Letter Sequence Supplement |
---|
|
Results
Other: ML12079A036, ML12095A224, ML12095A225, ML12095A226, ML12095A227, ML12095A228, ML12095A229, ML12095A230, ML12095A231, ML12095A251, ML12095A252, ML12095A253, ML12095A254, ML12095A255, ML12095A257, ML12095A258, ML12095A259, ML12095A260, ML12095A274, ML12095A275, ML12095A276, ML12095A347, ML12095A348, ML12095A349, ML12095A350, ML12095A353, ML12095A354, ML12095A370, ML12095A371, ML12095A372, ML12095A373, ML12095A374, ML12095A375, ML12095A376, ML12096A059, ML12096A060, ML12096A061, ML12096A062, ML12096A227, ML12101A089, ML12101A090, ML12101A091, ML12101A092, ML12101A093, ML12101A094, ML12101A095, ML12101A096, ML12101A097, ML12101A098, ML12101A099... further results
|
MONTHYEARML12074A0322012-03-0909 March 2012 G20120172/EDATS: OEDO-2012-0147 - Paul Gunter 2.206 Petition & Letter 2.206 - Fitzpatrick Emergency Enforcement Petitions Project stage: Request ML12079A0362012-03-13013 March 2012 G20120172/EDATS: OEDO-2012-0147 - Paul Gunter E-mail Treatment of FitzPatrick Emergency Enforcement Petition, March 9, 2012 Project stage: Other ML1228303422012-03-13013 March 2012 G20120172, EDATS: OEDO-2012-0147, E-mail to Mr. Gunter to Acknowledge the Receipt of the Petition Project stage: Other ML13017A3552012-03-15015 March 2012 from Bhalchandra Vaida to Joseph Pechacek: Fitzpatrick Emergency Enforcement Project stage: Other ML13162A6312012-03-22022 March 2012 from Andrea Russell to Brice Bickett: Action for Your Review/Comment Project stage: Other ML13022A2922012-03-22022 March 2012 from Andrea Russell to Samson Lee: FYI-G20120172 (Fitzpatrick 2.206): Supplements and New Co-Petitioner Project stage: Other ML1228303322012-03-27027 March 2012 G20120172, EDATS: OEDO-2012-0147, E-mail to Petitioner - Communication of Prb'S Decision on the Request for Immediate Action Project stage: Other ML13162A6322012-03-27027 March 2012 from Andrea Russell to Samson Lee: FYI-G20120172 Project stage: Other ML13162A6332012-03-29029 March 2012 from Brice Bickett to Bhalchandra Vaidya: Re PRB Decision on Request for Immediate Action Project stage: Other ML12095A2272012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12101A1442012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3532012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2252012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML13162A7422012-04-0303 April 2012 from Andrea Russell to Samson Lee: Update-G20120172 Project stage: Other ML12095A3472012-04-0303 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3732012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2602012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2542012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3482012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2282012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2512012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2262012-04-0303 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2522012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML13022A2932012-04-0303 April 2012 from Bhalchandra Vaidy to Jessica Azulay: Re PRB Decision Project stage: Other ML12095A3702012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2572012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3502012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3542012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2582012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3712012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2242012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A3492012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3752012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2552012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A3742012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2592012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2532012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A3762012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2312012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3722012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2302012-04-0404 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2752012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A0612012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A2272012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12101A1452012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2742012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A0622012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2292012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2762012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A0592012-04-0404 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other 2012-03-27
[Table View] |
|
---|
Category:2.206 Petition
