Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17228B5041996-06-0101 June 1996 Proposed Tech Specs Re Thermal Margin & RCS Flow Limits ML17228B3761996-01-0404 January 1996 Proposed Tech Specs Rectifying Discrepancy for Each St Lucie Unit & Providing Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3361995-11-22022 November 1995 Proposed TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation,Adapting STS for C-E Plants (NUREG-1432) Spec 3.4.15 ML17228B2451995-08-16016 August 1995 Proposed TS 3.6.6.1, Sbvs. ML17228B2421995-08-16016 August 1995 Proposed Ts,Reflecting Relocation of Selected TS Requirements Re Instrumentation & Emergency & Security Plan Review Process,Per GL 93-07 ML17228B1891995-06-21021 June 1995 Proposed Tech Specs Re Safety Injection Tank Surveillances ML17228B1811995-06-21021 June 1995 Proposed Tech Specs Re Time Allowed to Restore Inoperable LPSI Train to Operable Status ML17228B1791995-06-21021 June 1995 Proposed Tech Specs Re Extended Allowed Outage Time for EDGs ML17228B1471995-05-17017 May 1995 Proposed Tech Specs,Extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1441995-05-17017 May 1995 Proposed Tech Specs Re Administrative & Conforming Update ML17228B0901995-04-0303 April 1995 Proposed Tech Specs Re Incorporation of line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 for Licenses DPR-67 & NPF-16 ML17228B0591995-02-27027 February 1995 Proposed TS Re Sdcs Min Flow Rate Requirements ML17228B0521995-02-27027 February 1995 Proposed Tech Spec Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relays ML17228B0331995-02-22022 February 1995 Proposed TS 4.6.1.3,reflecting Deletion of Refs to Automatic Tester for Containment Personnel Air Lock ML17228A9921995-01-20020 January 1995 Proposed Tech Specs,Relocating Operability Requirements for Incore Detectors to (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillance 4.10.2.2,4.10.4.2 & 4.10.5.2 ML17228A9031994-11-0202 November 1994 Proposed Tech Specs 3/4.6.2.1 & 3/4.6.2.3,adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17228A8911994-10-27027 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML17228A6521994-07-28028 July 1994 Proposed Tech Specs Re LTOP Requirements for Power Operated Relief Valves,Per GL 90-06 ML17228A6591994-07-25025 July 1994 Proposed Tech Specs Implementing Enhancements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6561994-07-25025 July 1994 Proposed Tech Specs for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5771994-05-23023 May 1994 Proposed Tech Specs Removing Option That Allows HPCI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-06-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0441999-03-0202 March 1999 Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A6751998-03-27027 March 1998 Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17309A9171997-11-26026 November 1997 Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17309A8951997-06-11011 June 1997 Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A2981997-03-0606 March 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A0951996-10-24024 October 1996 Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage. ML17229A0861996-10-18018 October 1996 Startup Physics Testing Rept. W/961018 Ltr ML17229A2441996-09-23023 September 1996 Rev 18 to Offsite Dose Calculation Manual (Odcm). ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17229A0961996-06-12012 June 1996 Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. 1999-06-30
[Table view] |
Text
EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - T > 325'F LIMITING CONDITION FOR OPERATION 3.5.2 Two independent ECCS subsystems shall be OPERABLE with each sub-system comprised of:
- a. One OPERABLE high- ressure safest injection (HPSI) um,Qne-C~cE u sys- em-s i-nc um -an - e-seeon Vp.C 4OOSI:l. ~bsystem-shQ-1 Hict-ude-m-therHRS-I-pum soBAut<SP Sf aei H. L-9f-t b. One OPERABLE low-pressure safety injection pump, and (s/<Vvv)
- c. An independent OPERABLE flow. path capable of taking suction from the refueling water tank on a Safety Injection Actuation Signal and automatically transferring suction to the containment sump on a Recirculation Actuation Signal.
APPLICABILITY: MODES 1, 2 and 3.".
ACTION:
- a. With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s+or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. ,$"v'gSaf
- b. In the event the ECCS is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and submitted to the Commissi.on pursuant to Specification 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date.
"With pressurizer pressure > 1750 psia.
Zf the ECCs subsystem is inoperable only because the LpSI train is inoperable<,
the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit may be extended to a maximum of 7 days from initial" discovery of failure to meet the LCO.
ST. LUCIE - UNIT 1 3/4 5-3 Amendment No .
'7506230234 '750621 PDR ADaCK 05000335 p PDR
,r l
V
'I
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RK UIREMENTS (Continued
- e. At least once per 18 months, during shutdown, by:
- l. Verifying that each automatic valve in the flow path actuates to its correct position on a Safety Injection Actuation Signal.
- 2. Verifying that each of the following pumps start automatically upon receipt of a Safety Injection Actuation Signal;
- a. High-Pressure Safety Injection pump.
- b. Low-Pressure Safety Injection pump.
