|
---|
Category:Letter
MONTHYEARML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21301A0992021-10-28028 October 2021 Draft Request for Additional Information: Proposed Alternate for Examination of Steam Generator Welds - Energy Harbor Nuclear Corp., Davis-Besse Nuclear Power Station, Unit No. 1 ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20133J9792020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18305B0192018-11-0101 November 2018 18 Davis-Besse Nuclear Power Station - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information(Rdb) ML18201A4122018-07-19019 July 2018 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML17355A3722017-12-21021 December 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17257A1402017-09-14014 September 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17135A3612017-05-12012 May 2017 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000346/2017010 (Jvb) ML17129A4112017-05-0909 May 2017 Request for Additional Information Regarding Evaluation Submitted in Response to License Renewal Commitment No. 54 ML17100A1732017-04-19019 April 2017 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16364A2792017-01-23023 January 2017 Request for Additional Information Regarding License Renewal Commitment No. 42 ML16355A0352016-12-19019 December 2016 Ltr 12/19/16 Davis-Besse Nuclear Power Station, Unit 1 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000346/2017009 (Bxj) ML16256A0662016-10-18018 October 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 2024-09-05
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 April 26, 2011 Mr. Barry S. Allen Site Vice President, FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-30S0 5501 North State Route 2 Oak Harbor, OH 43449-9760 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, LICENSE RENEWAL APPLICATION
Dear Mr. Allen:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the Operating License NPF-003 for Davis-Besse Nuclear Operating Station, Unit 1, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Cliff Custer and the date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2323 or e-mail paula.cooper@nrc.gov.
Sincerely, Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.
Requests for Additional cc w/encl: Listserv DAVIS-BESSE NUCLEAR POWER STATION, UNIT LICENSE RENEWAL REQUESTS FOR ADDITIONAL General On February 16, 2011, a draft copy of the environmental audit needs list was e-mailed to the licensee for preparation of the NRC's environmental audit held on March 7-11, 2011. This list specified the additional information needed by the NRC staff to perform its environmental review. In response to the staff's request, the applicant had the information available to the staff for its review during the site environmental audit. The information is needed by the staff to have sufficient information to prepare its supplemental environmental impact statement.
Please submit the information provided at the environmental audit for docketing. The Environmental Report (ER) states that there is a lease agreement with U.S. Fish and Wildlife Service (USFWS) for land tracts adjacent to the Davis-Besse site. Please provide a copy of the lease agreement describing the lease terms and legal description of the land currently leased by the USFWS for docketing. The ER refers to areas of the Davis Besse site that are not clearly delineated Figure 3.1-1 general plant layout or on an Please include an aerial map or site plan delineating the following: Owner-controlled area Protected area Disturbed area (Le., disturbance depth greater than 2 ft) Undisturbed area (Le., pockets of undisturbed land or land with possible surface disturbance in the past of less than 2 ft, such as by agricultural practices prior to plant construction) within the 221-acre non-marshland industrial area Marshland (undisturbed) National Wildlife Refuge leased areas Aquatic & Terrestrial The ER states that there is a lease agreement with USFWS for portions of the Davis-Besse site. Information received during the audit indicates the lease is valid until 2022, or five years into the period of extended operation.
Please provide information on USFWS's management of the marsh areas under their control impoundments and invasive species management).
Please provide an evaluation of the potential environmental impacts, if any, in the event the lease with USFWS is not renewed in 2022. ENCLOSURE
-Health Physics The Updated Safety Analysis Report (USAR), Section 11.5.5, Storage Facilities, discusses how low-level radioactive waste is handled at Davis-Besse Nuclear Power Station. Davis-Besse Nuclear Power Station cannot dispose of Class Band C low-level radioactive waste at the Barnwell, South Carolina facility due to Ohio not being in the Atlantic Interstate Low-Level Radioactive Waste Management Compact. The USAR states that Davis-Besse Nuclear Power Station has sufficient capacity within the Low Level Radioactive Waste Storage Facility (LLRWSF) building for approximately five years of storage for Class Band C waste. In addition to the storage capability, the Annual Radiological Environmental Operating Report discusses the use of a contractor to process and take title of the Class Band C waste for its disposal.
However, based on the information contained in the ER and the USAR, the staff is unable to reach the conclusion that Davis-Besse Nuclear Power Station has adequate capability to store and dispose of low level radioactive waste over the term of license renewal. Please provide additional information about Davis-Besse's typical yearly low-level waste generation rates, processing methods, storage capability, and disposal options that demonstrate that there will be adequate storage and disposal capability during the period of license renewal. Cultural The ER states that there is a current lease agreement with USFWS for portions of the Davis-Besse site. Information received during the cultural break out session at the audit did not clearly specify the process of notifying the Ohio State Preservation Office in the event cultural resources are discovered on the leased land. Please describe the process or procedure for notifying the Ohio State Preservation Office in the event cultural resources were discovered on the land leased from the USFWS. The ER states that the site was constructed using fill. The geology section of the ER indicated the presence of two to three feet of topsoil overlaying an estimated 10 thousand year old glacial stratum. Areas of the plant site that remain undisturbed have a higher probability of containing cultural resources than areas previously disturbed.
