UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 21, 2009 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS. ME0965 AND ME0966)
Dear Mr. Christian:
By letter dated March 26,2009, Virginia Electric and Power Company (the licensee) submitted a license amendment request for North Anna Power Station, Unit Nos. 1 and 2. The proposed amendment request would increase each unit's rated thermal power (RTP) level from 2893 megawatts thermal (MWt) to 2940 MWt, and make technical specification changes as necessary to support operation at the proposed uprated power level; an increase in RTP of approximately 1.6 percent. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Part 50, Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR),
an amendment to the license (including the technical specifications) must fUlly describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
D. Christian
- 2 If you have any questions, please contact me at (301) 415-1345.
Sincerely, C1~A~~
rfO v '-
rf-o r John Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: Distribution via Listserv
D. Christian
- 2 If you have any questions, please contact me at (301) 415-1345.
Sincerely, IRA! by JThompson fori John Stang, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsAcrsAcnw MailCTR Resource RidsNrrDorl Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAMO'Brien Resource RidsNrrPMNorthAnna Resource RidsOgcRp Resource RidsRgn2MailCenter Resource ADAMS Accession No. ML091310495 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/PM DORL/LPL2-1/LA DORL/LPL2-1/BC NAME VSreenivas JStang (JThompson for)
MO'Brien (SRohrer for)
MWong DATE 5/20/09 5/21/09 5/21/09 5/21/09 OFFICIAL RECORD COpy