MONTHYEARML20294A2402020-10-16016 October 2020 OEDO-20-00413 - 2.206 Petition-Beyond Nuclear - GE Mark I Hardened Vents ML17044A0722017-03-23023 March 2017 G20120172 - Closure Letter to Gunter, Et Al 2.206 Petition on Containment Ventilation for James A. FitzPatrick Nuclear Power Plant ML14034A2572014-01-31031 January 2014 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Gay Nicholson ML14028A2212014-01-26026 January 2014 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Amy Harper ML13322A4602013-11-15015 November 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Robert Swiatek ML13294A4002013-10-16016 October 2013 G20130211 - 10/16/13 Supplement #4 Information to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont - Email from T.Judson to R.Guzman ML13253A1302013-09-0909 September 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Elaine Davis ML13239A4552013-08-27027 August 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Gary Shaw ML13239A1712013-08-23023 August 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Hali Jones ML13217A0612013-07-25025 July 2013 G20130561 - David Lochbaum E-mail Re Tanya Mensah, NRR, Merrilee Banic, NRR; Andrea Russell, NRR, David Pelton, NRR; Mary Spencer; OGC ML13203A1192013-07-19019 July 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Branden Ramer ML13119A0602013-04-24024 April 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Diane Lombardi ML13133A2072013-04-23023 April 2013 G20130211 - Timothy Judson E-mail to R.Guzman 2.206 Supplemental Information Dated April 23, 2013 - James A. Fitzpatrick/Pilgrim/Vermont Yankee Nuclear Power Stations ML13119A0612013-04-23023 April 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Jonathan Dwyer ML13113A2432013-04-22022 April 2013 G20130211 - Paul Gunter E-mail Re 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13106A1622013-04-12012 April 2013 G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Antonio Caniano, in the Matter of the James A. FitzPatrick Nuclear Power Plant, ME8189 ML13128A3052013-04-0909 April 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: Nuclear Decommissioning Discussion with the NRC Staff: Conference Call Transcript (April 9, 2013) ML13100A2572013-04-0606 April 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Terri Tuers ML13086A4812013-03-27027 March 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Sally Moore, Et Al ML13085A0602013-03-22022 March 2013 G20120172/EDATS: OEDO-2012-0147 - E-mail from 90 Additional Co-Petitioners with Alliance for a Green Economy and Beyond Nuclear'S March 9, 2012 Emergency Enforcement Petition to Suspend Operation of James A. FitzPatrick Nuclear Plant ML13079A0222013-03-18018 March 2013 G20130211 - Timothy Judson E-mail 2.206 - James A. Fitzpatrick/Pilrgim/Vermont Yankee Nuclear Power Stations ML13071A0642013-03-10010 March 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Hector Lopez ML13071A0712013-03-0909 March 2013 James a, FitzPatrick Nuclear Power Plant, ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner,Connie Hogarth ML13071A0702013-03-0909 March 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Dave Morrison ML13071A0692013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner H Patricia Hynes ML13071A0682013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner Ellin Feld ML13071A0672013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner Maureen Headington ML13071A0662013-03-0909 March 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Gary Sachs ML13071A0652013-03-0909 March 2013 ME8189-G20120172/EDATS: OEDO-2012-0147 - E-Mail from Additional Co-Petitioner Barbara Antonoplos ML13063A0452013-03-0101 March 2013 ME8189 - G20120172/EDATS: 0EDO-2012-047 - E-mail from Additional Co-Petitioner Anne Mathot ML13063A0482013-02-28028 February 2013 ME8189 - G20120172/EDATS: 0EDO-2012-047 - E-mail from Additional Co-Petitioner Ramona Gillings ML13063A0472013-02-28028 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, William G. Gonzalez ML13063A0462013-02-28028 February 2013 G20120172/EDATS: OEDO-2012-0147 - E-Mail from Bernard Yozwiak Wishing to Co-Petition with Alliance for a Green Economy and Beyond Nuclear'S March 9, 2012 Emergency Enforcement Petition to Suspend Operation of James A. FitzPatrick Nuclear Pl ML13059A2192013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Robert G Kelly ML13059A2162013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Marcella Crysler ML13059A2172013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Carlos Basualdo ML13059A2182013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, John and Lauren Cavuoto ML13059A2202013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Marianne Montero ML13059A2222013-02-27027 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Ann Prival ML13059A2212013-02-27027 February 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Augie Abel ML13056A4662013-02-22022 February 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Judith Farhat ML13128A3022013-02-20020 February 2013 G20130211 - Timothy Judson E-mail 2.206 Supplemental Information - Ubs Investment Research Report: in Search of Washington'S Latest Realities: DC Fieldtrip Takeaways (February 20, 2013) ML13051A0382013-02-17017 February 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner,Richard Horan ML13046A4072013-02-14014 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Robert Swiatek ML13046A0192013-02-13013 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Annie Wilson ML1304201632013-02-10010 February 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Henry Newnan ML13037A1852013-02-0404 February 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioners, Vic and Gail Macks ML13032A4312013-01-31031 January 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Frances Smith ML13029A4292013-01-26026 January 2013 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner, Jamie Tietjen ML13022A1202013-01-22022 January 2013 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Nancy Haney 2020-10-16
