NRCs Annual Assessment of Palisades Performance for 2013 Nuclear Regulatory Commission - Region III South Haven, MI June 26,, 2014 1
Opening p g Eric Duncan Branch Chief, Palisades NRC Region III 2
Purpose p and Agenda g
- Discuss Palisades Performance in 2013
- Palisades P li d Response R
- NRC Available to Address Questions 3
Our Mission To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security and protect the security, environment.
4
Significance g Threshold Performance Indicators Green: Baseline Inspection White: Increases NRC oversight Yellow: Increases NRC oversight Red: Increases NRC oversight Inspection Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue 5
Action Matrix Concept p Licensee Regulatory Degraded M ultiple/R ep.
ep Unacceptable Response Response Cornerstone Degraded Perform ance (Column I) (Column II) (Column III)
Cornerstone (Column V)
(Column IV)
Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC C Involvement Increasing g Regulatory g y Actions 6
National Summary of Plant Performance Status as of 12/31/2013 Licensee Response Column 1 80 Regulatory Response Column 2 9 Degraded Cornerstone Column 3 9 Multiple/Repetitive Degraded Cornerstone Column 4 1 Unacceptable Column 5 0 IMC 0350 Oversight 1 Total 100 7
2013 Annual Assessment January 1 - December 31 31, 2013
- Palisades operated safely
- All cornerstone objectives j met
- Palisades in Column 1 of the Reactor Oversight Process Action Matrix 8
NRC Additional Activities in 2013 In 2013, NRC performed an additional 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> of effort beyond the 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> allocated for routine baseline inspections.
NRC used these additional hours to:
- Review corrective actions implemented to address performance problems in 2011 and 2012.
- Increase public communication to address the publics public s concerns about plant performance 9
NRC Additional Activities in 2013
- S Safety f t Conscious C i Work W k Environment E i t (SCWE) -
an environment where personnel feel free to raise safety concerns without fear of retaliation, intimidation, harassment, or discrimination.
- All NRC licensees and contractors are expected to establish and maintain a SCWE which contributes to the safe operation of NRC-regulated facilities.
10
Safety Conscious Work Environment (SCWE) Inspections
- NRC identified chilled SCWE in Security
- Licensee developed SCWE Action Plan
- NRC reviewed i d SCWE Action A ti Plan Pl implementation i l t ti
- NRC determined that quality of actions were insufficient to assess and understand the cause of the chilled SCWE and did not demonstrate a strong t commitment it t to t improve i Security S it SCWE
Recent Inspection p Activities
- Control Rod Drive Mechanism Housing Inspection
- Reactor Vessel Foreign Material Inspection
- Safety Injection Refueling Water Tank (SIRWT) Inspection 12
Control Rod Drive Mechanism (CRDM) Housings
- During Spring 2014 Refueling Outage, Outage Palisades identified flaws in 17 of 45 CRDM housings
- NRC inspectors observed CRDM housing testing and reviewed licensee evaluations
- No through-wall through wall leakage identified
- Licensee replaced all CRDM housings
- NRC evaluating the appropriate frequency of future CRDM housing inspections 13
Reactor Vessel Foreign g Material
- D During i Spring S i 2014 R Refueling f li O Outage, licensee li identified foreign material within the reactor vessel
- NRC experts reviewed the licensees evaluation
- NRC concluded no impact to plant or public health and safety
- Review of licensee corrective actions continues 14
Safety Injection Refueling Water Tank (SIRWT)
- SIRWT contains water to cool the reactor core and containment building during accidents and for adjusting water level during outages
- SIRWT has leaked over the years and Palisades has performed numerous repairs
- NRC observed replacement of SIRWT bottom
- All leakage l k issues i now adequately d t l addressed dd d
- Confirmatory Action Letter closed 15
Other Inspections p in 2014
- Bi Biennial i l Problem P bl Identification Id tifi ti and d Resolution Inspection (Complete)
- Force-on-Force Security Inspection (Complete)
- Component Design Bases Inspection (Pending)
- Biennial Emergency Preparedness Exercise (Pending) 16
Open p to the Public
- Th The NRC placesl a high hi h priority i it on keeping k i the public and stakeholders informed of its activities.
- At www.nrc.gov, you can:
- Fi Findd public bli meeting ti dates d t and d transcripts; t i t
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
17
Contacting g the NRC
- Report an emergency emergenc
- (301) 816-5100 (call collect)
- Report R t a safety f t concern
- (800) 695-7403
- Allegation@nrc.gov Allegation@nrc gov
- Meeting Feedback
- General G l information i f ti or questions ti
- www.nrc.gov
- Select What We Do for Public Affairs 18
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/
ASSESS/index.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- NRC Information Digest
- http://www.nrc.gov/reading-rm/doc-ll i / / ff/ 1350/
collections/nuregs/staff/sr1350
- Public Document Room
- (800) 397-397 4209 (Toll (T ll Free)
F )
19
NRC Social Media Channels
- T itt Twitter: htt //t itt https://twitter.com/#!/nrcgov
/#!/
- YouTube: http://www.youtube.com/user/NRCgov
- RSS: http://www nrc gov/public http://www.nrc.gov/public-involve/listserver.html#rss 20
Actions in Response to the Japan Nuclear Accident
- Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of Contact:
OPA resource@nrc gov or 301-415-8200 OPA.resource@nrc.gov 301 415 8200 21
Licensee Response and Remarks Entergy Nuclear Operations Palisades Nuclear Plant Remarks 22
Closingg Remarks Kenneth OBrien Deputy Division Director Division of Reactor Projects NRCC Region eg o III 23
NRC Representatives p
- Viktoria Mitlyng Mitlyng, Office of Public Affairs, Affairs RIII
- (630) 829-9662
- Prema Chandrathil,, Office of Public Affairs,, RIII
- (630) 829-9663
- Eric Duncan, Branch Chief, RIII
- (630) 829-9620
- Alex Garmoe, Senior Resident Inspector
- (269) 764 764-8971 8971
- April Scarbeary, Resident Inspector
- (269) 764-8972 24