LER 98-060-00:on 981231,identified That Rt Sys Response Time Testing Did Not Comply with TS Definition.Caused by Inadequate Procedures.Corrective Actions Will Be Developed & Update to LER Will Be Submitted by 990415.With 990201 Ltr
ML17335A501
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/01/1999
From: Arent G, Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-98-060, LER-98-60, NUDOCS 9902090054
Download: ML17335A501 (5)


Text

'CA,TE GORY 1~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9902090054

.DOC.DATE'-

99/02/01 NOTARIZED:

NO FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M AUTH.NAKE AUTHOR AFFILIATION ARENT, G.Indiana Michigan Power Co.SAMPSON,J.R.

Indiana Michigan Power Co.RECIP..NAME RECIPIENT AFFILIATION DOCKET 05000315

SUBJECT:

LER 98-060-00:on 991231,identified that RT sys response time testing did not comply with TS definition.

Caused by inadecpxate procedures.

Corrective actions will be developed&update to LER will be submitted by 990415.With 990201 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES: A T RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD 3gg3 FILE CENTE/DE/EE NRR/DRCH/H1CB NRR/DRCH/HQMB NRR/DSSA/SPLB RGN3 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC POORE,W.NRC PDR COPIES LTTR ENCL..1 1 2 2 1-.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG, J AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HOHB NRR/DRPM/PECB RES/DET/EIB LITCO BRYCE,J H NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 1 1 C t C NOTE TO ALL"RIDS" REC1PIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION L1STS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22

(

Indiana Michigan Sidgman.MI49106 616 465 5901 INOMNA II/IICHIGAN PolYER February 1, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No.50-315 Document Control Manager: In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event i ig E LER 315/98-060-00,"Interim-Reactor Trip System Response'Time Testing Does Not Comply With Technical Specification Requirement".

No commitments were identified in this submittal.

Sincerely,'Am J.R.Sampson Site Vice President/mbd Attachment c: J.L.Caldwell (Acting), Region III R.P.Powers P.A.Barrett D.F,.Kunsemiller R.Whale D.Hahn Records Center, INPO NRC Resident Inspector 9902090054 99020i PDR ADQCK 05000315 S PDR N C Form 366 U.S.NUCLEAR REGU RY COMMISSION (6-1998)LiCENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)APPROV 0)/IB NO.3150.0104 EXPIRES 06/30/2001 ESTBIATED BURDEN PER RESPONSE TO COMPLY WITH THIS MANDATORY INFORMATION COLLECTION REOUEST: 50.0 HRS.REPORTED LESSONS LEARNED ARE INCORPORATED INTO THE UCENSWG PROCESS AND FED BACK TO INDUSTRYFORWARD COMMENTS REGARDNG BURDEN ESTBIATE TO THE INFORMATION AND RECORDS MANAGEMFNT BRANCH IT4 Fll).U S NUCLEAR REGIAATORY COMMISSION.

WASHWGTON.

DC 205554001.

AND TO THE PAPERWORK REDUCTION PRO)ECT Is)500104).

OFFICE OF MANAGEMENT AND BUDGET, WASIeNGTOIL DC 20505 FACIUlY NAME It)Cook Nuclear Plant Unit 1 DOCKET NUMBER (2)05000-315 PAGE I3)1 of1 TITLE Ia)Interim-Reactor Trip System Response Time Testing Does Not Comply With Technical Specification Requirement MONTH DAY 12 31 YEAR YEAR 1998 1998 EVENT DATE (5)LER NUMBER (6)SEQUENTIAL NUMBER 060 REVISION NUMBER 00 REPORT DATE (7)MONTH DAY YEAR 02 01 1999 A ILI NAM Cook Unit 2 A IL)lYNAM Oc NUM R 05000-316 DOCKET NUMBER OTHER FACILITIES INVOLVED (8)OPERATING MODE (9)POWER LEVEL(10)00 e)(11)20.2201 (b)20.2203(a)(1) 20.2203(a)(2)(i) 20.2203(a)(2)(ii) 20.2203(a)(2)(v) 20.2203(a)(3)(i) 20.2203(a)(3)(ii) 20.2203(a)(4) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50.73(a)(2)(iii) 50.73(a)(2)(iv) 50.73(a)(2)(viii) 50.73(a)(2)(x) 73.71 OTHER THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR g: (Check one or mor 20.2203(a)(2)(iii) 20.2203(a)(2)(iv) 50.36(c)(1) 50.36(c)(2)

LICENSEE CONTACT FOR THIS LER (12)50.73(a)(2)(v) 50.73(a)(2)(vii)

Speedy h Abstract beknr or n NRC Fons 366A NAME Mr.Gordon Arent, Licensing Manager TELEPHONE NUMBER (Inc4de Ares Code)(616)697-5064 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE To EPIX CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE TO EPIX SUPPLEMENTAL REPORT EXPECTED (14)X YES (If Yes, complete EXPECTED SUBMISSION DATE).NO EXPECTED SUBMISSION DATE (15)MONTH 04 DAY 05 1999 Abstract (Limit to 1400 spaces, i.e.~approximately 15 single-spaced typewritten lines)(16)On December 31, 1998, plant personnel identified that Reactor Trip System Reponse Time (RTSRT)testing did not comply with the Technical Specification (TS)definition of RTSRT.Upon further review of the TS requirements for the Reactor Trip System, it was determined on December 31, 1998, that TS surveillance requirements for the RTSRT was not performed in accordance with Technical Specification (TS)4.3.1.1.3.

TS Definition 1.22 states that the RTSRT is considered to be the interval from when a monitored parameter exceeds its trip setpoint at the channel sensor until the loss of stationary gripper coil voltage.TS 4.3.1.1.3 requires that the RTSRT of each reactor trip function be demonstrated to be within its limit at least once per 18 months.The testing to demonstrate compliance with the TS 4.3.1.1.3 surveillance requirement would be accomplished by channel test measurements, as stated in the TS bases.Surveillance test procedures used to comply with the TS surveillance requirement measures the response time from the initiation of the channel sensor trip to the the opening of the reactor trip breakers.However, these procedures do not measure the response time from the opening of the reactor trip breakers to the loss of stationary gripper coil voltage.Therefore, the surveillance requirement of TS 4.3.1.1.3 has not been met.In accordance with 10CFR50.73(a)(2)(i)(B), this interim LER is being submitted as a condition prohibited by the plant's TS.The proximate cause of this condition is inadequate procedures, which were apparently based on the definition of reactor trip system response time.There is currently an ongoing evaluation of the significance and root cause of this event.Corrective actions will be developed based on the results of the evaluation.