MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
CATEGORY.2<I REGULAT INFORMATION DISTRIBUTION SYSTEM (RIDS)ei ACCESSION NBR:9608260021 DOC.DATE: 96/06/28 NOTARIZED:
NO DOCKET¹FACIL:50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION KIRKPATQICK,E.
American Electric Power Co., Inc.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Requests relief from requirements of Section XI of ASME Code for in-service insp of Unit 2 reactor vessel nozzle welds for current ten year in-service insp interval ending on 960630.Background info s justification encl..DISTRIBUTION CODE: DF01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Direct Flow Distribution:
50 Docket (PDR Avail)NOTES: E RECIPIENT ID CODE/NAME INTERNAL'CENTER EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1, 0 D U N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 4 ENCL 4 American Electri wer 1 Riversi'de Plaza Columbus.OH 432 5 2373 614 223 1000~, AiHEJHCAN ELECTRIC POWER June 28, 1996'EP:NRC:0969AQ Docket No;, 5O:'3fQ U.S.'uclear Regulatory Commission ATTN: Document Control Desk Vashington, D.C.20555 Donald C.Cook Nuclear Plant Unit 2 REQUEST FOR ASME CODE RELIEF--REACTOR VESSEL NOZZLE WELDS Gentlemen:
The purpose of this letter is to request relief from the requirements of Section XI of the ASME Code for the in-service inspection of the Unit 2 reactor vessel nozzle welds for the current ten year in-service inspection interval (ISI)that ends on June 30, 1996.Following the inspection of the nozzle welds, which was conducted during the latest unit 2 refueling outage, it was discovered that an incorrect gain setting had been used during the examination and it was not practical to perform another examination at that time.The data obtained during the last examination has been reviewed and no indications greater than a known recordable indication have been observed.Ve are currently conducting tests and reviewing previous data.If the tests and data review cannot adequately demonstrate that acceptable detectability was achieved for the nozzle bore examination, these nozzles will then be reexamined during the first period of the third ten year interval.The error in the gain setting and our action plans were discussed with NRC (Region III), NRR, Idaho National Laboratory and Southwest Research Institute personnel during a conference call on April 23, 1996.960826002i 960628 PDR ADOCK 05000316'l, 8.PDR U.S.Nuclear Regulatory Commission Page 2 AEP:NRC:0969AQ The relief request, which is attached to this letter, is being submitted under the provisions of 10 CFR 50.55a(3)(i) as an alternative test that provides an acceptable level of quality and safety.If adequate detectability can be demonstrated, an amendment to this code relief request vill be submitted in August 1996..Sincerely, pm E.E.Fi zpatrick, Vice President llg Attachment CC: , A.A.Blind G.Charnoff H.J.Miller NFEM Section Chief NRC Resident Inspector-Bridgman J.R.Padgett I
U.S.Nuclear Regulatory Commission Page 3 AEP:NRC:0969AQ bc: S.J.Brewer/D.H.Malin/J.A.Kobyra/S.H.Steinhart/S.
P.Hodge/D.R.Hafer J.B.Shinnock J.S.Wiebe.J.B.Hickman, NRC-Washington, D.C.-w/attachment
'PRONET-w/attachment DC-N-6015.1 Attachment to AEP:NRC:0969'ackground Information and Justification Code Relief Request for the Reactor Pressure Vessel to Nozzle Weld Examinations for Cook Nuclear Plant Unit 2 Second ten-year Interval ISI Examination
Attachment to AEP:NRC:0969AQ I SystemjComponent for which relief is requested Page 1 Code relief is requested to defer the examination of two of the four outlet and all four inlet reactor pressure vessel (RPV)nozzle-to-shell welds on unit 2 from the second ten-year interval to the first period of the third ten-year interval.This relief applies for the scans performed from the nozzle bore surface for reflectors oriented parallel to the weld axis.The affected welds are listed belov.B-D B-D B-D B3.90 Outlet nozzle to shell veld (2-N4-0 Q 22)B3.90 Inlet nozzle to shell weld (2-N4-I Q 67)B3.90 Inlet nozzle to shell weld (2-N3-I Q 113')B-D B3.90 Outlet nozzle to shell weld (2-N3-0 Q 158)B-D B-D B3.90 Inlet nozzle to shell weld (2-N2-I Q 247)B3.90 Inlet nozzle to shell weld (2-Nl-I Q 293')IZ Code Requirements ASME Section XI, 1983 Edition Summer Addendum, Table IWB-2500-1, Category B-D, Item B3.90, requires volumetric examination of all RPV nozzle-to-shell welds in each ten-year'nterval.
