ML13199A008
Letter Sequence Meeting | |
---|---|
Initiation
Results
Other: | |
MONTHYEARML1210306402012-05-16016 May 2012
[Table View]Request for Additional Information, Review of Single Failure Analysis of Low Pressure Safety Injection Pumps for Minimum Required Refueling Water Tank Transfer Volume Project stage: RAI ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML13234A0052013-08-26026 August 2013 8/21/2013 - Summary of Preapplication Meeting with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 Project stage: Meeting 2013-07-22 |
ML13199A008 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/22/2013 |
From: | Jennivine Rankin Plant Licensing Branch IV |
To: | Markley M Plant Licensing Branch IV |
Rankin J | |
References | |
TAC ME8284, TAC ME8285, TAC ME8286 | |
Download: ML13199A008 (4) | |
Similar Documents at Palo Verde | |
---|---|
Category:Meeting Agenda
MONTHYEARML24262A1052024-09-20020 September 2024
[Table view]Pre-Submittal Presentation Slides - 1R25 Pzr Nozzle Life of Repair - Relief Request 73 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 12024-09-0606 September 2024 Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1 ML24236A7032024-08-22022 August 2024 Pre-Submittal Meeting Slides to Support August 29, 2024 Aps/Westinghouse Thermal Design Procedure (Wtdp) Meeting PMNS20241084, Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-08-21021 August 2024 Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24212A3392024-08-0101 August 2024 August 1, 2024, Public Meeting on Potential Palisades Nuclear Plant Restart Presentation ML24275A2332024-06-28028 June 2024 APS Slides Supporting Preapplication Meeting Regarding Safety Injection Tank Pressure Band PMNS20240840, Preapplication Meeting with Arizona Public Service Company to Discuss Proposed Increases to TSs 3.5.1 and 3.5.2 Safety Injection Tank Nitrogen Cover Pressure Band for Palo Verde Nuclear Generating Station, Units 1, 2 and 32024-06-20020 June 2024 Preapplication Meeting with Arizona Public Service Company to Discuss Proposed Increases to TSs 3.5.1 and 3.5.2 Safety Injection Tank Nitrogen Cover Pressure Band for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 PMNS20240731, Notice of Meeting with Arizona Public Service Company to Discuss Proposed Relief Requests at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-06-0404 June 2024 Notice of Meeting with Arizona Public Service Company to Discuss Proposed Relief Requests at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20240363, NRC Public Outreach to Discuss Palo Verde Nuclear Generating Station 2023 Reactor Oversight Program Performance Assessment2024-03-12012 March 2024 NRC Public Outreach to Discuss Palo Verde Nuclear Generating Station 2023 Reactor Oversight Program Performance Assessment PMNS20240087, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-01-25025 January 2024 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231377, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-12-0707 December 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231177, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 12023-10-19019 October 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan PMNS20230945, Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-08-18018 August 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line PMNS20230590, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-05-0404 May 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230286, Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-04-0303 April 2023 Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230297, Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-03-22022 March 2023 Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) PMNS20230166, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-02-17017 February 2023 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20221074, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-10-13013 October 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220282, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-03-22022 March 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22013B2642022-01-13013 January 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request for Palo Verde Nuclear Generating Station, Unit 2 PMNS20211505, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-29029 November 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides PMNS20211411, Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-16016 November 2021 Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211230, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-10-0606 October 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211082, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-08-17017 August 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210743, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-06-0202 June 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210576, Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-05-0303 May 2021 Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210105, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-02-0303 February 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20210096, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-01-26026 