Issue date | Title | Topic | |
---|---|---|---|
A08995, Rev 1 to Auxiliary Initiation Event Analysis | 14 September 1990 | Rev 1 to Auxiliary Initiation Event Analysis | |
B12020, Summary of Results of Haddam Neck Probabilistic Safety Study | 31 March 1986 | Summary of Results of Haddam Neck Probabilistic Safety Study | |
B12480, Const Design Info Submittal:New Switchgear Bldg Const. W/38 Oversize Encl | 30 April 1987 | Const Design Info Submittal:New Switchgear Bldg Const. W/38 Oversize Encl | Hot Short Safe Shutdown Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Emergency Lighting Tornado Generated Missile Earthquake |
B12619, Bimonthly Progress Rept 5:New Switchgear Bldg Const | 31 July 1987 | Bimonthly Progress Rept 5:New Switchgear Bldg Const | Fitness for Duty |
CY-85-062, Rev 2 to Steam Generator Tube Sleeving & Plugging | 22 January 1986 | Rev 2 to Steam Generator Tube Sleeving & Plugging | Shutdown Margin |
CY-86-031, Rev 1 to 4.10.1(D) Inservice Insp of Steam Generator Tubes (Acceptance Criteria) | 8 May 1986 | Rev 1 to 4.10.1(D) Inservice Insp of Steam Generator Tubes (Acceptance Criteria) | |
ML093430794 | 31 October 1981 | Evaluation of Indian Point 3 Nuclear Power Plant. | High Radiation Area |
ML100321545 | 31 October 1981 | Evaluation of Indian Point Station Unit No 2. | Nondestructive Examination Temporary Modification |
ML17258A375 | 31 August 1981 | Evaluation of Robert E Ginna Nuclear Power Plant. | |
ML20055D893 | 30 June 1990 | Fracture Mechanics Evaluation:Haddam Neck Pressurizer | |
ML20055G495 | 31 July 1990 | Decommissioning Financial Assurance Certification Rept | |
ML20058G348 | 31 October 1993 | Nonproprietary VIPRE/WRB-1 DNBR Thermal Limit for Westinghouse Fuel Types, for Oct 1993 | |
ML20058G677 | 29 September 1993 | Rev 0 to Project Assignment 91-006, Connecticut Yankee Event V Mods | |
ML20058L741 | 15 July 1993 | QA Svcs Dept Surveillance Rept SS-169, Assessment of Fitness for Duty Program | Fitness for Duty |
ML20062G495 | 31 July 1990 | Rev 3 to Northeast Utils USNRC Read & Sign | |
ML20125E566 | 31 March 1992 | Nonproprietary PWR SG Tube Repair Limits:Technical Support Document for Expansion Zone PWSCC in Roll Transitions Final Rept | Anticipated operational occurrence Nondestructive Examination |
ML20126A799 | 31 January 1980 | Effects of High Energy Piping Sys Break Inside Containment, SEP Topic III-5.A | Safe Shutdown Boric Acid |
ML20127J539 | 30 November 1992 | Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Load Combinations Code Changes | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Tornado Generated Missile Tornado Missile Protection Earthquake |
ML20133C005 | 6 September 1985 | Final Rept,Connecticut Yankee Plant Design Change External Review Group | Design basis earthquake |
ML20134L238 | 19 December 1996 | Rev 0 to Accident Analysis | Anticipated operational occurrence |
ML20134L248 | 30 December 1996 | Rev 0 to Sys Needed for Decommissioning Sys Evaluation Process | Boric Acid |
ML20134L259 | 31 December 1996 | Rev 0 to Sys Reclassification | |
ML20134L272 | 31 December 1996 | Commitment Mgt Grpi | |
ML20134L275 | 3 February 1997 | Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis | |
ML20134L284 | 23 December 1996 | Rev 0 to Spent Fuel Pool Island Studies | |
ML20134L287 | 19 December 1996 | Rev 0 to Grpi for Defueled Condition Fire Protection Technical Requirements | Safe Shutdown Hydrostatic Continuous fire watch Fire Protection Program Fire Watch |
ML20134L291 | 8 January 1997 | Rev 0 to UFSAR Rev Grpi | |
ML20135E271 | 26 December 1996 | Evaluation of Intakes by Two Workers at CT Yankee Atomic Power Co | |
ML20135E322 | 13 February 1997 | Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures | Condition Adverse to Quality Grace period |
ML20135F365 | 26 July 1985 | Draft Connecticut Yankee Plant Design Change Task Group, Final Rept | Boric Acid Temporary Modification Design basis earthquake |
ML20135F370 | 23 July 1985 | Review of Design Change Process | Nondestructive Examination Temporary Modification Fire Protection Program |
ML20135F374 | 19 July 1985 | Plant Design Change Evaluations | Safe Shutdown Boric Acid Tornado Missile Safe Shutdown Earthquake Design basis earthquake |
ML20135F385 | 8 May 1985 | Screening of Plant Design Changes | Boric Acid |
ML20137C628 | 14 March 1997 | Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews | |
ML20137H303 | 31 March 1997 | Rev 2 to Nuclear Training Loit/Lout Audit Reviews | Power change |
ML20138B156 | 31 March 1986 | Permanent Exemptions Re Types a & C Leak Testing | Exemption Request Fire Protection Program |
ML20138B183 | 31 March 1986 | Schedular Exemption Requests Re Type C Leak Testing | Probabilistic Risk Assessment Exemption Request |
ML20138B200 | 31 March 1986 | Status of Containment Integrated Leak Rate Test Program | |
ML20141A004 | 31 May 1997 | Independent Assessment of Radiological Controls Program at Cyap Haddam Neck Plant Final Rept May 1997 | High Radiation Area Locked High Radiation Area Process Control Program Scaffolding |
ML20153G403 | 8 March 1988 | Rev 0 to, Connecticut Yankee Modernize Reactor Protection Sys - Phase 2, Conceptual Project Description | Fuel cladding Fire Protection Program |
ML20153G408 | 3 June 1988 | Rev 0 to Conneticut Yankee Replace Nuclear Instrumentation Sys, Neo Project Description | |
ML20155E759 | 28 February 1986 | Best Estimate LOCA Analysis, Vol 5 | Loop seal Hydrostatic Fuel cladding Coast down |
ML20199L073 | 31 March 1986 | Probabilistic Safety Study,Northeast Util Svc Company Evaluation of Probabilistic Safety Study Results | |
ML20199L589 | 24 December 1997 | Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant | |
ML20202D507 | 30 June 1986 | Non-LOCA Transient Analysis | Boric Acid Shutdown Margin Fuel cladding |
ML20204B681 | 31 December 1996 | Nuclear Lemons Assessment of America Worst Commerical Nuclear Power Plants. 5th Edition | |
ML20205Q701 | 30 April 1987 | Bimonthly Progress Rept 3:New Switchgear Bldg Const | Emergency Lighting |
ML20205T120 | 19 May 1986 | Steam Generator Tube Insp Rept for 1986 Refueling Outage | |
ML20205T123 | 8 May 1986 | Steam Generator Tube W/55% Through Wall Defect Safety Evaluation for Structural Integrity | |
ML20205T153 | 13 January 1986 | Safety Evaluation,Connecticut Yankee Steam Generator Tube Repair. Supporting Info Encl | Hydrostatic |