ML18109A164
From kanterella
Revision as of 22:25, 17 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML18109A164 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 04/19/2018 |
From: | Maglio S A DTE Energy |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NRC-18-0022 | |
Download: ML18109A164 (8) | |
Similar Documents at Fermi | |
---|---|
Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024
[Table view]Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05 Category:Report MONTHYEARNRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023
[Table view]License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-21-0031, Request for Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2021-05-17017 May 2021 Request for Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML21055A3852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report - GE Document 209A4756, Logic Symbols NRC-19-0067, Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval2019-10-0808 October 2019 Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval NRC-19-0018, Submittal of 2018 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2019-04-18018 April 2019 Submittal of 2018 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) NRC-18-0022, Submittal of 2017 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2018-04-19019 April 2018 Submittal of 2017 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML17305A0382017-10-16016 October 2017 Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications Bases NRC-17-0052, High Frequency Seismic Confirmation Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2017-08-30030 August 2017 High Frequency Seismic Confirmation Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident NRC-17-0026, Submittal of 2016 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2017-04-0606 April 2017 Submittal of 2016 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML16231A4432016-08-30030 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) NRC-16-0026, Submittal of 2015 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2016-04-27027 April 2016 Submittal of 2015 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML16057A7592016-02-25025 February 2016 Comments on Advance Notice of Proposed Rulemaking on Regulatory Improvements for Decommissioning Power Reactors NRC-16-0014, Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal2016-02-25025 February 2016 Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal NRC-15-0085, Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask NRC-15-0043, Submittal of 2014 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2015-04-28028 April 2015 Submittal of 2014 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-14-0058, 10 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the TN-RAM Cask Due to As-Built Discrepancies Identified by Cask Certificate Holder2014-08-13013 August 2014 10 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the TN-RAM Cask Due to As-Built Discrepancies Identified by Cask Certificate Holder NRC-14-0061, Post Accident Monitoring Report Regarding Inoperable Instrumentation2014-08-0707 August 2014 Post Accident Monitoring Report Regarding Inoperable Instrumentation ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14093A7662014-05-0606 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NRC-14-0030, Submittal of 2013 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2014-04-28028 April 2014 Submittal of 2013 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML13317A8942013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Fermi Unit 2, TAC No.: MF0770 NRC-13-0052, CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time2013-09-0909 September 2013 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time NRC-13-0026, Response to Request for Additional Info Re Proposed License Amendment to Relocate Pressure and Temperature Curves to Pressure & Temperature Limits Report2013-07-0909 July 2013 Response to Request for Additional Info Re Proposed License Amendment to Relocate Pressure and Temperature Curves to Pressure & Temperature Limits Report NRC-13-0017, Submittal of 2012 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2013-04-26026 April 2013 Submittal of 2012 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-13-0013, DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations2013-03-0808 March 2013 DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations NRC-13-0004, Fermi 2, Enclosure 9 to NRC-13-0004, NEDO-33578, Rev. 0, Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization.2013-01-31031 January 2013 Fermi 2, Enclosure 9 to NRC-13-0004, NEDO-33578, Rev. 0, Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization. ML13043A6552013-01-31031 January 2013 Fermi 2, Enclosure 9 to NRC-13-0004, NEDO-33578, Rev. 0, Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization. NRC-12-0076, Detroit Edison'S Response to March 12, 2012 Information Request Regarding Flood Protection Walkdowns2012-11-26026 November 2012 Detroit Edison'S Response to March 12, 2012 Information Request Regarding Flood Protection Walkdowns ML12341A3642012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-43 Through C-149 ML12341A3632012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Cover Through Appendix C, Page C-42 ML12341A3612012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-336 Through C-426 ML12341A3582012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-247 Through C-335 ML12341A3652012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-150 Through C-246 ML12341A3662012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-427 Through C-529 ML12341A3672012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-530 Through C-628 ML12341A3682012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-629 Through Appendix D, Page D-7 ML12341A3692012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-8 Through Page D-108 ML12341A3702012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-109 Through Page D-211 NRC-12-0075, TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End2012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases2012-11-0505 November 2012 Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases ML13004A1352012-10-31031 October 2012 Enclosure 5 to NRC-12-0037, NEDO-33785, Rev 0, DTE Energy/Enrico Fermi Power Plant 2 Pressure and Temperature Limits Report Up to 24 and 32 Effective Full-Power Years. ML1203704612012-01-30030 January 2012 Theodore Smith Ltr Revised Final Report No. 1: Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan ML1131111732011-10-27027 October 2011 Revised Final Report No. 2, Fermi Independent Confirmatory Survey Summary and Results ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants NRC-11-0036, Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 42011-06-29029 June 2011 Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 4 NRC-11-0018, Enrico Fermi Atomic Power Plant, Unit 1 - Fermi 1 Groundwater Site Conceptual Model2011-06-29029 June 2011 Enrico Fermi Atomic Power Plant, Unit 1 - Fermi 1 Groundwater Site Conceptual Model ML1029401782010-10-13013 October 2010 B. Watson Ltr. Report No. 1: Independent Confirmatory Survey Summary and Results for the Enrico Fermi: Atomic Power Plant, Unit 1, Newport, Michigan ML1011004632010-04-0707 April 2010 Technical Requirements Manual, Vol. 1, Revision 97 NRC-09-0080, Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil Dcgl Values2009-11-30030 November 2009 Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil Dcgl Values 2023-03-07 Category:Miscellaneous MONTHYEARNRC-21-0031, Request for Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2021-05-17017 May 2021
