MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19235A2882019-08-23023 August 2019 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 ML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML19018A0072019-01-18018 January 2019 (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding a One-Time Change for the WBN Unit 2 Technical Specification (TS) 3.7.8, Essential Raw Cooling Water (ERCW) System. ML18291A5732018-10-18018 October 2018 Chilled Work Environment 2024-08-15
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24184B9162024-07-10010 July 2024 U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values 2024-08-15
[Table view] |
Text
NlWattsBarTPBARLoadingIncreaseLARPreSubmittalMeetin g N uc l ear gJanuary23,2013 A g enda Nl g N uc l earIdi TCibb*Intro d uct i onT erryC r ibb e*BackgroundMarkBurzynski*DOETPBAR Loading Plans Curtis Chambellan
- DOETPBARLoadingPlans CurtisChambellan
- TritiumPermeationExperienceLarryBagaasen*Pro jectedPathwa yEx posuresMarkBurz y nski j y p y*PlantModificationsJeffMcGuire*LicensingActivitiesMarkBurzynski*PostLOCAShutdownMarginAnalysisGreggSwindlehurst
- LicensingActivitiesScheduleTerryCribbe 2*ClosingCommentsTerryCribbe Introduction Nl N uc l ear*PurposeofMeeting-UpdateNRCManagementonTVA'sPlantoSubmitaLicenseAmendmentRe quest(LAR)inJune2013toq ()IncreaseAllowableTPBARLoadingforWattsBarUnit1 3 Back ground Nl g N uc l ear*Background
-LicenseAmendment40IssuedonSeptember23,2002AuthorizedLoadingUpto2304TPBARs*Allowed LoadingSubsequentlyReduced toAddressPost*AllowedLoadingSubsequentlyReducedtoAddressPostLOCAShutdownMarginIssues-TVALetterDatedMarch22,2005NotifiedNRCofInterimCumulativeTPBARTritiumReleaseLimits*WhileHigherthanProjectedPermeationRateswereInvestigatedInvestigated-LicenseAmendment77IssuedonMay4,2009AuthorizedLoadingUpto704TPBARs4 DOETPBARLoadin gPlans Nl g N uc l ear*DOETPBARLoadingPlansforWattsBarUnit1:CycleDateTPBARLoadingTechSpecLimit C11 April 2011 544 704 C11 April2011 544 704C12October2012544704C13April2014544704704C14October2015110410241696*C15April2017150414241696*C16October201816961696*
5*Proposed TritiumPermeation Experience (1/2)Nl Experience(1/2)N uc l ear*TVAandPNNLPerformedSurveillanceOfEstimatedTritiumPermeationOverLast6C y clesofTPBARIrradiationfortheTritiumyReadinessProgram.-PermeationWasHigherthanOriginalDesignGoal,ButNoDesignorProductionFlawsHaveBeenIdentified.Utit b U ncer t a i n t ybarsrepresent90%confidenceinterval6 TritiumPermeation Experience (2/2)Nl Experience(2/2)N uc l ear*OriginalFunctionalRequirementforTPBARTritiumPermeationinCycle6wasanAverageof1Ci/TPBAR/Yea r.*RadionuclideReleasestoEnvironmentatWBN 1willbeManagedtoMeetNRCRequirementsin10CFRPart20and10CFRPart50AppendixI.-ProposedManagementStrategyAssumesTPBARTritiumPermeationwillbe5.0Ci/TPBAR/year Ci/TPBAR/year
.7*Projected Pro jectedPathwa yEx posure(1/2)Nl j y p ()N uc l ear*FSARChapter11RadiologicalConsequenceAnalysesWillBeBasedon:-ReleaseSourceTermBasedonNRCNUREG 0017MethodologytoCalculateanAverageMaximumHypotheticalRelease-TPBAR Loading of 1700TPBARsTPBARLoadingof1700TPBARs-TPBARTritiumPermeationRateof5Curies/TPBAR/Year(BasedonConservativeUpperBoundofPlantData)-UseofTVAQAComputerCodesGELCandQWATAtoCalculateDosetoMaximumExposedOffsiteIndividual 8
Pro jectedPathwa yEx posure(2/2)Nl j y p ()N uc l ear*ProjectedPathwayExposurestoMaximumHypothetical IndividualRemain BelowNRCRegulatoryHypotheticalIndividualRemainBelowNRCRegulatoryLimitsforAllCases.PathwaysPreliminaryProjectedDoses Liquid(Realistic)0.75mremTotalBody Liquid(Design)0.81mremTotalBody129mremTotal Body Gaseous(Realistic) 1.29mremTotalBody 10.86mremCriticalOrgan Gaseous(D es i g n)1.29mremTotalBody*ApplicableNRCRequirements(10CFRPart20and10CFR Pt 50Adi I)dThilSifiti Gaseous(esg)11.34mremCriticalOrgan 9 CFR P ar t50A ppen di xI)an dT ec h n i ca lS pec ifi ca ti onsWillBeMetforAllCases.