January 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20201399, Notice of Meeting with Arizona Public Service Company2020-12-15015 December 2020 Notice of Meeting with Arizona Public Service Company ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML14077A3712014-03-18018 March 2014 Notice of Public Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom-Mounted Instrumentation to End of Unit 3 Operating Life ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13156A2322013-06-13013 June 2013 7/11/13 Notice of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13135A3702013-05-17017 May 2013 Notice of 5/30/13 Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML1108803052011-03-29029 March 2011 Notice of Special Open Meeting with Arizona Corporation Commission ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1012703882010-06-25025 June 2010 License Renewal - May 6, 2010 Public Meeting - Arizona Public Service Handout 2024-09-06 Category:Meeting Notice MONTHYEARPMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 12024-09-0606 September 2024
[Table view]Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1 PMNS20241084, Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-08-21021 August 2024 Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20240840, Preapplication Meeting with Arizona Public Service Company to Discuss Proposed Increases to TSs 3.5.1 and 3.5.2 Safety Injection Tank Nitrogen Cover Pressure Band for Palo Verde Nuclear Generating Station, Units 1, 2 and 32024-06-20020 June 2024 Preapplication Meeting with Arizona Public Service Company to Discuss Proposed Increases to TSs 3.5.1 and 3.5.2 Safety Injection Tank Nitrogen Cover Pressure Band for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 PMNS20240731, Notice of Meeting with Arizona Public Service Company to Discuss Proposed Relief Requests at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-06-0404 June 2024 Notice of Meeting with Arizona Public Service Company to Discuss Proposed Relief Requests at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20240363, NRC Public Outreach to Discuss Palo Verde Nuclear Generating Station 2023 Reactor Oversight Program Performance Assessment2024-03-12012 March 2024 NRC Public Outreach to Discuss Palo Verde Nuclear Generating Station 2023 Reactor Oversight Program Performance Assessment PMNS20240087, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-01-25025 January 2024 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231377, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-12-0707 December 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231177, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 12023-10-19019 October 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 PMNS20230945, Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-08-18018 August 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230590, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-05-0404 May 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230286, Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-04-0303 April 2023 Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230297, Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-03-22022 March 2023 Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230166, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-02-17017 February 2023 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20221074, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-10-13013 October 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220282, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-03-22022 March 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22013B2642022-01-13013 January 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request for Palo Verde Nuclear Generating Station, Unit 2 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides PMNS20211505, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-29029 November 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211411, Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-16016 November 2021 Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211230, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-10-0606 October 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211082, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-08-17017 August 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210743, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-06-0202 June 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210576, Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-05-0303 May 2021 Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210105, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-02-0303 February 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20210096, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-01-26026 January 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20201399, Notice of Meeting with Arizona Public Service Company2020-12-15015 December 2020 Notice of Meeting with Arizona Public Service Company ML20245E5832020-09-0101 September 2020 Meeting_Notice_EA-20-054_APS_ADR ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15217A6312015-08-0505 