Email J. Monninger to A. Russell, B. Vaidya, Subj: G20120172 (Fitzpatrick 2.206): PRB Internal Meeting Notes on Initial Recommendation
ML13164A237
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/05/2012
From: Monninger J D
Division of Operating Reactor Licensing
To: Andrea Russell, Bhalchandra Vaidya
Plant Licensing Branch 1, Division of Policy and Rulemaking
References
2.206, FOIA/PA-2013-0010, G20120172, TAC ME8189
Download: ML13164A237 (19)


Text

Monninger, John From: Monninger, John ,'Sent: Wednesday, September 05, 2012 12:37 PM To: Russell, Andrea; Vaidya, Bhalchandra

Subject:

RE: G20120172 (Fitzpatrick 2.206): PRB Internal Meeting Notes on Initial Recommendation based on 3rd meeting and comments from John and OGC (TAC ME8189)Attachments:

With comments from Monninger and OGC addressed-ME8189 (G20120172)

Final PRB Notes 08-23-2012.docx Andrea, Bhalchandra:

I concur. The attached file contains a few minor editorial changes for your consideration.

Also, I provided a comment reanrdinn our resnanse-to-Questinn 3,.nane 5) on whether the netitinn meets the renuirements for review,. (b)(5)(b)(5)Thanks for your efforts, John M.From: Russell, Andrea Sent: Tuesday, September 04, 2012 7:11 AM To: Lee, Samson; Blckett, Brice; Doerfleln, Lawrence; JennerIch, Matthew; Dennig, Robert; Fretz, Robert; Jefferson, Steven; Eul, Ryan; Monninger, John; McIntyre, David; Collins, Timothy; Cook, William; McCarver, Sammy; Lemoncelli, Mauri; Miranda, Samuel Cc: Vaidya, Bhalchandra; Thadani, Mohan; Pelton, David

Subject:

RE: G20120172 (Fitzpatrick 2.206): PRB Internal Meeting Notes on Initial Recommendation based on 3rd meeting and comments from John and OGC (TAC ME8189)Good morning, I have not received comments or concurrences from the majority of the PRB members. In order to move forward with the initial recommendation, we need consensus from the PRB. Please reply to Bhalchandra and myself stating that either you concur on the attached or that you have comments by COB Thursday September 6 t".Thanks, Andrea 2.206 Coordinator From: Russell, Andrea Sent: Thursday, August 23, 2012 8:29 AM To: Lee, Samson; Bickett, Brice; Doerflein, Lawrence; Jennerich, Matthew; Dennig, Robert; Ulses, Anthony;MorganButler, Kimyata; Fretz, Robert; Jefferson, Steven; Eul, Ryan; Safford, Carrie; Monninger, John; McIntyre, David;Collins, Timothy; Scott, Catherine; Albert, Michelle; Cook, William; McCarver, Sammy Cc: Valdya, Bhalchandra; Thadanl, Mohan Subject- G20120172 (Fitzpatrick 2.206): PRB Internal Meeting Notes on Initial Recommendation based on 3rd meeting and comments from John and OGC (TAC ME8189)Good morning, On behalf of Bhalchandra, I am providing you with the revised Final PRB internal meeting notes on the initial recommendation, for your review, These meeting notes have been updated since the last meeting on July 19, 2012, to incorporate changes from OGC and John Monninger.

The changes are shown in tracked format.131 Please provide your comments/concurrence on the notes to myself and Bhalchandra by COB Thursday August 30th.Thank you for your time, Andrea 2.206 Coordinator Andrea Russell Project Manager Nuclear Regulatory Commission NRRIDPR/PGCB Ph: 301-415-8553 2

10 CFR 2.206 PRB Closed Meetina Notes -0711912012

SUBJECT:

PETITIONER:

2ATE GUNTER ET AL. 2.206 REQUESTING ENFORCEMENT ACTION AGAINST JAMES A. FITZPATRICK PLANT (G20120172) (TAC ME8189)Paul Gunter, et al March 9, 2012, the supplements dated March 13, and March 20, 2012, and Petitioners' Presentations to the PRB In the Public Meeting on April 17, 2012.PRB MEMBERS & ADVISORS Samson Lee Bhalchandra Vaidya Sam Miranda Robert Dennig Robert Fretz John Monninger Andrea Russell David Pelton Brice Bickett Mathew Jennerich Lawrence Doerflein Ryan Eul Mauri Lemoncelli (PRB Chair- Deputy Director, NRR, Division of Risk Assessment)(Petition Manager -NRR, Division of Operating Reactor Licensing)(Branch Chief(A) -NRR, Division of Safety Systems, Reactor Systems Branch)(Branch Chief -NRR, Division of Safety Systems, Containment and Ventilation Branch)(Senior Project Manager -NRR, Japan Lessons Learned Project Directorate, Projects Management Branch)(Associate Director -NRR, Japan Lessons Leamed Project Directorate)(Agency 2.206 Coordinator

-NRR, Division of Policy and Rulemaking)(Branch Chief -NRR, Division of Policy and Rulemaking, Generic Communications Branch)(Senior Project Manager -Region 1, Branch 2. Division of Reactor Projects)(Project Engineer -Region 1, Branch 2, Division of Reactor Projects)(Branch Chief- Region 1, Branch 2, Division of Reactor Safety)(Enforcement Specialist

-Office of Enforcement)(Senior Attorney -Assistant General Counsel -Materials Litigation and Enforcement

-Office of General Counsel).................

