Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000220/LER-1988-009, FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util | 15 May 1989 | FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util | |
ML17285A234 | 6 January 1989 | Discusses Issues Highlighted at BWR/6 Alternate Ac Task Force Meeting on 881115,including Need for Capability of Div III Sys to Maintain Plant in Safe Shutdown Condition (Hot Shutdown) for Min of 4 H | Safe Shutdown |
ML17285A235 | 6 February 1989 | Forwards Proprietary Draft Conformance of HPCS Div to NUMARC 87-00 App B Aac Criteria, for 890214 Meeting | |
ML17309A277 | 28 June 1982 | Repts Under Purchase Order DR-82-0961 Re Review of Two Draft SEP Integrated Assessments for Facilities.Ltr Comprises Rept on Ginna SEP (Draft NUREG-0821) | High winds Probabilistic Risk Assessment Backfit |
ML17341B644 | 23 February 1982 | Advises That Project Has Escalated to Approx 60 to 70% of Current Billings | |
ML17342A774 | 13 July 1987 | Forwards Technical Evaluation of Rept, Retran Code: Transient Analysis Model Qualification, Dtd Jul 1985. Criteria for Use of Single & Two Loop Plant Models Listed. NRC Audit of Util QA Procedure Recommended | |
ML18038A003 | 7 March 1985 | Forwards Rev 1 to Vol 1, Summary & Conclusions, to Final Rept of Independent Review of Nine Mile 2 Related NRC Const Assessment Team Insps & SALP Rept & Niagara Mohawk Identified Deficiencies, Per 841114 Presentation | |
ML18052B191 | 17 June 1987 | Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item | |
ML18114A428 | 6 April 1979 | Forwards Computer Programs & Info Related to Shock 1,2 & 3 Pstress & NUPIPE-SW.Requests Info Be Withheld (Ref 10CFR2.790).Forwards Affidavit & Supporting Documentation | |
ML18114A444 | 13 April 1979 | Forwards Update Rept on Plan for Verification of Dynamic Analysis Codes Dtd 790406 | Earthquake |
ML18114A445 | 6 April 1979 | Forwards Plan for Verification of Dynamic Analysis Codes, for Listed Dockets in Response to NRC 790402 Ltr | |
ML18114A459 | 13 April 1979 | Forwards Affidavit of Tj Pashos of Nuclear Svcs Corp Re Application for Withholding Proprietary Info from Public Disclosure | |
ML18114A517 | 27 April 1979 | Forwards Status Rept on 790427 Plan for Verification of Dynamic Analysis Codes. | Earthquake |
ML18114A558 | 8 May 1979 | Forwards Proprietary Documents Requested During 790501-04 Special Insp | |
ML18114A560 | 4 May 1979 | Requests Withholding Technical Guideline EMTG-22-0 & Technical Rept EMTR-612 (Ref 10CFR2.790).Affidavit Encl | |
ML18114A561 | 9 May 1979 | Confirms 790504 Telcon W/Wt Russell Re Computer Deck Associated W/Shock 0 Program | |
ML18114A569 | 11 May 1979 | Notifies That Review of Computer Deck Is Completed.Shock 0 Program Still Unrecovered.Piping Sys Conservatively Designed & Will Perform Intended Function | |
ML18114A575 | 14 May 1979 | Forwards Shock 1 Computer Program Listing.Supersedes Submittal of 790406.Program Listing Withheld (Ref 10CFR2.790) | |
ML18114A612 | 18 May 1979 | Summarizes Procedures & Calculational Techniques Used in Reanalysis of Piping Sys Designed W/Shock II Computer Program.Reanalysis Will Satisfy 790313 Order to Show Cause | Earthquake |
ML18136A378 | 8 January 1980 | Supplements 800103 Ltr Re SHOCK-II Computer Calculations Performed on Piping of Six Inches or Less.Surry & Me Yankee re-examined as Part of Show Cause Reanalysis Effort.One Piping Problem Remains at Fitzpatrick | |
ML18136A424 | 8 January 1980 | Ack Receipt of NRC 791206 Ltr Re Wj Kennedy Request for Withholding Computer Programs W/Proprietary Info Concerning Pipe Stress Analysis.Will Notify When No Longer Necessary to Classify Info as Proprietary | |
ML18139A326 | 12 June 1980 | Resubmitts Rept on Reanalysis of Safety-Related Sys,Surry Power Station,Unit 2, Revision 1.Original Submittal Contained Errors | |
ML18150A117 | 14 April 1987 | Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. | |
ML18150A120 | 17 April 1987 | Forwards EGG-NTA-7378, Conformance to Generic Ltr 83-28, Item 2.2.1 - Equipment Classification for All Other Safety- Related Components:Surry 1 & 2, Final Informal Rept.Plant Conforms to Generic Ltr Item | |
ML18150A124 | 23 March 1987 | Forwards EGG-NTA-7633, Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Surry Units 1 & 2. Util Submittals Reconfirm That GDC 14,15 & 30 Met | |
ML18150A186 | 1 May 1987 | Forwards EGG-NTA-7612, Conformance to Generic Ltr 83-28, Item 2.2.2 - Vendor Interface Programs for All Other Safety- Related Components,North Anna Units 1 & 2 & Surry Units 1 & 2, Final Informal Rept | |
