|
---|
Category:License-Operator
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5792020-08-27027 August 2020 ES-301-6 ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5742020-08-27027 August 2020 ES-301-3 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios 2024-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20258A0162020-08-27027 August 2020 ES-401-6 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5792020-08-27027 August 2020 ES-301-6 ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline 2024-09-06
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: AUGUST 2014 _
Examination Level: RO Operating Test Number: PI-ILT-NRC-14_
Administrative Topic Type Describe activity to be performed (see Note) Code*
DETERMINE BLENDED FLOW CONCENTRATION 2.1.25 (3.9/4.2)
Conduct of Operations D, R This is a bank JPM where the examinee determines the boric acid flow setting for the Boric Acid Flow Control Valve.
VERIFY CORRECT PROCEDURE 2.1.21 (3.5*/3.6*)
Conduct of Operations M, R Original JPM has operator verify correct revision of SP 1313. The modified JPM will have the operator verify the correct revision of a procedure other than SP 1313.
REVIEW CLEARANCE ORDER 2.2.13 (4.1/4.3)
This JPM will be different than previous versions of Equipment Control N, R reviewing a clearance order by isolating a different system and inputting different mistakes for the operator to discover.
REMOVE RADIATION MONITOR FROM SERVICE 2.3.5 (2.9/2.9)
Radiation Control D, R This is a bank JPM where the examinee removes 1R-11, Containment Air Particulate Radiation Monitor, from service.
Emergency Procedures/Plan NONE NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: AUGUST 2014 _
Examination Level: SRO Operating Test Number: PI-ILT-NRC-14 Administrative Topic Type Describe activity to be performed (see Note) Code*
ASSESS SHIFT STAFFING LEVELS 2.1.5 (2.9*/3.9)
Conduct of Operations D, R This is a bank JPM where the examinee must determine if the U1 SS can be released due to an emergency.
PERFORM PRA CALCULATION USING EOOS SOFTWARE 2.1.19 (3.9/3.8)
Conduct of Operations D, R This is a bank JPM where the examinee must use the plant computer to determine PRA status of Unit 1 and Unit 2.
AUTHORIZE INSTALLATION OF A BYPASS 2.2.11 (2.3/3.3)
Equipment Control D, R This is a bank JPM where the examinee approves the use of a bypass using a plant administrative work instruction.
AUTHORIZE EMERGENCY RADIATION EXPOSURE 2.3.4 (3.2/3.7)
Radiation Control D, R This is a bank JPM where the examinee determines if an individual can receive an emergency exposure or not.
VALIDATE IMMINENT AIRBORNE THREAT 2.4.28 (3.2/4.1)
Emergency Procedures/Plan N, R This is a new JPM to perform SRO actions of AB-8, Response to Security Threat.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: AUGUST 2014_
Exam Level: RO Operating Test No.: PI-ILT-NRC-14 _
@
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. CRDS / UNCONTROLLED ROD INSERTION A, M, S 1
- b. ESFAS / CONTAINMENT ISOLATION FAILURE L, D, S, EN 2
- c. ECCS / RAISE 11 SI ACCUMULATOR LEVEL D, EN, S 3
- d. SWS / LOSS OF COOLING WATER HEADER PRESSURE A, N, S 4S
- e. RCS / PRT HI TEMP AND HI LEVEL A, M, S 5
- f. EDG / SYNCHRONIZE D1 ON BUS 15 D, EN, S 6
- g. NIS / PR DAILY CALIBRATION - SP 1005 N, S 7
- h. IAS / INSTRUMENT AIR SYSTEM HIGH PRESSURE A, N, S 8
@
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. CRDS / LOCALLY TRIP THE REACTOR AND TURBINE A, D, E, L, P 1
- j. PZR LCS / RAISE PZR LEVEL USING LOCAL CONTROLS D, E, L, R 2
- k. FP / INITIATE CARDOX D, E 8
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)
(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: AUGUST 2014_
Exam Level: SRO-I Operating Test No.: PI-ILT-NRC-14 _
@
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. CRDS / UNCONTROLLED ROD INSERTION A, M, S 1
- b. ESFAS / CONTAINMENT ISOLATION FAILURE L, D, S, EN 2
- c. ECCS / RAISE 11 SI ACCUMULATOR LEVEL D, EN, S 3
- d. SWS / LOSS OF COOLING WATER HEADER PRESSURE A, N, S 4S
- e. RCS / PRT HI TEMP AND HI LEVEL A, M, S 5
- f. EDG / SYNCHRONIZE D1 ON BUS 15 D, EN, S 6
- g. NONE
- h. IAS / SWAP IA COMPRESSORS WITH HIGH AIR PRESS A, N, S 8
@
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. CRDS / LOCALLY TRIP THE REACTOR AND TURBINE A, D, E, L, P 1
- j. PZR LCS / RAISE PZR LEVEL USING LOCAL CONTROLS D, E, L, R 2
- k. FP / INITIATE CARDOX D, E 8
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)
(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: AUGUST 2014_
Exam Level: SRO-U Operating Test No.: PI-ILT-NRC-14 __
@
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. NONE
- b. NONE
- c. ECCS / RAISE 11 SI ACCUMULATOR LEVEL D, EN, S 3
- d. SWS / LOSS OF COOLING WATER HEADER PRESSURE A, N, S 4S
- e. NONE
- f. NONE
- g. NONE
- h. IAS / SWAP IA COMPRESSORS WITH HIGH AIR PRESS A, N, S 8
@
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. CRDS / LOCALLY TRIP THE REACTOR AND TURBINE A, D, E, L, P 1
- j. PZR LCS / RAISE PZR LEVEL USING LOCAL CONTROLS D, E, L, R 2
- k. NONE
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)
(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator