ML17228A577
| ML17228A577 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/23/1994 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17228A576 | List: |
| References | |
| NUDOCS 9406010228 | |
| Download: ML17228A577 (2) | |
Text
'EMERGENCY CORE COOLING SYSTEMS ECCS SUBSYSTEMS - T
> 325'F LIMITING CONDITION FOR OPERATION 3.5.2 Two independent ECCS subsystems shall be OPERABLE with each sub-system comprised of:
a.
One OPERABLE hi h-ressure safety injection HPSI) pum (ene.
C subsystem-s al.mc u e-H 5I~um
<n-
-E665-ebs stemmhal 1-incl-ude-either HPSI-mp-Bmr 3)EL'ETE.
b.
One OPERABLE low-pressure safety injection pump, and c..
An independent OPERABLE flow path capable of taking suction from the refueling water tank on a Safety Injection Actuation Signal and automatically 'transferring suction to the containment sump on a Recirculation Actuation Signal.
APPLICABILITY:
NODES 1, 2 and 3.".
ACTION:
a b.
With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
In the event the ECCS is actuated and injects water into the Reactor Coolant System, a Special Report shall be prepared and sub'mitted to the'Commission pursuant to Specification 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date.
- Wit pressurizer pressure
> 1750 psia.
ST.
LUCIE - UNIT 1 3/4 5-3 Amendment No.
'94060 10228, 940523
- -', PDR ADOCK 05000335",..*',<.
- ,
P',
i'",, '.
PDR,'<,",.'"'~'
A
[\\
A s
/k II