 Issue dateTitleTopic
FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl10 November 1986Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl
L-75-474, Interim Deficiency Rept Re Leaking Field Welds on Lines. Investigation Still in Progress.Next Rept Expected by 7510313 October 1975Interim Deficiency Rept Re Leaking Field Welds on Lines. Investigation Still in Progress.Next Rept Expected by 751031
ML17261A53018 June 1987Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys
ML17264A93810 July 1997Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process
ML17340B14331 March 1981Part 21 Rept Re Review of All Deficiency Repts Submitted to NRC for 770810-800731.Forwards LERs Determined Reportable Under 10CFR21
ML17347A7512 May 1988Part 21 Rept Re Component Cooling Water Sys Containment Isolation Function.Addl Evaluation of Issue in Progress as Part of Util Design Basis Effort.Ltr Sent as Formal Followup to Feb 1988 Discussion
ML17348A16227 March 1990Part 21 Rept Re Matls W/Programmatic Defects Supplied by Dubose Steel,Inc.Customers,Purchase Order,Items & Affected Heat Numbers Listed
ML17348B04316 August 1991Part 21 Rept Re Potential Generic Component Defect Found During Insp of Asea/Abb Type RXMH2,Model RK223068-EA & RK223069-EA Relays.Caused by Misplacement of Insulating Tape Installed on Coil Termination
ML17348B29212 August 1991Part 21 Rept Re Potential Generic Component Defect in Asea/Abb Type RXMH2 Relays.Relays Utilized in Emergency Diesel Generator Bus Load Sequences.Info Gathering Underway. Customers Will Be Notified as Soon as Possible
ML17348B30512 December 1991Supplement to 910812 Part 21 Rept Re Potential Generic Defects in Abb Type RHMH2 Model RK223068-EA & 069-EA Relays. Caused by Tape Fold Back Condition.New Method for Installing Insulation Tape Initiated
ML17348B44123 March 1992Interim Part 21 Rept Re Westinghouse Reactor Vessel Head Adaptor Tube Cracking.Wog Approved Project Authorization on 920205 for Reactor Vessel Closure Head Penetration Alloy 600 Primary Water Stress Corrosion Cracking
ML17352A89515 November 1994Part 21 Rept Re Unit 3A Sequencers at Turkey Point Plant. Unless Contacted by FP&L to Perform Programming Changes & Subsequent V&V to Sequencer Software,United Controls Plans No Other Evaluation of Defect for Listed Reason
ML17352B13928 April 1995Part 21 Rept Re Mechanical Defect in Shaft Length of Some HEA63 Lockout Relays Mfg Between 1990-94.Defect Identified Could Possibly Result in Binding of Front Shaft.Suspect Relays Checked for Date Codes & Replacements Ordered
ML17353A61428 February 1996Part 21 Rept 10CFR21-0073 Re Defect W/Voltage Adjust Potentiometer Mfg by Chicago Telephone Supply Used on NEI Peebles (Portec) Voltage Regulators at Plant.Util Updating Voltage Regulators W/Maury Instrument Corp Potentiometer
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML18038A8977 September 1994Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML18079A95228 October 1978Deficiency Rept:On 780928,during Routine Design Review, Undersizing of Refueling Water Storage Tank Was Discovered. Tank Storage Capacity Has Been Increased.Design Drawings for Tank Piping & Foundation Will Be Modified
ML18081A3755 October 1979Significant Deficiency Rept Re Containment Purge & pressure- Vacuum Relief Valves.Actuator Torque Values Were Insufficient to Move Valves from Open to Closed Positions W/ Design Differential Pressure of 60 Psi.Design Reviewed
ML18081A3785 October 1979Significant Deficiency Rept 79-06 Re Steam Generator Water Level Instrumentation.Pipe Breaks in Containment Could Lead to Elevated Temp Readings Which Could Result in Delayed Protection Sys Actuation.Setpoints to Be Changed
ML18081A7554 October 1979Interim Deficiency Rept Re Max Flow of RHR Pump During post- LOCA Mode.Caused by Low Sys Resistance to Pump Runout Conditions.Sys Resistance Increased by Placement of Resized Orifices
ML18081B04821 December 1979Final Deficiency Rept Re Undetectable Failure in Engineered Safety Features Actuation Sys.Testing Procedures Revised to Include Testing of Permissive Circuitry P4 on Periodic Basis.Unit Will Be Tested Prior to Operation
ML18081B0603 December 1979Initial Deficiency Rept Re Potential Dropped Rod Events Leading to Calculated DNB Ratios Lower than Reported to NRC for Certain Westinghouse Plants.Util Is Investigating Condition for Applicability to Facility
