Responds to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co. Status of Findings & Completion Date Will Be Submitted by 790907
ML19208B393
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 08/10/1979
From: Reed C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7909200159
Download: ML19208B393 (2)


Text

.

/

Commonwealth Edison g

y one First National Plaza. Chicago. Illinois Address Reply to: Post Office Box 767 Chicago, !!!inois 60690

.i August 10, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Ccanmission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Response to IE Bulletin 79-03

" Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Manufactured by Youngstown Welding and Engineering Company" NRC Docket Nos. 50-454, 50-455 50-456 and 50-457 References (a) :

March 12, 1979 letter from J. G.

Keppler to B. Lee, Jr. transmitting IE Bulletin No. 79-03 (b) :

May 8,1979 letter from C. Reed to J. G. Keppler concerning IE Bulletin No. 79-03

Dear Mr. Keppler:

Reference (a) transmitted IE Bulletin 79-03 which requested information concerning the use of certain stainless steel pipe spools manufactured by Youngstown Welding and Engineering Company.

Reference (b) indicated the possibility that stainless steel piping weld without filler metal from Youngstown Welding and Engineering Company had been supplied to the Byron and Braidwood Stations.

Reference (a) also requested additional time for the fabricator to review his records and compile lists of affected piping and for Ccm:monwealth Edison to formulate a program for examination of any affected piping.

9ff' g

<f 790920

.,$sN&U

.. ~..,. -......... -.

Commonwealth Edison Mr. James G. Keppler: August 10, 1979 Due to unforeseen delays in initiating the record review and the complexity of the review, the fabricator is just now compiling the affected piping lists.

Once complete, Commonwealth Edison will expeditiously review the list and formulate a pipe examination program.

Thus, additional time will be required to complete the required action of the Bulletin.

However, Commonwealth Edison will submit a status of the findings to date and a revised completion dated by September 7, 1979.

Please address any questions that you may have concerning this matter to this office.

Very truly yours,

).b Cordell Re Assistant Vice-President cc:

NRC Office of Inspection and Enforcement - Division of Reactor Construction Inspection

(,]')

s

/