Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-08-094, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application12 March 2008Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application
L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45)23 July 2013Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45)Aging Management
ML02240034027 August 2002Draft Graphs for Flaw Curves and Stress Intensity Factors
ML02240034527 August 2002Failure Frequency Curve for Davis-Besse Conditions
ML02246014229 August 2002Chart, Long-Term Results for Integrated Model with Handwritten Notes
ML02246014829 August 2002Heat 69 Crack Growth - Bounding Weibull with 1.5 Shape Facto with Handwritten Notes
ML02246014929 August 2002Undated Data Chart, CDF, LERF, Rem
ML0308000431 January 2003Firstenergy Nuclear Operating Company, NRC Allegations and Employee Concerns Program Contact Trends, January 2002 - January 2003
ML04113019921 April 2004Oversight Panel Final Restart Checklist Public Release MemoBoric Acid
ML04145032613 February 2004Restart Action Matrix - Open Items Only
ML04145033713 February 2004IMC 0350 Panel Process PlanBoric Acid
Coatings
B.5.b Mitigating Strategies
ML04145033813 February 2004Oversight Panel Open Action Item ListBoric Acid
ML05238014131 August 2005Status of Davis-Besse Lessons Learned Task Force Recommendations - Last Update: August 31, 2005Boric Acid
Ultimate heat sink
Foreign Material Exclusion
Pressure Boundary Leakage
Generic Issues Program
Through-Wall Leakage
Backfit
Unidentified leakage
Unidentified leak
ML05257079812 September 2005Documentation of Completed Post-Restart Process Plan for Transition of Davis-Besse from the IMC 0350 Oversight Process to the Reactor Oversight Program (ROP)Boric Acid
Pressure Boundary Leakage
ML05307036813 March 2002Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wastage Rev.3, 3-13-02Boric Acid
ML05307040220 April 2001Normal Sump Pump Samples
ML06114013016 March 2006Ltr Fm J. Gutierrez, Morgan Lewis to S. Brock Requesting to Withhold Materials from Public Disclosure Which Was Submitted by FENOC - Affidavits of Terry Young and Warren BilaninBoric Acid
Finite Element Analysis
ML06180025827 June 2006Closure of Davis-Besse Operational Improvement PlanGrace period
ML07026039531 January 2007Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts
ML07086025315 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 3. BackgroundBoric Acid
ML07086026115 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 5. Worldwide Industry Response to CRDM and Other Alloy 600 Nozzle CrackingBoric Acid
Nondestructive Examination
ML07086026415 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 6. Boric Acid Wastage of Carbon Steel Components in Us PWR PlantsBoric Acid
Pressure Boundary Leakage
ML07086026815 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 7. FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion IssuesBoric Acid
Non-Destructive Examination
Condition Adverse to Quality
Pressure Boundary Leakage
ML07086027115 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 8. Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3Boric Acid
Hydrostatic
Finite Element Analysis
ML07086028115 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix a, Finite Element Stress Analysis of Davis-Besse CRDM Nozzle 3 PenetrationHydrostatic
ML07086028215 March 2007Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix B, Crack Driving Force and Growth Rate EstimatesFinite Element Analysis
ML07274051011 February 2008Lltf Action Plan Feb 2008 Update - PublicBoric Acid
Hydrostatic
VT-2
Pressure Boundary Leakage
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0803700811 February 2008Lltf Status of Recommendations February 2008Boric Acid
Ultimate heat sink
Foreign Material Exclusion
Pressure Boundary Leakage
Generic Issues Program
Through-Wall Leakage
Backfit
Unidentified leakage
Unidentified leak
ML0824902752 October 2008Draft a, Attachment to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope IssuesShutdown Margin
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
Pressure Boundary Leakage
Offsite Circuit
ML0824902802 October 2008ITSB Draft La, to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues
ML0824902892 October 2008ITSB Draft L, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope IssuesShutdown Margin
High Radiation Area
ML0824902952 October 2008ITSB Draft M, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues
ML0824903002 October 2008ITSB Draft R, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope IssuesBoric Acid
Shutdown Margin
ML10053962322 February 2010Lessons Learned Task Force Action Plan Regarding Stress Corrosion Cracking Dec 2009 (Final Update)Boric Acid
Hydrostatic
VT-2
Pressure Boundary Leakage
ML10152011728 May 2010Nozzle 4 - 52M Deposit Depth
ML12145001423 May 2012NFPA 805 LAR Status Matrix - May 2012
ML12167A26229 May 2012Enclosure - Davis-Besse 17RFO License Condition 2.C(7) SG Circumferential Crack Report
ML14307B70710 December 2014Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-TProbabilistic Risk Assessment
Fukushima Dai-Ichi
ML15238B8653 September 2015FHRR MSFHI Tables 1 and 2
ML15239B2123 September 2015Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism ReevaluationFLEX
Fukushima Dai-Ichi
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML20142A3975 May 2020Annual Radiological Environmental Operating Report, Figure 32, Wind Rose Annual Average 10MAnnual Radiological Environmental Operating Report
ML20142A3985 May 2020Annual Radiological Environmental Operating Report, Figure 31, Wind Riose Annual Average 75MAnnual Radiological Environmental Operating Report
ML20142A3995 May 2020Annual Radiological Environmental Operating Report, Figure 30, Wind Rose Annual Average 100MAnnual Radiological Environmental Operating Report