August 2015 Open House Meeting with Members of the Public to Discuss Issues Related to Palo Verde Nuclear Generating Station ML14240A6132014-08-28028 August 2014 Notice of Open House Meeting with the Public to Discuss Issues Related to Palo Verde Nuclear Generating Station During the Calendar Year 2014 ML14077A3712014-03-18018 March 2014 Notice of Public Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom-Mounted Instrumentation to End of Unit 3 Operating Life ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13156A2322013-06-13013 June 2013 7/11/13 Notice of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13135A3702013-05-17017 May 2013 Notice of 5/30/13 Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML1111601622011-04-25025 April 2011 Notice of Public Meeting with Arizona Public Service Company, to Present and Discuss Performance Results of Palo Verde for Period of January 1 Through December 31, 2010 ML1108803052011-03-29029 March 2011 Notice of Special Open Meeting with Arizona Corporation Commission ML1107701002011-03-18018 March 2011 Notice of Meeting with Arizona Public Service Company to Discuss Potential Submittal to Revise Technical Specification 3.7.4, Atmospheric Dump Valves for Palo Verde, Units 1, 2, and 3 ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1009804822010-04-20020 April 2010 05/06/10 Notice of Public Working Meeting with Arizona Public Service to Discuss Issues Related to the Palo Verde Nuclear Generating Station License Renewal Application ML1007401912010-03-15015 March 2010 Notice of End-of-Cycle Meeting with Arizona Public Service Company to Discuss Performance Results of the Palo Verde Nuclear Generating Station for the Period of January 1 Through December 31, 2009 ML0923307792009-08-21021 August 2009 Notice of Public Meeting with Arizona Public Service Company to Discuss Status of Palo Verde Performance Improvement Initiatives ML0914803482009-06-0303 June 2009 06/25/2009 Meeting Notice to Discuss the License Renewal Process and Environmental Scoping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 License Renewal Application Review 2024-09-06 Category:Memoranda MONTHYEARML24297A6392024-10-30030 October 2024
[Table view]Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21061A3202021-03-10010 March 2021 Summary of February 25, 2021, Public Meeting with Nuclear Energy Institute to Further Discuss the Inclusion of TSTF-425 Under the Risk-Informed Process for Evaluations Initiative ML21006A3242021-01-0707 January 2021 Approval of the Risk-Informed Process for Evaluations ML19120A1972019-04-26026 April 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for Arizona Public Service Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 73.30(b) and 10 CFR 72.30(c) for Palo Verde ISFSI ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17128A4522017-05-0808 May 2017 Lessons Learned from Modeling the Flex Steam Generator Feed Pump for Palo Verde Nuclear Generating Station ML17082A4462017-03-28028 March 2017 PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3 ML17027A2842017-01-27027 January 2017 Charter for the NRC Special Inspection Team at Palo Verde Nuclear Generating Station-Review of Licensee Actions Related to the Failure of the Unit 3 Train B Emergency Diesel Generator ML17018A1232017-01-17017 January 2017 Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure ML17003A0832017-01-0303 January 2017 Safety Evaluation Input Regarding Changes to Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML17004A2092017-01-0303 January 2017 Safety Evaluation Input for Palo Verde Nuclear Generating Station, Unit 3, Llcense Amendment Request for a One-Time Extension of the 3B Emergency Diesel Generator Completion Time ML17003A3892017-01-0303 January 2017 Safety Evaluation Input Regarding the Palo Verde Nuclear Generating Station Unit 3 Emergency Request to Extend Diesel Generator 3B Completion Time ML16358A4152016-12-23023 December 2016 Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15205A3602015-07-24024 July 2015 Assessment of Cyber Security Program Draft Temporary Instruction (Ti) Performed at Palo Verde Nuclear Generating Station ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13238A0352014-04-22022 April 2014 Memo from P. Lee to M. Markley Palo Verde RAI Memorandum ML13330A5732013-12-0505 December 2013 Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13324A4942013-11-19019 November 2013 Deferral of Baseline Inspection Activities ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13154A4832013-06-0404 June 2013 Rai'S Following Ifib Analysis of Ap'S 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13105A0182013-05-16016 May 2013 Request for Additional Information Regarding APS Overall Integrated Plan in Response to Order EA-12-049 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1104604622011-02-15015 February 2011 Minutes Meeting of Palo Verde Nuclear Generating Station Units 1, 2, and 3 License Renewal Subcommittee, September 8, 2010, in Rockville, Maryland ML1030105232010-11-16016 November 2010 Summary of Teleconference Held on Between the U.S. NRC and Arizona Public Service Company, Concerning Draft Follow-Up Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, LRA