ML17223A909

From kanterella
Revision as of 16:33, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Proposed Tech Specs Re Moderator Temp Coefficient Surveillance Requirements
ML17223A909
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/27/1990
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17223A906 List:
References
NUDOCS 9009040034
Download: ML17223A909 (3)


Text

fNSERT FOR ST.LUC1E U4T f p 3/4 f-6 At any THERMAL POWER, within 7 EFPD after reaching a RATED THERMAL POWER equilibrium boron concentration of 300 ppm.The MTC determination of this paragraph is not required if the results of Surveillance Requirements 4.l.l.4.2a.

and 4.l.l.4.2b.

are within a tolerance of+2.0 pcm/8 from corres onding design valu h q)q<eggy>g q QQ$~Qppggg~pg~~~~i~i<<~~<<<<~~~~4~~<<~~3oc,~quiz<c<<~q~<<vk me~9q~e~Re wteeq 4.WL2., E JW4/052/4 2 90090400~'000~3 PDR pDOGK 0@Dc P r

~INSERT FOR ST.LUCIE UI 2 p.3/4 lA At any THERMAL POWERs within 7 EFPD after reaching a RATED THERMAL POWER equilibrium boron concentration of 300 ppm.The MTC determination of this paragraph is not required if the results of the tests required in Surv'eillance requirements 4.l.l 4.2a.and 4.l.l.4.2b.

are within a tolerance of+2.0,pcrn/

F mcorres~In desi value and phn QNa~s&.RpBG VKRhhl.B Eg.Q54~~<~e$+~'~"0~&<~"8%QI)o~0q~Go~%Ãe.)4 g.ca~~4j)K SogchlaQ).c Re)))t).AA'Ll.l.l.l.k E JW4/052/5

~%~~N b