........ ...............................................................

...........................

.FormatUed:

Fonttcoior:

Auto

SUMMARY

OF REQUEST: On March 9, 2012, as supplemented March 13 and March 20, 2012, Mr. Paul Gunter, et. al., arubmitted a joint petition to the NRC, under Title 10 of the Code of Federal Regulations, Part 2.206, regarding James A. FitzPatrick Nuclear Power Plant (FitzPatrick).

The joint petitioners request that the FitzPatrick operating license be Immediately suspended as the result of the undue risk to the public health and safety presented by the operator's reliance on non-conservative and wrong assumptions that went into the analysis of the capability of FitzPatrick's pre-existing ductwork containment vent system. The joint petitioners state that the risks and uncertainty presented by FitzPatrick's assumptions and decisions, In regard to NRC Generic Letter 89-16, as associated with the day-to-day operations of this nuclear power plant now constitute an undue risk to public health and safety. The joint petitioners request that the suspension of the operating license be in effect pending final resolution of a public challenge to I the adequacy of the pre-existing vent line in light of the Fukushima 08iichiDai-ichi nuclear accident.

The joint petitioners do not seek or request that FitzPatrick operators now Install the Direct Torus Vent System (DTVS) as It is demonstrated to have experienced multiple failures to mitigate the severe nuclear accidents at Fukushima DairhiDai-ichi.

The joint petitioners request that the NRC take action to suspend the FitzPatrick operating license immediately until the following emergency enforcement actions are enacted, completed, reviewed, and approved by the NRC and informed by independent scientific analysis: 1) Entergy Nuclear Operations' FitzPatrick nuclear power plant shall be subject to public hearings with full hearing rights on the continued operation of the Mark I BWR and the adequacy and capability of a pre-existing containment vent which is not a fully hardened vent line as recommended by NRC Generic Letter 89-16. As such, the FitzPatrick operator uniquely did not make containment modifications and did not install the DTVS, otherwise known as 'the hardened vent," as requested by NRC Generic Letter 89-16 and as Installed on every other GE Mark I in the US;2) Entergy Nuclear Operations shall publicly document for Independent review its post-Fukushlma re-analyses for the reliability and capability of the FitzPatrick pre-existing containment vent system as previously Identified as "an acceptable deviation" from NRC Generic Letter 89-16 which recommended the installation of the Direct Torus Vent System and as outlined In the NRC Safety Evaluation Report dated September 28, 1992. The publicly documented post-Fukushima analysis shall include the reassessment of all assumptions regarding the capability and reliability of the pre-existing containment venting and specifically address non-conservative assumptions regarding:

a) the FitzPatrick cost-benefit analysis used to justify not installing a fully hardened vent system and;b) 'unlikely Ignition points" as claimed In the FitzPatrick pre-existing vent line system that would otherwise present increased risks and consequences associated with the detonation of hydrogen gas generated during a severe accident.In the March 20, 2012, supplement to the petition, the joint petitioners state that the Temporary Instruction 2515/183 provides the NRC inspection results in the 'Follow-up to the Fukushima Daii 'Dai-ichi Nuclear Station Fuel Damage Event." The joint petitioners draw attention to what is described at page 8 of the enclosure as an "apparent beyond design and licensing basis vulnerability" involving the FitzPatrick operators refusal to install the D'VS as recommended by NRC in Generic Letter 89-16.To summarize the supplement, the joint petitioners state that:* The Commission's March 12, 2012, Order states that "Current regulatory requirement and existing plant capabilities allow the NRC to conclude that a sequence of events such as the Fukushima Dai-Ichi accident Is unlikely to occur In the US. Therefore, continued operation and continued licensed activities do not pose an imminent threat to public health and safety." The Order further states, "While not required, hardened vents have been In place in U.S. plants with BWR Mark I containments for many years but a wide variance exist with regard to the reliability of the vents."* The NRC Inspection report identifies that FitzPatrick's "existing plant capabilities" and"current procedures do not address hydrogen considerations during primary containment venting" which is further Identified as a "current licensing basis vulnerability." The joint petitioners further reiterate that the NRC inspection finding that FitzPatrick's "existing plant capabilities" as assumed by the Order are in fact negated by the finding that"FitzPatrick's current licensing basis did not require the plant to have a primary containment torus air space hardened vent system as part of their Mark I containment improvement program." 2

  • The Commission Order timeline setting December 31, 2016, for installing the reliable hardened vent does not address In a timely way the unique condition" of FitzPatrick.