[Table view] Category:E-Mail
MONTHYEARML24298A1382024-10-24024 October 2024 Final RAI for FitzPatrick JAFP-24-0047 (L-2024-LLA-0134) ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A1072024-06-0404 June 2024 NRR E-mail Capture - (External_Sender) Supplement for FitzPatrick TS 3.4.2-2 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24060A0512024-02-28028 February 2024 NRR E-mail Capture - FitzPatrick - Final Arcb RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24033A0542024-02-0101 February 2024 NRR E-mail Capture - FitzPatrick - Final HFE RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21246A2112021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-505 ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21014A5112021-01-12012 January 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-545 Revision 3 ML20352A2752020-12-17017 December 2020 Request for Additional Information Regarding FitzPatrick Primary Containment Isolation Valve Amendment Request ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20294A0372020-10-19019 October 2020 Request for Additional Information Primary Containment Isolation Valve License Amendment Request ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment 2024-09-06
[Table view] |
Text
Vaidya, Bhalchandra From: Jessica Azulay [jessica@allianceforagreeneconomy.org]
Sent: Thursday, October 11, 2012 11:44 AM To: Vaidya, Bhalchandra
Subject:
Re: PRB Decision on Initial Recommendation Re: Your Petition under 10CFR2.206 Pertaining to the James A. FitzPatrick Nuclear Plant in Scriba, New York (TAC No. ME8189)Attachments:
petitioner response toNRCFitzOct_11.pdf Bhalchandra K. Vaidya, Please find attached our response to your October 4 communication.
Sincerely, Jessica Azulay On 10/4/2012 9:22 AM, Vaidya, Bhalchandra wrote: Ms. Jessica Azulay, On May 17, 2012, May 29, 2012, and July 19, 2012, the PRB met internally to discuss the petition and to make the initial recommendation.
The PRB's initial recommendation is to partially accept the petition for review because portions of the petition meet the criteria for review under the 2.206 process.The PRB's initial recommendation is to accept, in part, and hold in abeyance three of the issues of the petition addressing containment venting under severe accident conditions and the design of vent systems being able to accommodate hydrogen gas. The NRC staff notes that these concerns are undergoing NRC review as part of the lessons-learned from the Fukushima event. Even though the Commission has issued the Order concerning reliable hardened vent for accident prevention, the NRC staff is conducting further review of additional aspects of the hardened vent system, such as venting under severe accident conditions.
In addition, the staff is evaluating hydrogen control and mitigation measures.
Since these issues will take longer than the target timeframe for reaching a decision on a petition, the NRC plans on accepting those issues, and holding them in abeyance.In addition, the PRB's initial recommendation is to reject all other issues in the petition because they do not meet the criteria for review under 10 CFR 2.206 process described in MD 8.11.Also, please let me know, ASAP, if the Petitioners would like a second meeting to address the Petition Review Board as described in MD 8.11, the process for 10 CFR 2.206 Petitions.
Thank you, Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (0)bhalchandra.vaidyat-nrc.qov 1
AGREE New York 2013 E. Genesee St., Syracuse, NY 13210 I info@agreenewyork.org 1 (315) 480-1515 Bhalchandra K. Vaidya Licensing Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Email: bhalchandra.vaidya~nrc.gov Bhalchandra K. Vaidya: As the point of contact, I received your communication dated October 4. 2012, regarding the NRC Petition Review Board (PRB) initial recommendation to partially accept for review the 2.206 petition filed by joint petitioners Alliance for a Green Economy (AGREE) and Beyond Nuclear. On behalf of the joint petitioners, I would like to request additional information.
You wrote that the "PRB's initial recommendation is to accept, in part, and hold in abeyance three of the issues of the petition addressing containment venting under severe accident conditions and the design of vent systems being able to accommodate hydrogen gas." We request that the PRB provide us an itemized list detailing which portions of our petition have been accepted.
