ML24212A339
ML24212A339 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 08/01/2024 |
From: | Ngola Otto Licensing Processes Branch |
To: | |
References | |
Download: ML24212A339 (1) | |
Similar Documents at Palo Verde | |
---|---|
Category:Meeting Agenda
MONTHYEARML24262A1052024-09-20020 September 2024
[Table view]Pre-Submittal Presentation Slides - 1R25 Pzr Nozzle Life of Repair - Relief Request 73 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 12024-09-0606 September 2024 Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1 ML24236A7032024-08-22022 August 2024 Pre-Submittal Meeting Slides to Support August 29, 2024 Aps/Westinghouse Thermal Design Procedure (Wtdp) Meeting PMNS20241084, Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-08-21021 August 2024 Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24212A3392024-08-0101 August 2024 August 1, 2024, Public Meeting on Potential Palisades Nuclear Plant Restart Presentation ML24275A2332024-06-28028 June 2024 APS Slides Supporting Preapplication Meeting Regarding Safety Injection Tank Pressure Band PMNS20240840, Preapplication Meeting with Arizona Public Service Company to Discuss Proposed Increases to TSs 3.5.1 and 3.5.2 Safety Injection Tank Nitrogen Cover Pressure Band for Palo Verde Nuclear Generating Station, Units 1, 2 and 32024-06-20020 June 2024 Preapplication Meeting with Arizona Public Service Company to Discuss Proposed Increases to TSs 3.5.1 and 3.5.2 Safety Injection Tank Nitrogen Cover Pressure Band for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 PMNS20240731, Notice of Meeting with Arizona Public Service Company to Discuss Proposed Relief Requests at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-06-0404 June 2024 Notice of Meeting with Arizona Public Service Company to Discuss Proposed Relief Requests at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20240363, NRC Public Outreach to Discuss Palo Verde Nuclear Generating Station 2023 Reactor Oversight Program Performance Assessment2024-03-12012 March 2024 NRC Public Outreach to Discuss Palo Verde Nuclear Generating Station 2023 Reactor Oversight Program Performance Assessment PMNS20240087, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-01-25025 January 2024 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231377, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-12-0707 December 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231177, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 12023-10-19019 October 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan PMNS20230945, Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-08-18018 August 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line PMNS20230590, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-05-0404 May 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230286, Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-04-0303 April 2023 Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230297, Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-03-22022 March 2023 Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) PMNS20230166, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-02-17017 February 2023 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20221074, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-10-13013 October 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220282, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-03-22022 March 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22013B2642022-01-13013 January 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request for Palo Verde Nuclear Generating Station, Unit 2 PMNS20211505, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-29029 November 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides PMNS20211411, Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-16016 November 2021 Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211230, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-10-0606 October 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211082, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-08-17017 August 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210743, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-06-0202 June 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210576, Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-05-0303 May 2021 Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210105, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-02-0303 February 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20210096, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-01-26026 January 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20201399, Notice of Meeting with Arizona Public Service Company2020-12-15015 December 2020 Notice of Meeting with Arizona Public Service Company ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML14077A3712014-03-18018 March 2014 Notice of Public Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom-Mounted Instrumentation to End of Unit 3 Operating Life ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13156A2322013-06-13013 June 2013 7/11/13 Notice of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13135A3702013-05-17017 May 2013 Notice of 5/30/13 Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML1108803052011-03-29029 March 2011 Notice of Special Open Meeting with Arizona Corporation Commission ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1012703882010-06-25025 June 2010 License Renewal - May 6, 2010 Public Meeting - Arizona Public Service Handout 2024-09-06 Category:Meeting Briefing Package/Handouts MONTHYEARML24262A1052024-09-20020 September 2024
[Table view]Pre-Submittal Presentation Slides - 1R25 Pzr Nozzle Life of Repair - Relief Request 73 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24236A7032024-08-22022 August 2024 Pre-Submittal Meeting Slides to Support August 29, 2024 Aps/Westinghouse Thermal Design Procedure (Wtdp) Meeting ML24212A3392024-08-0101 August 2024 August 1, 2024, Public Meeting on Potential Palisades Nuclear Plant Restart Presentation ML24192A3262024-07-12012 July 2024 Licensee Slides to Support Pre-Submittal Meeting – Relief Request 71 Slides ML24192A3402024-07-12012 July 2024 Licensee to Support Pre-Submittal Meeting - Relief Request 72 Slides ML24275A2332024-06-28028 June 2024 APS Slides Supporting Preapplication Meeting Regarding Safety Injection Tank Pressure Band ML24155A2112024-06-0707 June 2024 VRR-02: Exercise Test Frequency Reduction (Slides) ML24155A2122024-06-0707 June 2024 VRR-03: SOV Test Criteria (Slides) ML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 – April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call 2024-09-20 Category:Slides and Viewgraphs MONTHYEARML24262A1052024-09-20020 September 2024
