Other: ML15321A014, ML15356A735, ML15356A744, ML16099A099, ML16158A384, ML16221A582, ML16281A529, ML16343A936, ML17100A304, ML17160A221, ML17167A417, ML17167A418, ML17167A419, ML17220A252, ML17283A335, ML17345A936, ML18043A185, ML18158A225, ML18219B609, ML18282A368, ML19025A118, ML19039A277, ML19057A489, ML19094A032, ML19176A345, ML19226A121, ML19303B793, ML19303C304, ML19303C397, ML19336A030, NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding
|
MONTHYEARML16029A4072015-06-24024 June 2015 ODEO-15-00479: 2.206 Petition on Current Licensing Basis for Flooding at Pilgrim Project stage: Request ML15321A0142015-11-16016 November 2015 NRR E-mail Capture - Initial Recommendations: 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479) Project stage: Other NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding2016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding Project stage: Other ML15356A7352016-02-11011 February 2016 OEDO-15-00479: David Lochbaum and Others 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding Acknowledgement Letter Project stage: Other ML15356A7442016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding Project stage: Other ML16099A0992016-04-0808 April 2016 OEDO-15-00479 - E-mail to David Lochbaum 2.206 Petition - Pilgrim Current Licensing Basis for Flooding - 60 Day Status Project stage: Other ML16158A3842016-06-0606 June 2016 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479)(CAC No. MF6460) - 60 Day Status Project stage: Other ML16221A5822016-08-0808 August 2016 NRR E-mail Capture - 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479)(CAC No. MF6460) - 60 Day Status Project stage: Other ML16250A0182016-08-18018 August 2016 Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions - Commitment Changes Project stage: Request ML16281A5292016-10-0505 October 2016 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479)(CAC No. MF6460) - 60 Day Status Project stage: Other ML16343A9362016-12-0606 December 2016 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding (OEDO-15-00479)(CAC No. MF6460)-60 Day Status Project stage: Other ML17100A3042017-04-10010 April 2017 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Current Licensing Basis for Flooding - 60 Day Status Project stage: Other ML17160A2212017-06-0808 June 2017 OEDO-15-00479 - Email to David Lochbaum Re. 2.206 Petition Regarding Pilgrim Nuclear Power Stations Current Licensing Basis for Flooding 60-Day Status Report Project stage: Other ML17220A2522017-08-0808 August 2017 OEDO-15-00479 - Email to David Lochbaum Re. 2.206 Petition Regarding Pilgrim Nuclear Power Stations Current Licensing Basis for Flooding 60-Day Status Report Project stage: Other ML17283A3352017-10-0606 October 2017 OEDO-15-00479 - E-mail to David Lochbaum Re. 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding; 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML17345A9362017-12-11011 December 2017 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML18043A1852018-02-12012 February 2018 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML18158A2252018-06-0707 June 2018 (OEDO-15-00479) Pilgrim Nuclear Power Station - 2.206 Petition Regarding Pilgrim Nuclear Power Station - Current Licensing Basis for Flooding - 60-Day Status Report (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML18219B6092018-08-0707 August 2018 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML18282A3682018-10-0909 October 2018 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60 Day Status Report (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML19025A1182019-01-24024 January 2019 NRR E-mail Capture - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML19039A2772019-02-0808 February 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - 60-Day Status Report (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML19057A4892019-02-26026 February 2019 E-mail to Mary Lampert, David Agnew (2018), Et Al., 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information Project stage: Other ML19094A0322019-04-0303 April 2019 OEDO-15-00479 - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status Update (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML19170A3912019-06-19019 June 2019 Final Response Regarding Request for Information Pursuant to Title 10 CFR 50.54(f) Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Request ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) Project stage: