Request for Information MOD/50.59 Baseline Inspection and Temporary Instruction 2515/166, Pressurized Water Reactor Containment Sump Blockage.
ML073180716
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/14/2007
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-08-006
Download: ML073180716 (5)


Text

November 14, 2007 Mr. Christopher M. Crane

President and Chief Nuclear Officer

Exelon Nuclear

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT

MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND

TEMPORARY INSTRUCTION 2515/166, "PRESSURIZED WATER REACTOR

CONTAINMENT SUMP BLOCKAGE"

Dear Mr. Crane:

On January 14, 2008, the NRC will begin a Modifications, 10 CFR 50.59 (MOD/50.59) baseline

inspection at the Byron Station, Units 1 and 2. In addition, we intend to complete Temporary

Instruction (TI) 2515/166, "Pressurized Water Reactor Containment Sump Blockage." This

inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02, IP 71111.17 and TI 2515/166. However, please note that in accordance with

recent Reactor Oversight Process inspection program realignment results, IP 71111.02 and

IP 71111.17 are planned to be combined into a new revised procedure. This procedure is

currently under development, but will likely be i ssued in time for implementation for this inspection. The on-site portions of the inspection will take place on January 14 through

January 18, 2008 and January 28 through February 1, 2008.

Experience has shown that these baseline ins pections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both parties, we have enclosed

a request for documents needed for the inspection. These documents have been divided

into four groups. The first group is necessary to ensure that the inspection team is

adequately prepared for the inspection. This information should be available to the Regional

Office no later than December 10, 2007. The inspection team will review this information and, by December 21, 2007, will request specific items that should be available for review by January 7, 2008, i.e., the second group of documents. The third group of requested documents contains

items that the team will review, or need access to, during the inspection and should be available

by the first day of the on-site inspection, January 14, 2008. The fourth group lists information

necessary to aid the inspection team in tracking issues identified as a result of the inspection. It

is requested that this information be provided to the lead inspector as the information is

generated during the inspection. It is important that all of these documents are up to date and

complete in order to minimize the number of additional documents requested during the

preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. Langstaff. We understand that our contacts with

your organization for this inspection are Mr. Perchiazzi and Ms. Hubert, for technical and

regulatory areas, respectively. If there are any questions about the inspection or the material

C. Crane

requested, please contact the lead inspector at (301) 415-1082 (through December 7, 2007, or

at (630) 829-9747 thereafter) or via e-mail at RAL4@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS

), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information

Available On-site During Inspection)

cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station

Regulatory Assurance Manager - Byron Station

Chief Operating Officer

Senior Vice President - Nuclear Services

Vice President - Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing

Manager Licensing - Braidwood and Byron

Senior Counsel, Nuclear

Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station C. Crane

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS

), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information

Available On-site During Inspection)

cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station

Regulatory Assurance Manager - Byron Station

Chief Operating Officer

Senior Vice President - Nuclear Services

Vice President - Operations Support

Vice President - Licensing and Regulatory Affairs

Director Licensing

Manager Licensing - Braidwood and Byron

Senior Counsel, Nuclear

Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station

DOCUMENT NAME:

G:\DRS\Work in Progress\

Ltr. 11__07 Byron RFI RAL.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME DEH for RLangstaff: ls RSkokowski DHills DATE 11/14/07 11/14/07 11/14/07 OFFICIAL RECORD COPY

Letter to Mr. C. Crane from Mr. J. Lara dated November 14, 2007.

SUBJECT:

BYRON STATION, UNITS 1 AND 2 INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT

MODIFICATIONS, 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION AND

TEMPORARY INSTRUCTION 2515/166, "PRESSURIZED WATER REACTOR

CONTAINMENT SUMP BLOCKAGE"

DISTRIBUTION

RAG1 TEB RFK RidsNrrDirsIrib

MAS KGO JKH3 RML2 SAM9 SRI Byron

CAA1 LSL CDP1 DRPIII DRSIII PLB1 TXN

INITIAL DOCUMENT REQUEST Enclosure 1 MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Reports

05000454/2008006; 05000455/2008006

Inspection Dates

January 14 through February 1, 2008

Inspection Procedures

IP 71111- 02, "Changes, Tests, or Experiments" IP 71111- 17, "Permanent Plant Modifications"

TI 2515/166, "Pressurized Water Reactor Containment Sump

Blockage (NRC Generic Letter 2004-02)"

Lead Inspector

R. Langstaff, Reactor Inspector (301) 415-1082 through December 7, 2007

(630) 829-9747 after December 7, 2007

I. Information Requested for In-Office Preparation Week The following information is requested by December 10, 2007, or sooner, to facilitate the

selection of specific items that will be reviewed during the on-site inspection week. The team

will select specific items from the information requested below and submit a list to your staff by December 21, 2007. We will request that certain items be made available to the regional office during the week prior to the inspection (by January 7, 2008). We request that the remaining

items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information from the last

Permanent Modification inspection (February 1, 2006) to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible.

(1) List of "permanent plant modifications" to systems, structures or components that are field work complete (For the purpose of this inspection, permanent plant modifications

include permanent: plant changes, design changes, set point changes, equivalency

evaluations, suitability analyses, and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a

description of each modification and a list of associated calculations and affected

procedures.

(2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine

operating configurations; or (e) departures in methods of analyses. This list should be

limited to calculations, procedure changes, and departures in methods of analysis which

have been approved for use; and changes to the facility which are field work complete.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document INITIAL DOCUMENT REQUEST Enclosure 2 (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought

and obtained.

(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of

analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4) List of calculation changes that have been issued for use.

(5) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should

also include corrective action documents associated with modification and 50.59 change

implementation.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitab ility analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and Updated Final

Safety Analysis Report (UFSAR) updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(8) Changes including any modification, procedure changes, training, and UFSAR changes that resulted from commitments made in response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis

Accidents at Pressurized-Water Reactors."

(9) Names and phone numbers for the regulatory and technical contacts.

(10) Description of system designators/

abbreviations used in lists provided.

INITIAL DOCUMENT REQUEST Enclosure 3 II. Information Requested to be Available the Week Prior to Inspection (January 14, 2007 - Request will be made by December 21, 2007)

(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59

evaluations or screenings, and any corrective action documents.

III. Information Requested to be Available on First Day of Inspection (January 14, 2008)

(1) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

a. UFSAR;
b. Original Final Safety Analysis Report (FSAR) Volumes;
c. Original SER and Supplements (for Original FSAR);
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications;
g. Latest IPE/PRA Report; and
h. Vendor Manuals.

(2) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during

the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(3) Current management and engineering organizational chart.

(4) Site phone list.

IV. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.

(2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.