Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] Category:Technical Specification
MONTHYEARML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-17-137, License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years NL-17-137, Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years ML16280A2292016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-16-109, Indian Point 2 Improved Technical Specifications Bases2016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-15-094, Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements2015-08-11011 August 2015 Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements NL-15-021, Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 22015-02-12012 February 2015 Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 2 NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections ML14287A3002014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections NL-14-122, Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance2014-09-15015 September 2014 Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance ML14268A3532014-09-15015 September 2014 Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance NL-13-145, Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 32014-04-0101 April 2014 Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 3 NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-133, Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2010-12-16016 December 2010 Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources ML1015506572010-06-28028 June 2010 Issuance of Amendment Refueling Water Storage Tank Level Instrumentation ML0934307192009-10-13013 October 2009 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03, Technical Specification Bases, November 2009, Appendix a, B.2.0 Through B.3.9.6 NL-09-062, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2009-07-23023 July 2009 Proposed Technical Specification Change Regarding RWST Surveillance Requirement ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions NL-09-004, License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed2009-03-25025 March 2009 License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed NL-08-158, Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-10-28028 October 2008 Additional Information Regarding Amendment Application on Control Room Envelope Habitability NL-08-163, (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 212008-10-20020 October 2008 (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 21 NL-08-101, Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance2008-07-0909 July 2008 Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance ML0820701552008-06-26026 June 2008 Distribution of IP3 Technical Specification Amendment 236 ML0729102922007-10-0101 October 2007 Technical Specification Bases Change ML0724801632007-07-0606 July 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases ML0715003222007-03-29029 March 2007 IPEC Site Management Manual, Technical Specification Bases Update 23-05/16/07 ML0711402032007-03-29029 March 2007 Technical Specification Bases ML0707205372007-02-26026 February 2007 Improved Technical Specifications, Amendment 233 ML0702903522007-01-19019 January 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases NL-06-099, Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-4852006-09-25025 September 2006 Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-485 ML0620003692006-04-19019 April 2006 Update to IP3 Technical Specifications Bases ML0631905242006-04-19019 April 2006 Technical Specification Bases Manual, IP-SMM-AD-103 ML0604505332006-02-13013 February 2006 Tech Spec Pages for Amendments 245 and 229 Inoperability of Snubbers ML0532004452005-10-28028 October 2005 Technical Specification Bases Changes NL-05-105, Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements2005-10-0303 October 2005 Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements NL-05-107, Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology2005-09-26026 September 2005 Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology ML0523702312005-08-0808 August 2005 Technical Specification Bases NL-05-065, Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)2005-06-0808 June 2005 Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 22005-05-25025 May 2005 Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 ML0510800342005-04-14014 April 2005 Tech Spec Pages for Amendment 242 Reporting Requirements for Annual Radiological Environmental Operating Report ML0510903802005-03-31031 March 2005 Technical Specification Bases ML0509600592005-03-25025 March 2005 Distribution of IP3 Technical Specification Amendment 224 and 225 ML0508703842005-03-24024 March 2005 Technical Specification Pages Re 4.85 Percent Stretch Power Uprate & Relocation of Cycle-Specific Parameters ML0507500422005-02-0303 February 2005 Technical Specification Bases ML0506705222005-02-0303 February 2005 Technical Specification Bases 2022-02-28
[Table view] Category:Bases Change
