MONTHYEARNG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC NG-97-1781, Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Duane Arnold Energy Center ML20217C3491997-08-31031 August 1997 Revised MOR for Aug 1997 for DAEC ML20210V1851997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for DAEC NG-97-1452, Monthly Operating Rept for July 1997 for DAEC1997-07-31031 July 1997 Monthly Operating Rept for July 1997 for DAEC NG-97-1258, Monthly Operating Rept for June 1997 for DAEC Per GL 97-021997-06-30030 June 1997 Monthly Operating Rept for June 1997 for DAEC Per GL 97-02 NG-97-1033, Monthly Operating Rept for May 1997 for Duane Arnold Energy Center1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Duane Arnold Energy Center NG-97-0894, Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Duane Arnold Energy Ctr NG-97-0674, Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Duane Arnold Energy Ctr NG-97-0453, Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center NG-97-0308, Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Duane Arnold Energy Center NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center NG-96-2647, Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Duane Arnold Energy Center NG-96-2447, Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Duane Arnold Energy Center NG-96-2166, Monthly Operating Rept for Sept 1996 for DAEC1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for DAEC NG-96-1913, Monthly Operating Rept for Aug 1996 for DAEC1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for DAEC NG-96-1713, Monthly Operating Rept for Jul 1996 for DAEC1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for DAEC NG-96-1481, Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Duane Arnold Energy Ctr NG-96-1298, Monthly Operating Rept for May 1996 for Duane Arnold Energy Center1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Duane Arnold Energy Center NG-96-1055, Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Duane Arnold Energy Center NG-96-0825, Monthly Operating Rept for Mar 1996 for DAEC1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for DAEC NG-96-0624, Monthly Operating Rept for Feb 1996 for DAEC1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DAEC NG-96-0320, Monthly Operating Rept for Jan 1996 for DAEC1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for DAEC ML20096C3101995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Duane Arnold Energy Ctr NG-95-3516, Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr NG-95-3235, Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Duane Arnold Energy Ctr NG-95-3057, Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Duane Arnold Energy Ctr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8991999-10-18018 October 1999 SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Daec.With ML20212H2381999-09-22022 September 1999 Safety Evaluation Supporting Amend 228 to License DPR-49 NG-99-1226, Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Duane Arnold Energy Center.With NG-99-1115, Monthly Operating Rept for July 1999 for Daec.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Daec.With NG-99-0963, Monthly Operating Rept for June 1999 for Daec.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Daec.With ML20195G9901999-06-0909 June 1999 Safety Evaluation Supporting Amend 227 to License DPR-49 NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Daec.With ML20206N7551999-05-13013 May 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safey-Related Power-Operated Gate Valves NG-99-0682, Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Duane Arnold Energy Center.With NG-99-0530, Monthly Operating Rept for Mar 1999 for Daec.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Daec.With ML20207G0251999-03-0303 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety- Related MOVs at Duane Arnold & That Licensee Adequately Addressed Actions Requested in GL 96-05 NG-99-0330, Monthly Operating Rept for Feb 1999 for Daec.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Daec.With ML20202B4311999-01-26026 January 1999 Safety Evaluation Accepting Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr ML20202B3851999-01-26026 January 1999 Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues.Ampacity Derating Analysis Results Acceptable NG-99-0020, Monthly Operating Rept for Dec 1998 for Daec.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Daec.With ML20206N3211998-12-0707 December 1998 Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Daec.With ML20196F9571998-11-24024 November 1998 Rev 20 to QA Program Description,Ufsar 17.2 for Daec NG-98-1875, Monthly Operating Rept for Oct 1998 for Daec.