Omitted from Applicant 860411 Prefiled Testimony. Related Correspondence ML20203B5391986-04-14014 April 1986 Forwards Certificate of Svc Inadvertently Omitted from Applicant Prepared Testimony Served on 860412.Certificate of Svc Encl.Related Correspondence ML20205M7991986-04-11011 April 1986 Forwards Applicant Testimony on Intervenor Rorem QA Subcontentions 8.B,8.D,8.E,8.F,10.B & 10.D.Testimony of Braidwood-authorized Nuclear Inspector Still Under Preparation.Related Correspondence ML20141D5161986-04-0404 April 1986 Forwards Proposed Partial Initial Decision & Requested Findings of Fact ML20140D6651986-03-24024 March 1986 Forwards Mi Miller 860320 Affidavit Inadvertently Omitted from 860311 Response to Intervenor Motion to Compel Discovery.Related Correspondence ML20141N8701986-03-14014 March 1986 Forwards Notice of Rf Heishman 860324 Deposition in Bethesda,Md Re Const Appraisal Team Rept.Notification Requested If Heishman,Georgiev & Hooks Depositions Scheduled on 860324 Pose Problem.Related Correspondence ML20137X4181986-03-0404 March 1986 Forwards Notice of Resumption of Deposition of Lg Mcgregor on 860318.Notice Needed Due to B Guild Being Unable to Tell M Miller Whether Recall of Mcgregor Intended.Approx 4 H Needed for Exam.Related Correspondence ML20154D5841986-03-0404 March 1986 Discusses Const Appraisal Team Depositions Scheduled for 860310 & 11,per 860224 Notice.Keshishian Deposition Rescheduled for 860311 & Georgiev & Hooks Depositions Rescheduled for 860312.Related Correspondence ML20154K7771986-03-0404 March 1986 Forwards Const Appraisal Team Insp Rept 50-455/85-27 & Util 860124 Response,Per ALAB-143 Re Full Disclosure.Violations 2 & 3b in Insp Rept May Be Relevant to Intervenor Amended QA Contentions,Items 8.C & 10.D.Related Correspondence ML20153G7121986-02-27027 February 1986 Forwards Notice of Depositions & Accompanying Transmittal Ltr.Notice Includes Svc List Certification.Related Correspondence ML20153F1381986-02-24024 February 1986 Forwards Direct Testimony Addressing Intervenor Emergency Planning Contentions 1(a) & 1(b) & Notifies of Intent to Introduce Into Evidence, Il Plan for Radiological Accidents, at 860311 Hearing.Related Correspondence ML20153G7221986-02-24024 February 1986 Forwards Notice of Depositions Re Members of Const Appraisal Team Insp Group.Hooks Identified as Having Responsibility for Welding & Nondestructive Section of Rept.Related Correspondence ML20153D8281986-02-19019 February 1986 Forwards Util 860219 Application for Deposition Subpoenas. Identities of 11 Individuals to Whom Subpoenas Sought Subj to ASLB 851206 Protective Order.Certificate of Svc Encl.W/O Encl.Related Correspondence ML20153D3841986-02-18018 February 1986 Forwards 12 Affidavits of Nondisclosure on Behalf of Applicant,Per ASLB 851206 Order ML20137W7911986-02-17017 February 1986 Forwards Complete Observation Record for Exhibit a to Orlov Affidavit in Support of Applicant Motion for Summary Disposition Re Contention Item 12.E Re Lk Comstock Electrical Welding.Svc List Encl.Related Correspondence ML20137U8041986-02-14014 February 1986 Forwards Transcript of JW Gieseker 860212 Deposition in Chicago,Il Correcting 851219 Affidavit Supporting Applicant 851212 Motion for Summary Disposition of Intervenor Contention 3.C.Related Correspondence ML20151W9371986-02-10010 February 1986 Confirms That Applicant Completed Revised Evacuation Time Study.Study Not Final Until State of Il Issues Final State Plan for Radiological Accidents.Svc List Encl.Related Correspondence 1990-03-26 |
Text
5-
- ,t ISHAM, LINCOLN & BEALE COUNSELOPS AT LAW ONE FIRST NATION AL PLAZA FORTY-SECOND FLOOR CHIC AGO, ILLINOIS 60603 TELEPHONE 312-558-7500 TELEX: 2-5288 WASHINGTON OFF'CE lOSO 17* f f p E ET, N . W.
5 September 14, 1979 '
,,,, ,',;',"c ,", '.'c . ,"o o 3, 202-833-9730 Mr. Marshall E. Miller, Esq. Mr. A. Dixon Callihan Chairman Union Carbide Corporation
?.tomic Safety and Licensing P.O. Box Y Board Panel Oak Ridge, Tennessee 37830 U.S. Nuclear Regulatory Commission Dr. Richard F. Cole Washington, D.C. 20555 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: In The Matter of Commonwealth Edison' Company (Braidwood Station, Units 1 and 2) Docket Nos.
50-456 and 50-457
Dear Members of the Board:
At the special prehearing conference, the Board rsquested that the parties advise the Board in writing of their positions regarding Contention 9. As the farm census data in question had not been received by the 13th of Sep-tember, one of Applicu .c's attorneys contacted Mr. Bock, counsel for Neiner Far. :. Mr. Bock informed Applicant's attorney that after having reviewed the farm census data it is apparent that the data used by Applicant in its analysis is the most current data available, and therefore, Neiner Farms will voluntarily withdraw Contention 9 from this proceeding.
Sincerely,)
/
.7 Alan
.$')
P. Bielawski u- a ~
~, s CC: ServiceList/ f' N/g
,4 /so, s.x*y s, ='l g 4y=
m t-
?$ ce M2 &q N 1256 206
- m a" 0 O 't i M
g 791102