MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
.-ACCELERATED DISTRJBUTION DEMONSTPWTION SYSTEM REGULRTOINFORMATION DISTRIBUTION TEM (RIDE)
ACCESSION NBR:9204060129 DOC.DATE: 92/04/01 NOTARIZED: YES DOCKET FACIL:50-315 "Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. Document Control Branch (Document Control Desk)
SUBJECT:
Responds
/
to NRC request for addi info re proposed plant spent fuel pool reracking a forwards proprietary Rev 1 to HI-88243, "Fluid Coupling in Fuel Racks..." 6 HI-91700, "Dynarack Validation...." Repts withheld (ref 10CFR2.790).
DISTRIBUTION CODE: AP01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Proprietary Review Distribution. Operating Reactor NOTES:g P~ g~peyr-7g If RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 1 1' PD3-1 PD 1 1 STANG,J 3 INTERNAL 'Ee 0 1 1 OGC/HDS2 1 0 R' FILE 01 1 '
EXTERNAL: NRC PDR Ap NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WAFIH CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 7
Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 INEMBNA NfCIMISAN NaOWM AEP:NRC:1146C Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 SPENT FUEL POOL RERACKING RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Attention: T. E. Murley April 1, 1992 Dear Dr. Murley; Attachment 1 to this letter contains our responses P
to your staff's February 21, 1992 request for additional information regarding the proposed Donald C. Cook Nuclear Plant spent fuel pool reracking (TAC NOS. M80615 and M80616). Please contact us should you require additional information or clarification of our response.
Attachment 2 to this letter contains information proprietary to Holtec International. It is supported by an affidavit signed by Holtec, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Holtec be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations.
Additionally, members of the NRC staff requested that, for this rerack project, we commit to Draft Regulatory Guide DG-8006, "Control of Access to High and Very High Radiation Areas in Nuclear Power Plants," dated October 1991. We will commit to this draft regulatory guide as it applies to the spent fuel pool reracking pro]ect license amendment request submitted in our letter AEP:NRC:1146 dated July 26, 1991.
In compliance with the requirements of 10 CFR 50,91(b)(1), copies of this letter and its attachments have been transmitted to 9204060129 920401 PDR ADOCK 05000315 P PDR
Dr. T E. Murley
~ AEP'NRC:1146C Mr. J. R. Padgett of the Michigan public Service Commission and to the Michigan Department of Public Health.
This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, CC'4g E. E.
~
Fitzpa rick Vice President an Attachments CC; D. H. Williams, Jr. (w/o)
A. A. Blind - Bridgman (w/o Attachment 2)
J R. Padgett (w/o Attachment 2)
~
G. Charnoff (w/o)
NFEM Section Chief (w/o Attachment 2)
A. B. Davis - Region III NRC Resident Inspector - Bridgman (w/o Attachment 2)
ATTACHMENT 1 TO AEP'NRC'1146C ADDITIONAL INFORMATION DONALD C. COOK NUCLEAR PLANT SPENT FUEL POOL RERACKING
Attachment 1 to AEP:NRC:1146C Page 1 Question 1. "With regard to Figure 2.2.1 [sic], Cook Spent Fuel Pool Layout, please describe as to what occupies each shaded area by providing size of equipments and machines, if any. Also, provide the elevation of the shaded area with respect to adj acent pool floor. Is the elevation of the shaded area level with the pool floor or recessed? Discuss if there is any barrier around the cask area to restrict translational movement of racks E4 and G."
Response to 1. In Figure 2.1.1 of our submittal AEP:NRC:1146 (Reference 5),
the shaded area is the cask handling area. This area is.
normally empty of all equipment and material. The elevation of the cask area is 604'04" nominal. The pool floor is at an elevation of 606'h" nominal. There is no barrier around the cask area to prevent translational movement of racks E4 and G as it is not necessary.
The results of three runs of the whole pool multi-rack (WPMR) analysis are provided in the licensing report in Reference (5). The maximum displacements of Rack-E4 (Rack 18) and Rack-G (Rack 23) at rack baseplate level, which may be towards the cask area, are summarized from the results in Table l. It is clear from Table 1 that a large margin exists against the racks tipping into the cask depression.
Question 2. "Provide drawings for the racks that depict dimensions including thickness of various members, 'weld locations and sizes, weight of the racks and fuel assemblies such that one may be able to perform engineering stress calculations. Also provide pool dimension that indicates relative position of racks to pool including water level during operation and, also, during refueling."
Response to 2. Attachment 2 to this submittal contains Holtec International proprietary drawings 666-Revision 3, 667-Revision 3, 668-Revision 3, and 669-Revision 2, which depict rack dimensions including thickness of various members, weld locations and sizes and weight of the racks. Dimension and weight data on fuel assemblies can be found in Tables 3.2.1-1 and 3.5.1-1 of the Unit 1 UFSAR and Tables 3.1-1 and 3.3-1 of the Unit 2 UFSAR. Pool dimensions that indicate the relative position of the racks to the pool are given in Holtec International Drawing 666. The pool floor is at elevation 606' 1/2" nominal and the normal water level is at elevation 645' 1/2". High and low water level alarms are at 645' 3/4" and 644'", respectively. The pool water level is not a function of reactor mode of operation, thus it is nominally the same during operation and refueling.
