Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23024A0462023-01-17017 January 2023 License Amendment Request for the Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan ML22332A0482022-11-22022 November 2022 New York State Alyse Peterson Comments on Completion of Emergency Planning Nd License Amendment Request Prior to Spent Fuel Transfer from Spent Fuel Pools to Casts (Dockets 50-003, 50-247, 50-286) ML22321A1482022-11-17017 November 2022 License Amendment Request to Approve the Independent Spent Fuel Storage Installation-Only Emergency Plan ML22306A1262022-11-0202 November 2022 License Amendment Request to Revise Indian Point Nuclear Generating Unit Nos. 2 and 3 Renewed Facility Licenses and Permanently Defueled Technical Specifications and IP3 Appendix C Technical Specifications to Reflect Permanent Removal of Sp ML22214A1282022-08-0202 August 2022 License Amendment Request to Revise Indian Point Nuclear Generating Unit No. 2 Permanently Defueled Technical Specifications to Modify Staffing Requirements Following Transfer of Spent Fuel to Dry Storage ML22140A1262022-05-20020 May 2022 License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements ML22035A1212022-02-0404 February 2022 Revision to Holtec Decommissioning International, LLC, License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition ML21356B7042021-12-22022 December 2021 License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications ML20078L1402020-04-15015 April 2020 Issuance of Amendment Nos. 62, 293, and 268 Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML20017A2902020-01-17017 January 2020 Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-053, Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2019-06-0606 June 2019 Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NL-19-013, Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition2019-04-15015 April 2019 Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition NL-19-026, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-04-15015 April 2019 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-001, License Amendment Request to Revise the Indian Point Energy Center Site Emergency Plan to Address the Permanently Shut Down and Defueled Condition2019-04-15015 April 2019 License Amendment Request to Revise the Indian Point Energy Center Site Emergency Plan to Address the Permanently Shut Down and Defueled Condition CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 NL-18-034, License Amendment Request- Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2018-06-20020 June 2018 License Amendment Request- Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) NL-17-070, Additional Information for the Review of the Plants License Renewal Application (LRA) Regarding the Containment Leak Rate Program2017-05-31031 May 2017 Additional Information for the Review of the Plants License Renewal Application (LRA) Regarding the Containment Leak Rate Program NL-17-049, Unit Nos., 1, 2, and 3, License Amendment Request - Cyber Security Plan Implementation Schedule2017-04-28028 April 2017 Unit Nos., 1, 2, and 3, License Amendment Request - Cyber Security Plan Implementation Schedule NL-17-035, Proposed License Amendment Regarding Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank2017-04-0707 April 2017 Proposed License Amendment Regarding Connection of Non-Seismic Boric Acid Recovery System to the Refueling Water Storage Tank NL-17-018, Consistency Certification for Entergy Nuclear Indian Point 2 and Entergy Nuclear Indian Point 3 License Renewal Application2017-01-31031 January 2017 Consistency Certification for Entergy Nuclear Indian Point 2 and Entergy Nuclear Indian Point 3 License Renewal Application NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application NL-16-118, Indian Point Nuclear Power Plant, Units 2 & 3, Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel2016-12-14014 December 2016 Indian Point Nuclear Power Plant, Units 2 & 3, Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel ML16355A0682016-12-14014 December 2016 Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel NL-16-118, Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel2016-12-14014 December 2016 Proposed License Amendment Regarding the Inter-Unit Transfer of Spent Fuel CNRO-2016-00020, Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning .2016-08-16016 August 2016 Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning . NL-15-148, Amendment 17 to License Renewal Application (LRA)2015-12-14014 December 2015 Amendment 17 to License Renewal Application (LRA) NL-15-144, License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-144, Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-109, Reply to Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-022015-09-0101 September 2015 Reply to Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-02 NL-15-067, License Amendment Request - Cyber Security Plan Implementation Schedule2015-06-16016 June 2015 License Amendment Request - Cyber Security Plan Implementation Schedule NL-15-021, Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 22015-02-12012 February 2015 Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 2 NL-14-146, Amendment 16 to License Renewal Application (LRA)2014-12-15015 December 2014 Amendment 16 to License Renewal Application (LRA) NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years2014-12-0909 December 2014 Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years ML14304A7002014-04-30030 April 2014 Annual Energy Outlook 2014 NL-13-145, Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 32014-04-0101 April 2014 Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 3 NL-14-035, Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves2014-04-0101 April 2014 Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves NL-14-016, License Amendment Request - Cyber Security Plan Implementation Schedule2014-01-30030 January 2014 License Amendment Request - Cyber Security Plan Implementation Schedule NL-13-131, Amendment 14 to License Renewal Application (LRA)2013-09-26026 September 2013 Amendment 14 to License Renewal Application (LRA) NL-13-077, License Renewal Application-Update to Electrical Meb and Structures Monitoring Program Scope, Aging Management Programs2013-05-0606 May 2013 License Renewal Application-Update to Electrical Meb and Structures Monitoring Program Scope, Aging Management Programs NL-13-015, Proposed License Amendment Regarding Connection of Non Seismic Boric Acid Recovery System to the Refueling Water Storage Tank2013-04-15015 April 2013 Proposed License Amendment Regarding Connection of Non Seismic Boric Acid Recovery System to the Refueling Water Storage Tank ML13116A0082013-04-0909 April 2013 Engineering Evaluation of Postulated RWST Inventory Loss During the Reverse Osmosis Clean-up Skid Process in Accordance to 2-TAP-001-ROS Due to Seismic Event NL-13-046, Amendment 13 to License Renewal Application (LRA) Pertaining to One-Time Inspection and Selective Leaching Programs2013-03-18018 March 2013 Amendment 13 to License Renewal Application (LRA) Pertaining to One-Time Inspection and Selective Leaching Programs ML13046A1662013-02-22022 February 2013 Issuance of Amendment Connecting Non-Seismic Purification System Piping to the Refueling Water Storage Tank NL-12-190, Amendment 12 to License Renewal Application (LRA)2012-12-27027 December 2012 Amendment 12 to License Renewal Application (LRA) NL-12-090, Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank2012-08-14014 August 2012 Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank NL-12-107, Application to Renew Operating Licenses for Indian Point Nuclear Power Reactors Unit 2 and Unit 3, General Correspondence - NL-12-1072012-08-0808 August 2012 Application to Renew Operating Licenses for Indian Point Nuclear Power Reactors Unit 2 and Unit 3, General Correspondence - NL-12-107 2023-01-17
[Table view] Category:Technical Specification
MONTHYEARML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-17-137, License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years NL-17-137, Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years ML16280A2292016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-16-109, Indian Point 2 Improved Technical Specifications Bases2016-09-19019 September 2016 Indian Point 2 Improved Technical Specifications Bases NL-15-094, Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements2015-08-11011 August 2015 Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements NL-15-021, Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 22015-02-12012 February 2015 Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems Indian Point Unit Number 2 NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections ML14287A3002014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections NL-14-122, Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance2014-09-15015 September 2014 Indian Point, Unit 2 - Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance ML14268A3532014-09-15015 September 2014 Proposed License Amendment Re an Exigent Change to Technical Specification 3.8.6, Station Battery Surveillance NL-13-145, Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 32014-04-0101 April 2014 Proposed License Amendment to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Indian Point Unit Nuclear Generating Unit Nos. 2 and 3 NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-133, Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2010-12-16016 December 2010 Supplement to Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources ML1015506572010-06-28028 June 2010 Issuance of Amendment Refueling Water Storage Tank Level Instrumentation ML0934307192009-10-13013 October 2009 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03, Technical Specification Bases, November 2009, Appendix a, B.2.0 Through B.3.9.6 NL-09-062, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2009-07-23023 July 2009 Proposed Technical Specification Change Regarding RWST Surveillance Requirement ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions NL-09-004, License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed2009-03-25025 March 2009 License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed NL-08-158, Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-10-28028 October 2008 Additional Information Regarding Amendment Application on Control Room Envelope Habitability NL-08-163, (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 212008-10-20020 October 2008 (IP2) - Transmittal of Amendment Update to the Final Safety Analysis Report (Fsar), Revision 21 NL-08-101, Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance2008-07-0909 July 2008 Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance ML0820701552008-06-26026 June 2008 Distribution of IP3 Technical Specification Amendment 236 ML0729102922007-10-0101 October 2007 Technical Specification Bases Change ML0724801632007-07-0606 July 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases ML0715003222007-03-29029 March 2007 IPEC Site Management Manual, Technical Specification Bases Update 23-05/16/07 ML0711402032007-03-29029 March 2007 Technical Specification Bases ML0707205372007-02-26026 February 2007 Improved Technical Specifications, Amendment 233 ML0702903522007-01-19019 January 2007 Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases NL-06-099, Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-4852006-09-25025 September 2006 Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-485 ML0620003692006-04-19019 April 2006 Update to IP3 Technical Specifications Bases ML0631905242006-04-19019 April 2006 Technical Specification Bases Manual, IP-SMM-AD-103 ML0604505332006-02-13013 February 2006 Tech Spec Pages for Amendments 245 and 229 Inoperability of Snubbers ML0532004452005-10-28028 October 2005 Technical Specification Bases Changes NL-05-105, Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements2005-10-0303 October 2005 Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements NL-05-107, Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology2005-09-26026 September 2005 Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology ML0523702312005-08-0808 August 2005 Technical Specification Bases NL-05-065, Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)2005-06-0808 June 2005 Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 22005-05-25025 May 2005 Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 ML0510800342005-04-14014 April 2005 Tech Spec Pages for Amendment 242 Reporting Requirements for Annual Radiological Environmental Operating Report ML0510903802005-03-31031 March 2005 Technical Specification Bases ML0509600592005-03-25025 March 2005 Distribution of IP3 Technical Specification Amendment 224 and 225 ML0508703842005-03-24024 March 2005 Technical Specification Pages Re 4.85 Percent Stretch Power Uprate & Relocation of Cycle-Specific Parameters ML0507500422005-02-0303 February 2005 Technical Specification Bases ML0506705222005-02-0303 February 2005 Technical Specification Bases 2022-02-28
[Table view] Category:Amendment
MONTHYEARML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) ML21074A0002021-04-22022 April 2021 Issuance of Amendment No. 270 Permanently Defueled Technical Specifications ML21083A0002021-04-14014 April 2021 Issuance of Amendment No. 63 Permanently Defueled Technical Specifications NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-17-137, Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 Indian Point Unit No. 3 - License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years NL-17-137, License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years2017-12-0808 December 2017 License Amendment Request (LAR) for One-Time Extension of the Containment Type a Leak Rate Testing Frequency from 15 to 16 Years ML1015506572010-06-28028 June 2010 Issuance of Amendment Refueling Water Storage Tank Level Instrumentation ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions NL-09-004, License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed2009-03-25025 March 2009 License Amendment Request Regarding Surveillance Requirements for ECCS Valves Required to Be in Position with Power to the Valve Operator Removed NL-08-101, Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance2008-07-0909 July 2008 Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance ML0707205372007-02-26026 February 2007 Improved Technical Specifications, Amendment 233 NL-06-099, Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-4852006-09-25025 September 2006 Units, 2 and 3 - Proposed Changes to Technical Specifications: Miscellaneous Editorial Changes, Including TSTF-485 ML0604505332006-02-13013 February 2006 Tech Spec Pages for Amendments 245 and 229 Inoperability of Snubbers NL-05-105, Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements2005-10-0303 October 2005 Proposed Change to Technical Specifications Regarding Emergency Core Cooling System Throttle Valve Surveillance Requirements NL-05-107, Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology2005-09-26026 September 2005 Proposed Change to Indian Point 2 Technical Specifications Regarding LBLOCA Analysis Methodology NL-05-065, Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)2005-06-0808 June 2005 Application for a Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 22005-05-25025 May 2005 Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 ML0510800342005-04-14014 April 2005 Tech Spec Pages for Amendment 242 Reporting Requirements for Annual Radiological Environmental Operating Report ML0509600592005-03-25025 March 2005 Distribution of IP3 Technical Specification Amendment 224 and 225 ML0508703842005-03-24024 March 2005 Technical Specification Pages Re 4.85 Percent Stretch Power Uprate & Relocation of Cycle-Specific Parameters NL-04-025, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2004-03-0909 March 2004 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process NL-04-022, Proposed Change to Technical Specifications Regarding Reactor Coolant Pump Flywheel Inspection Interval (TSTF-421)2004-03-0303 March 2004 Proposed Change to Technical Specifications Regarding Reactor Coolant Pump Flywheel Inspection Interval (TSTF-421) ML0330904272003-10-30030 October 2003 Tech Spec Page for Amendment No. 219, Revising TS 5.5.10 to Adopt the Requirements of the American Society for Testing and Materials Standard D3803-1989 ML0325213882003-08-28028 August 2003 Transmittal of IP3 Technical Specification Amendment 218 ML0311403682003-03-26026 March 2003 Transmittal of Technical Specification Amendment 216 ML0221202052002-07-30030 July 2002 Technical Specifications, Amendment Reactor Vessel Material Surveillance Program (Tac No. MB3917) NL-02-082, License Amendment Request (LAR No. 02-010) - Regarding Indian Point Energy Center, Unit No. 2 Technical Specifications Requirements for Control Rod Misalignment & Rod Position Indication2002-07-0909 July 2002 License Amendment Request (LAR No. 02-010) - Regarding Indian Point Energy Center, Unit No. 2 Technical Specifications Requirements for Control Rod Misalignment & Rod Position Indication ML0215505332002-05-29029 May 2002 List of Figures for Amendment No. 227, Indian Point, Unit 2 ML0211905422002-04-25025 April 2002 No. 2 - Technical Specifications - Changes to Technical Specifications Bases ML0210103892002-04-11011 April 2002 Correction of Technical Specification Page Issued by Amendment No. 225 (Tac No. MB2990) ML0209400142002-04-0202 April 2002 Technical Specification, Amendment Technical Specification Changes to Secondary Leakage Limits and Steam Generator Tube Inservice Surveillance Requirements (Tac No. MB0770) ML0209101122002-03-27027 March 2002 Technical Specification Pages for Amendment No. 225 ML0205004982002-02-15015 February 2002 TS, Amendment Updated Pressure-Temperature Limit Curves (Tac No. MB2419) ML0204403322002-02-12012 February 2002 Technical Specification Amendment No. 223, Re Removal of Containment Isolation Valve Lists from Technical Specifications ML0037781142000-12-12012 December 2000 Transfer of Facility Operating Licenses and Proposed License Amendments. Consolidated Edison Co. of New York, Inc, Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit Nos. 1 and 2 2022-02-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 28,2010 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO.3 - ISSUANCE OF AMENDMENT RE: REFUELING WATER STORAGE TANK LEVEL INSTRUMENTATION (TAC NO. ME1751)
Dear Sir or Madam:
The Commission has issued the enclosed Amendment No. 241 to Facility Operating License No.
DPR-64 for the Indian Point Nuclear Generating Unit NO.3. The amendment consists of changes to the Technical Specifications (TS) in response to your application dated July 23, 2009.
The amendment removes the local refueling water storage tank level indication from TS Surveillance Requirement 3.5.4.5.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, hn P. Boska, Senior Project Manager lant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosures:
- 1. Amendment No. 241 to DPR-64
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 ENTERGY NUCLEAR INDIAN POINT 3, LLC ENTERGY NUCLEAR OPERATIONS, INC.
DOCKET NO. 50-286 INDIAN POINT NUCLEAR GENERATING UNIT NO.3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 241 License No. DPR-64
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Nuclear Operations, Inc. (the licensee) dated July 23, 2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-64 is hereby amended to read as follows:
-2 (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 241, are hereby incorporated in the license. ENO shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: June 28, 2010
ATTACHMENT TO LICENSE AMENDMENT NO. 241 FACILITY OPERATING LICENSE NO. DPR-64 DOCKET NO. 50-286 Replace the following page of the License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page Insert Page 3 3 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Page Insert Page 3.5.4-2 3.5.4-2
-3 (4) ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70, Amdt. 203 to receive, possess, and use in amounts as required any 11/27/00 byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) ENO pursuant to the Act and 10 CFR Parts 30 and 70, to Amdt. 203 possess, but not separate, such byproduct and special 11/27/00 nuclear materials as may be produced by the operation of the facility.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not in excess of 3216 megawatts thermal (100% of rated power).