The ASME Section XI code requires that ultrasonic (UT)examination of these welds be performed in accordance with,ASME Section V, Article 4, for reflectors oriented parallel and transverse to the weld.Paragraph T-425.3 states that scanning shall be performed at a gain setting at least two times the reference level, except that the reference level shall'be used when electronic distance amplitude correction is used with automated scanning.Additionally, the supplemental requirements specified in Regulatory Guide 1.150, Revision 1, are applicable to the UT examination of RPV shell welds.III Basis for code relief The second ten-year RPV ISI examination of the nozzle-to-shell velds from the nozzle bore surface for reflectors oriented parallel to the weld is not in compliance with ASME'Section V, T-425.3, and the supplemental requirements of Regulatory Guide 1.150 for gain setting.During post-examination data review, it was determined that these examinations were conducted at gain settings less than ASME Code or Regulatory Guide 1.150 requirements.
These welds were not reexamined upon discovery of this error due to the Attachment to AEP:NRC:0969AQ Page 2 undue hardship and burden of removing the core barrel and the equipment hatch flange and unpacking and reassembling of the automated inspection equipment.
We estimate that an additional seven outage days would have been required to reexamine these nozzle welds, with an estimated radiation dose of 500-700 mr without any commensurate benefits in quality and safety.IV'Alternate Examinations As an alternative to the requirements of the ASME Code and Regulatory Guide 1.150, the examinations performed from the nozzle bore surface in April 1996 (second ten-year ISI RPV examination) are proposed.We can not demonstrate full compliance with ASME Section V and Regulatory Guide 1.150 for the examinations conducted in 1996.We were able to detect, however, at the lower gain setting, the same code-acceptable indication that was found during the first interval examination, and our review of the nozzle data taken at the lower gain setting revealed no other indications of greater amplitude or extent (length)than the previously characterized indication.
We therefore have reasonable assurance that the nozzle-to-shell weld bore examinations conducted at the lower gain setting during the 1996 outage were capable of detecting flaws of equivalent amplitude or extent as the code-acceptable indication found during the first interval examination.
Justification for Granting of Code Relief During the unit 2 second ten-year ISI RPV examination, an incorrect gain setting was used on the eight nozzle-to-shell weld examinations conducted from the nozzle bore surface.This examination was performed in April 1996 during the last refueling outage of the second ten-year interval.Code relief is only requested for six of the eight nozzles, since two nozzles were properly examined during the first period of the second interval.The second ten-year interval ends June 30, 1996.The incorrect gain setting was discovered while investigating a discrepancy in the data between the first and second ten-year ISI examinations, for an indication on one of the inlet nozzles.This indication was originally found during the first ten-year ISI RPV examination and was further investigated by removing a small piece of insulation from the RPV outside diameter and scanning manually.The indication was characterized as a code-acceptable slag inclusion.
During the second ten-year ISI examination, this indication was also detected with the automated RPV UT equipment at the lower gain setting, but at a significantly lower amplitude than recorded during the first interval.Prior'o the 4
I Attachment to AEP:NRC:0969AQ Page 3 discovery of the incorrect gain setting, we performed the manual examination from the outside diameter surface of the RPV to compare with the results of the first interval examination.
The results of this manual examination correlated well with the results of the prior examination and demonstrated that the indication was approximately the same size as characterized during the first interval examination.
It is important to note that the core barrel was reinstalled in the vessel prior to the discovery of the incorrect gain setting on the automated UT examination.