PlantModifications(1/2)Nl ()N uc l ear*Additionof500,000GallonTritiatedWaterTankSystem-IncreaseFlexibilitytoManageRCSFeedandBleedUnderContingencyScenariosandTimeEffluentReleasestoEnvironment
-AllowsChangestoOperatingStrategyforRCSFeedandBleedtoKeepTritiumConcentrationsLowandSimplifyOccupationalExposureControlsSimplifyOccupationalExposureControls-Implementedunder10CFR50.59 10 PlantModifications(2/2)Nl ()N uc l ear*ReplaceCheckValvesUsedforThermalReliefonERCWSupplyLineswithreliefValves-EliminatesPostLOCAManualOperatorActionsforIsolationPreviouslyApprovedbyNRCinLicenseAmendmentIssuedonMarch29,2004-Eliminates40GPMSourceofUnboratedWaterLeakageintoContainment(Assumedfor16Hours)Ild d 10 CFR5059-I mp lemente dun d er10CFR 50.59 11 Licensin gActivities Nl g N uc l ear*UpdateLetterRemovingInterimLimitonTritiumReleasesAttributed toTPBARs(Update toMarchReleasesAttributedtoTPBARs(UpdatetoMarch22,2005Letter)-ReturntoNormalEffluentControlsof10CFRPart20,0 0 di dhilSifii 1 0CFRPart5 0Appen di xI,an dTec h n i ca lS pec ifi cat i ons-WouldIncludeGeneralDiscussionofExpectedEffluentReleasesfor704TPBARs*LicenseAmendmentRequestfor1696TPBARs-UpdateofPostLOCAReactivityAnalysisPreviouslyApproved byNRCfor LicenseAmendment 77ApprovedbyNRCforLicenseAmendment77-WouldIncludeDiscussionofExpectedEffluentReleases(UsingRealisticSourceTerm)andRadwasteSystemDi dStti D(Ui Di Bi S 12 D es i gnan dSt a ti onD ose(U s i ngD es i gnB as i sSourceTerm)for1696TPBARs PostLOCAShutdownMarginAnalysis (1/5)NlMarginAnalysis(1/5)N uc l ear*PostLOCAReactivityAnalysiswillBeConsistentithPil Ad bNRC f Li w ithPrev i ous l yApprove db yNRCf orLi censeAmendment77withtheFollowingKeyChanges:-Elimination of Dilution of SumpWaterfrom 40 GPMEliminationofDilutionofSumpWaterfrom40GPMUnboratedWaterInLeakage-ReduceRequiredRCSBoronConcentrationbyIncreasedIFBALoading
-ModificationofSimplifiedAssumptionsonTPBARLithium Leaching at Time of Hot LegSwitchover LithiumLeachingatTimeofHotLegSwitchover
.*TimeDependentLeachingRateUsed*Preliminar yResultsShowSufficientShutdown13 yMarginfor1696TPBARs PostLOCAShutdownMarginAnalysis (2/5)NlMarginAnalysis(2/5)N uc l ear*XenonFreePostLOCA-RSACItem3.16BPreLOCAC b (ppm)PostLOCAC b (ppm)Limit (ppm)Margin (ppm)HFPEQXEC b=1200ppm(lessIFBA)544TPBARs93718912176285 1696TPBARs95321702178 8 HFPEQXEC