Additionally, we request that the PRB provide us an itemized list detailing which portions of our petition you propose to reject, and that the PRB provide an explanation as to why those portions do not meet the criteria for review under the 10 CFR 2.206 process. We request that this justification be entered into the public record.We hereby request another opportunity to address the PRB, however, we believe that it is essential that you provide the above requested detail of the PRB recommendation before scheduling this hearing.We are aware that the issues raised in our petition are related to concerns that are undergoing review by the NRC's Japan Lessons Learned Project. However, given that there are no assigned timelines for addressing or concluding much of this work, we are concerned about the issues we raised, including hydrogen generation and detonation, being held in abeyance.We reiterate that our communities surrounding the FitzPatrick reactor are currently at risk and will continue to be at risk until the FitzPatrick reactor is shut down or is required to have a truly reliable containment.
We, therefore, ask that you to reconsider the PRB's decision to allow FitzPatrick to operate during the indefinite process of the NRC Japan Lessons Learned Project regarding Mark I BWR reliable vents. NRC's own documents show that the FitzPatrick reactor does not have a reliable containment, nor does it have a reliable vent that protects the public and workers from radiation exposure or is free from the possibility of hydrogen over-pressurization and explosions.
An over-pressurization accident cannot currently be ruled out as impossible, and there is no assurance that an accident would wait until after the NRC's process regarding Mark Alliance for a Green Economy Citizens Awareness Network of Central New York Citizens Environmental Coalition Citizens for Health Environment and Justice Peace Action Central New York Peace Action New York State Sierra Club Atlantic Chapter Syracuse Peace Council AGREE New York 2013 E. Genesee St., Syracuse, NY 13210 I info@agreenewyork.org 1 (315) 480-1515 I reactors is concluded and required plant modifications are completed.
Allowing FitzPatrick to operate indefinitely in the meantime is an unacceptable risk.The Petitioners point out that power operations at FitzPatrick are currently ceased for refueling.
We ask that power operations at FitzPatrick remain suspended until the NRC can provide public assurance, through full disclosure of Entergy and NRC safety analyses, that operations at the plant do not pose an undue public health and safety risk. It is our contention that if the PRB is to reject our request for an emergency suspension of power operations at FitzPatrick while it considers our petition on an indefinite and indeterminate time-frame, it must provide transparency by publicly releasing its safety analysis in refutation of our concerns regarding the present risk posed to the public by the FitzPatrick reactor in its current design.Therefore, we ask that the PRB publicly release its safety evaluations and justification for the reliability of current venting operations for FitzPatrick's pressure suppression containment system in its current state without the requested modifications for the Direct Taurus Vent System in Generic Letter 89-16, including its justification of continued operation with the "beyond design and licensing bases vulnerability" as described in the post-Fukushima inspection report referenced in our petition.
This analysis must also take into account FitzPatrick's unique plan to vent high temperature and pressure steam and potentially high radiation and explosive gases at the ground level. We further request that the NRC publicly release a safety evaluation that rules out potential hydrogen ignition points in the Standby Auxilliary Gas Treatment Building currently as relied upon by FitzPatrick operations.
We further request that the NRC make publicly available the safety evaluation for the current FitzPatrick vent plan that could render the FitzPatrick nuclear site dangerous or inaccessible for site personnel activity precisely at a time when workers would need greatest access to all parts of the site. To date, neither NRC nor the FitzPatrick operator has publicly released any safety analysis of the impact of a ground-level release on worker access to the site, worker health and safety, or public health and safety.We thank you and the PRB for the serious manner in which you are treating our concerns regarding the FitzPatrick reactor. We look forward to a more detailed response from you.Sincerely, Jessica Azulay Chasnoff for the Petitioners Alliance for a Green Economy (AGREE) works for safe, affordable energy and the development of a green economy in New York State. Our goal is a prosperous, safe, and healthy New York, fulfilling the promise of conservation, energy efficiency, and safe, clean renewable energy sources to end our state's reliance on wasteful and environmentally destructive forms of energy. The Alliance works to promote this transition to a carbon-free and nuclear-free future and educates the public about alternatives that can revitalize the economy and safeguard human health and the environment.