ML17219A666

From kanterella
Revision as of 16:56, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Special Rept:On 870528,city Water Tank 1B Declared Inoperable for More than 7 Days in Violation of Tech Specs to Perform Necessary Maint.Caused by Necessary Repairs to Protective Coating Sys to Prevent Further Corrosion
ML17219A666
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/01/1987
From: WOODY C O
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-278, NUDOCS 8707060691
Download: ML17219A666 (3)


Text

REGUL*TO>

INFORMATION DISTRIBUTlON>STEM(RIDS3ACCESSION NBR:8707060691 DOC.DATE:87/07/01NOTARIZED:

NOFACIL:50-335St.LuciePlant>Unit1>FloridaPoeer8cLightCo.50-389St.LuciePlant.Unit2>FloridaPoeerZcLightCo.AUTH.NAMEAUTHORAFFILIATIONNOODY>C~O.FloridaPoojerZcLightCo.RECIP.NAMERECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)DOCKET0500033505000389

SUBJECT:

Specialrept:on870528>citeatertank1Bdeclaredinoperable formorethat7dayslimitedalloUjedbyTechSpecstopreformnecessary maint.Causedbysandblasting oWtankinnershellZcevaluated corrosion pitting.DISTRIBUTION CODE:IE2ZDCQPIESRECEIVED:

LTR(ENCLQSIZE:TITLE:50.73LicenseeEventReport(LER>>IncidentRpt>etc.NOTFS:RECIPIENT IDCODE/NAME PD2-2LATOURIGNY>E1NTERNAL:

ACRSMICHElSONAEQD/DOAAEOD/DSP/TPAB NRR/DEST/ADE NRR/DEST/CEB NRR/DEST/ICSB NRR/DEST/MTB NRR/DEBT/RSB NRR/DLPG/HFB NRR/DOEA/EAB NRR/DREP/RPB NRR/PMAS/PTSB RESDEPYGIRES/DE/EI BCOPIESLTTRENCL111111101111111112211111RECIPIENTIDCODE/NAME PD2-2PD'CRSMOELLERAEOD/DSP/ROAB DEDRONRR/DEST/ADS NRR/DEST/ELB NRR/DEST/MEB NRR/DEST/PSB NRR/DEST/SGB NRR/DLPG/GAB NRR/DREP/RAB NRARMALRBREGF02RE>JRGN2FILE01COPIESLTTRENCL11222211101111111111111EXTERNAL:

EGe<rGROH.MLPDRNSICHARRIS>J5511HSTLOBBYNARDNRCPDRNSICNAYS>G111TOTALNUMBEROFCOPIESREQUIRED:

LTTR44ENCL42\+55%-e>55~')55)555)'5'~')~))85-=*-~

cJJP,<14000,JUNOBEACH,FL334IOBFLORIDAPOWER8LIGHTCOMPANYgod)l98tL-87-278IOCFR50.4U.S.NuclearRegulatory Commission Attn:DocumentControlDesk'ashington, D.C.2055SGentlemen:

Re:St.LucieUnitsIand2DocketNos.50-335and50-389SpecialReportDateofEvent:May28,l987IBCitWaterStoraeTankTheattachedSpecialReportisbeingtransmitted pursuanttotherequirements ofTechnical Specifications 3.7.II.Iand6.9.2.Thereportprovidesnotification thattheIBCity.WaterStoragetankwasoutofserviceforgreaterthanseven(7)daysandtheactionstakentorestorethetanktoservice.Shouldthere.beanyquestions onthisinformation, pleasecontactus.Verytrulyyours,C.O.WooGroupVicePresident NuclearEnergyCOW/GRM/gp Attachment cc:Dr.J.NelsonGrace,Re'gional Administrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant87070bob'yl 500033587070>PDRADOCK0PDR8/6>~GRMS/0I7/IPEOPLE...

SERVINGPEOPLEc-NRCSPECIALREPORTIBCITYWATERSTORAGETANKINOPERABLE FORMAINTENANCE ASALLOWEDBYTECHNICAL SPECIFICATIONS At235IhoursonMay28,l987,theIACityWaterStorageTank(CWST)wasdeclaredinoperable aspartofscheduled repairstobeperformed onthetank.Recentinspections oftheIAandIBCWSTperformed onJanuary3,l987,revealedthatcorrosion pittingwastakingplaceontheinteriorshellofthetanks.Theprotective coatingisbeginning todeteriorate andsmallareasareexposedtotheenvironment.

Thisresultedinthepittingseeninthetanks.Eventhoughtheextentofthepittingwasnotofimmediate concernforthestructural integrity ofthetanks,itwasrecommended torepairthetankprotective coatingsystemtopreventfurthercorrosion.

TheIACWSTrepairswerecompleted onJanuary27,l987.ASpecialReportwaspreviously submitted byFPLletterL-87-6I,datedFebruary9,I987.Inaccordance withtheSt.LucieUnitIandUnit2Technical Specification 3.7.II.I,thisSpecialReportisbeingsubmitted tonotifytheNRCthattheIBCWSThasbeeninoperable forgreaterthantheallowedseven(7)days.Thefollowing istheplantorestoretheequipment tooperablestatus.Thereasonfordeclaring theequipment inoperable wasthemaintenance repairontheIBCWST.Thetankinnershellhasbeensandblasted andthecorrosion pittinghasbeenevaluated byFPLEngineering andChicagoBridgeIncorporated.

Weldrepairsarebeingperformed andtheprotective coatingwillbeappliedassoonasweldrepairsarecompleted.

Theexpectedcompletion dateofthetankrepairisJulyl5,I987.TheIACWSThasremainedoperabletosupplytheredundant firesuppression systemwhiletheIBCWSTisundergoing repairs.GRM5/0I7/2