MONTHYEARML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications ML16280A2292016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-16-109, Indian Point 2 Improved Technical Specifications Bases2016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-15-094, Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements2015-08-11011 August 2015 Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements NL-15-021, Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 22015-02-12012 February 2015 Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 2 ML14287A3002014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections ML14268A3532014-09-15015 September 2014 Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance NL-14-122, Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance2014-09-15015 September 2014 Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance NL-13-145, Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 32014-04-0101 April 2014 Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 3 NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-133, Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2010-12-16016 December 2010 Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources ML0934307192009-10-13013 October 2009 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03, Technical Specification Bases, November 2009, Appendix a, B.2.0 Through B.3.9.6 NL-09-062, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2009-07-23023 July 2009 Proposed Technical Specification Change Regarding RWST Surveillance Requirement NL-08-158, Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-10-28028 October 2008 Additional Information Regarding Amendment Application on Control Room Envelope Habitability NL-08-163, (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 212008-10-20020 October 2008 (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 21 ML0820701552008-06-26026 June 2008 Distribution of IP3 Technical Specification Amendment 236 ML0729102922007-10-0101 October 2007 Technical Specification Bases Change ML0724801632007-07-0606 July 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases ML0715003222007-03-29029 March 2007 IPEC Site Management Manual, Technical Specification Bases Update 23-05/16/07 ML0711402032007-03-29029 March 2007 Technical Specification Bases ML0702903522007-01-19019 January 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases ML0631905242006-04-19019 April 2006 Technical Specification Bases Manual, IP-SMM-AD-103 ML0620003692006-04-19019 April 2006 Update to IP3 Technical Specifications Bases ML0532004452005-10-28028 October 2005 Technical Specification Bases Changes ML0523702312005-08-0808 August 2005 Technical Specification Bases ML0510903802005-03-31031 March 2005 Technical Specification Bases ML0507500422005-02-0303 February 2005 Technical Specification Bases ML0506705222005-02-0303 February 2005 Technical Specification Bases ML0503303642005-01-19019 January 2005 Transmittal of Indian Point, Unit 3 Technical Specifications Bases ML0436303732004-12-10010 December 2004 Technical Specification Bases ML0318205862003-06-18018 June 2003 Transmittal of Indian Point 3 Technical Specification Bases ML0311204822003-03-28028 March 2003 Transmittal of Technical Specification Bases ML0311403632003-03-18018 March 2003 Transmittal of Technical Specification Amendment 215 ML0311403592003-03-18018 March 2003 Controlled Document Transmittal Form No. 27784 ML0218401362002-06-0505 June 2002 Proposed Changes to Technical Specifications: Selective Adoption of Alternate Source Term and Incorporation of Generic Changes; TSTF-51, TSTF-68; & TSTF-312 NL-02-037, Technical Specification Bases Changes2002-03-28028 March 2002 Technical Specification Bases Changes NL-02-024, Submittal of Technical Specifications Bases Changes for Indian Point Unit 22002-03-0101 March 2002 Submittal of Technical Specifications Bases Changes for Indian Point Unit 2 2020-09-14
[Table view] |
Text
SEntergy Enteray Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 J. E. Pollock Site Vice President July 23, 2009 NL-09-062 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Proposed Technical Specification Change Regarding RWST Surveillance Requirement Indian Point Unit Number 3 Docket No. 50-286 License No. DPR-64
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc, (Entergy) hereby requests a License Amendment to Operating License DPR-64, Docket No. 50-286 for Indian Point Nuclear Generating Unit No. 3 (IP3). The proposed amendment will delete the level indication instrument from the Refueling Water Storage Tank (RWST) Technical Specification Surveillance Requirement (SR)3.5.4.5.Attachment 1 provides a description and assessment of the proposed change. The marked-up pages showing the proposed changes are provided in Attachment
- 2. A copy of this application and the associated attachments are being submitted to the designated New York State official in accordance with 10 CFR 50.91.Entergy requests approval of the proposed amendment within 12 months and an allowance of 30 days for implementation.
There are no new commitments being made in this submittal.