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Daec.With NG-98-1717, Monthly Operating Rept for Sept 1998 for Daec.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Daec.With NG-98-1767, Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with1998-09-30030 September 1998 Cyclic Rept of Facility Changes,Tests & Experiments,Fire Plan & Commitment Changes,For Period from 970301-980930. with ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML20153B4141998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DAEC NG-98-1389, Monthly Operating Rept for July 1998 for DAEC1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DAEC ML20236X5321998-07-29029 July 1998 Safety Evaluation Re USI A-46 Program Implementation for Plant ML20236W0021998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief NDE-R020 Re Third 10-yr ISI Interval of Plant,Per 10CFR50.55a(a)(3(i) ML20236S2541998-07-14014 July 1998 Special Rept 98-01:on 980629,diesel-driven Fire Pump Was Inoperable for Greater than Seven Days.Caused by Sheared Off Tie Rods on Accessory Drive End of Engine.Evaluated Condition,Procured Parts & Replaced Tie Rods ML20236R3251998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DAEC ML20249B5171998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DAEC ML20247P5651998-05-18018 May 1998 Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard ML20247K1881998-05-0808 May 1998 Rev 0 to Cycle 16 COLR, for May 1998 ML20247H9381998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DAEC ML20216J9171998-04-16016 April 1998 Safety Evaluation Accepting Relief Request MC-R001 for First 10-yr Interval of Containment Insp Program Per 10CFR50.55a (a)(3)(ii),per 971219 Request ML20217K7251998-04-16016 April 1998 Correction to SE of Relief Request MC-R001 Re Qualification Requirements for non-destructive Exam Personnel Performing Containment Insp ML20217K0471998-04-0101 April 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request NDE-R004 for Plant Third 10-yr ISI Interval,Based on Finding That Compliance W/Code Would Result in Hardship W/O Compensating Increase in Level of Quality & Safety ML20217H8831998-04-0101 April 1998 Safety Evaluation Supporting Request for Relief for Third ISI Program NG-98-0650, Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Duane Arnold Energy Center ML20216F6791998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for DAEC ML20217F8841998-03-23023 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Program Plan Requests for Relief for Plant NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for DAEC NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center ML20199L3481998-01-31031 January 1998 Rev 0 to Duane Arnold Energy Ctr Emergency Action Level (EAL) Technical Basis Document ML20249B3331997-12-31031 December 1997 1997 Annual Rept for Alliant Corporation ML20249B3391997-12-31031 December 1997 Central Iowa Power Coopertive 1997 Annual Rept ML20249B3351997-12-31031 December 1997 1997 Annual Rept for Corn Belt Power Cooperative NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center NG-97-2118, Monthly Operating Rept for Nov 1997 for DAEC1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DAEC ML20199J6841997-11-21021 November 1997 SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center NG-97-1959, Monthly Operating Rept for Oct 1997 for DAEC1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for DAEC 1999-09-30
[Table view] |
Text
,
1 Duane Amoc Energy Center e
'h 3277 CAEC P:aa
, , Pato. A 5233 Telephone 319 8517611 Fat 319 8517511 March 11,1996 I NG-96-0624 UTILITIES Mr. Ifubert J. Miller Regional Administrator i Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351
Subject:
Duane Arnold Energy Center I Docket No: 50-331 Operating License DPR-49 February 1996 Monthly Operating Report
Dear Mr. Miller:
l l
Please find enclosed the Duane Arnold Energy Center Mammy Operating Report for February 1996. The report has been prepared in accordance with the guidelines of NUREG-0020 and distribution has been made in accordance with DAEC Technical Specifications, Section 6.ll.l.c.
Very truly yours, M %
G Van Middlesworth I Plant Manager, Nuclear GDV/RBW i Enclosures File A ll8d cc:
U.S. Nuclear Regulafory Commission Mr. Dennis Murdock Attn: Document Control Desk Centrallowa Power Cooperative Mail Station PI-37 Box 2517 Washington, DC 20555-0001 (Origa Cedar Rapids, IA 52406 Mr. Glenn Kelly Dr. William A. Jacobs, Jr.
Project Manager GDS Associates,Inc.