Attachment 1 to AEP:NRC:1146C Page 2 Question 3. "In pages 6-8, it is stated that the Coulomb friction between the racks and pool liners must be simulated by appropriate piecewise linear spring. Provide exact mathematical formulation of model and also discuss theoretical and experimental bases for the model. Discuss your representation of Coulomb friction damping with the model discussed in Reference 4 and explain the differences."
Response to 3. The classical definition of Coulomb friction is:
F < RN where N is the normal force on the friction interface, p is the coefficient of friction and F is the supportable lateral force available from friction. The Coulomb friction force is reactive, rather than active. In other words, it develops only to counteract a laterally applied external force and its value cannot exceed the lesser of pN and the applied external force, P; i.e., referring to Figure 1:
F Absolute Minimum (AMIN) [P,pN] were P and N are absolute values. The direction of F is such as to oppose the direction of actual or impending motion.
It therefore follows that the body to given ifofsubject A
interface load N will begin to slide the lateral load reaches pN. The lateral displacement, 8, body A will have the relationship depicted by Figure 2, which can be written symbolically as:
0 if <'pN P
~if P>pN 8 can be viewed as the slip between the point 0'nd 0 at the friction interface in Figure l.
The "ideal" Coulomb friction force-displacement profile shown in Figure 2 can be written in a more generalized form by referring to Figure 3:
F AMIN [P, Kb], if Kb' pN, 6' 0
- AMIN [P; pN]; if Kb > pN, 6 = 0 where point 0 and 0't K is the stiffness of the theoretical spring connecting the interface in Figure 1.
[6.4.3] of the licensing report in Reference (5)
Reference states that the spring constant, K, should be chosen an order of magnitude larger than the characteristic elastic stiffness of the interface structure.
Attachment 1 to AEP:NRC:1146C Page 3 The relationship exhibited by the above formula is the Coulomb piecewise linear spring utilized in DYNARACK. It is a standard procedure in numerical simulation of friction interfaces and is succinctly described in Reference [6.4.3] in the licensing report in Reference (5). It is consistent with the methodology described in the literature on nonlinear dynamics including the references cited in the request for additional information and other texts.
Question 4. "Discuss in detail what numerical values are used for the hydrodynamic masses with associated discretized rack mass ~
Provide a quantitative discussion as to how such values are calculated including supporting'xperimental bases particularly with regard to multi-mass system and narrow-gaps.
Note that the Reference 6.5.1 of the submittal only discusses idealized simple objects. One should also note that, in the reference, the model assumes irrotational flow in the derivation whereas some of the experiments performed in the reference 6.5.1 realized turbulence."
Response to 4. The development of the fluid coupling terms in multi-body (rack) motion involving small rack-to-rack gaps is presented in the proprietary report, "Fluid Coupling in Fuel Racks:
Correlation of Theory and Experiment, Holtec International Report No. HI-88243 (1989)," which is being provided to the Commission in Attachment 2 to this submittal under the appropriate provisions for proprietary materials submitted on a docket. This document provides the theoretical bases and experimental validation of the fluid coupling terms.
It should be noted that fluid coupling terms used to incorporate the contribution of water in rack dynamics utilize irrotational flow in the interest of conservatism and to comply with USNRC guidelines, in particular the OT Position paper, which disallows any credit for fluid damping.
Irrotational flow implies no viscous damping; in fact, no dissipation of energy at all. Turbulence, wake shedding, etc., are mechanics of energy extraction that are conservatively neglected in the analysis. The fluid coupling effect, therefore, merely entails transfer of energy (no loss of energy) among the individual racks. The methodology is, therefore, uniformly conservative, Question 5. "The governing equation of the motion presented in pages 6-17 is stated to be a representative of a system of twenty-two degrees of freedom. Also, they are highly nonlinear because of gap, fluid structure interaction and friction damping. The proprietary code "DYNARACK" is said to perform numerical solution of the equation using a central difference scheme.
We have reviewed a similar submittal in the FitzPatrick
to AEP:NRC:1146C Page 4 application and had several questions with regard to the numerical analysis of the finite central difference application. In particular, for a stable system (this is determined by experiments), one should demonstrate that the governing equation and the numerical scheme is "well posed" in a form discussed in Reference 3. Otherwise, one should define carefully unstable regions of the rack response from experiments and demonstrate that "DYNARACK" simulates unstable response adequately and is able to bound the results such that it can provide a conservative design (References 1 and 2).