P FitzPatrick uniquely does not have a fully hardened vent system on the vulnerable Mark I containment As a result, FitzPatrick's current capability is identified with "a beyond design and licensing bases vulnerability, In that FitzPatrick's current licensing basis did not require the plant to have a primary containment torus air space hardened vent system as part of their Mark I containment Improvement program." Given that the FitzPatrick unit willfully refused to install the DTVS, the documented discovery of the'licensing basis vulnerability" of Its chosen pre-existing vent now uniquely warrants the suspension of operations pending closer scrutiny, public hearings, and full disclosure for its adequacy and capability In the event of a severe accident The additional identified"vulnerability" and the relatively remote and uncertain mitigation strategy places the public health and safety unduly and unacceptably at risk by the continued day-to-day operations where 'current procedures do not address hydrogen considerations during primary containment venting" and will not for nearly five (5) more years.BASIS FOR THE REQUEST: As a basis for the request, the joint petitioners' state that in light of the multiple failures of the GE Mark I containment and hardened vent systems at the Fukushima gailfeW1L-ichil nuclear power station in the days following the March 11, 2011, station black out event, the joint petitions seek the prompt and Immediate suspension of the FitzPatrick operations because: 0 The GE Mark I BWR pressure suppression containment system is identified as inherently unreliable and likely to fail during a severe accident.* The capability of FitzPatrick's pre-existing containment vent as approved for severe accident mitigation is not a fully "hardened vent" system.e The capability of FitzPatrick's pre-existing containment vent as approved relies upon non-conservative and faulty assumptions.

e The capability of FitzPatrick's pre-existing containment vent system uniquely allows for a severe nuclear accident to be released at ground level.9 The Fukushima Dai;GhiDai-ichi nuclear catastrophe dramatically and exponentially changes the FitzPatrick cost-benefit analyses.9 The continued day-to-day reliance upon the significantly flawed pre-existing containment vent system as would be relied upon to mitigate a severe accident at the FitzPatrick Mark I reactor presents an undue risk to the public health and safety.e The identified containment vulnerability, the non-conservative if not false assumption of"no likely ignition sources" in the pre-existing vent line and the unacceptable consequences of failure of the FitzPatrick pre-existing containment vent place both greater uncertainty and undue risk on public health and safety and are not reasonably justified by arbitrarily assigning a low probability of the occurrence of a severe accident.IS THERE A NEED FOR IMMEDIATE ACTION: (If Yes, describe)NO.In its internal meeting on March 20, 2012, the PRB found that there is no immediate safety concern to FitzPatrick, or to the health and safety of the public and therefore, denied the request for emergency enforcement action based on the following considerations:

1. The Near-Term Task Force (NTTF), established by the NRC in response to the Fukushima DalahiDai-ichi nuclear event, concludesd in its report dated July 12, 2011, that continued nuclear reactor operation and licensing activities do not pose an imminent risk to the public 3 health and safety and are not Inimical to the common defense and security because of the low likelihood of an event beyond the design basis at a U.S. nuclear power plant and the current mitigation capabilities at those facilities.-,.t__e.

Comrmission has-endorsed the .Formattd'.

Font: Not soad, Not HIghlight NTTF Report, Including Its conclusions as evident by the Cormttic ta Font: Not Bold, Not Highight Requirements Memorandum for D0eiesiGntem.-SECY-1 1-0093, dated Auu 2011, and ,;4 .... :..............................................

.... ................

1 =.,: Not sl, No ,Hghligh 2. On March 12, 2012, the NRC ordered licensees of BWR facilities with Mark I and Mark II containments to have reliable hardened containment vents (EA-12-050).

This order was based on the Commission's direction provided by the Staff Requirements Memorandum (SRM) to SECY-12-0025, dated March 9, 2012. The order stated that Current regulatory requirements and existing plant capabilities allow the NRC to conclude that a sequence of events such as the Fukushima Dal-ichi accident is unlikely to occur in the U.S. Therefore, continued operation and continued licensing activities do not pose an imminent threat to public health and safety. However, the importance of reliable operation of hardened vents during emergency conditions was already well established and this understanding has been reinforced by the clear lessons of Fukushima.

While not required, hardened vents have been in place in U.S. plants with BWR Mark I containments for many years but a wide variance exists with regard to the reliability of the vents. Additionally, hardened vents are not required on plants with BWR Mark II containments although as discussed above, Mark II containments are only slightly larger than Mark I. Reliable hardened venting systems In BWR facilities with Mark I and Mark II containments are needed to ensure that adequate protection of public health and safety is maintained.

LThe NRC staff was aware of the conclusions presented In its Safety Evaluation (SE) dated September 28, 1992, for Fitzpatrick with respect to GL 89-16, and considered this information in its overall assessment on whether or not BWR facilities with Mark I and Mark II containments were safe to operate following the events at Fukushima.