Other ML17167A4172019-10-0808 October 2019 OEDO-15-00479 - Proposed Director'S Decision, David Lochbaum, Union of Concerned Scientists, 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Flood Current Licensing Basis Project stage: Other ML17167A4192019-10-0808 October 2019 OEDO-15-00479 - Letter to Petitioner, Proposed Director'S Decision, David Lochbaum, Union of Concerned Scientists, 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Flood Current Licensing Basis Project stage: Other ML17167A4182019-10-0808 October 2019 OEDO-15-00479 - Letter to Licensee, Proposed Director'S Decision, David Lochbaum, Union of Concerned Scientists, 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Flood Current Licensing Basis Project stage: Other ML19303C3042019-11-25025 November 2019 OEDO-15-00479 - Pilgrim Nuclear Power Station - Director'S Decision Under 10 CFR 2.206 Current Licensing Basis for Flooding Project stage: Other ML19303C3972019-11-25025 November 2019 OEDO-15-00479 - Pilgrim Nuclear Power Station - Letter to Petitioner Concerning David Lochbaum, Et Al, 2.206 Petition Regarding Pilgrim Nuclear Power Plant'S Current Licensing Basis for Flooding (EPID L-2015-CRS-0002) Project stage: Other ML19303C4332019-11-25025 November 2019 OEDO-15-00479 - Pilgrim Nuclear Power Plant - Final Director'S Decision 2.206 Petition on Current Licensing Basis for Flooding Project stage: Request ML19303B7932019-11-25025 November 2019 OEDO-15-00479 - Federal Register Notice with Pilgrim Nuclear Power Station - Director'S Decision 2.206 Petition Regarding Current Licensing Basis for Flooding Project stage: Other ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision Project stage: Approval ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding Project stage: Other 2018-10-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
From: Venkataraman, Booma To: Dave Lochbaum Cc: Danna, James
- Banic, Merrilee
Subject:
2.206 Petition Regarding Pilgrim Nuclear Power Station's Current Licensing Basis for Flooding Day Status Report (OEDO-15-00479) (CAC No. MF6460)
Date: Thursday, June 08, 2017 6:43:00 PM Mr. Lochbaum:
In accordance with Management Directive 8.11, "Review Process for 10 CFR 2.206
Petitions," I am writing to provide you a status update on your petition submitted in
accordance with 10 CFR 2.206, dated June 24, 2015, regarding the current licensing basis
on flooding for the Pilgrim Nuclear Power Station (Pilgrim). This e-mail provides a status
since my last update to you on April 10, 2017.
On August 18, 2016, Entergy (or the licensee) sent a letter (ADAMS Accession No.
ML16250A018) to the NRC, "Request for Deferral of Actions Related to Beyond-Design-Basis
External Events Flooding Actions - Commitment Changes."
The licensee requested that the
remaining activities related to the reevaluation of flooding hazards for Pilgrim associated
with a request for information dated March 12, 2012, pursuant to 10 CFR 50.54(f) (ADAMS
Accession No. ML12073A348), be permanently deferred.
The basis for the deferral included
Entergy's plans to permanently shut down Pilgrim no later than June 1, 2019 as intended by
the licensee in its letter dated November 10, 2015 (ADAMS Accession No. ML15328A053).
In an April 17, 2017 letter (ADAMS Accession No. ML16278A313), the NRC staff responded
to Entergy's August 18, 2016, request and deferred the remaining flood assessments until
December 31, 2019.
The petition review board (PRB) met on May 9, 2017, and deliberated on the path forward for your petition.
The PRB noted that the issue of reevaluated flooding hazards raised in
your petition is currently being considered by the Commission as part of SECY-16-0142, the
mitigation of beyond-design-basis event (MBDBE) draft final rule dated December 15, 2016 (ADAMS Accession No. ML16301A005).
Given the delay in the closure of the Pilgrim flood
assessments associated with the March 12, 2012, request for information and the
Commission consideration of the issues raised in your petition as part of the MBDBE draft
final rule, the PRB determined that the Commission's decision on the MBDBE draft final rule
would likely disposition your petition.
As such, once the Commission provides direction on
this rule, the staff intends to issue a proposed director's decision reflecting the
Commission's decision.
Sincerely, Booma Booma Venkataraman, P.E.
Project Manager, NRR/DORL/LPL1
Office of Nuclear Reactor Regulation
Booma.Venkataraman@nrc.gov 301.415.2934