[Table view]Pre-Submittal Presentation Slides - 1R25 Pzr Nozzle Life of Repair - Relief Request 73 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24236A7032024-08-22022 August 2024 Pre-Submittal Meeting Slides to Support August 29, 2024 Aps/Westinghouse Thermal Design Procedure (Wtdp) Meeting ML24212A3392024-08-0101 August 2024 August 1, 2024, Public Meeting on Potential Palisades Nuclear Plant Restart Presentation ML24192A3262024-07-12012 July 2024 Licensee Slides to Support Pre-Submittal Meeting – Relief Request 71 Slides ML24192A3402024-07-12012 July 2024 Licensee to Support Pre-Submittal Meeting - Relief Request 72 Slides ML24275A2332024-06-28028 June 2024 APS Slides Supporting Preapplication Meeting Regarding Safety Injection Tank Pressure Band ML24155A2112024-06-0707 June 2024 VRR-02: Exercise Test Frequency Reduction (Slides) ML24155A2122024-06-0707 June 2024 VRR-03: SOV Test Criteria (Slides) ML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23296A0162023-10-20020 October 2023 – October 20, 2023 Presubmittal Meeting Presentation - 1R24 Pressurizer Nozzle Repair - RR-70 (EPID: L?2023?LLR-0057) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22312A5952022-11-0808 November 2022 Independent Spent Fuel Storage Installation, Submittal of Annual Financial Reports 2021 ML22299A1812022-10-26026 October 2022 – Presubmittal Meeting Presentation - License Amendment Request - Adoption of TSTF-107-A Separate Control Rods That Are Untrippable Versus Inoperable and Change to TS 3.1.5 Condition B (EPID: L?2021?LRM-0081) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21165A1832021-06-14014 June 2021 RR-67 6-16-21 Pre-Submittal Public Meeting Presentation Slides ML21130A6462021-05-13013 May 2021 Pre-Submittal Meeting with NRC on May 13, 2021 Application for Transfer of Minority Interests in Palo Verde Nuclear Generating Station, Units 1 and 2 Subject to Expiring Leases ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML21011A2752021-01-0606 January 2021 License Amendment Request (LAR) to Revise Containment Leakage Rate Testing Program Frequencies - NRC Pre-Submittal Meeting, January 6, 2021 (Presentation Slides) ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19060A2982019-03-0101 March 2019 Transmittal of Audit Presentation Slides Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome CE16HTP Fuel ML17003A0762017-01-10010 January 2017 Regulatory Audit Report for the November 2-3, 2016, Audit at the Westinghouse Facility in Rockville, MD, for the License Amendment and Exemption Requests Associated with Next Generation Fuel (CAC Nos. MF8076-MF8081) ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15348A0542015-12-15015 December 2015 Slides for December 17, 2015 Public Meeting with APS on Resolution of GL 2004-02 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle 2024-09-20 |
Text
Public Meeting Agenda 5:15-6:00 pm Open House NRC 6:00-6:15 pm Welcome, Ground Rules, Opening Remarks Facilitator, NRC 6:15-6:40 pm Holtec Presentation on Plant Activities Holtec 6:40-7:00 pm NRC Presentation on Licensing and Inspection NRC Activities 7:00-7:30 pm Statements from Elected Officials Elected Officials 7:30-9:00 pm Public Questions and Comments Public 9:00 pm Meeting Adjourned
Potential Palisades Nuclear Plant Restart U.S. Nuclear Regulatory Commission August 1, 2024
Maximizing Engagement Please silence phones, smart watches, and laptops.
Please keep your questions brief and concise to allow everyone to participate.
Questions In-Person: Use one of the microphones Dial-in using the bridgeline Raise Hands on Teams Dial-In Info 1 (301) 576-2978 Passcode:
110229600#
Press *5 to raise your hand (opt.) Press *6 to unmute your microphone Closed Captioning Click the three dots at the top of the Teams Application Click Language and Speech Click Turn on Live Captions
Meeting Opening
- Welcome & Ground Rules
- Opening Remarks
- Introductions Brett Klukan, NRC Facilitator Jason Kozal, Director, Division of Operating Reactor Safety (DORS), Region III NRC Staff
NRC Presenters and Facilitators Brett Klukan, NRC Facilitator (in-person)
Marlayna Doell, NRC Facilitator (online)
Jason Kozal [Palisades Restart Panel (PRP) Co-Chair], Director, Division of Operating Reactor Safety (DORS), Region III Jamie Pelton [PRP Co-Chair], Deputy Director, Division of Operating Reactor Licensing (DORL)
Phil McKenna [PRP Co-Chair], Deputy Director, Division of Reactor Oversight John Moses [PRP Member], Deputy Director, Division of Rulemaking, Environmental, and Financial Support Justin Poole, Project Manager, DORL April Nguyen, Team Leader, DORS, Region III
NRC Presentation Palisades Restart Panel Licensing Activities Noticing Process Inspection Activities
Oversees regulatory activities Provides management for licensing and inspection activities Proactively identifies and promptly resolves any challenges regarding restart Focus on communications Palisades Restart Panel
Licensing Activities All expected licensing actions have been submitted and accepted for review Detailed technical review underway Requests for additional information have been issued for some licensing reviews Environmental review has begun NRC staff will make efficient licensing decisions that ensure safety
Noticing Process License amendment requests and license transfers are noticed for comment and opportunity to request a hearing 2 Notices License transfer: 30-day comment/
20-day hearing request window License amendments: 30-day comment/
60-day hearing request window Notices to be published on August 7th
Potential Restart Inspection and Assessment NRC regional inspectors have directly inspected restart activities Licensed operator requalification program Radiological hazards Primary coolant system decontamination Reactor vessel inspection
Potential Restart Inspection and Assessment Results of restart inspections are provided in publicly available quarterly restart inspection reports Resident Inspectors expected to start working at the site in late 2024
Find further information about the Palisades Potential Restart Project:
https://www.nrc.gov/info-finder/reactors/pali.html Contact us at: OPA3.Resource@nrc.gov
Maximizing Engagement Please silence phones, smart watches, and laptops.
Please keep your questions brief and concise to allow everyone to participate.
Questions In-Person: Use one of the microphones Dial-in using the bridgeline Raise Hands on Teams Dial-In Info 1 (301) 576-2978 Passcode:
110229600#
Press *5 to raise your hand (opt.) Press *6 to unmute your microphone Closed Captioning Click the three dots at the top of the Teams Application Click Language and Speech Click Turn on Live Captions