In add.tie., theThe NRC inspected the design of the Fitzpatrick hardened wetwell vent system and documented the results in an inspection report (50-333/95-06) issued April 18. 1995, The NRC staff was cognizant of and reviewed the results of Inspections performed under TI 183 at FitzPatrick (Report dated May 13, 2011, ADAMS Accession No. ML111330455) following the events at Fukushima.

The ogiensal staff has c.mmunlatod with N..F r-r. .'g ..the Vent sysetom con~figWration at FzitzPatrick, including the difo-na fro fL 80 16 recommendations (La..r D, a rF)ln issuing the March 12, 2012, order, the NRC staff explicitly recognized the wide variance in the reliability of hardened vent designs among Mark I plants. The design at Fitzoatrick is one example of that variance.

The petition for emergency enforcement action provided no new additional information relating to the existing containment venting capability of the Fitzpatrick plant.DOES IT MEET CRITERIA FOR REVIEW?Fom atted: Lst Paragraph, Numbered +,Level: + Numbenrh Style: 1, 2, 3, ... + Start at: I + Allgnment:

Left + Aligned at: 0.06" +9Indent at. 0.31" Criteria for Reviewing Petitions Under 10 CFR 2.206: 1. The petition contains a request for enforcement-related action such as issuing an order modifying, suspending, or revoking a license, issuing a notice of violation, with or without a proposed civil penalty.YES.2. .The facts that constitute the bases for taking the particular action are specified.

The petitioner must provide some element of support beyond the bare essentials.

The 4 supporting facts must be credible and sufficient to warrant further inquiry.YES.3. There is no NRC proceeding available in which the petitioner is or could be party and through which the petitioner's concerns could be addressed.

Formatted:

Font color. AVj._ .. -Formatfted Fot: Not Bold, Font color: Auto, 0 Not HIlghllght Criter or Ree ln Petit ns Under 10 CFR .0 .. .............

.....................................

.1. The incoming correspondence does not ask for an enforcement-related action or fails to ..', provide sufficient facts to support the petition, but simply alleges wrongdoing, violations

.mted Font colo Auto of NRC regulations, or existence of safety concerns.

Fw=w--..on.

olor---Formatted:

Font color: Auto YES, In part ............

Formated:

Font color. Am 2. The petitioner raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and the resolution Is applicable to the facility in question.YES, In part.On March 12, 2012, the NRC ordered licensees of BWR facilities with Mark I and Mark II containments to have reliable hardened containment vents (EA-12-050).

This order was based on the Commission's direction provided by the Staff Requirements Memorandum (SRM) to SECY-12-0025, dated March 9, 2012.Accept on the basis of the staffs ongoing review of NTTF Recommendation 5.1 and Recommendation

6. Recommendation 5.1 orders licensees to include a reliable hardened vent in BWR Mark I and Mark II containmentsa for the prevention of core damage. This order Included performance objectives for the design of hardened vents to ensure reliable operation and ease of use (both opening and closing) during a prolonged SBO. Rocammondltion 6 r...mm.nds, as part of the longor tSrm, ra'oW,-that thW NRC identify insghts abutAs discussed in SECY-12-0025.

the staff determined that consideration of severe accident conditions in the design and operation of the hardened vent involved policy matters that are still under consideration by the staff. As such, venting under severe accident conditions is currently being evaluated by the staff on a -generic basis. The staff is also evaluatinQ NTTF Recommendation 6 conceming hydrogen control and mitigation inside containment or in other buildings as additional Information is revealed through further study of the Fukushima Dai-ichi accident.-

As such, the design of hardened vent systems to handle hydrogen gas is currently being evaluated by the staff on a generic basis.FitzPatrick's response to the GL 89-16 was-alse reviewed and approved by the NRC in September 1992, Including the staff review of the licensee's processes and procedures-;

ad iThe NRC staff evaluation stated, while approving FitzPatrick's positions with regard to GL-89-16, that FitzPatrick's containment vent system met the design bases and the design intent of GL 89-16. In addition, the NRC inspected the design of the Fitzpatrick hardened wetwell vent system and documented the results in 5 an inspection report (50-333/95-06) issued April 18, 1995.With respect to Fukushima accident, the NTTF rd the subsequont Commass..ipn Order hav NRC has concluded that a sequence of events such as the Fukushima Dai-ichi accident is unlikely to occur in the U.S. Therefore, continued operation and continued licensing activities do not pose an imminent threat to public health and safety.,. Fr" atted: Font color: Auto.....jhr~~!ýistdeny alicense appicto or amendmentAt.


... ...ca.Uonq ~r_. e.ndment ......................

..............

F a"t l t 4. The request addresses deficiencies within existing NRC rules, NO. ................

............