ML1029905302010-11-16016 November 2010 Summary of Telephone Conference Call Held on October 22, 2010, Btw the USNRC and Arizona Public Service Company, Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, LRA ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1020305002010-10-15015 October 2010 Summary of Tele Conf Call Held on 7/21/10, Btw the USNRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal App ML1019401422010-10-15015 October 2010 July 8, 2010, Summary of Telephone Conference Call Held Between USNRC and Arizona Public Service Company Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application ML1027801622010-10-13013 October 2010 9/15/10 Summary of Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for Palo Verde Nuclear Generating Station ML1028003402010-10-13013 October 2010 Final Response to Task Interface Agreement - Requirements for Degraded Voltage Relay Setpoints at Palo Verde Nuclear Generating Station (TIA 2010-005 ML1024303382010-10-0505 October 2010 Letter Summary of Telephone Conference Call Held on 8/31/10 Btw the USNRC and Arizona Public Service Company, Concerning Draft Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Lr ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1021606502010-08-0909 August 2010 Transmittal Letter Advisory Committee on Reactor Safeguards Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application - Safety Evaluation Report ML1017600272010-07-19019 July 2010 Summary of Telecon Calls Held on May 5, May 19, and June 16, 2010 Between the USNRC and Arizona Public Service Company, Concerning D-RAI Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application ML1013407042010-06-0202 June 2010 License Renewal, May 14, 2010 Conference Call Summary ML1013302522010-06-0202 June 2010 4-13-2010, Telecon Summary Re Draft Request for Additional Information Pertaining to the License Renewal Application ML1013302862010-06-0202 June 2010 04/23/10 Summary of Telepone Conference Call Held Between NRC and Arizona Public Service Co., Concerning Palo Verde, Units 1, 2 & 3 License Renewal Application ML1013406662010-06-0202 June 2010 Summary of Tele Conf Call Held on 4/12/10, Btw the USNRC and APS, Concerning the PVNGS, Units 1, 2, and 3, License Renewal Application ML1013407882010-06-0202 June 2010 Summary of Tele Conf Call Held on 4/14/10, Btw USNRC and APS, Concerning D-RAI Pertaining to the PVNGS, Units 1,2 and 3, License Renewal Application ML1010606402010-04-27027 April 2010 Summary of Tele Conference Call Held on 4/9/10, Btw the USNRC and Arizona Public Service Company, Concerning Draft Requests for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1,2, and 3, License Renewa 2024-10-30 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2013 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Jennie K. Rankin, Project Manager ~ ~. ~
Plant Licensing Branch IV ~ i'\~\fjV.
Division of Operating Reactor Licensing 0 QYl Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING CONFERENCE CALL WITH ARIZONA PUBLIC SERVICE COMPANY (TAC NOS. ME8284, ME8285, AND ME8286)
DATE & TIME: WednesdaY,August21,2013 1:00 p.m. - 2:00 p.m. EDT (10:00 a.m. -11:00 a.m. PDT)
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North, Room 0-1 'I B02 11555 Rockville Pike Rockville, Maryland 20855 PURPOSE: The purpose of the conference call is to discuss the U.S. Nuclear Regulatory Commission (NRC) staff's review of Arizona Public Service Company's (APS) submittal dated August 3,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12229A125), in response to the NRC staff's request for additional information dated May 16, 2012 (ADAMS Accession No. ML121030640),
regarding single failure of low pressure safety injection pumps to trip on a recirculation actuation signal at Palo Verde Nuclear Generating Station, Units 1, 2, and 3.
CATEGORY 1:* This is a Category 1 Meeting. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
M. Markley -2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC APS M. Markley, NRR R. Roehler, et al.
C. Jackson, NRR W. Lyon, NRR J. Rankin, et a\.
Interested members of the public can participate in this meeting via a toll free audio teleconference. Please email the meeting contact listed below before Tuesday, August 20, 2013, 3:30 p.m. EDT to get the telephone number and the pass code.
MEETING CONTACT: Jennie Rankin, NRR 301-415-1530 jennivine.rankin@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involvellistserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING CONFERENCE CALL WITH ARIZONA PUBLIC SERVICE COMPANY REGARDING PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3 TO DISCUSS SINGLE FAILURE OF LOW PRESSURE SAFETY INJECTION PUMPS TO TRIP ON A RECIRCULATION ACTUATION SIGNAL WEDNESDAY, AUGUST 21,2013 1:00 p.m. to 2:00 p.m. EDT (10:00 a.m. to 11:00 a.m. PDT) 1:00 p.m. -1:05 p.m. Introductions (NRC) 1:05 p.m. - 1 :55 p.m. Discussion on single failure of low pressure safety injection pumps to trip on a recirculation actuation signal 1:55 p.m. - 2:00 p.m. Public questions 2:00 p.m. Adjourn Enclosure
Ml13199A008 *via email .~
"~r-~--'--' - -'=====;0 IOFFICE NRR/DORLlLPL4/PM NRRIDORULPL4/LA NRR/DORLlLPL4/BC NRR/DORLlLPL4/PM NAME -'Rankin JBurkhardt* MMarkley JRankin DATE 7/18/13 7118/13 7122113 7/22/13