Summary of 861027 Meeting W/Util & Eg&G Idaho Re Discussion of Selected Issues from Second 10-yr Interval Inservice Test Program Recently Approved by NRC .List of Attendees & Meeting Agenda Encl
ML20207B071
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/30/1986
From: Ross T
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8611110458
Download: ML20207B071 (5)


Text

- - .- -

. Oct;ber 30, 1986 MEMORANDUM FOR: John Stolz,. Director PWR Project Directorate #6 Division of PWP, Licensing-B

[OOD FROM: Thierry Ross, Project Manager PWR Project Directorate #6 Division of PWR Licensing-B

SUBJECT:

SUMMARY

OF A MEETING WITH GPUN ON IST RELIEF REQUESTS FROM PROGRAM CODE REQUIREMENTS General Public Utilities Nuclear (GPUN) Corporation held a meeting with NRR

. staff on Monday, October 27, 1986 to discuss selected issues from the'2nd Ten Year Interval IST program recent,1y approved by letter dated October 3,1986.

Meeting attendees are provided in Enclosure 1. Enclosure 2 contains the meeting agenda presented by GPUN. Most components listed in Enclosure 2, as topics of discussion, were previously the subject of relief requests denied by the staff in the aforementioned letter. Other components were new items required to be incorporated into the TMI-1 2nd Interval IST program.

GPUN chose this meeting as a forum to pursue possible relief from code requirements for components listed in Enclosure 2. As a result of their presentation, the staff was favorably inclined to grant relief for many of the issues. Official NRC approval will be contingent upon an acceptable submittal from GPUN containing additional information and justification.

GPUN plans to formally submit a request relief from IST program code requirements within the next two weeks.

ORIGnal SIGNED BY Thierry Ross, Project Manager PWR Project Directorate #6 Division of PWR Licensing-B

Enclosures:

As stated cc w/ enclosures:

See next page Raw i' PBD-6 PBD-6 TRoss; ak RWeller 10/Jo/86 10/fo/86 8611110458 861030 PDR ADOCK 05000289 P PDR

^

DISTRIBUTION

  • Docket File NRC PDR O)6

' Local PDR PBD#6 Rdg JPartlow JStolz TRoss JThoma

.RWeller OGC-MNBB 9604 EJordan BGrimes ACRS(10)

JPage GHammer

. PTKuo TMarsh cc: Licensee.and Plant Service List t

f h

f

Enclosure 1~

ATTENDANCE TMI-1 IST Program NAME TITLE OPGANIZATION Dave Johnson Resident Inspector, TMI-1 NRC Richard Barley Manager, Plant Eng. TMI-1 GPUN Joe Colitz Plant Eng. Director TMI-1 GPUN Bob Knight Licensing Engineer TMI-1 GPUN Henry.B. Shipman TMI-1 Operations GPUN J. R. Bashista TMI-1 Plant Engineer GPUN Joel Page NRC-NRR DSR0-EIB NRC Gary i smmer NRC-NRR PFR-D-E0 NRC Terry :cok Contractor EG8G Idaho Don Caphton Region I DRS GPUN Thierry Ross NRR PWR-8/PBD#6 NRC Rick Weller NRR PWR-B/PBD#6 NRC P. T. Kuo NRR PWR-8/EB NRC L. B. Marsh NRR PWR-B/EB NRC M. O. Sanford Manager, Mech. Syst GPUN R. McGoey Manager, PWR Licensing GPUN J. H. Correa Piping Engineering Manager GPUN

?

1

MEETING WITH NRC TO RESOLVE IST ISSUES (OCTOBER 27, 1986)

GPUN Attendees:

R. O. Barley - Manager, TMI-l Plant Engineering J. R. Bashista - THI-l Mechanical Engineer

- J. J. Colitz - TMI-l Plant Engineering Director J. H. Correa - Piping & Valve Manager, Engineering and Design M. R. Knight - TMI-1 Licensing Engineer R. J. McGoey - Manager, PWR Licensing M. O. Sanford - Manager, Mechanical Systems, Engineering and Design H. B. Shipman . TMI-1 Operations Engineer Introduction and Overview Bob Knight CA-Pl A/B, WDL-P13A/B, and MU-PI A/B Rick Barley

-Benefit of the Current Test Program

-Relief denied October 3,1986

-Alternatives Investigated BS-V30A/B, BS-V52A/B, DH-V14A/B, MS-V9A/B Joe Bashista Valve Disassembly for Inspection Purposes

-TMI-l Disassembly History Results

-DHR System Availability (TS 3.4.2, Am.119)

-ALARA

-Risks from More Frequent Disassembly DH-V16 , Henry Shipman

-NUREG 0737, II.B.2, Plant Shielding, Resolution

-ALARA HPI Check Valve Testing Mark Sanford

-TS 3.1.12.3 Limitations '

-Allowable Cycles on Thermal Sleeves RC-RV2 Jim Correa

-GPUN Proposed Test Program Options Spent Fuel Cooling System Joe Bashista

-GPUN Proposed Test Program Control Valve Testing Joe Bashista

-GPUN Test Program Changes:

AH-VllA/B NS-V56A/B NS-V54A/B NS-V108A/B NS-VSSA/B SW-V24A/B t -

~

- ?. -

' MU-Vil Joe Bashista

-Passive ALARA Convenience Valve ,

-No Safety Related Function Diesel Generator Fuel Oil Pumps Rick Barley and Air Start Valves

-Review of Current Testing Miscellaneous- Items: Joe Bashista

-River Water Pumps / Lube Water DR-PlA/B NR-PIA /B/C RR-PlA/B SW-P2A/B

-Passive Containment Isolation Yalves

-Clarification of Interim Relief for AH-P3A/B

!' and SW-P2A/S Summary and Conclusions Bob Knight e