I Whiteflint North Suite 720 Mail Stop 13E21 1850 Parkway Place i1555 Rockville Pike Marietta, GA 30068-8237 Rockville, MD 20852 Document Control Desk Mr. Dale Arends INPO Records Center Corn Belt Power Cooperative 700 Galleria Parkway 130013th Street North Atlanta, GA 30339-5957 ilumboldt. IA 50548 Ms. Lisa Stump DOCU Iowa State Utilities Boscd Lucas State Office Building NRC Resident inspector l Des Moines, IA 50319 I
I Mr. Fred Yost Ms. Kathleen Shea Director, Research Services Morgan, Lewis, Bochius ,
Utility Data Institute 1800 M St. NW 1700 K St. NW, Suite 400 190043 Washington, DC 20006 Washington, DC 20036-5859
[ /(h#
/
l 9603190362 960229 l PDR ADOCK 05000331
! R PDR l 4,es<= s.m.:como. ,
l OPERATING DATA REPORT DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Cgntgr COMPLETED BY: Richard Woodward TELEPHONE: (319)851-7318 OPERATING STATUS Average Daily Power Level
- 1. Unit Name: Duane Arnold Energy Center 500
- 2. Reporting Period: Februarv 199Jl _
400 1
- 3. Licensed Thermal Power (MW ):th EiiE ;E
, 300 v
- 4. Nameplate Rating (Gross MWe DER): 565.7 (Turbine)
.a 200
- 5. Design Electrical Rating (Net MWe DER): 118 100 0
- 6. Maximum Dependable Capacity (Gross MW e MDC): 510 1 6 11 16 21 26
- 7. Maximum Dependable Capacity (Net MWe MDC): 520
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through
- 7) since the last report, Give Reasons: Items #fi and #1 reflect 5 % increased canacity credit resulting from heat rate imorovement. Ihe change officiallv took effect .Ianuary L.192fi,
- 9. Power Level to Which Restricted, If Any (Net MWe): Not Aeolicable
- 10. Reasons for Restrictions,if Any: No.1 Anolicable February-96 1996 Cummutative
- 11. Hours in Reporting Period 696.0 1,440.0 184,776.0
- 12. Number of Hours Reactor Was Critical 696.0 1,440.0 139,965.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 192.8
- 14. Hours Generator On-Line 696.0 1,440.0 136,553.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,106,221.6 2,282,978.5 191,544,192.9
- 17. Gross Electrical Energy Generated (MWH) 376,754.0 779,425.0 64,191,395.6
- 18. Net Electrical Energy Generated (MWH) 355,493.7 735,489.0 60,212,503.6 l l
- 19. Unit Service Factor 100.0 % 100.0 % 73.9 %
- 20. Unit Availability Factor 100.0 % 100.0 % 73.9 %
- 21. Unit Capacity Fa: tor (Using MDC Net) 98.2% 98.2 % 68.8 %
- 22. Unit Capacity Factor (Using DER Net) 94.9 % 94.9 % 65.9 %
- 23. Unit Forced Outage I. ate
. 0.0% 0.0% 10.7 %
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of each): N!%
- 25. If Shutdown at End of Report Period, Estimated Date of Startup: N!%
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 MONTH February 1996 Day Average Daily Power 12 vel (MWe-Ne0 1 534.4 2 530.4 3 532.2 4 531.9 5 534.8 6 532.3 7 528.9 8 519.6 9 492.1 TO 254.9 11 361.7 12 502.9 13 521.3 14 513.9 15 511.7 16 519.1 17 523.1 18 523.4 19 525.1 20 526.7 21 529.6 22 528.5 23 529.4 24 531.1 25 533.3 26 534.2 27 534.6 28 535.2 29 536.2
]
DOCKET NO: 50-0331 DATE: 03/11/96 -
Unit: Duane Arnold Fnercy Center COMPLETED BY: Richard Woodward ,
TELEPIIONE: (319)851-7318 UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MONTil: February 1996 No. Date - Type Duration Reason Method of Licensee Event System Code Comp. Code Cause (1) (llours) (2) Shutting Report # (4) (5)
Down Reactor (3) 2 Feb. 7 - 27 S 0 B 5 n/a TA V, FCV Turbine Control Valve Testing, Control Rod Sequence (28.0 full (Main Turbine (Valve, Flow Exchange,"A" Motor-Generator Set Maintenance, maintain power System, Control margin to thermal limits hours various) Valve) equivalent) 1 - F: Forced 2 - Reason 3 - Method: 4 - Exhibit G- Instructions for S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry B-Maintenance or Test 2-Manual Scram Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File (NUREG-D-Regulatory Restriction 4-Continued 0161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 9-Other (Explain) 5 - Exhibit I (Same Source)
G-Operational Error (Explain)
II-Other (Explain)
.. _ = _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ - _ _ _ _ _ _ - -- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _
, REFUELING INFORMATION
, . DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (3191 851-7318
- 1. Name of facility.
