May 13, 2002 Mr. James F. Mallay Director, Regulatory Affairs Framatome ANP, Richland, Inc.

2101 Horn Rapids Road Richland, WA 99352

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE NORTH ANNA POWER STATION, UNIT 2 (TAC NO. MB4044)

Dear Mr. Mallay:

By letter dated February 11, 2002, Virginia Electric and Power Company submitted an affidavit dated February 5, 2002, executed by you, requesting that information contained in the document entitled Discussion of Proposed License Changes for North Anna 2 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790. A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(a) The information reveals details of FRA-ANPs research and development plans and programs or their results.

(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.

(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for FRA-ANP.

(d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for FRA-ANP in product optimization or marketability.

(e) The information is vital to a competitive advantage held by FRA-ANP, would be helpful to competitors to FRA-ANP, and would likely cause substantial harm to the competitive position of FRA-ANP.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1544.

Sincerely,

/RA/

Stephen R. Monarque, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-339 cc: See next page

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1544.

Sincerely,

/RA/

Stephen R. Monarque, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-339 cc: See next page DISTRIBUTION:

PUBLIC EDunnington (Hard copy) KLandis, RII PDII-1 R/F SMonarque HBerkow JNakoski MPSiemien, OGC FILENAME - G:\PDII-1\NOANNA\ProprtryApprvlLttrMB4044.wpd OFFICE PM:PDII/S1 LA:PDII/S2 OGC SRXB PDII-1/SC NAME SMonarque Dunnington MPSiemien RCaruso GEdison for JNakoski DATE 04/19/02 04/22/02 04/25/02 04/24/02 04/29/02 COPY Yes/No Yes/No Yes/No Yes/No Yes/No OFFICIAL RECORD COPY North Anna Power Station

Virginia Electric & Power Company Unit 2 cc: Mr. David A. Heacock Mr. C. Lee Lintecum Site Vice President County Administrator North Anna Power Station Louisa County P. O. Box 402 P.O. Box 160 Mineral, Virginia 23117 Louisa, Virginia 23093 Mr. David A. Christian Ms. Lillian M. Cuoco, Esquire Sr. Vice President and Chief Nuclear Officer Senior Nuclear Counsel Virginia Electric and Power Company Dominion Nuclear Connecticut, Inc. Innsbrook Technical Center Millstone Power Station 5000 Dominion Blvd.

Building 475, 5th Floor Glen Allen, Virginia 23060-6711 Rope Ferry Road Rt. 156 Mr. Richard H. Blount, II Waterford, Connecticut 06385 Site Vice President Surry Power Station Dr. W. T. Lough Virginia Electric and Power Company Virginia State Corporation 5570 Hog Island Road Commission Surry, Virginia 23883-0315 Division of Energy Regulation P. O. Box 1197 Robert B. Strobe, M.D., M.P.H.

Richmond, Virginia 23209 State Health Commissioner Office of the Commissioner Old Dominion Electric Cooperative Virginia Department of Health 4201 Dominion Blvd. P.O. Box 2448 Glen Allen, Virginia 23060 Richmond, Virginia 23218 Mr. Stephen P. Sarver, Director Mr. William R. Matthews Nuclear Licensing & Operations Vice President - Nuclear Operations Support Virginia Electric and Power Company Virginia Electric and Power Company Innsbrook Technical Center Innsbrook Technical Center 5000 Dominion Boulevard 5000 Dominion Blvd. Glen Allen, Virginia 23060-6711 Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117