If you have any questions or require additional information, please contact Mr. Robert Walpole, Manager, Licensing at (914) 734-6710.0 iLo NL-09-062 Docket 50-286 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on 2009.Sincerely, JEP/sp Attachments:
- 1. Analysis of Proposed Technical Specification Change Regarding RWST Surveillance Requirements
- 2. Markup of Technical Specification Page for Proposed Change Regarding RWST Surveillance Requirements cc: Mr. John P. Boska, Senior Project Manager, NRC NRR DORL Mr. Samuel J. Collins, Regional Administrator, NRC Region 1 NRC Resident Inspector, IP3 Mr. Francis J. Murray, Jr., President and CEO, NYSERDA Mr. Paul Eddy, New York State Dept. of Public Service ATTACHMENT 1 TO NL-09-062 ANALYSIS OF PROPOSED TECHNICAL SPECIFICATION CHANGE REGARDING RWST SURVEILLANCE REQUIREMENTS ENTERGY NUCLEAR OPERATIONS, INC.INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 DOCKET NO. 50-286 NL-09-062 Docket 50-286 Attachment 1 Page 1 of 5
1.0 DESCRIPTION
Entergy Nuclear Operations, Inc (Entergy) is requesting a License Amendment to Operating License DPR-64, Docket No. 50-286 for Indian Point Nuclear Generating Unit No. 3 (IP3). The proposed amendment will delete the level indication instrument from the Refueling Water Storage Tank (RWST) Technical Specification (TS) Surveillance Requirement (SR) 3.5.4.5.
2.0 PROPOSED CHANGE
S The requested amendment will change Technical Specification surveillance requirement 3.5.4.5 as follows: From: Perform CHANNEL CALIBRATION of RWST level Indicating switch and ensure the low level alarm setpoint is _10.5 feet and <12.5 feet.To: Perform CHANNEL CALIBRATION of RWST level switch and ensure the low level alarm setpoint is !10.5 feet and !12.5 feet.Changes to the Bases have not been included since changes are minimal.
3.0 BACKGROUND
SR 3.5.4.5 is one of two surveillances which calibrate the Io-lo level alarm functions of the Refueling Water Storage Tank (RWST). This SR also requires the level indication function of the RWST to be calibrated.
The surveillance requirement refers to a "level indicating switch" which is associated with both functions.
The proposed change is to delete "indicating" which will eliminate the level indication function from SR 3.5.4.5.The purpose of the proposed change is to make the TS more consistent with the standard technical specifications and it will allow a modification to improve the performance of the level alarm functions currently associated with LIC-921. Following the TS change Entergy is planning a modification, to be made using the 10 CFR 50.59 process, that will separate the Io-lo level alarm function from the level indication and add a separate instrument for the level alarm function.
The modification is expected to correct the past performance of RWST level instrument LIC-921 which has been indicating an adverse trend (instrument drift noted during performances of the calibration test).The problems with LIC-921 have at least in part been caused by dual function of level indication and the Io-lo level alarm. These functions are performed by a set of cams and linkages that interface with a common rotating shaft. Setting the alarm and calibrating the indicator have shown evidence of interaction in the past and calibration strategies to maximize the reliability of the alarm function may have affected the performance of the indication.
Testing is currently quarterly to assure operability.
NL-09-062 Docket 50-286 Attachment 1 Page 2 of 5 The design objective is to replace the existing LIC-921 alarm function by adding a new switch (as information it is noted that the current design plans to use a pressure switch with a significantly smaller range and, therefore better resolution and accuracy).
The indication function of LIC-921 shall remain in place for local monitoring of tank level. The new switch will be designated LC-923.4.0 TECHNICAL ANALYSIS Instruments installed on the RWST provide "level indication" and "1o-lo level alarms." The instrument loops installed are the following:
- Loop number L-920 provides CCR indication support for confirming initial condition minimum tank water volume. It also provides a RWST Io-lo Level alarm in the Central Control Room (CCR) that is redundant to that of LIC-921. The Io-lo level alarm is calibrated by SR 3.5.4.6.The level indication is not calibrated by TS SR.* Loop number L-921 includes instrument LIC-921 which includes a level switch with local indication and actuates a Io-lo level alarm on panel SBF-2 in the CCR when water level decreases below 11.5 ft (nominal).
The level switch level indication and Io-lo level alarm are calibrated by SR 3.5.4.5.In addition, Loop number L-922 provides alarms at two different levels above the level which represents the initial condition minimum tank water volume. The lo level alarm alerts operations to a condition wherein the minimum TS volume is being approached due to decreasing level and the high alarm alerts operations to a condition wherein an overflow condition is being approached due to increasing level. This loop is not TS required.The proposed change will remove the level switch function for indication but not the Io-lo level alarm function from SR 3.5.4.5. The proposed change will not affect the safety related Class I classification, it will not revise the seismic design requirements, it will not add or delete any functions, and it will not revise the setpoints.
