Monthly Operating Rept for Dec 1981.Narrative Summary Encl
ML20065T709
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/31/1982
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20065T688 List:
References
NUDOCS 8211020656
Download: ML20065T709 (9)


Text

.

OPERATING DATA REPORT 33 DOCKET NO.

DATE JANUARY 1982 COMPLETED BY E. ZUitLT 4

TELEPHONE (315)3 63840 OPERATING STATUS FITZPATRICK Notes

1. Unit Name:
2. Reporting Period:

811201 - 811231

3. Licensed Thermal Power (MWt).

2436

4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net MWe): 821
6. Masimum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:

NOIE

9. Power Level To Which Restricted,if Any (Net MWe): NONE
10. Reasons For Restrictions,If Any:

This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0 6637.2 39551.2

12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0 6540.8 38443.6 0 0 0
15. Unit Reserve Shutdown Hours 0 14217720 78401314
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 4o31100 26760610
18. Net Electrical Energy Generated (MWH) 0 4779650 25904730 0% 74.7% 68.2%
19. U. it Service Factor 0% 74.7% 68.2%
20. Unit Availability Factor 0% 67 4% 61.3%
21. Unit Capacity Factor (Using MDC Net) 0% 66.5% 56.0%
22. Unit Capacity Factor (Using DER Net) 0% 10.1% 16.9%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup: FEBRUARY 1982
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h

R 656 820107 CK 05000333 PDR e

  • AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI DECDEER 1981 AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL -

DAY (MWe-Net)

(MWe-Nel) 0 j7 0 1

0 ,3 0 2

0 39 0

3 0 20 0

4 ,

0 0 21 5

22 0 6

0 0 7 23 0

0 24 8

0 9 25 0 0 10 26 0 0 11 27 0 0 12 28 13 29 0 0 14 30 0 3g 0 15 16 0

SUBEARY: Fourth refbeling and maintenance outage continued through this.

reporting period.

1 DOCKET NO.

50-333 - .

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP

' DATE JANUARY : 962 __

COMPLETED BY E. ZUFbJi?

REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4

i

! w.

e ei 's ui 5 Ii

'*"**" gj Cause & Currective N. i . Date E- k $  ? EU Event I'T" Action to p 33  :] -5 5 m Report =

n in G yUo oO 2 3 Ui j g Prevent Recurrence 1

12 81103r s 744 C 1 NA NA NA Refueling outage (cumulative hours to date 1486.7)

I j

)

J I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. Event Report (LER) File (NUREG-i D Regulatory Restriction 4 Other (Explain) 0161)

E-Operatur Training & License Examination F Administrative -

5 G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain)

POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATIONAL EXPERIENCES DECEMBER 1981 i

i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7

generator maintenance, feedwater heater replacement and fire ,

protection modifications. Presently the outage activities are on schedule.

i

]

1

.--,,. , , ,. _m.. - _ . . - - . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ . . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ .

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT .

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 I

DATE SYSTEM 0 EST REPAIR

, HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 11/13 10 11120 Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8 INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat- Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M. N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M. N/A Performed visual inspection & 217 EDG "B" P.M.

11/27 93 16:155 P.M. N/A Performed visual inspection & 224 EDG "D" P.M.

11/27 13 13540 P.M. N/A Disassembled, inspected, 6 RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8 I TU-2 inspection plug l missing 11/30 23 13539 P.M. d/A Disassembled, inspected, 12 HPI-61 ISI reassembled

POWER AUTHORITY OF THE STATE OF NEW YORK '

JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 ATE SYSTEM Q I HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ENT

. 2/1 23 12012 Ops . Valves leak by seat Replaced valves 32 HPI-27C & due to erosion .

28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2 Scram Disc. wrench Inst. Vol.

2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M. N/A Disassembled, inspected - 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at & Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona

. super metal

POWER AUTHORITY OF THE STATE OF NEW YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT '.

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

, DECEMBER 1981 DATE SYSTEM K REQ HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE ENT T 12/15 46 13534 P.M.- '

N/A Disassembled, inspected, 12 ESW-9A ISI reassembled .

12/15 15 13537 P.M. N/A Disassembled, inspected, 6 RBC-35A ISI reassembled 12/15 46 13536 P.M. N/A Disassembled, inspected, 6 ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3 HCU-34-47 111 Valve

(

s

w .

POWER AUTHORITY OF THE STATE OF NEW YORK '

JAMES A. FITZPATRICK NUCLEAR POWER PLANT < .

MAINTENANCE

SUMMARY

I&C DECEMBER 1981

  1. K HOW DETECTED O DATE SYSTEM ML COMPONENT]# MALF C ON CTI p l 15635 Square rooters Replaced 74M, +

12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl. Recalibrated 74N 24  !

t 17193 Level detector Cleaned &

l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2 respond IS-129 Level detector Cleaned & ,

12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2  !'

HCU-18-43 resnond LS-129 17195 Level switch -

Replaced switch j 12/28/81 03 HCU--34-39 .;, OPS Old age doesn't work IE-129 2

~

02012 Replaced power 1

12/17/81 07 LPRM JIC Unknown Inspection supply 128 ,

16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM  !

12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2 indicator logic race No high alarm on Checked monitor, 09640 OPS between light & 09-3 panel tested o.k. 2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 12/6/81 27 FT-103A broken

l POWER AUTHORITY OF THE STATE OF NEW YORK .~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT 'N
MAINTENANCE

SUMMARY

I&C DECEMBER 1981 DATE SYSTEM

  • R RE EST # HOW DETECTED T

CO NENT LFU C ON ML CIN R H S Repeatability of 13766 i L2/19/81 46 I&C Age switch gone Replaced switch 12 DPS-132A 11544 High speed Recalibrated per i i 1.1/30/81 93 EDG "D" Tach OPS Relay tach drift indication in F-IMP-93 3 26 j; control room -

13761 Calibration Replace &

4 EDG "A" to ' D" JIC Unknown needed to be calibrate 31 12/29/81 93 checked indicators i Temperature -

Replaced &

16984 No temperature 3 EDG "A"-TS Iih I&C switch alarm calibrated 10.5

L2/7/81 93 inoperative switch i

l W