(2) Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No. 241, are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.
(3) (DELETED) Amdt. 205 2-27-01 (4) (DELETED) Amdt. 205 2-27-01 D. (DELETED) Amdt.46 2-16-83 E. (DELETED) Amdt.37 5-14-81 F. This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.
Amendment No. 241
RWST 3.5.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.4.1 -------------------NOTE-------------------
Only required to be performed when ambient air temperature is < 35°F or > 110°F.
Verify RWST borated water temperature is ~ 35°F and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- -s; 110°F.
SR 3.5.4.2 Verify RWST borated water level is ~ 35.4 feet. 7 days SR 3.5.4.3 Verify RWST boron concentration is ~ 2400 ppm and 31 days
- -s; 2600 ppm.
SR 3.5.4.4 Perform CHANNEL CHECK of RWST level. 7 days SR 3.5.4.5 Perform CHANNEL CALIBRATION of RWST 1evel switch and 184 days ensure the low level alarm setpoint is ~10.5 ft and
- -S;12.5 ft.
SR 3.5.4.6 Perform CHANNEL CALIBRATION of RWST level transmi tter 18 months and ensure the low level alarm setpoint is ~10.5 ft and :-S;12. 5 ft.
INDIAN POINT 3 3.5.4-2 Amendment 241
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 241 TO FACILITY OPERATING LICENSE NO. DPR-64 ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO.3 DOCKET NO. 50-286
1.0 INTRODUCTION
By letter dated July 23, 2009, Agencywide Documents Access and Management System (ADAMS) Accession No. ML092120126, Entergy Nuclear Operations, Inc. (Entergy or the licensee) submitted a request for changes to the Indian Point Nuclear Generating Unit NO.3 (IP3) Technical Specifications (TS). The proposed changes would revise TS 3.5.4, "Refueling Water Storage Tank (RWST)," to remove the RWST local level indication from TS Surveillance Requirement (SR) 3.5.4.5.
2.0 REGULATORY EVALUATION
The following explains the applicability of General Design Criteria (GDC) for IP3. The construction permit for IP3 was issued by the Atomic Energy Commission (AEC) on August 13, 1969, and the operating license was issued on December 12,1975. The plant GDC are listed in the Updated Final Safety Analysis Report (UFSAR) Chapter 1.3, "General Design Criteria", with more details given in the applicable UFSAR sections. The AEC published the final rule that added Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants," in the Federal Register (36 FR 3255) on February 20, 1971, with the rule effective on May 21, 1971. In accordance with a Nuclear Regulatory Commission (NRC) staff requirements memorandum from S. J. Chilk to J. M. Taylor, "SECY-92 223 - Resolution of Deviations Identified During the Systematic Evaluation Program," dated September 18, 1992 (ADAMS Accession No. ML003763736), the Commission decided not to apply the Appendix A GDC to plants with construction permits issued prior to May 21, 1971.
Therefore, the GDC which constitute the licensing bases for IP3 are those in the UFSAR.
As discussed in the UFSAR, the licensees for IP3 have made some changes to the facility over the life of the unit that have committed to some of the GDCs from 10 CFR Part 50, Appendix A.
The extent to which the Appendix A GDC have been invoked can be found in specific sections of the UFSAR and in other IP3 licensing basis documentation, such as license amendments.
-2 The following GOCs, quoted from the UFSAR, pertain to this license amendment:
GOC-11: The facility shall be provided with a control room from which actions to maintain safe operational status of the plant can be controlled. Adequate radiation protection shall be provided to permit continuous occupancy of the control room under any credible post-accident condition or as an alternative, access to other areas of the facility as necessary to shut down and maintain safe control of the facility without excessive radiation exposure of personnel.
GOC-12: Instrumentation and controls shall be provided as required to monitor and maintain within prescribed operating ranges essential reactor facility operating variables.
GOC-13: Means shall be provided for monitoring or otherwise measuring and maintaining control over the fission process throughout core life under all conditions that can reasonably be anticipated to cause variations in reactivity of the core.
Section 182a of the Atomic Energy Act (Act) requires applicants for nuclear power plant operating licenses to include TSs as part of the license. The licensee provides TSs in order to maintain the operational capability of structures, systems and components that are required to protect the health and safety of the public. The Commission's regulatory requirements that are related to the content of the TS are contained in 10 CFR 50.36. The TS requirements in 10 CFR 50.36 include the following categories: (1) safety limits, limiting safety systems settings and limiting control settings; (2) limiting conditions for operation (LCOs); (3) SRs; (4) design features; and (5) administrative controls.
10 CFR 50.59(c)(1)(i) requires a licensee to submit a license amendment application pursuant to 10 CFR 50.90 if a change to the TS is required. Furthermore, the requirements of 10 CFR 50.59 necessitate that NRC approve the TS changes before the TS changes are implemented.
Specifically, 10 CFR 50.36(c)(2)(ii) requires that a TS LCO be established for each item meeting one or more of the following criteria:
Criterion 1 Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
Criterion 2 A process variable, design feature, or operating restriction that is an initial condition for a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of the fission product barrier.
Criterion 3 A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of the fission product barrier. .
-3 Criterion 4 A structure, system, or component which operating experience or probabilistic safety assessment has shown to be significant to public health and safety.
10 CFR 50.36(c)(3), "Surveillance requirements," states that SRs are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met.
In addition to the above criteria in 10 CFR 50.36, the NRC staff reviewed the proposed changes using other applicable regulatory guidance and docketed information including the following:
- Regulatory Guide (RG) 1.97, "Instrumentation For Light-Water-Cooled Nuclear Power Plants To Assess Plant And Environs Conditions During And Following An Accident,"
Revision 3, describes a method acceptable to the NRC staff for complying with the Commission's regulations to provide instrumentation for monitoring plant variables and systems during and after an accident.
3.0 TECHNICAL EVALUATION
The RWST supplies water to the emergency core cooling system (ECCS) during the injection phase of a loss-of-coolant accident (LOCA). The switchover from the injection phase to the recirculation phase is manually initiated when the RWST level has reached the low level alarm setpoint, which is given in TS SR 3.5.4.5 and SR 3.5.4.6, and sufficient coolant inventory to support pump operation during the recirculation phase is verified to be in the containment.
Therefore, the RWST low level setpoint is monitored for accident response purposes. Note that the licensee's submittal refers to this alarm as the "10-10 level alarm."
The primary purpose of the accident monitoring instrumentation is to display plant variables that provide information required by the control room operators during accident situations. RG 1.97 instrumentation fulfills the requirements of either 10 CFR 50.36(c)(2)(ii) Criterion 3 or Criterion 4.
The requirements of 10 CFR 50.36(c)(2)(ii) Criterion 1 and Criterion 2 are not applicable to RG 1.97 instrumentation.
RG 1.97 recommends that Type A instrumentation be provided for variables that provide primary information needed by the control room operating personnel to take specified manual actions for which no automatic control is provided and that are required for safety systems to accomplish their safety functions for design basis events. Type A instrumentation fulfills the requirements of 10 CFR 50.36(c)(2)(ii) Criterion 3.
RG 1.97 also provides design and qualification criteria separated into three categories (Category 1, Category 2, and Category 3) that provide a graded approach depending on the importance to safety of the measurement of a specific variable. Category 1 instrumentation fulfills the requirements of 10 CFR 50.36(c)(2)(ii) Criterion 4. RG 1.97 instrumentation that is not classified as Type A or Category 1 does not fulfill the requirements of 10 CFR 50.36(c)(2)(ii) Criterion 3 or Criterion 4 and does not need to be included in the TS.
RG 1.97 Type D variables are those variables that provide information to indicate the operation of individual safety systems and other systems important to safety. These variables are to assist
- 4 the operator to make appropriate decisions in using the individual systems important to safety in mitigating the consequences of an accident. RG 1.97 recommends that Type D, Category 2, RWST level indication instrumentation be provided in the control room to monitor the operation of safety injection systems.