[Formttei:

Font coir: Auto IS THERE A NEED FOR QE. 01, OIG, or OGC INVOLVEMENT:

The petition does not contain any allegations of licensee or NRC staff wrongdoing.

However, the PRB includes representatives from OE and OGC.RECOMMENDED APPROACH AND SCHEDULE (Next Steps): Accept, in part, and hold in abeyance the foliew;g-parts of the petition addressing containment venting under severe accident conditions and the design of vent systems being able to accommodate hydrogen gas (issue Nos. 5(b), 7, and 11 in the Table) (see Table for a detailed explanation).

Three of the issues in the petition, identified and discussed as Issue Nos. 5(b), 7, and 11 in the Table, will be accepted for review by the NRC staff. However, as indicated in the Table, the NRC staff notes that these concerns are undergoing NRC review as part of the lessons-learned from the Fukushima event. Even though the Commission has issued the Order concerning HaFdenod Ventreliable hardened vent for accident prevention, the NRCMJL- staff is conducting further review of additional aspects of the ..ardonod Vent S'....hardened vent system, such as WadtftieAventing under severe accidept conditions, In addition, the staff is evaluating hydrogen control and mitigation measures.

Since Issue Nos. 5(b), 7, and 11 in the Table will take longer than the target timeframe for reaching a decision on a petition, the NRC plans on accepting those issues, and holding them in abeyance.All the other Issues in the petition, identified and discussed in the Table are denied for the reasons discussed in the Table The next steps would be to: " Ensure management agrees with the PRB initial recommendation.

  • Inform the petitioners of the PRB's initial recommendation.
  • Provide the second opportunity for the petitioners to address the PRB, and make the arrangements for an acceptable date and time.6 Table (This table summarizes each Issue for the following criteria).

Isue No.1 Specific Issue Raised Does this meet critria for review under 2.206 process?Recommendation FitzPatic operating license be immediately suspended as the result of the undue risk to the public health and safety presented by the operators reliance on non-conservative and wrona assumptions that went into the analysis of the capability of FitzPatdic's pre-existing ductwork containment vent system. The risks and uncertainty presented by FitzPatdck's assumptions and decisions, in regard to NRC Generic Letter 89.16, as associated with the day-today operations of this nuclear power plant now constitute an undue risk to public health and safety.No.I J Jl

  • A(In I~ IT-1 1..1 Mn JLU in- inn .Lmm.~~ uror n.,-,,Jdud that the NRCq.cn.d..ued..ta.ta sequenoe.of events like the Fukushima accident is unlikely to occur in the United States and 6emeappron)date.

mitigation measures have been Implemented, reducing the likelihood of core damage and radiological releases.

Therefore, continued operation and continued licensing activities do not pose an imminent risk to public health and safety and there is no immediate safety concern to FitzPatrick, or to the health and safety of the pubric, and therefore, the request for immediate action should be rejected.

The Petitioners have not provided andequaebasis f eir argue..........

regarding the operator's reliance on non.conservative and wrong assumptions that went into the analysis of the capability of FiRzPatMcl(s pre-existing ductwork containment vent system,.The petitioner's oncenms regarding this issue do not require immediate shutdown of FitzPatick based on the conclusions reached by NTTRhe NRC and the.fRmrWtte Forl Won A*t Commission OrdAr reaardina RMigble Hardened Vent for the US GE Mark I BWRs.U. S. plants have implemented

'beyond-design-basis' requirements such as ATNS, SBO, combustible gas control, aircraft impact assessment, mitioation of maior fires or explosions, and extensive 7 Issue No, Specific Issue Raised Does this meet criteria for review under 2.206 process?Recommendation damage mitigation guidelines, thereby reducing the likelihood of core damage and radiological releases.A sequence of events like those occurring in the Fukushima accident is unlikely to occur at US GE Mark I BWRs.The NRC based on the NITF report on July 12, 2011, bacd on ....i.w of insights from the Fuku,'hima Dai ichi accdent, made a recommendation to the Commission to include a reliable hardened vent system,, 2 The suspension of the operating license be in effect No. This is merely a statement to support the petition in pending final resolution of a public challenge to the general, This is not an enforcement related action adequacy of the pre-existing vent line in light of the and is outside the scope of the 2.206 process and Fukushima Dai Dai-ichi nuclear accident, therefore, this request should be rejected, pursuant to Criterion 1 for reiecting a petition under 10 CFR 2206.3 The joint petitioners do not seek or request that No. This is merely a statement to support the petition in FitzPatrick operators now install the Direct Torus general. This is not an enforcement related action Vent System (DTVS) Recommended by GL89-16, and is outside the scope of the 2,206 process and as it is demonstrated to have experienced multiple therefore, this request should be reiected, pursuant failures to mitigate the severe nuclear accidents at to Criterion 1 for reieding a petition under 10 CFR Fukushima Da"ihiDai-ichi.