"Alternatively, the following information should be provided to resolve the questions:
(a) Two extreme cases of the rack boundary conditions consist of one fully fixed base rack and the other case a rack completely free of friction at the base. Rack response to the fully fixed case may represent the most extremely stressed case where as [sic] the case with frictionless base may produce a maximum potential of a rack to pool wall or to an adjacent rack. Understanding of these two extreme cases would provide a confidence in assessing rack responses. Please provide calculations for these cases.
(b) Associated physical experiment performed by you as well as by others which would support the adequacy and engineering validity of your analysis code."
Response to 5. The nonlinear equation set, represented in matrix differential equation form on pages 6-17 of the licensing report in Reference (5), was reviewed by the NRC in the James A.
FitzPatrick submittal, as well as multiple other dockets, and subsequently approved. Over a thousand dynamic simulations of spent fuel rack structures were performed using DYNARACK in support of previous licensing submittals, and hundreds of analyses by others using other computer codes have uncovered no evidence of dynamic instability discernible in such structures. DYNARACK, in particular, has been tested in a wide range of nonlinear problems and has demonstrated its ability to simulate instability in unstable systems without fail. The DYNARACK Validation Manual documents the capability and veracity of this code in capturing nonlinear effects. It is submitted herein in Attachment 2, under proprietary provisions, to assist you in gaining confidence in this analysis code.
Experiments are not the only vehicle to understand dynamic response of structures; numerical methods are widely recognized as a powerful and reliable tool. The standard
Attachment 1 to AEP:NRC:1146C Page 5 component element formulation described in the text by Levy, et.al., (Reference [6.4.3] of the licensing report in Reference (5)) uses the classical central difference discretization scheme. This formulation is used in solving technical problems referenced in permanent literature, as noted in the DYNARACK Validation Manual. This formulation has never been reported to suffer from the defect of being "ill-posed." There is no evidence--technical, mathematical or heuristic--to suggest that the DYNARACK solutions do not bound the actual rack response, or that the motion of high density fuel racks is intrinsically unstable.
We trust that the above response, in conjunction with the DYNARACK Validation Manual, clarifies the issue of stability of racks and DYNARACK's ability to simulate rack motions.
The alternative approach (a) suggested in the RAI does not provide a complete problem definition and is non-linear if the fuel in the rack is not fixed. Our experience with fuel rack dynamic simulation suggests that bounding models of the type suggested in alternative approach (a) are of little value in assessing dynamic responses in closely spaced high density rack layouts. The DYNARACK Validation Manual offers various simulations which more, directly relate to the dynamic responses of rack modules in realistic scenarios.
The DYNARACK Validation Manual and Holtec Report HI-88243 are being submitted to comply with item (b) of the alternative approach.
References:
(1) Holems, P. J., and Shaw, S. W., "A Periodically Forces Piecewise Linear Oscillator," Journal of Sound and Vibration 1983.
(2) Thompson, J. M. T., and Ghaffari, R., "Chaos After Period-Doubling Bifarcations in the Resonance of an Impact Oscillator," Ph sics Letters, 1982 (Vol. 2A, Number 1).
(3) Issacson, E., and Keller, H. B., "Anal sis of Numerical Methods," John Wily and Sons, New York 1966.
(4) Stoker, J. J., "Nonlinear Vibrations," Interscience Publishers, New York 1966.
(5) Letter, AEP:NRC:1146, E. E. Fitzpatrick to T. E. Murley, July 26, 1991, and its attachment, "Licensing Report for Storage Densification of D. CD Cook Spent Fuel Pool," Holtec International.
to AEP:NRC:1146C Page 6 TABLE 1 MAXIMUM DISPLACEMENT OF PEDESTAL PROXIMATE TO THE CASK AREA WPMR Rack E-4 in Rack-G in Analysis N-S Direction E-W Direction Run I.D. Loading Case (inch) (inch)
Mpl Regular fuel, fully 0.09693 0.04812 loaded; DBE seismic friction coeff. 0.2 MP2 Regular fuel, fully 0.1913 0.2388 loaded; DBE seismic, friction coeff. - random MP3 Regular fuel, fully 0.4526 0.1033 loaded; DBE seismic, friction coeff. 0.8 Required Pedestal Movement 8.69 10.76 for pivoting at the edge of the cask area depression
O ANO O'RE CONTIGOOI.IS POINTS ON THE FRICTION INTERFACE 0
( REACTIVE FRICTION FORCE ) F P (EXTERNALLY APPLIEO FORCE)
FIGIJRE l A
OISPLACENENT OISPLCENENT FIGORE 2 FIGORE 3
-r " gt ~'p ATTACHMENT 2 TO AEP:NRC:1146C HOLTEC INTERNATIONAL PROPRIETARY DRAWINGS (666-R3, 667-R3, 668-R3 AND 669-R2),
INTERNATIONAL PROPRIETARY REPORT HI-88243
'OLTEC (1989),
DYNARACK VALIDATION MANUAL HI-91700 (1991),
AND ACCOMPANYING AFFIDAVIT