We estimate that the reexamination would have resulted in an additional seven outage days and radiation exposure of 500-700 mr.At this time, we are unable to demonstrate full compliance with ASME Section V and Regulatory Guide 1.150 for the examinations from the nozzle bore.We were able to detect,~at the lower gain setting, the same code-acceptable indication that was found during the first interval examination and manual characterization of this indication from the outside surface of the vessel demonstrated that it was within acceptance standards and had not grown since the ,prior interval examination.
We therefore have reasonable assurance that the nozzle-to-shell weld bore examinations conducted at'he lower gain setting during the 1996 outage were capable of detecting flaws of equivalent or greater reflectivity as the code-acceptable indication found during the first interval examination.
The six nozzle-to-shell welds for which code relief is requested were examined in 1988 for reflectors parallel and transverse to the weld with an ASME Section V/Regulatory Guide 1.150-acceptable technique.
The only relevant indication found in these nozzles during the 1988 examinations was the code-acceptable slag-line indication mentioned above.The ASME code/Regulatory Guide 1.150 compliant examinations of the nozzle-to-vessel welds from the shell, side for reflectors transverse to the weld were conducted in April 1996 at the proper gain setting and no indications were found.In-service, ASME code/Regulatory Guide 1.150-acceptable examinations of outlet nozzles 2-Nl-0 and 2-N2-0, which are not part of this request, were conducted in the first period of the second ten-year interval, with no recordable indications.
Additionally, neither Indiana Michigan Power Company personnel nor our ISI vendor is aware of any past experience with service-induced flaws on the nozzle-to-shell welds in PWRs.We therefore believe that there are no safety or structural integrity concerns based on past examination results, industry experience on service-induced flaws in nozzle-to-shell welds, and the close review of data.on the recent, second ten-year interval ISI RPV exams.
~t\V'$l Attachment to AEP:NRC:0969'I Status of Additional Investigations Page 4 Since the disco~cry of the incorrect gain setting, Indiana Michigan Power Company and Southwest Research Institute personnel have been reviewing past data and conducting mockup testing, to better understand the detection capability of the examinations performed during April 1996.Two tests were designed to determine critical characteristics of the nozzle-to-vessel weld examinations conducted during the 1996 unit 2 second ten-year'interval ISI examinations.
The first test is the 508 DAC threshold test which was designed to compare the amplitude difference between the correct gain setting and the incorrect gain setting used at Cook Nuclear Plant for the nozzle welds.This test was conducted on a test block of comparable metal path distance to the unit 2 vessel using a.079'ia.X 1'ong flat bottomed hole and using the automated ultrasonic equipment employed at the for the 1996 second ten-year interval ISI vessel examinations.
Data obtained from the 1996 examination have been reviewed using the 50%DAC threshold value at the lower gain setting as the recording criteria.No indications were observed with reflectivity greater than the well-documented, code-acceptable indication recorded during the past first interval examination.
The second test is the reflectivity test which will use a specially designed test block to provide additional information on the detectability of various reflectors for the large metal path distances for the unit 2 vessel.This block is designed with several surface and sub-surface planar reflectors of smaller than code-acceptable sizes.This test will be conducted utilizing the automated ultrasonic equipment used at Cook Nuclear Plant in the recent 1996 second ten-year interval ISI vessel examinations and is scheduled to start June 28, 1996, when fabrication of the block is complete.To further increase our understanding of the results of this examination, we will reevaluate the data from past, code-acceptable examinations (preservice and first interval)to compare with the 1996 data.Additionally, we will reevaluate the code-acceptable transverse exams conducted in 1996 to further characterize indications in the weld.A preliminary review of the available data indicates that there is sufficient basis to amend this code relief request to accept the examination performed in April 1996 as an alternate examination to satisfy the ASME Section XI second interval requirements.
We expect that an amended code relief request will be submitted following the analysis of the reflectivity test results and the final data review.We
~t II Attachment to AEP:NRC:0969AQ Page 5 estimate this relief request will be submitted in August 1996.VII Implementation Schedule f The second ten-year interval examination of nozzle-to-vessel weldsfrom the nozzle bore surface will be deferred to the first period of the third interval.If vendor tests and data analysis currently scheduled in late June and early July demonstrate that acceptable detectability was achieved, this relief request will be amended.