2.206, FitzPatrick be subject to public hearings with full No. Thepeptioner raises issues that.have al#rdy.been.

hearing rights on the continued operation of the the subject of NRC staff review and evaluation either Mark I BWR and the adequacy and capability of a on that facility, other similar facilities, or on a generic pre-existing containment vent which is not a fully basis, for which a resolution has been achieved, the hardened vent line as recommended by NRC issues have been resolved, and the resolution is Generic Letter 89-16. As such, the FitzPatrick applicable to the facility in question.

The SE dated-operator uniquely did not make ontainment September 28, 1992 shows that FitzPatrick met the Formatted:

Font oor: Auto...... Formatted:

Font cor: Auto 8 Issue Specific Issue Raised Does this Recommendation No. meet criteria for review under 2 206 process?modifications and did not install the DTVS, otherwise BWROG criteria recommended by GL 89-16.known as 'the hardened vent,' as requested by NRC Tee ln addition, the NRC inspected the desin Generic Letter 89$16 and as installed on every other of the Fitzpatrick hardened wetwell vent system and GE Mark in the US; documented the results in an inspection report (50-333195-06) issued April 18, 1995Therefore.this

.......issue should be reiected, pursuant to Criterion 2 for_ __,__reiet a petition under 10 CFR 2.206, 5 FitzPatrick shall publicly document for independent review its post*Fukushima re.analyses for the reliability and capability of the FitzPatck pre-eisting containment vent system as previously identified as 'an acceptable deviation' from NRC Generic Letter 89.16 which recommended the installation of the Direct Torus Vent System and as outlined in the NRC Safety Evaluation Repor dated September 28,1992. The publicly documented post-Fukushima analysis shall include the reassessment of all assumptions regarding the capability and reliability of the pre-existing containment venting and specifically address non-conservative assumptions regarding:

a) the FitzPatck cost-benefit analysis used to justify not installing a fully hardened vent system and;There is no requirement for the licensee to conduct a re-analvss of their existino containment vent system. The licensee's response to the OrTeliable hardened vent order will be publicly available, Sub,.quont

.NR do FrB@@ding additional

  • Ase i.e., hydrnnrol would teo. be publicly avilblle.FitzPatrick's response to the GL 89-16 was reviewed and approved by the NRC in September 1992, including the staff review of the licensee's processes and procedures, and inspections.

The NRC staff evaluation stated, while approvinq Fat~d FcobCAk No.9 Issue Specific Issue Raised Does this Recommendation meet cUteda for review under 2.206.. proces?FitzPatrick's positions with regard to GL-8916, that FitzPat6cl's containment vent system met the design bases and the design intent of GL 89-16.With respect to the Fukushima Dai-ichi accident, the NTTF evaluation and the subsequent Commission Order have concluded that a sequence of events such as the Fukushima Daichi accident is unlikely to occur in the US and some appropriate mitigation measures have been implemented, reducing the likelihood of core damage and radiological releases, Therefore, continued operation and continued licensing activities do not pose an imminent threat to public health and safety.Accept on the basis of NTTF Recommendation 5.1 and Recommendation k, hydrogen control and mitigation.

The staff is evaluatinQ hydrooen control b) 'unlikely ignition points' as daimed in the FitzPatrick preexisting vent line system that would otherwise present increased risks and consequences associated with the detonation of hydrogen gas generated during a severe accident.Yes.and mitioaaion an a aenedic basis.The results of that and.... a o on.'- ...... genei c ..... .........

re ut ........evaluation will aDolv to the FitzDatrick olant..Recommendation 5.1 orders licensees to include a reliable hardened vent in BWR Mark I and Mark II containment p o r This order included performance objectives for the design of hardened vents to ensure reliable operation and ease of use (both opening and closing) during a prolonged SBO. The gaff is continuing to evaluate vuntinn inrdar ovra 2r"Jint mndifinner - -.1-1-1 10 Issue NO.Speck Isue R-aised Does this meet crftera for review under2.206 process?RecommendaUon Recommendation 6 recommends, as part of the longer term review, that the NRC identify insights about hydrogen control and mitigation inside containment or in other buildings as additional information is revealed through further study of the Fukushima Dachi accident.

, 6 The Temporary Instruction 2515/183 provides the No. The petitioner raises issues that have already been NRC inspection results in the'Follow-up to the the subject of NRC staff review and evaluation either Fukushima aiiDai-ichi Nuclear Station Fuel on that facility, other similar facilities, or on a generic Damage Event.' The joint petioners draw attention basis, for which a resolution has been achieved, the to what is described at page 8 of the inspection issues have been resolved, and the resolution is report as an 'apparent beyond design and licensing applicable to the facility in question.