Qg QP5
- 3. Veri fying on a Recircul ation Actuation Test Signal, the containment sump isolation valves. open and the recirculation valv 5 o the refueling water tank close . ygQ'Te PEP
- f. By verifying that each of the following pumps develops the specified total developed head on recirculation flow when tested pursuant to Specification 4.0.5:
- 1. High-Pressure Safety Injection pumps: greater than or equal to 2571 ft.
- 2. Low-Pressure Safety Injection pumps: greater than or equal to 350 ft.
ST. LUG IE - UNIT 1 3/4 5-5 Amendment No. gg, p(f
~ ~
~
)t
),( v
~~
~,
~ t
St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments LPSI S stem AOT Extension ATTACHMENT 4 ST ~ LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 3/4 5-3 Page 3/4 5-5
EMERGENCY CORE COOLING SYSTEMS 3/4.5.2 ECCS SUBSYSTEMS - T GREATER THAN OR E UAL TO 325 F LIMITING CONDITION FOR OPERATION 3.5.2 Two independent Emergency Core Cooling System (ECCS) subsystems shall be OPERABLE with each subsystem comprised of:
- a. One OPERABLE high pressure safety injection pump,
- b. One OPERABLE low pressure safety injection pump, and
- c. An independent OPERABLE flow path capable of taking suction from the refueling water tank on a Safety Injection Actuation Signal and automatically transferring suction to the containment sump on a Recirculation Actuation Signal, and
- d. One OPERABLE charging pump.
APPLICABILITY: MODES 1, 2, and 3".
ACTION:
- a. With one ECCS subsystem inoperable, restore the inoperabl'e subsystem to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s~or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours. S erscri'.
In the event the ECCS is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.9.2 within 90 days des-cribing the circumstances of the actuation and the total accumulated actuation cycles to date. The current value of the usage factor for each affected safety injection nozzle shall be provided in this Special Report whenever its value exceeds 0.70.
With pressurizer pressure greater than or equal to 1750 psia.
If the ECCS subsystem is inoperable only because the LPSI train is inoperable, the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit may be extended to a maximum of 7 days from discovery of failure to meet the LCO.
initial ST. LUCIE - UNIT 2 3/4 5-3
f r A pre g~
I
) Qa
<yQ ~,
LS "'
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE RE UIREMENTS (Continued)
- 2. A visual inspection of the containment sump and verifying that the subsystem suction inlets arh not restricted by debris and that the sump components (trash racks, screens, etc.) show no evidence of structural distress or corrosion.
- 3. Verifying that a minimum total of 173 cubic feet of solid granular trisodium phosphate dodecahydrate (TSP) is contained within the TSP storage baskets.
- 4. Verifying that when a representative sample of 70.5 + 0.5 grams of TSP from a TSP storage basket is submerged, without agitation, in 10.0 + O.l gallons of 120 + 10'F borated water from the RWT, the pH of the mixed solution is raised to greater than or equal to 7 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- f. At least once per 18 months, during shutdown, by:
Verifying that each automatic valve in the flow path actuates to its correct position on SIAS and/or RAS test signals.
- 2. Verifying that each of the following pumps start automatically upon receipt of a Safety Injection Actuation Test Signal:
- a. High-Pressure Safety Injection pump.
- b. Low-Pressure Safety Injection pump.
3: Verifying that on a m Recirculation Actuation Test Signal, the containmen sump isolation valves open and the valv to the refueling water tank clos~ 'ecirculation
- g. By verifying that each of the following pumps develops the specified total developed head on recirculation flow when tested pursuant to Specification 4.0.5:
High-Pressure Safety Injection pumps: greater than or equal to 2854 ft.
- 2. Low-Pressure Safety Injection pump: greater than or, equal to 374 ft.
- h. By verifying the correct position of each electrical and/or mechanical position stop for the following ECCS throttle valves:
- l. During valve stroking operation or following maintenance on the valve and prior to declaring the valve OPERABLE when the ECCS subsystems are required to be OPERABLE.
ST. LUCIE - UNIT 2 3/4 5-5
St. Lucie Unit 1 and Unit 2 L-95-133 Docket Nos. 50-335 and 50-389 Proposed License Amendments LPSI S stem AOT Extension ENCLOSURE'oint Applications Report for LOW PRESSURE SAFETY INJECTION SYSTEM AOT EXTENSION (CE NPSD-995, Final Report CEOG Task 836; May, 1995)
ATTAABVQ~22TA "Mark-up" of NUREG-1432 SECTIONS 3.5.2 & 8 3.52
ECCS Operating 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEHS (ECCS) 3.5.2 ECCS Operating LCO 3.5.2 Two ECCS trains shall be OPERABLE.
APPLICABILITY: MODES 1 and 2, HODE 3 with pressurizer pressure ~ f1700] psia.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIHE A. l One or more trains ino rable.
