MONTHYEARML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 2024-09-09
[Table view] |
Text
Vito A. Kaminskas Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: kaminskasv@dteenergy.com
.DTE Energy-10 CFR 20.1703(b)
April 10, 2015 NRC- 15-0046 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2) DTE Electric Company, NRC-I15-0019, "Request for Use of MURUROA Supplied, Air Suits Models MTH2 &V4F 1 and the MURUROA BLU Suit Systems," February 12, 2015 (ML15043A782)
- 3) U.S. Nuclear Regulatory Commission, "Fermi 2- Supplemental Information Needed for Acceptance of Request for Use of MURUROA Supplied Air Suits Models MTH2 & V4F 1 and the MURUROA BLU Suit Systems (TAC NO. MF5742)," March 30, 2015 (ML15084A069)
Subject:
Response to NRC Request for Supplemental Information Needed for Acceptance of Request for Use of MURUROA Supplied Air Suits In Reference 2, DTE Electric Company (DTE) submitted a request for authorization for use of the M`URUROA supplied air suits, Models MTH2 and V4F 1, and the MURUROA BLU Suit Systems, which have not been tested or certified by the National Institute for Occupational Safety and Health (NIOSH). In Reference 3, the U.S.Nuclear Regulatory Commission (NRC) requested that DTE provide supplemental information needed to complete their acceptance review of the request. The enclosure to this letter provides the requested supplemental information.
Ao00 KJ (.7 USNRC NRC- 15-0046 Page 2 This letter contains no new commitments.
Should you have any questions or require additional information, please contact Mr. Christopher Robinson, Licensing Manager at (734) 586-5076.Sincerely,
Enclosure:
Response to Request for Supplemental Information cc: Director, Office of Nuclear Reactor Regulation NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission, Regulated Energy Division (kindschl@michigan.gov)
Enclosure to NRC-15-0046 Response to Request for Supplemental Information Enclosure to NRC- 15-0046 Page 1 Response to Request for Supplemental Information
Background
On February 12, 2015, DTE Electric Company (DTE) submitted a request for authorization for use of the MURUROA supplied air suits, Models MTH2 and V4F 1, and the MURUROA BLU Suit Systems, which have not been tested or certified by the National Institute for Occupational Safety and Health (NIOSH). On March 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) requested that DTE provide additional information regarding the minimum supplied inlet air pressure to the MTH2 and V4F1 suits or revise the scope of the application regarding inlet air pressure to the suits. NRC requested that DTE "provide reliable test information that demonstrates that the MTH2 and V4F 1 will provide adequate air pressure to the suits sufficient to meet the minimum air flow and [carbon dioxide] C02 build up limits of the [European Union]EU certification standard" or "revise the scope of the application to be within the test data provided." Response In accordance with NRC's request, DTE is revising the scope of the application to be within the test data provided regarding inlet air pressure to the MTH2 and V4FI suits. This change complies with the manufacturer's instructions.
This change will revise the first paragraph on Page 4 of Reference 2, Enclosure 1, Section 1.2.2 to state: Air hoses of any length can be used, but air shall be supplied to the suits at 85 PSI (6 bar). A regulator at the inlet is used to adjust the airflow. To ensure user safety, the regulator cannot shut off the air supply. There are two patented exhaust valves on the back of the suit, one behind the neck and one at the lower back. The exhaust valves prevent any aspiration of contaminants if supplied air is lost.The last paragraph in Reference 2, Enclosure 1, Section 1.2.4 on page 5 will be revised to state: DTE will follow the manufacturer's instructions for use ensuring that the minimum operating air pressure and airflow is being supplied to the suit prior to working in them, specifically ensuring that the minimum pressure will be monitored during regular use. Air hoses of any length can be used, but air shall be supplied to the MURUROA MTH2 and V4F1 at 85 PSI (6 bar). A regulator at the inlet can adjust the air flow. To ensure user safety, the regulator cannot shut off the air supply. The maximum noise level is kept between 76 decibels (dB) at maximum air flow and 58 dB at minimum air flow.