The Order on basis vulnerability involving the FitzPatrick hardened containment vents (EA-12-050) has a operator's refusal to install the DTVS as timeline of December 31, 2016, for installing the recommended by NRC in Generic Letter 89-16. reliable hardened containment vent. Therefore, this issue should be reiected, pursuant to Criterion 2 for reiecting a Petition under 10 CFR 2.206.7 The NRC inspection report [per Ti-2515/183]

Yes, Accept on the basis of NTTF Recommendation 5.1 identifies that FitzPatrick's'existing plant and Recommendation 6.capabilities' and 'current procedures do not address hydrogen considerations during primary containment Recommendation 5.1 orders licensees to include a venting' which is further identified as a 'current reliable hardened vent in BWR Mark I and Mad 11 licensing basis vulnerability.'

The joint petitioners containments-for prevention of core damage This further reiterate that the NRC inspection finding that order included performance objectives for the design FitzPatrick's

'existing plant capabilities' as assumed of hardened vents to ensure reliable operation and by the Order are in fact negated by the finding that ease of use (both opening and dosing) during a'FitzPatrick's current licensing basis did not require prolonged SBO. The staff is still evaluating on a the plant to have a primary containment torus air generic basis venting under severe accident space hardened vent system as part of their Mark I conditions.

rommod.Fort c*: AM 11 Issue No.Specific Issue Raised containment improvement program.'Does this meet critea fo, review under 2206 Drocess?Recommendation Recommendation 6 recommends, as pan of the longer term review, that the NRC identify insights about hydrogen control and mitigation inside containment or in other buildings as additional information is revealed through further study of the Fukushima Dai.Ichi accident.-

The staff is also evaluating hydrogen control and mitigation on a noanp=re in j mw.tc* A&Z 8 The Commission Order timeline setting December 31, 2016, for installing the hardened vent Order does not address, in a timely way, the unique condition of the FitzPatrick nuclear power plant.No.The petitioner raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and the resolution is applicable to the facility in question.

The SE dated September 28,1992 shows that FitzPatrick mel the BWROG criteria recommended by GL 89.16. In issuing the March 12, 2012, order, the NRC staff explicitly recoonized the wide variance inithe reliability of hardened vent designs among Mark I plants. The design at Fitzpatrick is one example of that variance.

Therefore, this issue should be reiected, pursuant to Criterion 2 for reiecting a netition under 10 CFR 2.206.-I.9 The FitzPatrick nuclear power plant uniquely does not have a fully hardened vent system on the vulnerable Mark I containment.

As a result, FitzPatrick's current capability is identified with 'a beyond desion and licensina bases vulnerabilitv, in No.The petitioner raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and the resolution is--I I I -12 Issue No.Specific Issue Raised that FitzPatridck's current licensing basis did not require the plant to have a primary containment torus air space hardened vent system as part of their Mark I containment improvement program,'Does ths meet criteria for review under2,206 process?Recommendaton applicable to the facility in question.

The SE dated September 28,1992 shows that FitzPatrick met the BWROG criteria recommended by GL 89-16. In issuing the March 12,2012, order, the NRC staff explicitly reconized the wide variance in the reliability of hardened vent designs among Mark I plants. The design at Fitzpatrick is one example of that variance.

Therefore, this issue should be rejected, pursuant to Criterion 2 for reiecting a netition under 10 CFR 2.206.Font ~ALIto 10 Given that the FitzPatrick unit willfully refused to install the D"VS, the documented discovery of the'licensing basis vulnerability' of its chosen pre-existing vent now uniquely warrants the suspension of operations pending closer scrutiny, public hearings, and full disclosure for its adequacy and capability in the event of a severe accident, No.GL 89.16 urged-he licensees to voluntanly install hardened vent capabilities at their Mark I containments.

If licensees chose not to install the hardened vent capability, the NRC staff requested the licensee to provide their plant-specific estimates of cost-s of installation of hardened vent capabilities.

The licensees were informed that the NRC staff would use the cost data to perform plant-specific backdit analyses, and to determine, if hardened vent installations could be imposed as backfits in accordance with 10 CFR 50.109.In response to GL 89-16, FitzPatridck indicated that it had decided not 1o commit to install hardened vent capabilities.

The NRC staff performed a backfit analysis and concluded that there will be substantial additional increase in protection to public health and safety i hardened vent capability is implemented at FitzPatrick and therefore, the backfit is justified.

By letter dated June 15,1990, the NRC staff urced 13 Issue Specific Issue Raised Does this Recommendation No. meet criteria for review under2,206 process?FitzPatrck to reconsider its decision and Implement the hardened vent installation by January 1993, Otherwise, the NRC staff intended to impose the backfit under 10 CFR 50.109.By letters dated January 24,21991, the NRC staff approved the licensee's request dated July 25, 1990, to integrate the results of its IPE program into its decision regarding making any modifications to existing vent system to implement GL 89-16 hardened vent design crteria. Fi:af" ....ided By letters dated December 6,1991, and August 14, 1992, FitzPatrick provided its final position regarding implementation of the hardened vent design critena, use of IPE to re-examine the venting procedures and training of operators, insights gained from performing the IPE program, and the status of investigations into accident management strategies associated with severe accidents.