Additionally the current TS surveillance periodicity of the Io-lo level will be retained for the new level alarm.Removal of the level switch function for indication from SR 3.5.4.5 will remove the possibility of unnecessary shutdown or a request for waiver of compliance.
SR 3.0.1 states that SRs shall be met during the modes or other specified conditions in the TS applicability statement for individual LCOs, unless otherwise stated in the SR. Failure to meet a SR, whether such failure is experienced during the performance of the surveillance or between performances of the surveillance, shall be failure to meet the LCO. Since SR 3.5.4.5 includes level indication, a failure of the level indication would mean the LCO would not to be met. There is no action statement for level indication so LCO 3.0.3 would apply and require plant shutdown to mode 5 to be initiated within one hour.The RWST Io-lo level alarm function is identified in UFSAR Table 7.5-1 as Regulatory Guide 1.97 Type Al instrumentation and was approved as such in Reference
- 1. Type A is defined as those variables that provide primary information needed to permit control room operators to take specified manually controlled actions for which automatic controls are not provided.
The Io-lo level alarms specified in TS LCO 3.5.4 are the primary means used for the manual switchover to recirculation.
Type 1 specifies the design and qualification criteria.
The Io-lo level alarms have NL-09-062 Docket 50-286 Attachment 1 Page 3 of 5 been integrated into the RWST TS and the action statements associated with these instruments are appropriate based on the manual actions they would prompt to initiate transfer to recirculation.
It is appropriate that they be left in this TS LCO rather than TS 3.3.3 for post accident monitors.The RWST level indication is not required to be in the TS. Only loop 920 is a post accident monitor and it is identified in Table 7.5-1 of the UFSAR as Type D.2 (variables that indicate the operating status).5.0 REGULATORY ANALYSIS 5.1 No Significant Hazards Consideration Entergy Nuclear Operations, Inc (Entergy) has evaluated the safety significance of the proposed change to the Indian Point 3 Technical Specifications that revises the RWST surveillance criterion to remove the level indicating function.
This proposed change has been evaluated according to the criteria of 10 CFR 50.92, "Issuance of Amendment".
Entergy has determined that the proposed change does not involve a Significant Hazards Consideration, as discussed below.1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
No. The proposed change revises the existing Indian Point 3 Refueling Water Storage Tank (RWST) Technical Specification (TS) Surveillance Requirement (SR) to remove the level indication function for the L-921 instrument loop. Removal of a TS SR for the level indication does not increase the probability of an accident occurring since it is not an accident initiator and does not increase the consequences of an accident since it is not performing any mitigating function and is not a post accident instrument.
The proposed revision will not affect RWST Io-lo level alarm function used for operator guidance to begin sequencing to Recirculation Mode of Safety Injection during a postulated loss of coolant accident (LOCA). There will be no change in equipment qualification requirements or changes to the surveillance requirement for the Io-lo level alarm. Therefore the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
No. The proposed change removes the RWST level indication function from the RWST 1o-1o level alarm surveillance requirement for the L-921 instrument loop. The proposed change does not involve installation of new equipment or modification of existing equipment, so that no new equipment failure modes are introduced.
Also, the proposed change does not result in a change to the way that the equipment or facility is operated so that no new accident initiators are created. Therefore the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?No. The proposed change removes the RWST level indication function from the RWST Io-lo level alarm surveillance requirement for the L-921 instrument loop. There is no change to the design requirements or the surveillance interval.
The proposed change does not add NL-09-062 Docket 50-286 Attachment 1 Page 4 of 5 the level indicating function elsewhere in the TS because it is a local level indication that is only used during normal operation and was never a post accident monitoring instrument.