Duane Arnold Energy Center
- 2. Scheduled date for next refueling shutdown.
Refuel Outage XIV to begin October 10,1996.
- 3. Actual date for restart following refueling.
November 14,1996
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes RTS 269, T.S. 3.2, " Plant Containment Systems" RTS 288, T.S. 2.1,3.2," Reactor Water Clean-up Systems Vessel Level isolation Set-Point Change"
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
RTS 269, submitted December 22,1995 RTS 288, submitted January 18,1996
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
No
- 7. Current and projected fuel assemblies inventory:
l Number of Projected date oflast Fuel refueling that can be i Assemblies discharged Installed in reactor core (following refueling) 368 j n/a Previously discharged from core to Spent Fuel Storage , 1408 n/a Pool (following refueling) i Under present physical capacity of Spent Fuel Storage 2411 2007 Pool Under Licensed Capacity of Spent Fuel Storage Pool 3152 , 2014
, e j DOCKET NO.: 50-0331 DATE: 03/11/96 i Unit: Duane Arnold Enerev Center l COMPLETED BY: Richard Woodward j TELEPilONE: (319) 851-7318 Monthly Operational Overview for February 1996:
The DAEC operated at full thermal power throughout the month except:
- February 7 - 8, to perform scheduled turbine control valve surveillance testing and a control rod sequence exchange,0.9 full-power-hours lost.
- February 9 - 10, to perform maintenance on the "A" Recirculation Pump Motor-Generator Set.14.1 full-power-hours lost.
- February 11 - 27, to maintain margin to thermal limits,14.9 full-power-hours lost.
Total forgone production (including other small planned losses) was the equivalent of 32.0 full-power hours of operation.
At the end of the month the Duane Arnold Energy Center had operated 269 consecutive days, its best-ever continuous operating run.
Allocation of Production & Losses: Electncal Capacity Factor Full Power Output %of 565.7 Equivaleni MWe MWe Hours (Design Gross Rating) ,
Actual Metered Net Electnc Output 510.8 90.3 % 628.4 l Actual Metered Plant Electnc Loads 30.5 5.4% 37.6 Load Following 0.0 0.0% 0.0 Off-Line 0.0 0.0% 0.0
(-) Weather losses, ie., condenser pressure < 2.75 in lig / Cire Water Temp < 74.5 'F -2.1 -0.3% -2.6 Planned Capacity Losses: Turbine Control Valve Testing Seq. Exchange, Thermal Linut 22.8 4.0% 28.0 l
Unplanned Capacity Losses 0.0 0.0% 0.0 Normal Capacity Losses (Avg MWth < 1658) 0.2 0.0% 0.2 Metering Losses (Avg indic MWe - Avg MWHe) 2.7 0.5% 3.4 Etriciency Losses (Weather Norm-Full-Power-MWe < 565.7) DJi Ol% L.Q ;
Design Gross Electric Output 565.7 100 0 % 6960 There were no Licensee Event Reports.
Licensine Action Summary:
Plant Availability: 100.0 % Unplanned Auto Scrams (while/ critical) this month: 0 Number of reportable events: 0 Unplanned Auto Scrams (while/ critical)last 12 months: 1 i