[Table view]Request for Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NRC-19-0067, Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval2019-10-0808 October 2019 Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) NRC-18-0022, Submittal of 2017 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2018-04-19019 April 2018 Submittal of 2017 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML17305A0382017-10-16016 October 2017 Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications Bases NRC-17-0026, Submittal of 2016 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2017-04-0606 April 2017 Submittal of 2016 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML16231A4432016-08-30030 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) NRC-16-0026, Submittal of 2015 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2016-04-27027 April 2016 Submittal of 2015 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML16057A7592016-02-25025 February 2016 Comments on Advance Notice of Proposed Rulemaking on Regulatory Improvements for Decommissioning Power Reactors NRC-16-0014, Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal2016-02-25025 February 2016 Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal NRC-15-0085, Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask NRC-15-0043, Submittal of 2014 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2015-04-28028 April 2015 Submittal of 2014 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-14-0058, 10 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the TN-RAM Cask Due to As-Built Discrepancies Identified by Cask Certificate Holder2014-08-13013 August 2014 10 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the TN-RAM Cask Due to As-Built Discrepancies Identified by Cask Certificate Holder NRC-14-0061, Post Accident Monitoring Report Regarding Inoperable Instrumentation2014-08-0707 August 2014 Post Accident Monitoring Report Regarding Inoperable Instrumentation ML14093A7662014-05-0606 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NRC-14-0030, Submittal of 2013 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2014-04-28028 April 2014 Submittal of 2013 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-13-0052, CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time2013-09-0909 September 2013 CFR 71.95 Report - Failure to Observe Certificate of Compliance Conditions for the 8-120B Vent Port Leak Test Hold Time NRC-13-0017, Submittal of 2012 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2013-04-26026 April 2013 Submittal of 2012 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-13-0013, DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations2013-03-0808 March 2013 DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations ML12341A3702012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-109 Through Page D-211 ML12341A3582012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-247 Through C-335 ML12341A3612012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-336 Through C-426 ML12341A3642012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-43 Through C-149 NRC-12-0075, TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End2012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End ML12341A3692012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-8 Through Page D-108 ML12341A3682012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-629 Through Appendix D, Page D-7 ML12341A3672012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-530 Through C-628 ML12341A3662012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-427 Through C-529 ML12341A3632012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Cover Through Appendix C, Page C-42 ML12341A3652012-11-20020 November 2012 TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix C, Page C-150 Through C-246 NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases2012-11-0505 November 2012 Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants NRC-11-0036, Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 42011-06-29029 June 2011 Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 4 NRC-09-0080, Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil Dcgl Values2009-11-30030 November 2009 Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil Dcgl Values ML0929604282009-10-23023 October 2009 Independent Spent Fuel Storage Installation Control of Heavy Loads Inspection Document Request NRC-09-0025, Submittal of 2008 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2009-04-17017 April 2009 Submittal of 2008 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML0818304092008-06-30030 June 2008 GE-NE-0000-0047-1716-R1, DTE Energy Enrico Fermi 2, Safer/Gestr Loss-of-Coolant Accident Analysis for GE11 Fuel. ML0818304112008-06-30030 June 2008 GE-NE-0000-0030-6565-R1, DTE Energy, Enrico Fermi 2, Safer/Gestr Loss-of-Coolant Accident Analysis for GE14 Fuel NRC-08-0035, Submittal of 2007 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2008-04-28028 April 2008 Submittal of 2007 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report ML0723403152007-08-22022 August 2007 Staff Evaluation of BWRVIP Response to Nuclear Regulatory Commission Safety Evaluation of BWR Vessel and Internals Project, Evaluation of Crack Growth in BWR Stainless Steel RPV Internals (BWRVIP-14-A) NRC-07-0029, Response to Request for Additional Information Regarding License Amendment Request for Extension of Completion Time for an Inoperable Emergency Diesel Generator2007-05-23023 May 2007 Response to Request for Additional Information Regarding License Amendment Request for Extension of Completion Time for an Inoperable Emergency Diesel Generator NRC-06-0058, Groundwater Protection - Data Collection Questionnaire2006-07-28028 July 2006 Groundwater Protection - Data Collection Questionnaire ML0414602392004-05-17017 May 2004 Rev 38 to Tlcomp, Restricted Engineered Components List. ML0626304082004-03-0101 March 2004 PSEG Nuclear, LLC Salem/Hope Creek Safety Culture Assessment ML0318903172003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-For-Duty Enhancements for Nuclear Security Force Personnel for Fermi 2 NRC-03-0018, Submittal of Changes to Emergency Response Data System for Integrated Plant Computer System Replacement2003-03-25025 March 2003 Submittal of Changes to Emergency Response Data System for Integrated Plant Computer System Replacement NRC-02-0013, Annual Report for 20012002-04-16016 April 2002 Annual Report for 2001 2021-05-17 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18109A164&oldid=641496"