North Anna Power Station, Units 1 & 2 - Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965
ML091320704
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/09/2009
From: Stang J F
Plant Licensing Branch II
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
Sreenivas V.NRR/DORL/LPL2-1 415-2597
References
TAC ME0965, TAC ME0966
Download: ML091320704 (4)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 June 9,2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER CAMERON SUPPORTING DOCUMENTS (TAC NOS. ME0965 AND ME0966)

Dear Mr. Heacock:

By letter dated March 26, 2009, Virginia Electric and Power Company submitted an affidavit dated February 18, 2009, executed by Calvin R. Hastings, General Manager of Caldon Ultrasonics Technology Center requesting that the following documents (in their entirety) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Caldon Ultrasonics Engineering Report ER-646 Rev. 2 "Bounding Uncertainty Analysis for Thermal Power Determination at North Anna Unit 1 Using the LEFM,I+ System" Caldon Ultrasonics Engineering Report No. 689 Rev. 2 "LEFM,I+ Meter Factor Calculation and Accuracy Assessment for North Anna Unit 1" Caldon Ultrasonics Engineering Report ER-637 Rev. 3 "Bounding Uncertainty Analysis for Thermal Power Determination at North Anna Unit 2 Using the LEFM,I+ System" Caldon Ultrasonics Engineering Report No. 675 Rev. 2 "LEFM,I+ Meter Factor Calculation and Accuracy Assessment for North Anna Unit 2" The affidavit stated that the above documents (in their entirety) should be considered exempt from mandatory public disclosure for the following reasons: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies. (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

D. Heacock -(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product. (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Cameron, its customer or suppliers. (e) It reveals aspects of past, present or future Cameron or customer funded development plans and programs of potential customer value to Cameron. (f) It contains patentable ideas, for which patent protection may be desirable.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the four aforementioned documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

D. Heacock -3 If you have any questions regarding this matter, I may be reached at n F. Stang, Senior reject Manager ant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: Distribution via Listserv D. Heacock -2 If you have any questions regarding this matter, I may be reached at 301-415-1345.

Sincerely, IRA! John F. Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMNorthAnna Resource WKemper LPL2-1 RlF RidsNrrDciEicb Resource VSreenivas, NRR RidsAcrsAcnw MailCTR Resource RidsOgcmailCenler Resource RidsNrrLAMO'Brien Resource RidsNrrDorlLpl2-1 Resource RidsRgn2MailCenler Resource ADAMS Accession No ML091320704 NRR-106 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlEICB/BC NRRlLPL2-1/BC NAME VSreenivas JSlang MO'Brien WKemper MWong DATE OS/27/09 06/09/09 OS/27/09 OS/27/09 06/09/09 OFFICIAL RECORD COPY