ML18030A439

From kanterella
Revision as of 01:43, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Interim Deficiency Rept Re Status of Anchor Darling Valve Yokes.Ae Has Advised Final Rept on Cracked Yokes on Anchor Darling Valves Will Be Available in Aug 1980.Final Rept Will Be Forwarded During Sept 1980
ML18030A439
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/21/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To:
References
PLA-511, NUDOCS 8007250487
Download: ML18030A439 (2)


Text

REGULATO INFORMATION DISTRIBUTION TEN (AIDS)ACCESSION NBR:8007250487 OOC~DATE: 80/07/21 NOTARIZED:

NO DOCKET FACIL:50-387 Susquehanna Steam Electric Station~Unit ii Pennsylva 05000387 SF8 usquehanna Steam Electric Stationi Unit 2r Pennsylva 05000388 AUT AUTHOR AFF IL I AT ION CUR IS g iN~i'l~Pennsylvania Power 4 Light Co~RE IP~NAHE RECIPIENT AFFII IATION

SUBJECT:

Interim deficiency rept re status of Anchor Darling valve yokes.AE nas advised f inal rept on cracked yokes on Anchor Darling valves will be available in Aug 1980~Final rept will t>e fo,rwarded during Sept 1980.i DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR ENCL SIZE: ,/TITLE: Constr uction Def iciency Repor t (10CFR50~55E)NOTES:Send ISE 3 copies FSAR tt all amends'end ICE 3 copies FSAR 8 all amends.05000387 05000388 ACTION: HEC IPIE uT ID COOE/NA 1E A/D L ICENSiuG 2.1 RUSHt3ROOKiÃ

~20 STARKgR~14 COPIES LTTR FN 1 1 1 RECIPIENT ID CODE/NAr4E YOUNGBLOOOgB 15 SF RV ICED M~20 COPIES LTTR EN I.INTERNAL: AD/RC I/IE 0/DIR HUM FAC S EDO Ir STAFF 07 FIELD COOR/IE13 LIC QUAL BR NRC PDR 02 PR g~Sf REV BR EG F IL 01 7JGlRS DE V 1 1 AEOO 0 IR g HU14 FAC SFY EQUIP QUAL BR16 IFE 05 MPA 08 OELO 23 QA BR 10 RUTHERFORD/

u~IE EXTERNAL: ACRS NSIC 24 04 16 1 1 1 LPDR 03 JUL 29)sK)pier TOTAL NUMBER OF COPIES REQUIRED: LTTR~ENCL TWO NORTH NINTH STREET, ALLEN'TOWN, PA.18101 PHONEr (215)821~5151 NORM*N tv.CURTIS Vice President-Engineering 8 Construction-Nuclesr 821.5381 July 21, 1980 Mr.Boyce H.Crier Director, Region I U.S.Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION UPDATE IN THE STATUS OF A DEFICIENCY ON ANCHOR DARLING VALVE YOKES ER 100450 FILE 840-4/900-10 PLA-511

Reference:

PLA-505 dated July 7, 1980

Dear Mr.Grier:

This letter serves to supplement the above referenced correspondence which advised the Commission of the subject problem under provisions of 10CFR50.55(e).

PP&L has been advised by our architect engineer, Bechtel Power Corporation, that a final'eport on the sub)ect of cracked yokes on Anchor Darling valves will be available in August, 1980.Consequently, we expect to provide our final report to the Commission in September, 1980.Very truly yours, N.W.Curtis Vice President-Engineering

&Construction-Nuclear FLW:mcb cc: Mr.Victor Stello (15)Director-Office of Inspection

&Enforcement U.S.Nuclear Regulatory Commission Mr.Robert M.Gallo Washington, D.C.20555 U.S.Nuclear Regulatory Commission P.O.Box 52 Mr.G.McDonald, Director-Shickshinny, Pennsylvania 18655 Office of Management Information

&Program Control U.S.Nuclear Regulatory Commission Washington, D.C.20555 800 725 0'/~7.PENNSYLVANIA POWER Er LIGHT COMPANY Q (