A. 1 Restore OPERABLE
'~~
status.
to 7 dLo y's AND At lea 100~ f the ECC low equiv nt t a single OPERA
~
C
~ Required Action and
~ ~
P'.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion
~
Time not met. AND
.2 Reduce pressurizer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to
< [1700] psia.
GEOG STS 3.5-4 Rev. 0, 09/28/92
INSERT A One LPSI subtrain inoperable.
INSERT B B. One or more ECCS B.1 Restore ECCS train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> trains inoperable due to OPERABLE status.
condition(s) other than Condition A.
AND At least 100%%uo of the ECCS Qow equivalent to a single OPERABLE ECCS train available.
ECCS Operating B 3.5.2 BASES ACTIONS A.l Time con inued)
OPERABLE sta is based evaluation an
'2 on an NRC s
'asonable hours. The 4
amount o using a ompletion reliability feet many r
An ECCS train is inoperable if it is not capable of delivering the design flow to the RCS. The individual components are inoperable if they are not capable of if performing their design function, or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Oue to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessaril result in a loss of function for the ECCS. The inten f to maintain a combination of OPERABLE equipment such that 1008 of the ECCS flow equivalent to 1008 of a single OPERABLE train remains available. This allows increased flexibility in plant operations when components in opposite trains are inoperable.
ZQSE%'T An event accompanied by a loss of offsite power and the RE failure of an emergency OG can disable one ECCS train until power is restored. A reliability analysis (Ref. 4) has shown that the impact with one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours.
Reference 5 describes situations in which one component, disable both ECCS trains.
ln single OPERABLE in a conditi h t at 100~ of the e e the acci en u'w such as a shutdown cooling total flow control valve, can i one or more compon available, the to a facility Therefore, is must be imediatel entered.
c
.1 and .2 If the inoperable train cannot be restored to 'OPERABLE status within the associated Completion Time, the plant must (continued)
CEOG STS B 3.5-15 Rev. 0, 09/28/92
INSERT AA each of Condition A and Condition B are INSERT AB Each of Condition A and Condition B includes a combination of OPERABLE equipment such that at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available.
Condition A addresses the speciQc condition where the only affected ECCS subsystem is a single LPSI subtrain. The availability of at least 100% of the ECCS Qow equivalent to a single OPERABLE ECCS train is implicit in the deQnition of Condition A.
If LCO 3.52 requirements are not met due only to the existence of Condition A, then the inoperable LPSI subtrain components must be returned to OPERABLE status within seven (7) days of discovery of Condition A. This seven (7) day Completion Time is based on the Qndings of the deterministic and probabilistic analysis that are discussed in Reference 6. Seven (7) days is a reasonable amount of time to perform many corrective and preventative maintenance items on the affected LPSI subtrain. Reference 6 concluded that the overaH risk impact of this Completion Time was either risk-beneQcial or risk-neutral.
Condition B addresses other scenrarios where the availability of at least 100% of the ECCS Qow equivalent to a single OPERABLE ECCS train exists but the full requirements of LCO 352 are not met. If Condition B exists, then inoperable components must be restored such that Condition B does not exist with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of discovery. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability study (Ref. 4) and is a reasonable amount of time to effect many repairs.
INSERT AC With one or more components inoperable such that 100% of the equivalent Qow to a single OPERABLE ECCS is not available, the facility is in a condition outside of the accident analyses. In such a situation, LCO 3.03 must be immediately entered.
ECCS Operating B 3.5.2 BASES ACTIONS .1 and .2 (continued) be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and pressurizer pressure reduced to
< 1700 psia within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power in an orderly manner and without challenging unit systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained.
Misalignment of these valves could render both ECCS trains inoperable. Securing these valves in position by removing power or by key locking the control in the correct position ensures that the valves cannot be inadvertently misaligned or change position as the result of an active failure.
These valves are of the type described in Reference 5, which can disable the function of both ECCS trains and invalidate fhe accident analysis. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls ensuring that a mispositioned valve is an unlikely possibility.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves were verified to be in the correct position prior to locking, sealing, or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve automatically repositions within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position.
(continued)
CEOG STS 8 3.5-16 Rev. 0, 09/28/92
ECCS-Operating B 3.5.2 BASES SURVEILLANCE SR 3.5.2. 10 (continued)
RE(UIREMENTS outage, on the need to have access to the location, and on the potential for unplanned transients if the Surveillance were performed with the reactor at power. This Frequency is sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES 1. 10 CFR 50, Appendix A, GDC 35.
- 2. 10 CFR 50.46.
- 3. FSAR, Chapter [6] .
- 4. NRC Memorandum to V. Stello, Jr., from R. L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
~ScRT 5. IE Information Notice No. 87-01, January 6, 1987.
RD CEOG STS B 3.5-19 Rev. 0, 09/28/92
INSERT AD
- 6. CE NPSD-995, "CEOG Joint Applications Report for Low Pressure Safety Injection System AOT Extension," April 1995.