Commonwealth Edison
/
One Fast National Plaza Chicago. Illinois Address Reply to Post Ofhce Box 767 Chicago. Ilimors 60690 May 29, 1979 Mr. James G.
Keppler, Director Directorate r# Inspection and Enforcement - Region III U tS. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 601:7
Subject:
Byron Station Units 1 and 2 Additional Response to IE Inspection Report Ncs. 50-454/78-09 and 50-455/78-09 NRC Docket Nos. 50-454 and 50-455 Reference (a):
January 22, 1979 letter frcM C.
Reed to James G.
Keppler
Dear Mr. Kep?ler:
Per Reference (a), Commonwealth Edison company, in response to an item of noncompliance (deviation), indicated that a written inquiry had been made to the American Society of Mechanical Engineers (ASME) Committee to " clarify whether a procedure qualification test specimen must meet the mils lateral expansion required by Tables NC-2331-1 and ND-2331(a)-1 of ASME Secticn III for the thickness tested or the thickness to which the procedure is qualified."
Your letter of January 31, 1979 requested advisement of the ASME code committee interpretation of this item.
Enclosed for your review and information as Attachment 1 is the ASME response to commonwealth Edison's inquiry regarding the mils lateral expansion requirement Also enclosed, as,
is Commonwealth Edison's inquiry of the subject
- matter, w
Please address any additional questions that you might have reg,arding this matter to this office.
s very truly you s, c. PQ 1
iz Cordell Reed
[gq 7 !} }
Assistant Vice-President attachments 790B0$ g g 30 M
ATTACHMENT 1
'~bb The American Society of Mechanical Engineers I t t unw1 Enge.cnng Center
- 345 E 47m St. Ncw Yoo. N Y.1001/ e 212 C44 7722 e IWX 710 0B du THE BOILER AND PRESSURE VESSEL COMMIT T E E May 14, 1979 Osirman P. M. BRIST E R Commonwealth Edison Y"*'irr"J' Onc First National Plaza W. L HARD%G Chica o, IL 60690 secreury G. M. EISENBE RG Att:
W. L. Stiede B.W.BACE
Subject:
Section III, Division 1, NB-4335.2 Impact Test of Heat Affected Zone 8
ER Tabic NS-2332-1 Required C Valves for Piping, g
g y
V.W. BUTLER Pumps, and Valves Impact Testing for Mcld Procedure Qualification R. J. CEP LUCH L. J. CHOCKIE W. E. COOPER UU Ref: Your letter of.Januar3 25, 1979
)*],'EARNHEART ASME File CI?I 79-38 R. M. cs ssoN R. C. GRIF F IN S. F. H ARR ISON GentlemOn:
E. J. HEMZY erstanUng Wt you are asMng
'N
. E. L K E P.'.M L E R n respone to your leMer, R is our u J. W. KIME the folloWing question:
J. E. L ATTAN J. LeCO F F J. R. M AC K AY QUESTIO:::
H. S. M AUK g,' ".
For the condition where the ucid procedure qualification is limited
' LL to Caterial under 13 in., is it permissible to use a 2 in. plate LLEn 2
for the procedure qualification and qualify the impact properties T. E. NORT HUP to the thickness range of 3/4 in, to 1% in. as specified in Section C. E. R AW Lm s R. F. RE EDY
,1 W. R. SuiTH. sR.
III Tabic NB-2332-l?
W. ElSOME RS REPLY:
n
)
Yes, providing all requirements of the veld procedure specification I
for the lh in. thickness are complied with.
Yours truly,
)
ll~ M [.
sm i?a Robert E. Clazicr Assistant Secretary
> i (212) 644-8048 bec: R. F. Reedy REC:cv U. R. Smith
(
P. M. lirister
] ! } q, 3Lj W. I.. liarding F. N. Moschit:1 W. G. Knect.t
-- - - ~ - -
' & a b... h $$
e os
ATTACHMENT 2 3
Oammonwealth Edison I
d
[ ((j, t e re Nv i -.
,c.a::
I" c 5
' Accress Reply to Post O!:.ce Box 767 Chicago. Ilknois 60690 gj 99-38
- u. s.,...
January 25, 1979 FtS
- g79 C.~i..m., s"~.,
Mr. G. M. Eisenberg, Sec'retary
~
~
Boiler and Pressure 'lessel Committee c/o Tne American Society of F.echanical Engineers 345 E. 47th. Street New York, NY 10017
Dear Mr. Eisenberg:
We are in need of interpretation of AE' E Boiler and Pressure Vercel Code rules contained in Section III, Division 1 related to charry impact testing for weld pro-cedure c.ualification.
The specific rules are contained in Subsection NB.
The question involves the use of two inch thick material for a weld couron to : oduce icract test specimens to qualify a procedure l'or ll 'nch maximum material thick-i ness.
The specimens were needed to supplement ?;R data for a weld procedure (?-l material) wMeh had been previously qualified without the use of pre _at for ll-inch maximum material thickness (Section IX, QL403.5 & NB-4335.2).
Under the above conditions, is it permissible to use the charpy values for nominal wall thickness over 3/4" to ll" inclusive shown in Table NE-2332-1 for acceptance of the specimens removed from the 2-inch thick coupon?
'e believe this to,be acceptable on the basis that the '..elding procedure for li-inch maximum thick material was followed and the procedure is not permitted to be-used for matcrial over ll-inch thickness.
An early response in this matter-will be appreciated.
Sincerely,
/
/
!/
. t.4d16u W. L. Etiede cc: E. F. Reedv F. N. koschini E, (11 150 E. J. Hemzy
)
\\'
.