ML18082A14215 February 1980Final Deficiency Rept:Check Valve 2DR-7 Failed to Meet Applicable Seismic Class I Loading.Caused by Design Defect. Addl Support Will Be Completed by 800228
ML18093A47223 October 1987Part 21 Rept Re Calibr Gas Leakage Problem in Exo-Sensors, Inc Containment Hydrogen Analyzer Sys.Caused by Design Deficiency Associated W/Calibr Gas Subassembly.Monitoring Program to Be Maintained for Period After Sys Mods
ML18093A8286 May 1988Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced
ML18094A44216 May 1989Part 21 Rept Re Defect in Solid State Protection Sys. During Mods in Solid State Protection Sys Cabinets,Noted That Two Wires Became Dislodged from Circuit Board.Visual Insp & Complete Pull Test Performed
ML18094B44627 April 1990Part 21 Rept Re shaft-to-pinion Key Failures in Limitorque Actuators.Initially Reported on 900424.Caused by Reduction of cross-sectional Area & Ultimate Propagation of Cracks. Util Intends to Replace Keys in Actuators W/Keys of Steel
ML18095A22522 May 1990Part 21 Rept Re Insufficient Welds on Pedestal Support Alignment Lug & Slide Shoe for 11,12,21 & 22 Charging/Safety Injection Pumps.Initially Reported on 900516.Windows Cut in Support Pedestals to Gain Access to Affected Areas
ML18095A23224 May 1990Part 21 Rept Re Discrepancies Identified in ECCS Flow Orifice K Factors Supplied by Westinghouse.Initially Reported on 900518.Util Fabricated New Orifice Plates to Original SpecsUnanalyzed Condition
ML18095A4032 August 1990Part 21 Rept Re MSIV Design Deficiency at Plant.Design Spec Provided by Westinghouse Did Not Specify Requirement to Provide Seal in Capability & Util Design Process Failed to Recognize Deficiency
ML18096B2421 February 1993Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl
ML18100A76813 December 1993Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced
ML18100B19130 June 1994Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability
ML18100B21014 July 1994Deficiency Rept Re PORV Plug & Stem Material Defects. Initially Reported 940714.PORV Internals Were Replaced W/Plug Stellited
ML18100B22725 July 1994Part 21 Rept Re Cracking in Valve Stem & Plug Connection Pinning Collar Area on PORVs 1PR1 & 1PR2.Caused Attributed to Either IGSCC or Hydrogen Assisted Cracking.Porv Internals Replaced W/Internals Mfg from SS 316 Matl W/Plug Stellited
ML18100B23927 July 1994Part 21 Rept Re Signal Summators PM-505B & 506B Found to Saturate High When Summators Lose Power & Reenergized. Summators Powered from Independent Vital Instrument Buses & Inverters.Design Changes Implemented
ML18101A8611 August 1995Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily
ML18101A8774 August 1995Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve
ML18102A33821 August 1996Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor
ML18102A3706 September 1996Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & RepairedDesign basis earthquake
ML18102A5598 August 1996Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection SysDesign basis earthquake
ML18106B04429 January 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables
ML18106B0551 February 1999Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl
ML18106B09325 February 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified
ML18107A3441 June 1999Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716
ML19290B66026 September 1979Interim Significant Deficiency Rept Re Weld Wire Documentation.Electrodes Used in post-weld Heat Treated Condition Were Not Properly Tested.Caused by Discrepancy in Procedures.Procedures Will Be Revised by 800118
ML19290E03218 January 1980Second Interim Rept Re Pittsburgh Des Moines Use of 8018-C3 Weld Filler Metal.New Electrode Spec Issued,Welding Procedures Revised.Investigation Will Be Complete by 800314
ML19305C7533 March 1980Interim Deficiency Rept Re Main Steam Pipe Spools.Ge Issued Instructions to Restore Affected Wall Thickness to Original GE Spec Requirement.Final Rept Will Be Submitted by 800321
ML19309G7662 May 1980Potential Significant Deficiency Rept Re Discrepancy in Procurement of Weld Wire.Wire Used in post-weld,heat-treated Weldments Was Tested for Only as-welded Condition
ML19316A24323 February 1973Deficiency Rept Re Design &/Or Mfg of Undervoltage Trip Assemblies for Control Rod Drive Trip Breakers.Failures Noted 720913 & 730123.Vendors Informed