By letter dated September 28,1992, based on the review of the information provided by FitzPatrick, and the results of the NRC inspection of the FitzPatrick hardened wetwell vent path, the NRC staff determined that the current vent path meets the hardened vent design citeria or their intent.Furthermore, the NRC staff found that the plant procedures and training are adequate to provide information and guidance necessary for operators to effectively use FitzPatrick hardened wetwell vent 14 Issue No.Specific Issue Raised Does this meet criteria for review underZ2206 Drocess?Recommendation - 4. L. 4 capability.

Therefore, the NRC staff concluded that the existing wetwell vent capability at FitzPatrick is adequate.

In addition, the NRC inspected the design of the Fitzpatrick hardened wetwell vent system and documented the results in an inspectin report (50-333195-06) issued April 18,1995.Temporary Instruction 2515/183.

'beyond design and licensing basis vulnerabilhy for beyond design basis accidents]" was not a consideration during GL 89-16 inspections, The petitioner raises issues that have already been the subject of NRC staff review and evaluation either on that facility, other similar facilities, or on a generic basis, for which a resolution has been achieved, the issues have been resolved, and the resolution is ...applicable to the facility in question.

The SE dated September 28, 1992 shows that FitzPatrick met the BWROG criteria recommended by GL 89W6 ...........

Therefore, this issue should be rejected, pursuant to Criterion 2 for reiecting a petition under 10 CFR 2.206..Formatted:

Font Wor: Auto... Fo at: Font Wor' Auto 11 The additional identified

'vulnerability' and the Yes. Accept on the basis of NTTF Recommendation 5.1 relatively remote and uncertain mitigation strategy and Recommendation 6.places the public health and safety unduly and unacceptably at risk by the continued day-to-day Recommendation 5.1 orders licensees to include a operations where 'current procedures do not reliable hardened vent in BWR Mark I and Mark II 15 Issue No.Speciffc Issue Raised address hydrogen considerations durng primary containment venting' and will not for neary five (5)more years.Does ibis meet criteria for review under 2206 Drocess?I Recommendallon containments-for prevention of core damage. This order included performance objectives for the design of hardened vents to ensure reliable operation and ease of use (bothopeni .and .dosi.ng) du.ng a prolonged SBO. The Commission has already considered and deliberated the issue of continued operation in establishing the requirements and due dates in the order rather than calling for immediate action.- The staff is still evaluating on a generic basis venting under severe accident conditions.

Recommendation 6 recommends, as pad of the longer term review, that the NRC identify insights about hydrogen control and mitigation inside containment or in other buildings as additional information is revealed through futher study of the Fukushima Dai-ichi accident..

The staff is also .........evaluating hydrogen control and mitigation on a aeneric basis.iFwo*; o*A*o L. L 16

SUMMARY

... .. .... .. ... .. .. .. .. .. ............

..... ............


I orm at d: r- t co r Auto (1) The petition and the supplements do not include any new or additional information or facts that were not known to the NRC staff with respect to FitzPatrick's Containment Vent System.(2) FitzPatrick response to the GL 89-16 was also reviewed and approved by the NRC in September 1992, Including the staff review of the licensee's processes and procedures, and inspections.

The NRC staff evaluation stated, while approving FitzPatrick's positions with regard to GL-89-16, that FitzPatrick's containment vent system met the design bases and the design intent of GL 89-16. In addition, the NRC inspected the design of the Fitzpatrick hardened wetwell vent system and documented the results in an inspection report (50-333/95-06) issued April 18, 1995.S.............................

.. ............

FormattEd:

Fontco r: Auto (3) Recommendation 5.1 orders licensees to include a reliable hardened vent in BWR Mark I and Mark II containments-for prevention of core damage. This order included performance objectives for the design of hardened vents to ensure reliable operation and ease of use (both opening and closing) during a prolonged SBO. The staff is still evaluating on a generic basis venting under severe accident conditions.

Recommendation 6 recommends, as part of the longer term review, that the NRC identify insights about hydrogen control and mitigation inside containment or in other buildings as additional information Is revealed through further study of the Fukushima Dal-ichi accident.

The staff Is also evaluating hydrogen control and mitigation on a generic basis.(4) After the Issuance of the Facility Operating License, the NRC has conducted its regular and necessary inspections and assessments of the licensee's performance.

The Commission has not found it necessary to issue any generic based on the Indus."' op..ating c Or the plant specific communications, based on the licensee's performance, to require any changes to the design and operating requirements of the Containment -Von. Syt.....containment vent system. The plant continues to meet all the requirements with respect to the regulations and the licensing bases, including those with respect to the design basis accidents and natural phenomena.

Fukushlma events have been characterized as 'Beyond Design Basis Accidents.'

The design and operating requirements for "Beyond Design Basis Accidents' for Containment Vent System are being addressed through the Commission-Issued Order.