Therefore the proposed change does not involve a significant reduction in a margin of safety.Based on the above, Entergy concludes that the proposed amendment to the Indian Point 3 Technical Specifications presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of 'no significant hazards consideration' is justified.
5.2 Applicable
Regulatory Requirements
/ Criteria General Design Criteria (GDC) 11 dated July 11, 1967 formed part of the plant design basis. It required the facility to be provided with a control room from which actions to maintain safe operational status of the plant can be maintained.
IP3 Final Safety Analysis Report (FSAR) Chapter 7 discusses compliance with the GDC. Section 7.1 notes that the Control Room is continuously occupied by qualified operating personnel under all operating and Maximum Credible Accident (MCA) conditions.
The post accident monitoring system instrumentation available to the operator for monitoring plant conditions complies with Regulatory Guide 1.97 requirements as documented in NRC letter (Reference 1). Section 7.5 states that two redundant Io-lo level alarms indicate that the Safety Injection and Containment Spray Systems have removed water from the RWST and that recirculation can commence.
One level indication reads out on the control board and one level indication is local. The level indication in the control room is classified as type D.2 and is not required to be in the TS. The local level indicator was never a post accident monitoring instrument and never required to be in the TS.The proposed change to remove the local level indication from the TS surveillance requirement is consistent with the FSAR which specifies that only Type A post accident monitors are in the TS.The Io-lo RWST level alarm functions will remain subject to TS SR.5.3 Environmental Evaluation The proposed change to the Indian Point 3 Technical Specifications does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in the individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with this proposed amendment.
5.4 Precedence
There was no direct precedence identified for the proposed technical specification change because it is design specific.
The IP3 TS were originally custom and converted based upon the NRC Standard Technical Specifications (STS) (Reference 2). Although the STS does not contain provisions for a Io-lo level alarm, the Io-lo level alarm was added to the IP3 RWST Technical Specification
3.5.4 during
the conversion.
The IP3 design depends on the Io-lo level alarms to alert the Control Room operators to level conditions which require operators to begin sequencing to Recirculation Mode of Safety Injection during a postulated loss of coolant accident (LOCA).
NL-09-062 Docket 50-286 Attachment 1 Page 5 of 5 Since the level indication function for the RWST is integral with the Io-lo level alarm on one instrument loop, the description of the loop in the SR included the level indication function.Removal of the level indication function makes the TS consistent with those of IP2 which also incorporates the Io-lo alarm function in the RWST TS but not the level indication function.
6.0 REFERENCES
- 1. NRC letter to Entergy regarding Emergency Response Capability
-Conformance to RG 1.97 Revision 3, for Indian Point 3 (TAC No. 51099), dated April 3, 1991.2. NUREG 1431, Standard Technical Specifications for Westinghouse Plants, Revision 1, dated March 2004.
ATTACHMENT 2 TO NL-09-062 MARKUP OF TECHNICAL SPECIFICATION PAGE FOR PROPOSED CHANGE REGARDING RWST SURVEILLANCE REQUIREMENTS Changes indicated by lineout for deletion and Bold/Italics for additions ENTERGY NUCLEAR OPERATIONS, INC.INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 DOCKET 50-286 RWST 3.5.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.4.1 -------------------
NOTE--------------------
Only required to be performed when ambient air temperature is < 35°F or > 110 0 F.Verify RWST borated water temperature is 35°F and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 110 0 F.SR 3.5.4.2 Verify RWST borated water level is 35.4 feet. 7 days SR 3.5.4.3 Verify RWST boron concentration is 2400 ppm and 31 days 2600 ppm.SR 3.5.4.4 Perform CHANNEL CHECK of RWST level 7 days SR 3.5.4.5 Perform CHANNEL CALIBRATION of RWST level 184 days indeat-n-switch and ensure the low level alarm setpoint is 10.5 feet and 12.5 feet.SR 3.5.4.6 Perform CHANNEL CALIBRATION of RWST level 18 months transmitter and ensure the low level alarm setpoint is ý10.5 feet and 12.5 feet.INDIAN POINT 3 3.5.4-2 Amendment LzoG5