Photos seen during the audit show areas where significant excavation was performed during construction.
The staff needs additional information in order to meet the request made by the Ohio State Preservation Office. Please include an aerial map or site plan delineating areas that have had extensive excavation.
-References Air &
- ."nv NOAA 2009. NOAA e-mail, J. Kosanik to J, Snooks (AREVA), National Weather AM 1 Service, March 3, 2009. Description for Meteorological Monitoring System for the Toledo Edison AM 2 Company Davis-Besse Nuclear Power Station, Unit 1, Oak Harbor, Ohio, 032C, Rev. 2, 10104/2005 . Ohio EPA, Davis-Besse Station, Auxiliary Boiler Air Quality Permit, Date of AM 3 Issuance:
05/26/89.
Ohio EPA, No Permit Needed for Diesel Generators at Davis-Besse NPS, October 1, 1996. TRC Environmental Corporation, Emission Inventory Report, Centerior Energy AM 5 Corporation, Davis-Besse Nuclear Power Station, Oak Harbor, Ohio, February 10, 1995. AM 6 DBNPS, Greenhouse gas emissions at Davis-Besse, dated 03/04/2011 (1 page) 7 Memorandum from J.S. Seitz DBNPS, Actual vs Potential Emissions of Stationary Combustion Sources for 2005-2009 (15 pages) -Gale will add emissions for 2010 Second Extension of January 25, 1995 Emit Transition Policy and Clarification of Interim Policy, July 10, 1998 Final Title V Permit to West Lorain Plant, Issue Date: 11/19/04 (1 page) 4V\J"'-,,"V\.'>J Non-Title V Air Emissions Report for Davis-Besse Station, Non-Title V Air Emissions Report for Davis-Besse Station, AM 11 dated 04/04/2008 (1 Ohio EPA, 2008-2009 Non-Title V Air Emissions Report for Davis-Besse AM 12 dated 02/26/2010 (1 page)-_ .._...................
+ ......._...... _._----_ ... _--_ ..................
-.. Ohio EPA, Engineering Guide #61, "What is Ohio EPA's policy for limiting the AM 13 to emit (PTE) of air contaminant emissions at a facility for purposes of federal permitting?," Revised September 5, 1996 (3 pages) from Polly Bolssoneault (DBNPS) to Jay Liebrecht (Ohio EPA), Submittal of AM 14 o Annual Report for DBNPS Auxiliary Boiler (3 pages) AM 15 Davis-Besse 10 Yr. Average Operating Hours and Fuel Burn (2 pages) ...... f--.-.-.... AM 16 DBNPS, Diesel PM summaries (2 pages)
.b_L-08-039 Water WD rpt. for 2007 _2008-02-05.pdf Water WD Rpt for 2008_2009-02-11.pdf Water WD Rpt for 2006.pdf A 7 AE3.b_Reutter et al 1980 Env Evaluation Final Report Study 1.pdf A 8 AE3.c_Reutter J.M. 1981a, Ent.pdf AE3.d_Reutter 1981 b, Imp. pdf TR-1.PDF 2010_PUB356(Oct 2010).pdf 2011_RarePlantSpeciesbyCounty.pdf Layout for New Structures_12-7
-1 O.pdf T T 5_FirstEnergy Xmiss Line Veg Mgmt Specifications.
pdf T Best Mgmt Practices.
pdf T 2009b Critical Habitat.pdf 2009a.pdf 2009.pdf and Herdendorf 1993.pdf T 12 TR6.c_ Campbell 1995.pdf T 13 TR6.c_FirstEnergy 2008.pdf T 14 TR6.c_GORP 2009.pdf T 15 TR6.c_Herdendorf 1987.pdf T 16 TR6.c_MIPN 2009.pdf T TR6.c_ODNAP 2009c.pdf TR6.c_ODNAP 2009d.pdf 1988.pdf TR6.d_Ewert and Rodewald 2008, Mng Habits for Migrating Birds in ... T 21 TR6.d_FirstEnergy 2008.pdf
-Terrestrial (contd.) T H 1 2008.pdf 2009_Refuge Profiles.
pdf TR6.g_FECorp 2009,pdf TR6.g_0PSB 2007.pdf TR6.g_USEPA 2009.pdf Associates, Inc., 2002, letter J. Hewlett, Senior l..:JeCJIOClISI.