b=900ppm(moreIFBA)1696TPBAR*Conclusion:900ppmcorewith1696TPBARscan1696TPBAR s73620062148142 14 ppaccommodatecyclevariations PreliminaryResults PostLOCAShutdownMarginAnalysis (3/5)NlMarginAnalysis(3/5)N uc l ear*HotLe gSwitchover-RSACItem3.16A gPreLOCAC b (ppm)PostLOCAC b (ppm)Limit (ppm)Margin (ppm)HFPEQXE C b=1200 ppm (lessIFBA)HFPEQXEC b=1200ppm (lessIFBA)544TPBARs937189120091181696TPBARs95321702012 158 HFPEQXEC b=900ppm(moreIFBA)1696TPBARs-50%Leach(Max)73620061966 40 1696TPBAR*Conclusion:
1696TPBARcore at 900 ppm with 1696TPBAR s-3%Leach(TimeDependent)7361897196669 15
Conclusion:
1696TPBARcoreat900ppm withtimedependentleachratemeetsrequirements.PreliminaryResults PostLOCAShutdownMarginAnalysis (4/5)NlMarginAnalysis(4/5)N uc l ear*Cold Le gRecirculation-RSACItem3.11B gPreLOCAC b (ppm)PostLOCAC b (ppm)Limit (ppm)Margin (ppm)HFPEQXEC b=1200ppm(lessIFBA)544TPBARs93718912115224 1696TPBARs95321702119 52 HFPEQXEC b=900ppm(moreIFBA)*Conclusion:1696TPBARs ,900ppmcoremeets1696TPBAR7352006206458 16 , pprequirements.
PreliminaryResults PostLOCAShutdownMarginAnalysis (5/5)NlMarginAnalysis(5/5)N uc l ear*RefloodRecriticality-RSACItem3.11C PLOCA C LLBLOCAItditSllLBLOCA P reLOCAC b (ppm)LargeLBLOCA (Keff)I n t erme di a t eLBLOCA (Keff)S ma llLBLOCA (Keff)HFPEQXE C=1200 ppm (lessIFBA)HFPEQXEC b=1200ppm (lessIFBA)544TPBARs9370.9393490.9684020.982261 1696TPBARs9530.9640080.990343 1.007126HFPEQXEC b=900ppm(moreIFBA)1696TPBARs-50%Leach(Max)7360.9558940.985144 1.005015*Conclusion:
1696TPBARcore at 900 ppm with time 1696TPBARs-3%Leach(TimeDependent)7360.9485340.9772980.996649 17*Conclusion:1696TPBARcoreat900ppm withtimedependentleachratemeetsrequirements
.PreliminaryResults Licensin gActivitiesSchedule Nl g N uc l ear 18 Closin g Nl g N uc l ear*TVAWillSubmitaLicenseAmendmentRequestf 1696TPBAR i J 2013 f or1696TPBAR si nJ une2013-SupportingAnalyseswillBoundOperatingEi ihTii Pi E xper i encew i t hT r i t i umPermeat i on-SupportingAnalyseswillReflectPlantModificationsMd t I Mi M a d et oIncreaseMarg i ns-AllRegulatoryRequirementsandPlantTechnicalSpecifications will bemet with 1696TPBARCoreSpecificationswillbemetwith1696TPBARCoreDesign 19 Questions NlQuestions N uc l ear 20 Backup Slides NlBackupSlides N uc l ear 21 NlTPBARLeachingTest*Leachin gResultsfromD y namicLeachin gTestonanN uc l ear g y gIrradiatedTPBARSection HotLegSwitchover 1