ML19261B009 | 11 January 1978 | Forwards First Progress Rept Re Evaluation of Buckling Design Criteria for Steel Containment Shells.Study of Static & Dynamic Loading Conditions to Which Containment Shell Is Subjected Will Be Completed Shortly | |
ML19327A869 | 7 September 1989 | Submits Info Re Alchemie & Anderson County Bank Financing Transaction | |
ML19332F217 | 10 July 1989 | FOIA Request for Documents Re Communications Between Ofcs of Edo,Deputy Edo,Ofc of Director,Regional Administrators & Commissioners Ofcs Re Plants During period,890301-0615 | |
ML19347D158 | 6 March 1981 | Forwards for Review & Approval Sweco 8101, Models Used in Loctvs Computer Code to Determine Pressure & Temp Response of Vapor Suppression Containments Following Loca. | |
ML20023D031 | 24 July 1982 | Repts Allegation Re Zack Co Falsified Documents Concerning HVAC Activities at Facilities Per Nbc Nightly News Broadcast | |
ML20023D038 | 26 July 1982 | Repts Investigation Re Possible Flawed Equipment at Facilities,Per Eyewitness News Broadcast | |
ML20041E155 | 4 March 1982 | Responds to Generic Ltr 82-01,new Application Survey.Info Requests Re Crbr Should Be Submitted to DOE & to Wa Public Supply Sys Re Hanford.Application Will Be Submitted Under 10CFR50 During 1982-83 | |
ML20042C543 | 29 March 1982 | Forwards Responses to Comments Received on Geology & Geotechnical Engineering at 820317 Meeting.Formal Responses Will Be Submitted on 820419 W/Amend 24 to PSAR | Ultimate heat sink Earthquake |
ML20052B518 | 28 April 1982 | Responds to 820112 Generic Ltr 82-01 Re Plans for Submittal of Application & Requests for Review Prior to 841231.Early 1983 Application Planned to Extend 810209 Preliminary Design Authorization Request | |
ML20054C086 | 14 April 1982 | Part 21 Rept Re Airlock Door Seals Presenting Potential Safety Problem.Seals Should Not Be Used After Startup W/O Recertification.Seals Will Be Replace If Approved Test & Insp Program Cannot Be Developed | |
ML20054D846 | 21 April 1982 | Forwards Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa, Per 820317 Meeting | |
ML20064J557 | 13 January 1983 | Clarifies Request for Addl Info Re IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety-Related Sys Components by Asiatic Clams & Mussels | Biofouling |
ML20076K209 | 7 June 1983 | FOIA Request for SECY-83-98B & SECY-83-98D Re Salem 1 ATWS Events & Four Documents Concerning TMI-1 Restart | |
ML20078A160 | 1 June 1983 | FOIA Request for 821021 Document Re Palisades 820204 Cooling Tower Pump Trip & 821117 Document Re San Onofre 2 Auxiliary Feedwater Pump Vent Failure | |
ML20079Q977 | 17 June 1983 | Forwards Matl Presented at Anderson,Greenwood & Co (Agco) Vacuum Breaker Test Program Owners Group 830607 Meeting W/ NRC Re Dynamic Testing & Analysis of Agco Vacuum Breaker Valve Assemblies | Safe Shutdown Operating Basis Earthquake Finite Element Analysis Liquid penetrant |
ML20083E828 | 21 September 1983 | FOIA Request for Listed LERs | |
ML20084C053 | 22 March 1969 | Forwards Metallurgical Exam & Review of Casting Defects in Stainless Steel Valves Bodies .., Evaluation of Welding & Insp Techniques... & Rept of Participation in Intensive QA Audit by Region Iii,Div of Compliance... W/O Repts | |
ML20084C761 | 16 November 1967 | Clarifies Participation at ANS Chicago,Il Meeting.No Employees or Consultants Registered Nor Attended Any Formal Sessions Sponsored by ANS or Aif.Not Responsible for Disclosure of Info | |
ML20084N219 | 3 March 1973 | Summarizes Incident Rept,Turkey Point Unit 3,Valve Headers. Rept DC-94A Being Written by Parameter,Inc Re Header Failure Investigation | |
ML20084Q655 | 9 April 1970 | Answers Questions Raised at 700426 Meeting,Outlining Alternative Procedures to Repair safe-ends & Future Actions to Minimize Possibility of Unexpected Stress Corrosion | Weld Overlay |
ML20084R352 | 31 October 1969 | Forwards Rept of Review of Stress Analysis of Steam Line Flow Restrictor Attachment Weld Affected by High Rate Stress Relief. W/O Encl | |
ML20084R652 | 24 February 1984 | FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl | |
ML20091G177 | 24 May 1984 | Forwards Part 21 Rept Re Bug in Computer Code Affecting Calculation of Tech Specs for Nuclear Enthalpy Rise Peaking Factor.Bug Corrected | |
ML20093J111 | 21 September 1984 | Forwards Assessment Program Phase III Interim Repts.Rept Incomplete & Covers Only 169 of 216 Items Included in Program Scope.Total Results of Phase III Will Be Included in Final Rept.W/O Encl |