First Energy Service Co. clo Toledo Edison Company, regarding Preliminary Wetland Evaluation, Proposed Temporary Containment Area, Davis-Besse Plant, T T T T T T T T H Centerior Energy, 1994, letter from L.F. Stortz, Vice-President
-Nuclear, Besse, to T.O. Hic Division of Emergency and Remedial Response, Ohio Environmental Protection Agency, in, regarding Submittal of Information Regarding Spill of Gasoline, Identification Number 01-62-0180, February 22. H 3 H 5 H 6 H 7 H 8 H 9 Davis-Besse Nuclear Power Station, 2004, Periodic Test Procedure 04032, Wastewater Treatment Sludge Holding Tank Analysis, Revision 01, by R. Edwards, October 28. 2004, National (NPDES) Administrative Procedure DB-CN-00030, prepared by S. Chimo, June Davis-Besse, 2007, Business Practice DBBP-CHEM-2005, Spill Prevention Control and Countermeasure (SPCC) Plan, approved by V. Capozziello, March 16. Davis-Besse, undated, Condition Report #04-01719, "In 2004-05 Spent Fuel Pool i L"",::;m,c,,,,,,,, to Onsite Groundwater", discovery date 3/5/2004
-6 (contd.) . . . ___.____
I ! First Energy, 1998, letter from J.H. Lash, Plant Manager, Davis-Besse Nuclear ! H : Power Station, to C. Zipp, State Fire Marshall Office, regarding Underground
- Storage Tank Overfill Release Report, Incident Number 6281145-00, September
- 18 .
- FirstEnergy Nuclear Operating Comp any, 2007, l ett er from Kaminskas, H 11 i Director -Site Operations, to A. Gall, Division of Surface Water, Ohio i ! Environmental Protection Agency, regarding Submittal of 2006 Annual Sludge 1-----. i Disposal Report for the Davis-Besse Nuclear Power Station!
____.J I IFirstEnergy Nuclear Operating Company, 2009, letter from B. Allen, Vice President i i H 13 I -Nuclear, to A. .Gall, Sludge Coordinator, Ohio Protection i ! I Agency, regarding Submittal of the 2008 Annual Sludge Disposal Report for the i !Q§i\l i!?..
§i IlLJ.Ci 1l1J§i1)'?3. .1 : FirstEnergy Nuclear Operating Company, 2010, letter from P.M. Boissoneault, i H 14 I Manager, Site Chemistry, to A. Gall, Sewage Sludge Coordinator, Ohio , I Environmental Protection Agency, regarding Submittal of the 2009 Annual Sludge .i. -H-I Disposal Rep_ort for Davis-Besse Nuclear Station, Janual)' 21. ____I.. FirstEnergy Nuclear Operating Company, 2011, letter from P.M. Boissoneault, [ 15 Manager, Site Chemistry, to A. Gall, Sewage Sludge Coordinator, Ohio i i Environmental Protection Agency, regarding Submittal of the 2010 Annual Sludge !
i Surface Water, Ohio Environmental Protection Agency, regarding National ! , H 16 I Pollutant Discharge Elimination System Permit Renewal Application, Davis-Besse I I i Nuclear Power Station, EPA ID No. OH0003786, Permit No. 21B00011*ID, October I I ! .------+=_.
---_._------_._------_
..__...__ ..__..__._--_..__._._--'i I OEPA, 2010, letter from E. Swindall, Division of Water, to FirstEnergy Nuclear Gen i H 17 I Corp -Davis-Besse, regarding Preliminal)'
Compliance Review of Discharge . I ! Monitorif'!g November 20. I r-------*----**-
--*-----------*----------**-*
..*---*------*-------***---1 I I OEPA, 2010, letter from E. Swindall, Division of Water, to FirstEnergy Nuclear Gen
- I , H 18 ! Corp -Davis-Besse, regarding Preliminal)'
Compliance Review of Discharge l.. ..... -......
..................
'. ............
...... ................ I H 19 I Davis-Besse, undated, Graphs of tritium in wells I Socioeconomics, Environmental Justice & Land Use i-S"1$JS4, 5_Support Payments &Property Values ! r S sort) ......_-...............
_... I S 5 6 -7 Socioeconomics, Environmen t al Justice & Lan d Use 3 U.S. Government Leases for Ottawa Wildlife Refuge Formal documentation for land swap agreement (if there is one) Copies of photographs (6, 7, 15, 18, and 19 on flash drive at audit) C 1 demonstrating the level of disturbance on the industrialized portions of the plant. I Draft Final Preliminary Assessment Report: Locust Point Anti-Aircraft Artillery C 2 Firing Area, FUDS Property No. G050H0996, Nov 2010,2 volumes, prepared by Shaw Environmental for Army Corps of Engineers.
Request for Docket.
April 26, 2011 Mr. Barry S. Allen Site Vice President, FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, LICENSE RENEWAL APPLICATION
Dear Mr. Allen:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the Operating License NPF-003 for Davis-Besse Nuclear Operating Station, Unit 1, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Cliff Custer and the date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2323 or e-mail paula.cooper@nrc.gov.
Sincerely, IRA! Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.
Requests for Additional cc w/encl: Listserv DISTRIBUTION:
See next page Letter to Barry S. Allen from Paula E. Cooper dated April 26, 2011 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY: DLRRF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris DWrona EMilier MMahoney ICouret, OPA TReilly, OCA BHarris, OGC VMitlyng, RII JCameron, Rill