At IP3, the RWST low level alarm is identified as a RG 1.97 Type A variable. The RWST low level alarm is the primary means used for the manual switchover to the recirculation phase for a LOCA. The IP3 RWST level instrumentation also includes control room indication as a RG 1.97 Type D, Category 2 variable. Additionally, IP3 has a local RWST level indication that is not a RG 1.97 variable.
The IP3 RWST level instrumentation consists of instrumentation in Loops L-920 and L-921.
Loop L-920 provides the control room level indication and one channel of the control room low level alarm. The L-920 instrumentation is required to be calibrated by SR 3.5.4.6. Loop L-921 provides the local level indication via a level indicating switch and provides the redundant channel of the control room low level alarm. The L-921 instrumentation is required to be calibrated by SR 3.5.4.5.
The licensee proposed a change to SR 3.5.4.5 from "Perform CHANNEL CALIBRATION of RWST level indicating switch and ensure the low level alarm setpoint is ~1 0.5 feet and s12.5 feet," to "Perform CHANNEL CALIBRATION of RWST level switch and ensure the low level alarm setpoint is ~1 0.5 feet and s12.5 feet." The proposed change would remove the channel calibration of the local RWST level indication from SR 3.5.4.5, but would not remove the low level alarm function. The local RWST level indication is not a RG 1.97 variable and is not required to be in the TS by 10 CFR 50.36(c)(2)(ii) Criterion 4.
As a RG 1.97 Type A variable, the RWST low level alarm meets the requirements of 10 CFR 50.36(c)(2)(ii) Criterion 3 and should be in the TS. With the proposed change, the channel calibration of one channel of the low level alarm would be performed by SR 3.5.4.5 and the channel calibration of the second channel of the RWST low level alarm would be performed by SR 3.5.4.6. This fulfills the requirements of 10 CFR 50.36(c)(2)(ii) Criterion 3 and 10 CFR 50.36(c)(3).
The proposed change does not affect the control room RWST level indication. Although the control room RWST level indication is classified as a RG 1.97 Type D Category 2 variable and is not required to be in the TS by 10 CFR 50.36(c)(2)(ii) Criterion 4, the control room RWST level indication would remain in the TS.
Based on the above discussion, with the removal of the local RWST level indication from SR 3.5.4.5, IP3 continues to meet the requirements of 10 CFR 50.36, GDC-11, GDC-12, and GDC
- 13. This change does not affect conformance with the licensee's commitment to RG 1.97. The removal of the local RWST level indication from SR 3.5.4.5 is, therefore, acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New York State official was notified of the proposed issuance of the amendment. The State official had no comments.
-5
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (74 FR 51329). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. .
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: B. Marcus Date: June 28, 2010
June 28, 2010 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO.3-ISSUANCE OF AMENDMENT RE: REFUELING WATER STORAGE TANK LEVEL INSTRUMENTATION (TAC NO. ME1751)
Dear Sir or Madam:
The Commission has issued the enclosed Amendment No. 241 to Facility Operating License No.
DPR-64 for the Indian Point Nuclear Generating Unit NO.3. The amendment consists of changes to the Technical Specifications (TS) in response to your application dated July 23, 2009.
The amendment removes the local refueling water storage tank level indication from TS Surveillance Requirement 3.5.4.5.
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely,
/raj John P. Boska, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosures:
- 1. Amendment No. 241 to DPR-64
- 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
See next page ADAMS ACCESSION NO.: ML101550657 *See memo dated 5/13/10 OFFICE LPL1-1/PM LPL 1-1/LA EICB/BC* ITSB/BC OGC LPL1-1/BC NAME JBoska SLittie WKemper RElliott STurk (comments NSalgado noted)
DATE 6/7/10 6/14/10 5/13/10 6/16/10 6/25/2010 6/28/10 OFFICIAL RECORD COpy
DATED: June 28. 2010 AMENDMENT NO. 241 TO FACILITY OPERATING LICENSE NO. DPR-64 INDIAN POINT UNIT3 DISTRIBUTION: