ML16145A326

From kanterella
Revision as of 09:23, 8 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 - Annual Radioactive Effluent Release Report 58, January 1, 2015 Through December 31, 2015
ML16145A326
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/24/2016
From: Navin P D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of New Reactors
References
CCN: 16-51
Download: ML16145A326 (1)


Text

Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4

Subject:

Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.

Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.

The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.

This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator

-Region I NRC Senior Resident Inspector

-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)

Exelon Generation May 24, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277. 50-278. and ISFSI Docket 72-29 10CFR 50.4

Subject:

Correction to Peach Bottom Atomic Power Station Units 1, 2 and 3 Annual Radioactive Effluent Release Report 58, January 1, 2015 through December 31, 2015 On 4/29/16, Peach Bottom Atomic Power Station (PBAPS) submitted the subject Annual Radioactive Effluent Release Report (ARERR). This report included a revision to the site Process Control Program (PCP) for Radioactive Wastes (RW-AA-100) which was marked 'Exelon Confidential/Proprietary'.

Although the PCP was submitted as company confidential, Exelon has re-evaluated this marking and does not consider this procedure to be company confidential.

The PCP should not have included the 'Exelon Confidential/Proprietary' label and therefore, there is no need for the NRC to process this as a proprietary document.

This oversight has been entered into the Exelon Corrective Action Program. Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station CCN: 16-51 cc: NRC Regional Administrator

-Region I NRC Senior Resident Inspector

-Peach Bottom Atomic Power Station NRC Regional Inspector (C. Graves)