ML111160162

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Arizona Public Service Company, to Present and Discuss Performance Results of Palo Verde for Period of January 1 Through December 31, 2010
ML111160162
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/25/2011
From:
NRC Region 4
To:
References
Download: ML111160162 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 April 25, 2011

SUBJECT:

PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station DOCKET: 50-528, 50-529, 50-530 DATE AND TIME: May 11, 2011 6:00 pm to 7:30 pm LOCATION: Palo Verde Energy Education Center 600 North Airport Road Buckeye, AZ 85396 PURPOSE: This is the end-of-cycle public meeting between the NRC and Arizona Public Service Company to present and discuss performance results of the Palo Verde Nuclear Generating Station for the period of January 1 through December 31, 2010.

CATEGORY 3: This is a category 3 meeting. The public is invited to fully participate in this meeting/open house. The meeting is specifically designed to ensure maximum interaction with the NRC Staff.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRCs meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: NRC T. Pruett, Deputy Director, Division of Reactor Projects (DRP)

R. Lantz, Chief, Project Branch D, DRP L. Uselding, Public Affairs, Region IV T. Brown, Senior Resident Inspector J. Bashore, Resident Inspector M. Baquera, Resident Inspector

LICENSEE R. Edington, Executive Vice President Nuclear, Chief Nuclear Officer B. Bement, Senior Vice President, Site Operations D. Mims, Senior Vice President, Regulatory and Oversight MEETING CONTACT: Don Allen, NRC, RIV 817/276-6574 don.allen@nrc.gov To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

cc: Distribution via ListServ

Electronic Distribution:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Art Howell, DRA Kriss Kennedy, D:DRP Troy Pruett, DD:DRP Anton Vegel, D:DRS Sue Bogle, OEWEB Resource Stephanie Bush-Goddard,RIV/OEDO ETA OEMAIL, D/OE Amy Powell, OCA Thomas Combs, Congressional Affairs Officer Lauren Gibson, Project Manager, NRR Ryan Lantz, Branch Chief, PB/D Don Allen, Senior Project Engineer, PB/D Tony Brown, Senior Resident Inspector Zack Hollcraft, Project Engineer, PB/D Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC Nick Taylor, Region IV ACES Regina McFadden, Site Administrative Assistant Earnestine Clay, Administrative Officer Ann Mattila, Security Advisor Phil Longdo, Receptionist R:\_REACTORS\EOC 2010\PV EOC MN 05112011.docx SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials RL RIV/SPE:DRP/D PAO RSLO C:DRP/D DAllen VLDricks WAMaier RLantz

/RA/ /RA/ /RA/ /RA/

4/25/11 4/25/11 4/25/11 4/25/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax